Mme Group 2 2011
-
Upload
barchambault -
Category
Documents
-
view
1.000 -
download
3
description
Transcript of Mme Group 2 2011
![Page 1: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/1.jpg)
Collaborative, Proven & Fast
Integrated manufacturing solutions
![Page 2: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/2.jpg)
MME is a custom contract manufacturer producing OEM
customer’s products in a collaborated, proven and fast
method. Driven by it’s main core competencies:
Overview Integrated manufacturing solutions
MME leverages it’s 35+ year history, background working
with Fortune 100 customers, engineer based talent pool &
technical expertise to bring products to market on-time and
to budget.
![Page 3: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/3.jpg)
• Established 1974
• 75,000 SF Mfg- 2 plants
• 5,000 SF Design Center
• Full Contract Mfg
• ISO 9001:2008 & ISO 13485
• Medical
• Consumer electronics
• Health and Safety
• Government
Business Overview Key Markets
Integrated manufacturing solutions
![Page 4: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/4.jpg)
• Collaboration
• Proven
• Fast
• Engineering
• World Class Tool Fabrication
• Quality Controlled Services
• Plastic, LIM & Metal Molding
• Precision Value-Add Assembly
• Supplier Consolidation
Key Traits Key Deliverables
Integrated manufacturing solutions
![Page 5: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/5.jpg)
A Survey of MME’s Customers confirmed:
MME excels on projects that need coordinated
front end design and development of
mechanical sub-assemblies.
MME’s equipment and expertise fits products
that are the size of a large laptop or smaller
with complexity of design that require
interaction between engineers & designers
Core CompetencyIntegrated manufacturing solutions
![Page 6: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/6.jpg)
A Survey of MME’s Customers confirmed:
Leveraging expert technical resources plus providing
DFMA (Design For Manufacturing & Assembly) aides
successful launches
The ability to tool or source plastics, metal & electronic
components with speed and quality expertise allows
customers to focus on their own core competencies
Superb team work , integrity & responsiveness building
a mutually agreeable execution strategy to meet
program needs.
Core Competency Integrated manufacturing solutions
![Page 7: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/7.jpg)
Some of our Customers
![Page 8: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/8.jpg)
• Four Disciplines under one Business Model
• Supply chain management qualified by ISO 13485 Standards
• Low Cost country Partners available for varied cost models
• Program Management acts as one point of contact
• Multi-Industry exposure leads to coordinated expertise
• Experience with all sizes/types of businesses
Collaboration Integrated manufacturing solutions
![Page 9: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/9.jpg)
• Established in 1974
• Working with Several Fortune 100 Customers for decades
• “Dock-to-stock” Certified Supplier Status
• Awarded many time-sensitive/crucial projects by Key Customers
• Confidentiality Agreements in place and honored
• Multiple technologies show engineering savvy and strength
• References available regarding past successes
• Set the standards for large companies performance
• ISO Certified for 9001-2008 & ISO 13485:2003 for many years
Proven Integrated manufacturing solutions
![Page 10: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/10.jpg)
• Entire Supply Chain constructed for speed
• DFMA completed in days (2-10) not weeks
• Production Tooling delivered in 4 weeks
• Parts provided in 1-2 days from tooling completion
• Revisions & reactions measured in hours & days
• Assemblies and Automation timed with FOT
• Process Validation timely and concurrent
Entire Company Built for Speed!
Fast Integrated manufacturing solutions
![Page 11: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/11.jpg)
•Combine 4 disciplines into one
•Expedite time to market
•Multi industry expertise
•Turn-key manufacturing solutions
Why partner with us?Integrated manufacturing solutions
![Page 12: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/12.jpg)
Engineering Services
• Industrial Design
• Mechanical and Electrical Engineering
• Mechanical architecture development
• MCAD/ECAD data exchange
• Design for reliability
• Prototyping & Testing
• Contract Engineering
• Specialize in ESI & DFMA
• Database creation
• Complete 3D Mold Designs
• Mold Flow & CAV
Integrated manufacturing solutions
![Page 13: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/13.jpg)
World Class Tooling
• World class tool quality
• Fast Lead Times on all tools
• Consistent On-Time Deliveries
• Multi-Industry Experience
• Prototype-Bridge-Production Tools
• Bandwidth to Handle Large Projects
• 30+ Year History
• Fortune 500 Clients
“Fast Lead Times on Tooling”
Integrated manufacturing solutions
![Page 14: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/14.jpg)
• Quality Controlled injection molding
• Two Manufacturing Locations
• Low to high volume production runs
• Medical clean room molding
• Lean Manufacturing driven
• 15 ton to 900 ton press size
• 24 hour operations
Multiple Deliverables delivered FAST
Custom MoldingIntegrated manufacturing solutions
![Page 15: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/15.jpg)
• ISO 13485
• ISO 9001-2000
• TS 16949
• Qualified ASL
• Continuous Training
• SPC, Sight Boards, PCB’s
• Government & UL Certified
• CPK, FAI, PPAP
Custom MoldingIntegrated manufacturing solutions
![Page 16: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/16.jpg)
•Class 100K Clean Room
•LIM (Silicone molding)
•Vertical Insert molding
•Thin Wall Molding
•Two-shot molding
•Rare materials
•Complex molding solutions
Custom Molding Integrated manufacturing solutions
![Page 17: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/17.jpg)
• AIM – Alloy Injection Molding
• Amazing thermal management material
• 3 dimensional net shape molding
• Part designs similar to plastics
• Mold life comparable with plastic molds
• Fast cycle times with close tolerances
• Can
• Help you with thermal mgmt
• Replace machined parts
• Replace die cast parts
• Replace plastic parts
• Provide cost reductions
Ground Breaking Technology!
Unique Metal Molding Integrated manufacturing solutions
![Page 18: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/18.jpg)
Shared strengths within four disciplines
Contract Manufacturing
Integrated manufacturing solutions
![Page 19: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/19.jpg)
By collaborating our Four Diamond Process Flow,
our knowledge platform and approved suppliers,
we group provide FAST turn key solutions.
We are staffed and managed by business
graduates, engineers, trained specialists with
manufacturing experience geared to meet
aggressive deadlines while maintaining certified
quality standards.
Value Added Services
Contract Manufacturing
Integrated manufacturing solutions
![Page 20: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/20.jpg)
•Program Management
•Supply Chain Management
•Sterilization Services
•Packaging Solutions
•Qualified ASL
•Inventory Control
•Tooling Amortization
•Off shore Sourcing and Support
•International Shipping
Value Added ServicesIntegrated manufacturing solutions
![Page 21: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/21.jpg)
• Simple-Complex Assembly
• Lens Solutions
• Decorating Applications
• Paint Deliverables
• Metals Sourcing
• Sonic Welding
• Laser Etching
• Testing Stations
• Sterilization
Value Added Services
Experience With:
Integrated manufacturing solutions
![Page 22: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/22.jpg)
Industry - Medical
Product – Pacemaker Programmer
Challenge -
• Short time to market
• Tight tolerances
The MME Group Advantage -
• 3 Tools
• 4 week lead-time
• Plastic Painting
Value added -
• Up front involvement
![Page 23: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/23.jpg)
Industry - Medical
Product – Air Filter Mask
Challenge -
• 3-4 Tools
• 6 Week Lead- Time
The MME Group Advantage -
• Insert Shot Molding
Value added -
• ABS / Santoprene
![Page 24: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/24.jpg)
Industry - Medical
Product – Catheters Angioplasty
Challenge -
• 2 Tools
• 4 Week Lead- Time
The MME Group Advantage -
• Over- Molded Guide Wire
Value added -
• Clean Room Molding
![Page 25: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/25.jpg)
Industry - Medical
Product – Heart Monitoring Device
Challenge -
• 6 Tools
• 5 Week Lead- Time
The MME Group Advantage -
• Design Involvement
Value added -
• ESI (Early Supplier Involvement)
![Page 26: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/26.jpg)
Industry - Communications
Product –Cradle Kit
Challenge -
• Highly Cosmetic
• Engineered Custom Product
The MME Group Advantage -
• Purchased Components
• In House Manufacturing
Value added -
• Dock to Stock Shipment
Assemblies
![Page 27: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/27.jpg)
Industry - Medical
Product – Insulin Pump
Challenge -
• 7 Tools
• 4 Week Lead- Time
• Cosmetic Surfaces
The MME Group Advantage -
• Speed to Market
Value added -
• Mechanical Design
![Page 28: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/28.jpg)
Industry- Automotive
Product- Automotive, Housings
The Challenge -
• Asian tooling
• Asian molding, plating & assembly
The MME Group Advantage
• Asian sourcing partners
• Molding
Value Added –
• Chrome Plating
![Page 29: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/29.jpg)
Additional Products
![Page 30: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/30.jpg)
•Expedite time to market- fast tooling, molding & development
•Multi industry expertise to help expand your expertise
•Turn-key manufacturing solutions- Design thru distribution
•Bandwidth and Flexibility to handle entire programs
•AIM – Alloy Injection Molding- Precise & industry changing
Summary Integrated manufacturing solutions
![Page 31: Mme Group 2 2011](https://reader031.fdocuments.us/reader031/viewer/2022020110/54bf62b44a79591d2c8b4586/html5/thumbnails/31.jpg)
Thanks for your Time!Thanks for your time!
Integrated manufacturing solutions