Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and...
Transcript of Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and...
![Page 1: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/1.jpg)
Modular Design and Benefits
Presented by:
Keyes Niemer, Ph.D., P.E.
Project Manager
The Shaw Group
ASME Nuclear Technical Seminars: Blueprint for New Build
June 5-8, 2011 • Columbia, SC
![Page 2: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/2.jpg)
Presentation Overview
• What is Modularization?
• Challenges & Benefits of Modularization
• Modularization Examples
• Module Fabrication Facilities
![Page 3: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/3.jpg)
Corporate Profile
The Shaw Group Inc.® is a leading global provider of technology, engineering,
procurement, construction, maintenance, fabrication, manufacturing, consulting,
remediation, and facilities management services to clients in the energy,
chemicals, environmental, infrastructure, and emergency response industries.
• Headquarters: Baton Rouge, LA
• Stock Ticker: NYSE: SHAW
• Number of employees: 27,000
• FY 2010 Revenues: $7 billion
• Backlog: $20.6 billion (as of 2/28/11)
• Website: www.shawgrp.com
![Page 4: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/4.jpg)
Shaw’s Power Group Overview
• Three divisions comprise Shaw’s
Power Group:
– Fossil Division
– Nuclear Division
– Plant Services Division
• Ranked No. 1 in Power on Engineering News-
Record’s Top 500 Design Firms for three
consecutive years (2008, 2009, 2010)
• Approximately 4,500 professional employees
![Page 5: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/5.jpg)
What is Modularization?A term used to describe the three levels of “off-site” or
“on-site out of the hole” fabrication of piping, equipment and structures.
Pre-assemblyPre-fabrication
Module
![Page 6: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/6.jpg)
Philosophy: Modularization Allows
Activities To Be Done in Parallel
![Page 7: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/7.jpg)
Modularization Pros
• Streamline field installation
– Reduces number and skills requirement
– Facilitates remote site locations
– Shortens/reduces multiple work fronts
– Reduces risk of site conditions/weather
– Breaks projects into manageable parts
– Improves safety, quality, and productivity performance
– Shortens duration of and reduces field staff
![Page 8: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/8.jpg)
• Reduce on-site fabrication
• Reduce temporary facilities
• Reduce scaffolding
• Reduce small tools and consumables
• Reduce staff and craft
• Reduce amount of dimensional control
• Reduce number of field welds
Modularization Construction Pros
![Page 9: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/9.jpg)
• Committed execution sequence
• Committed module delivery schedule and routes
• Potential for design changes and rework
• Potential loss or damage during transport
• Heavier construction cranes
• More cranes earlier for large module assembly and
outfitting
• More planning, communication, organization
• Less flexibility
Modularization Construction Cons
![Page 10: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/10.jpg)
Modularization Evaluation Attributes
• Construction Schedule
• Detailed Engineering (timeliness of deliverables)
• Labor Availability (welding, electricians, etc.)
• Procurement Risk (can materials/equipment be delivered on time?)
• Safety Impact (e.g., work areas, working at height)
• Quality
• Transportation & Lifting
• Site Attributes
![Page 11: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/11.jpg)
Module Engineering Prerequisites
• Engineering MUST BE DONE DONE!
• EPC/Fabricator = Module Team
• Early Engineering and Construction Installation Details Development = Will be constructible
• Must Engineer Twice, i.e. design, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position
![Page 12: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/12.jpg)
Pipe/Equipment Module
![Page 13: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/13.jpg)
Modular Designed Pipe Rack
![Page 14: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/14.jpg)
Modular Designed Boiler Feed
Water Pumps and Piping
![Page 15: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/15.jpg)
Modular Designed Cooling Water Skid
![Page 16: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/16.jpg)
Modularized HRSG Shipped to Site via
Ocean Ship and Barge from Indonisia
![Page 17: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/17.jpg)
HRSGs Arrive @ Jobsite in NY City
![Page 18: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/18.jpg)
Oil/Gas Platform
![Page 19: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/19.jpg)
Purchaser Oversight
• Module fabrication at key facilities is seen as extensions of the Construction Projects and is expected to be treated as small EPC Projects with dedicated teams representing the Purchaser
• Full time residency at fabrication facilities anticipated for Purchaser’s Quality Control and Expediting representatives with periodic surveillance by Quality Assurance
• Purchaser’s Engineering staff may be assigned to fabrication facilities on a full time or part time basis to facilitate communication and resolution of design related issues
• Purchaser’s Management representation to be assigned to fabrication facilities to interface with Fabricator Management and assure common goals are being met
![Page 20: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/20.jpg)
Owner Oversight
• Owners being the Licensees have ultimate responsibility
for regulatory compliance of the plants
• Equipment and system reliability, quality, operability and
maintainability are of significant interest
• Owner’s representatives expected to provide rigorous
oversight of Purchaser’s and Fabricator’s activities
• Owners responsible for performing 100% of Inspections,
Tests, Analyses and Acceptance Criteria (ITAAC)
verification during construction and documentation of
inspection results
![Page 21: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/21.jpg)
Regulator Oversight
• Regulator oversight at fabrication facilities responsible
for safety related modules is expected
• Regulator inspections to encompass Owner,
Purchaser and Fabricator Program implementation
and effectiveness
• Regulator is responsible for witnessing a sample of
Owner’s ITAAC related activities and documentation of
inspection results
![Page 22: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/22.jpg)
Shaw Modular Solutions Facility
• Located in Lake Charles, LA
• 410,000 sf under roof for
fabrication, assembly and
inspection
• 7 production bays
• 8,200 sf administrative building
• 10,000 sf training facility
• Truck, barge and rail access
• NQA-1 program
• Located on 120 acres of land
with an option for 180 more acres
![Page 23: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/23.jpg)
Shaw Modular Solutions Facility
![Page 24: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/24.jpg)
Shaw Modular Solutions Facility
![Page 25: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/25.jpg)
Shaw Modular Solutions Facility
![Page 26: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/26.jpg)
Shaw Modular Solutions Facility
![Page 27: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/27.jpg)
Module Fabrication
![Page 28: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/28.jpg)
Module Fabrication
![Page 29: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/29.jpg)
Module Fabrication
![Page 30: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/30.jpg)
Module Fabrication
![Page 31: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/31.jpg)
Module Fabrication
![Page 32: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/32.jpg)
Module Fabrication
![Page 33: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/33.jpg)
Module Fabrication
![Page 34: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/34.jpg)
Module Fabrication
![Page 35: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/35.jpg)
Module Fabrication
![Page 36: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/36.jpg)
Module Fabrication
![Page 37: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/37.jpg)
Module Fabrication
![Page 38: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/38.jpg)
Module Fabrication
![Page 39: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/39.jpg)
Module Fabrication
![Page 40: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/40.jpg)
Module Fabrication
![Page 41: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/41.jpg)
Module Fabrication
![Page 42: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/42.jpg)
Module Fabrication - CA20 Aux Building
CA20 comprised of 72 Sub-
Modules:
Size (N x E x Height):
44’-0” x 68’-9” x 68’-0”
[13m x 21m x 20.7m]
Dry Weight:
1,712,000 lbs. [777 Mg]
![Page 43: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/43.jpg)
CA20_01
J1
J2
K2
L2
CA20_02
CA20_03
CA20_04
CA20_05
CA20_06 CA20_07 CA20_08
CA20_10
CA20_11
CA20_12
CA20_13
CA20_14
CA20_15 CA20_16 CA20_017
CA20_18
CA20_19
CA20_20
CA20_21
CA20_22
CA20_23 CA20_24 CA20_25
CA20_26
CA20_27 CA20_28 CA20_29
CA20_30
CA20_71 CA20_72 CA20_73
Sub-Module CA20_01
Module Fabrication – CA20 Submodules
![Page 44: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/44.jpg)
68’-0”
8’-6”
8’-3”
CA20-01
30 Tons
68’-0”
Module Fabrication –
Sub-Module CA20_01
![Page 45: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/45.jpg)
Module Fabrication
![Page 46: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/46.jpg)
Module Fabrication
![Page 47: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/47.jpg)
Module Fabrication
![Page 48: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/48.jpg)
Module Fabrication
![Page 49: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/49.jpg)
Module Fabrication
![Page 50: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/50.jpg)
Module Fabrication
![Page 51: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/51.jpg)
Module Fabrication
![Page 53: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/53.jpg)
Module Assembly Building
![Page 54: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/54.jpg)
Module Assembly - Upender
![Page 55: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/55.jpg)
Module Platen
![Page 56: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/56.jpg)
Module Assembly
![Page 57: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/57.jpg)
Module Assembly
![Page 58: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/58.jpg)
Module Assembly
![Page 59: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/59.jpg)
Module Assembly
![Page 60: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/60.jpg)
Module Assembly
![Page 61: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/61.jpg)
Module Assembly
![Page 62: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/62.jpg)
Module Assembly
![Page 63: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/63.jpg)
Summary
• Modularization has been extensively used by the shipbuilding and chemical process industries resulting in significant value to the client
• The Westinghouse AP1000 is utilizing modularization extensively in China and the U.S.
• Given the right business and project conditions, modularization should be strongly considered for fabrication and construction of the next generation of power plants
![Page 64: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe](https://reader035.fdocuments.us/reader035/viewer/2022081620/60ffabb4c26e1e5a95185a05/html5/thumbnails/64.jpg)
Questions?