MM Questionnaire Certification
Transcript of MM Questionnaire Certification
8/13/2019 MM Questionnaire Certification
http://slidepdf.com/reader/full/mm-questionnaire-certification 1/3
1. Vendor quotation resulting from an RFQ is displayed as an independent document in SAP
True False
2. The AAC is used in PR but not PO
True False
3. While creating Mat Master you will maintain the below
Mat grp | Number Assignment | whether mat can be ordered | permissible length of Short
description | Restrict purchasing from certain vendors | maintain User-dept-specific (views) data |
4. If you maintain multiple AAC for an item, you can chose between Qty based and % based distribution
True False
5. You can chose stock overview to learn about the stock situation of one material in different
plants/stores
True False
6. In standard analysis You can perform ABC analysis
True False
7. Which org levels need to indicate while creating PO
Client | Co Code | Plant | Stor loc | Purch Org | Purch Grp |
8. If you automatically convert PR items to a POs, you can specify in the New PO area how the system
groups the PR items into POs. For example you can chose between the following settings
per Puch grp | per delivery date | per plant | per storage loc | per vendor | per aac | per purch org |
per source of supply | (PO always refers to 1 vendor and 1 Purch Org)
9. If conditions are maintained in a PIR, these conditions are always copied to PO
True False
10. You can create PO with or without PR refTrue False
11. Which purchasing doc(s) allow(s) only time-independent conditions
RFQ/Quotation | Contract | PO | SA
12. A purch org can act for several plants
True False
13. What are the effects of entry of GR for a PO?
PO is deleted | an a/c doc can be generated | mat doc is generated for each item | a PO history is
updated for each item of PO | A mat doc is generated | a credit memo is automatically generated
for the vendor for the amount of delivery date |
14. Which of the following master data is relevant to the procurement of external services
Vendor master | Mat Master | Service Master | PIR | BOM | Service conditions
15. Which Org levels play a role in the maintenance of Vendor Master data?
Client | Co Code | Plant | Stor loc | Purch Org | Purch grp |
16. In case of consumable material with a master record, the stock figure (shown in Mat Mast Record) is
never updated on a Value basis
True False
17. When the service entry sheet is saved, the postings are made in FI. However, these postings are
blocked and not released until the SES is accepted
True False
8/13/2019 MM Questionnaire Certification
http://slidepdf.com/reader/full/mm-questionnaire-certification 2/3
18. In which of the following docs and master records can you enter the conditions
RFQ (type AN) | Quotation | Mat Mast Record | PIR | PO
19. Which functions can you execute from or with ME49/price comparison list?
Compare prices from quotation at item level |generate more RFQ from an RFQ | Maintain/change
price in quotations | print rejection letters | save market places |
20. Scope of list parameter determines which purchasing documents are to be analyzed
True False
21. Condition can be defined in the info record if the info record was created manually
True False
22. Which of the following do you enter when you create a blanket purchase
Vendor | Material | Delivery date | short text | order price for material | AAC | Item cat B | Limited
validity indicator | Mat grp | Qty | Unit of measure |
23. You have replicated the following procurement process in the system; PO for stock material - GR
against PO - IR against PO - where the invoice includes delivery costs that are 100% unplanned.
Select the all accounts to which postings could be made within the framework of invoice entry.Vendor a/c | GR/IR clearing a/c for external procurement| GR/IR freight clearing a/c | stock a/c | a/c
for gain from price differences |a/c for input tax |
24. While creating Vendor Master record with ref, you can decide whether or not address data need to
be adopted from the reference.
False True
25. A Purch Org must always be assigned to a Purch Org
False True
26. You wish to procure a material for consumption, which data must exist in PR?
Mat description | AAC | Mat number | G/L a/c | Mat grp | a/c asgnmt data |
27. During the service entry process, you can always enter unplanned services
False True
28. You can chose stock overview to learn about the stock situation of several material in different
plants/stores
True False
29. You must determine the company code as the valuation area if you want to use one of the
components Production Planning/Product Cost Accounting
True False
30. In which screen areas can you break down a MRP list?
Header | Footer | Items with information about the MRP elements | Material tree | Favorites | Help
area
31. Which of the following Org levels are relevant for PIR?
Client | Co code | Plant | Store loc | Purch org |
32. The MRP list is dynamic list that displays the currently valid stock/requirement situation of the
material
True False
33. Which type of the data must be specified in the MMR if the material is to be planned with the
manual reorder point planning procedure?
MRP type VB | Purch Grp | MRP controller | safety stock | Lot size FX | Reorder point | Planned
delivery time | Planning cycle |
8/13/2019 MM Questionnaire Certification
http://slidepdf.com/reader/full/mm-questionnaire-certification 3/3
34. In the invoice overview enables you to display a list of invoices. when selecting documents, you can
restrict the volume of data with the data entry type. which of the following data entry types are
possible?
ERS | Online entry | Blocked | Parked | partially entered | Delivery costs only | EDI
35. In which master record and documents can the indicator or stock type quality inspection occur?
MMR | VMR | PIR | RFQ | PO | Mat Doc |
36. The plant parameters have higher priority than MRP groups
True False
37. Invoices that were created by ERS are generally blocked for payment and released automatically
when the message is issued
True False