MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE
description
Transcript of MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE
1GIS Post-Processing - Technical Presentation - September, 2010
MOBILEMAPPER FIELD
MOBILEMAPPER 6
MOBILEMAPPER OFFICE
GIS POST-PROCESSING
2
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
PREPARATION– Power, USB/PC cable, Active Sync Connection
– Install MobileMapper Today on MobileMapper 6 ftp://ftp.ashtech.com/Mobile Mapping/MobileMapper 6/Software/Mobil
eMapper Software/MobileMapper Today/MobileMapper Today.zip
File on FTP site is zipped and must be extracted prior to installation
Execute MobileMapperTodaySetup.exe file on PC while MobileMapper 6 is connected via ActiveSync
MobileMapper Today is installed on to PC and then on to the MobileMapper 6
– Install MobileMapper Office on PC ftp://ftp.ashtech.com/Mobile Mapping/MobileMapper 6/Software/Mobil
eMapper Software/MobileMapper Software.zip
File on FTP site is zipped and must be extracted prior to installation
Execute Setup.exe file on PC to install MobileMapper Office to PC
3
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
PREPARATION (Continued)– Install MobileMapper Field on MobileMapper 6
ftp://ftp.ashtech.com/Mobile Mapping/MobileMapper 6/Software/MobileMapper Software/MobileMapper Software.zip
File on FTP site is zipped and must be extracted prior to installation
Execute Setup.exe file on PC to install software while MobileMapper 6 is connected via ActiveSync and install the MobileMapper Field software to MobileMapper 6. MobileMapper Field is installed to the PC and then on to the MobileMapper 6
– Versions MobileMapper Today (MobileMapper 6) – V 1.0.0.15
MobileMapper Office (PC) – V 1.0.1.3
MobileMapper Field (MobileMapper 6) – V 1.00
GNSS Toolbox (MobileMapper 6) – V 1.00
Installed as part of MobileMapper Field
4
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
PREPARATION (Continued)
– Licensing
MobileMapper Office (PC) requires no license
MobileMapper Field (MobileMapper 6) must be licensed with
activation code
Program will not open without license
Post-processing for MobileMapper Field must be licensed with
activation code
Code requested when selecting “Record raw data for post-
processing” box inside the “Recording” tab under the “Options”
dialogue boxes
5
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
OUTDOOR FUNCTIONALITY TESTS
– Outdoors cannot be simulated using GNSS Toolbox
– Satellites tracking
– Raw data logging – Has this option been licensed and is there
sufficient memory?
– Ground truth against known data – Does the computed position
appear correct?
6
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION
– Advice
Software activation codes require the user to put the MobileMapper 6
into suspend mode or the code will be lost. With that task done once,
it can be powered on and off without losing the code.
Use MobileMapper Today to set the clock every time it is turned on to
ensure that the clock is set properly before using MobileMapper Field.
It is the first clue that the MobileMapper 6 is ready for work.
Manually setting the clock does not ensure that the clock is set
properly.
Good PDOP does not ensure good accuracy. Consider the quality of
the GPS signal. One customer who complained about accuracy sent
photos showing the receivers lying on the ground. Signals bouncing
off the ground are multipath.
7
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Advice (Continued)
Do not expect CORS reference data on the same day of recording. Accuracy has as much to do with the 10 minutes before and after the
feature was recorded as it does the ten seconds spent recording a point feature.
– Common mistakes and things you should NOT do: Raw data recording begins before the clock is set or before there is a
stable DGPS solution. Raw data recording is halted between feature mapping resulting in
dozens of tiny raw data files, none of which will process properly. Raw data recording of such short duration that it will not process.
Many of these contain ephemeris files too tiny to have recorded the current ephemeris. Good rule of thumb is that a file less than 20 minutes long is wasted effort.
Feature mapping that begins within seconds of starting the raw data recording.
Put receiver in pocket while walking between features to be logged..
8
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Orient GPS unit against the local sky
Ensure satellite tracking
Ensure DGPS solution if in an SBAS coverage area
– MobileMapper Field basics Main screen
Position icon
DOP
Solution type
Easting/Northing
Scale
Menu
Log
9
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– MobileMapper Field basics (Continued)
Menu
Pause/Resume
Stop
Layers
Job
Options
Status
Exit (not the “X”)
10
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Create New Job
11
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Create New Layer
Point Feature
12
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Create New Layer (Continued)
Point Feature (Continued)
13
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Add another layer
Line Feature
14
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Add another layer (Continued)
Line Feature (Continued)
15
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
DATA COLLECTION (Continued)– Add another layer (Continued)
Polygon Features
16
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Data Collection (Continued)
– Turn on raw data recording
Menu / Options
Choose memory location
Check box and then OK
Wait a few minutes in clear view of
the sky before recording features.
17
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Data Collection (Continued)
– Collect (Log) four points describing a rectangle
18
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Data Collection (Continued)
– Collect (Log) four points describing a rectangle (Continued)
19
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Data Collection (Continued)
– Collect (Log) four lines describing the same rectangle
20
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Data Collection (Continued)
– Collect (Log) a polygon describing the same rectangle
21
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Data Collection (Continued)
– Turn off raw data recording
Wait a few minutes after recording
last feature
Menu / Options
Deselect check box and then OK
22
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Post-Processing– Submit raw data files to Joe Sass for pre-analysis
[email protected] All shape files (*.shp, *.prj, *.shx, *.dbf) in targeted directory GPS Raw Data in its own folder (*.grw and *.crw) Reference data – Preferably 1 second data rate
Rinex data from local CORS
“G” file from ProMark/ProFlex 500 base station
– Create new or open existing Map project in MobileMapper Office– Activate collected SHP files from the data collector– Import Rover raw data from the data collector– Import Reference raw data from file or internet– Enter correct reference station position– Post-process data– Export or transfer data to destination software
23
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING
Follow-up webinar scheduled for…
24
GIS
Pos
t-Pro
cess
ing
- Tec
hnic
al P
rese
ntat
ion
- Sep
tem
ber,
2010
GIS POST-PROCESSING