    Surface Transportation Technical CommitteeFebruary 23, 2018

  • Agenda Review

  • 3

    Agenda

    1. Roadway Recommendations2. Public Transportation Recommendations3. Draft Financial Plan4. Selected Recommended Policies5. Public Meeting Comments6. Schedule and Next Steps

  • Roadway Recommendations

  • 5

    Roadway Recommendations MapMajor Roadway Recommendations

  • 6

    Asset Optimization MapAsset Optimization Recommendations

  • 7

    Arterial Recommendations Map

    8

    Arterial Capacity Improvements

  • 8

    Priced Facilities MapPriced Facility Recommendations

  • 9

    Controlled Access MapFreeway Recommendations

  • 10

    Roadway Recommendations MapMajor Roadway Recommendations

    Project Recommendation

    Tables Are Available

  • 11

    Illustrative Roadway Corridorsfor Future ConsiderationRoadway Corridors for Future Evaluation

  • 12

    Additional Plan ComponentsSustainable DevelopmentBicycle and Pedestrian FacilitiesPeople MoversFreightAviationTransportation Demand ManagementTransportation System ManagementTransportation System Safety and Security

  • 13

    Additional Plan ComponentsEnvironmental ConsiderationsNatural Environment – Extreme Weather ResiliencyEnvironmental Justice

    High-Speed RailSocial ConsiderationsFinancial PlanTechnologyPoliciesProgramsPublic Transportation

  • Public Transportation Recommendations

  • 15

    Mobility 2045 Transit Programs

    • High-speed rail, intercity bus, intercity train, next generation magnetic levitation

    State and National Transit Connections Program

    • High-intensity bus, guaranteed transit, stacked commuter rail, regional rail, light rail

    Regional Connections: Next Generation Transit Program

    • People mover and goods movement, circulator, streetcar, local bus

    Last-Mile Transit Connections Program

    • Specialized services for community access including autonomous vehicles

    Community Access Transit Program

    • Improvements to safety and security, capacity, operations, technology, and accessibility

    Transit Enhancements and Mobility Improvements Program

  • 16

    DRAFT

    Transit Corridor Recommendations

  • Draft Financial Plan

  • 18

    Mobility 2040 vs Mobility 2045Mobility 2040 Mobility 2045

    Planning Horizon 2016 – 2040 (25 Years) 2018 – 2045 (28 Years)Legislative Action Revenue

    Propositions 1 & 7revenues estimated

    Propositions 1 & 7 now integrated into UTP and TIP

    Innovative Revenue

    Toll and tolled managed lane facilities scaled back

    Continue to use toll managed tools in select corridors based on new regional toll policy boundary

    Enhancement Revenue

    Needs outpace ability to pay for improvements; included state, federal, and local revenue enhancements

    Needs outpace ability to pay for improvements; continuing assumptions of federal, state, and local revenue enhancements

  • 19

    Financial AssumptionsTraditional Funds are InsufficientMultiple Scenarios and Options to Generate

    Additional FundsContinue Toll Roads and Toll Managed Lanes as a

    Long Term Strategy Not Approving a Specific ScenarioFuture Available Funding Sources Unknown

    New Federal Infrastructure InitiativeApproving Equivalent Magnitude Funding

    Amount

  • 20

    Financial AssumptionsFunding Strategy

    Mobility 2040 (Final)

    Mobility 2045 (DRAFT)

    State Fuel Tax(per gallon)

    Existing State Motor Fuel Tax+$0.05 in 2020+$0.07 in 2030

    Existing State Motor Fuel Tax+$0.05 in 2025+$0.07 in 2035

    State Fuel Tax Indexing No No

    Federal Fuel Tax(per gallon)

    Existing Federal Motor Fuel Tax+$0.05 in 2020+$0.05 in 2030

    Existing Federal Motor Fuel Tax+$0.05 in 2025+$0.05 in 2035

    Average Vehicle Registration Fee

    Existing Fee+$10 in 2020+$10 in 2030

    Existing Fee+$10 in 2025+$10 in 2035

    Tollroads, Managed Lanes, CDA, and PPP

    Currently Funded Facilities Currently funded projects + select, strategic facilities based on new toll area policy

    Other Assumptions Utilize New Revenues from 84thLegislature (~$34.5B to region over time)

    New revenues from 84th legislature, now allocated in UTP/TIP, will continue through horizon year

    Total Revenue ($B) $118.9 $135.5

  • 21

    Funding Estimates (in $billion)

    Traditional Federal and State 42.9$ Tolled/Managed (Local) 9.3$

    Subtotal* 52.2$

    Traditional (Federal and Local) 37.7$ Innovative ( State and Local) 19.8$

    Subtotal* 57.5$

    State 3.3$ Federal 3.9$ Local 2.4$

    Subtotal* 9.6$

    Local Spending and Local Match 16.2$

    135.5$ Grand Total*

    Roadway Funds

    Transit Funds

    Revenue Enhancements

    Local Funds

    * Actual dollars in billions. Values may not sum due to independent rounding.

    Sheet1

    Roadway Funds

    Traditional Federal and State$ 42.9

    Tolled/Managed (Local)$ 9.3

    Subtotal*$ 52.2

    Transit Funds

    Traditional (Federal and Local)$ 37.7

    Innovative ( State and Local)$ 19.8

    Subtotal*$ 57.5

    Revenue Enhancements

    State$ 3.3

    Federal$ 3.9

    Local$ 2.4

    Subtotal*$ 9.6

    Local Funds

    Local Spending and Local Match$ 16.2

    Grand Total*$ 135.5

  • 22

    $37.4

    $7.2

    $3.6

    $27.2

    $43.4Freeways/Tollways and Arterials

    Additional Roadway Capacity

    HOV/Managed LanesIncrease Auto Occupancy

    Rail and BusInduce Switch to Transit

    Growth, Development, and Land Use StrategiesMore Efficient Land Use & Transportation Balance

    Management and OperationsImprove Efficiency & Remove Trips from SystemTraffic Signals and Bicycle & Pedestrian Improvements

    Infrastructure MaintenanceMaintain & Operate Existing FacilitiesBridge Replacements

    Total Expenditures* $118.9

    $ 38.7

    $ 9.6

    $ 3.2

    $ 33.4

    $ 50.6

    $ 135.5

    2040 2045

    * Actual dollars, in billions. Values may not sum due to independent rounding.

    Max

    imize

    Exi

    stin

    g Sy

    stem

    Stra

    tegi

    c In

    fras

    truc

    ture

    Inve

    stm

    ent

    DRAFTPrioritization and Expenditures

  • 23

    Regional FundingRoadway

    Expenditures

    $ 51 BRegional

    Roadway Needs

    $ 389 BShortfall$ 338 B

  • Selected Recommended Policies

  • 25

    Selected Proposed Policy Additions

    FreightEncourage Regional Railroads to Participate in

    Regional Planning

    Active Transportation Mode ShareSupport Active Transportation Measurable Share

    of all Transportation Modes

  • 26

    Selected Proposed Policy Additions

    TechnologyEncourage Data SharingEncourage Automated VehiclesSupport Infrastructure MaintenanceEncourage Ridesharing

    Asset OptimizationResiliency

    Develop Strategies to Address Vulnerabilities

    Roadway MaintenanceSupport Asset Management Policies

  • 27

    Selected Proposed Policy Additions

    GeneralSupport Ability to Modify Mobility Plan for

    Emergency Operational ImprovementsTechnology LanesManaged LanesAccess RampsAuxiliary Lanes

    Managed Toll Lane SystemSupport Implementation within a Tolled

    Managed Lane Policy Area

  • 28

    Toll/Managed Lane Policy Boundary

    Toll Managed Lane System Policy Boundary

    Within Boundary13% Land Area67% of Congestion

  • Public Meeting Comments

  • 30

    Public Comment TopicsOctober 2017

    Eminent DomainLake Corridor Project in Collin County

    January 2018FundingHyperloop and Bullet TrainBackup Plan for Toll Road FundingArterial Needs AssessmentDraft Plan Available When?Use UPRR From Fort Worth to Dallas for Commuter RailAlternate Roads, Do Not Expand Other Modes

  • 31

    Public Comment Topics

    February 2018Policy Foundation for Mobility 2045Transportation Assistance for South Dallas CountyTransit Funding

  • Schedule and Next Steps

  • 33

    Mobility 2045 ScheduleAugust 2017

    Sep. 2017

    Oct. 2017

    Nov.2017

    Dec. 2017

    Jan.2018

    Feb. 2018

    March 2018

    April 2018

    May 2018

    June 2018

    July 2018

    August2018

    Sep. 2018

    Oct.2018

    Nov. 2018

    Notes:• Public meetings held during highlighted months.• Regional Transportation Council action on Mobility 2045 Plan scheduled for June 14, 2018.

    Air Quality Conformity

    STTCAction

    Official Comment

    Period

    Draft Recommendations

    for Review

    Plan Development

    RTCAction

  • 34

    Next Steps

    Official Public Comment PeriodApril through May

    Revise RecommendationsDraft Final Document – April 1 STTC Updates in March and AprilReview and Action

    STTC – May 25RTC – June 14

  • 35

    Questions?

    Kevin FeldtProgram [email protected]

    (817) 704-2529

    Dan LamersSenior Program Manager

    [email protected](817) 695-9263

    www.nctcog.org/mobility2045

    Sarah ChadderdonProgram Manager

    [email protected](817) 695-9180

    Mobility 2045 UpdateAgenda ReviewAgendaRoadway RecommendationsRoadway Recommendations MapAsset Optimization MapArterial Recommendations MapPriced Facilities MapControlled Access MapRoadway Recommendations MapSlide Number 11Additional Plan ComponentsAdditional Plan ComponentsPublic Transportation RecommendationsMobility 2045 Transit ProgramsSlide Number 16Draft Financial PlanMobility 2040 vs Mobility 2045Financial AssumptionsFinancial AssumptionsFunding Estimates (in $billion)Slide Number 22Slide Number 23Selected Recommended PoliciesSelected Proposed Policy AdditionsSelected Proposed Policy AdditionsSelected Proposed Policy AdditionsSlide Number 28Public Meeting CommentsPublic Comment TopicsPublic Comment TopicsSchedule and �Next StepsMobility 2045 ScheduleNext StepsQuestions?