MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

24
1 GIS Post-Processing - Technical Presentation - September, 2010 MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE GIS POST-PROCESSING

description

MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE. GIS POST-PROCESSING. GIS POST-PROCESSING. PREPARATION Power, USB/PC cable, Active Sync Connection Install MobileMapper Today on MobileMapper 6 - PowerPoint PPT Presentation

Transcript of MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

Page 1: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

1GIS Post-Processing - Technical Presentation - September, 2010

MOBILEMAPPER FIELD

MOBILEMAPPER 6

MOBILEMAPPER OFFICE

GIS POST-PROCESSING

Page 2: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

2

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

PREPARATION– Power, USB/PC cable, Active Sync Connection

– Install MobileMapper Today on MobileMapper 6 ftp://ftp.ashtech.com/Mobile Mapping/MobileMapper 6/Software/Mobil

eMapper Software/MobileMapper Today/MobileMapper Today.zip

File on FTP site is zipped and must be extracted prior to installation

Execute MobileMapperTodaySetup.exe file on PC while MobileMapper 6 is connected via ActiveSync

MobileMapper Today is installed on to PC and then on to the MobileMapper 6

– Install MobileMapper Office on PC ftp://ftp.ashtech.com/Mobile Mapping/MobileMapper 6/Software/Mobil

eMapper Software/MobileMapper Software.zip

File on FTP site is zipped and must be extracted prior to installation

Execute Setup.exe file on PC to install MobileMapper Office to PC

Page 3: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

3

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

PREPARATION (Continued)– Install MobileMapper Field on MobileMapper 6

ftp://ftp.ashtech.com/Mobile Mapping/MobileMapper 6/Software/MobileMapper Software/MobileMapper Software.zip

File on FTP site is zipped and must be extracted prior to installation

Execute Setup.exe file on PC to install software while MobileMapper 6 is connected via ActiveSync and install the MobileMapper Field software to MobileMapper 6. MobileMapper Field is installed to the PC and then on to the MobileMapper 6

– Versions MobileMapper Today (MobileMapper 6) – V 1.0.0.15

MobileMapper Office (PC) – V 1.0.1.3

MobileMapper Field (MobileMapper 6) – V 1.00

GNSS Toolbox (MobileMapper 6) – V 1.00

Installed as part of MobileMapper Field

Page 4: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

4

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

PREPARATION (Continued)

– Licensing

MobileMapper Office (PC) requires no license

MobileMapper Field (MobileMapper 6) must be licensed with

activation code

Program will not open without license

Post-processing for MobileMapper Field must be licensed with

activation code

Code requested when selecting “Record raw data for post-

processing” box inside the “Recording” tab under the “Options”

dialogue boxes

Page 5: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

5

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

OUTDOOR FUNCTIONALITY TESTS

– Outdoors cannot be simulated using GNSS Toolbox

– Satellites tracking

– Raw data logging – Has this option been licensed and is there

sufficient memory?

– Ground truth against known data – Does the computed position

appear correct?

Page 6: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

6

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION

– Advice

Software activation codes require the user to put the MobileMapper 6

into suspend mode or the code will be lost. With that task done once,

it can be powered on and off without losing the code.

Use MobileMapper Today to set the clock every time it is turned on to

ensure that the clock is set properly before using MobileMapper Field.

It is the first clue that the MobileMapper 6 is ready for work.

Manually setting the clock does not ensure that the clock is set

properly.

Good PDOP does not ensure good accuracy. Consider the quality of

the GPS signal. One customer who complained about accuracy sent

photos showing the receivers lying on the ground. Signals bouncing

off the ground are multipath.

Page 7: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

7

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Advice (Continued)

Do not expect CORS reference data on the same day of recording. Accuracy has as much to do with the 10 minutes before and after the

feature was recorded as it does the ten seconds spent recording a point feature.

– Common mistakes and things you should NOT do: Raw data recording begins before the clock is set or before there is a

stable DGPS solution. Raw data recording is halted between feature mapping resulting in

dozens of tiny raw data files, none of which will process properly. Raw data recording of such short duration that it will not process.

Many of these contain ephemeris files too tiny to have recorded the current ephemeris. Good rule of thumb is that a file less than 20 minutes long is wasted effort.

Feature mapping that begins within seconds of starting the raw data recording.

Put receiver in pocket while walking between features to be logged..

Page 8: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

8

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Orient GPS unit against the local sky

Ensure satellite tracking

Ensure DGPS solution if in an SBAS coverage area

– MobileMapper Field basics Main screen

Position icon

DOP

Solution type

Easting/Northing

Scale

Menu

Log

Page 9: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

9

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– MobileMapper Field basics (Continued)

Menu

Pause/Resume

Stop

Layers

Job

Options

Status

Exit (not the “X”)

Page 10: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

10

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Create New Job

Page 11: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

11

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Create New Layer

Point Feature

Page 12: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

12

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Create New Layer (Continued)

Point Feature (Continued)

Page 13: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

13

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Add another layer

Line Feature

Page 14: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

14

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Add another layer (Continued)

Line Feature (Continued)

Page 15: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

15

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

DATA COLLECTION (Continued)– Add another layer (Continued)

Polygon Features

Page 16: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

16

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Data Collection (Continued)

– Turn on raw data recording

Menu / Options

Choose memory location

Check box and then OK

Wait a few minutes in clear view of

the sky before recording features.

Page 17: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

17

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Data Collection (Continued)

– Collect (Log) four points describing a rectangle

Page 18: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

18

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Data Collection (Continued)

– Collect (Log) four points describing a rectangle (Continued)

Page 19: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

19

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Data Collection (Continued)

– Collect (Log) four lines describing the same rectangle

Page 20: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

20

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Data Collection (Continued)

– Collect (Log) a polygon describing the same rectangle

Page 21: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

21

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Data Collection (Continued)

– Turn off raw data recording

Wait a few minutes after recording

last feature

Menu / Options

Deselect check box and then OK

Page 22: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

22

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Post-Processing– Submit raw data files to Joe Sass for pre-analysis

[email protected] All shape files (*.shp, *.prj, *.shx, *.dbf) in targeted directory GPS Raw Data in its own folder (*.grw and *.crw) Reference data – Preferably 1 second data rate

Rinex data from local CORS

“G” file from ProMark/ProFlex 500 base station

– Create new or open existing Map project in MobileMapper Office– Activate collected SHP files from the data collector– Import Rover raw data from the data collector– Import Reference raw data from file or internet– Enter correct reference station position– Post-process data– Export or transfer data to destination software

Page 23: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

23

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING

Follow-up webinar scheduled for…

Page 24: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

24

GIS

Pos

t-Pro

cess

ing

- Tec

hnic

al P

rese

ntat

ion

- Sep

tem

ber,

2010

GIS POST-PROCESSING