MLR Associates 11-99 1
Configuration Management
Based on Best PracticesAlan E. Lager
MLR Associates
Alan E. Lager MLR Associates
2801 Park Center Drive, #A1612, Alexandria, VA 22302, USA
Voice: 1 703 5673280; 1 703 624 8857 Fax: 1 703 567-3279
E-Mail: [email protected]://www.mlrassociates.com
Manchester, UK, FEB 2000Manchester, UK, FEB 2000CMCMEuropeEuropeEuropeEuropeSeminar A1 – Establishing Industry Best Seminar A1 – Establishing Industry Best
PracticesPracticesSeminar A1 – Establishing Industry Best Seminar A1 – Establishing Industry Best
PracticesPractices
MLR Associates 11-99 2
Configuration Management Based on Best Practices
What is CM -- Really? What are Best CM Practices? ANSI/EIA-649 Perspective Fundamental CM Principles
– Planning and Management– Configuration Identification– Configuration control– Configuration Status Accounting– Configuration Verification and Audit
Measuring and Benchmarking CM Practices
Configuration Management Based on Best Practices
What is CM -- Really? What are Best CM Practices? ANSI/EIA-649 Perspective Fundamental CM Principles
– Planning and Management– Configuration Identification– Configuration control– Configuration Status Accounting– Configuration Verification and Audit
Measuring and Benchmarking CM Practices
Agenda
MLR Associates 11-99 3
What is Configuration Management
- Really?
MLR Associates 11-99 4
What is CM - Really!
Change Requests• Improve design• Increase reliability• Enhance Maintainability• Reduce Cost• Etc.
Known Current Configuration
Updated Configuration
Controlling changes from idea inception to incorporation in all affected items
CMIN OUT
Status
MLR Associates 11-99 5
What is CM - Really?
CM makes sure that:–The configuration of a product
is known and reflected in product information
–Product change is beneficial and effected without adverse consequences
–Change is managed from idea inception to incorporation in all items affected
CM makes sure that:–The configuration of a product
is known and reflected in product information
–Product change is beneficial and effected without adverse consequences
–Change is managed from idea inception to incorporation in all items affected
MLR Associates 11-99 6
What is CM - Really? CM is an amalgamation of a set
of best industry practices Properly applied, CM
– Serves both the provider (developer, producer, supplier) and the user (customer) of a product
– Facilitates Logistic Support (Product Support) and product maintenance
– Is a Cost Avoider NOT a Cost Driver!!!
CM is an amalgamation of a set of best industry practices
Properly applied, CM – Serves both the provider
(developer, producer, supplier) and the user (customer) of a product
– Facilitates Logistic Support (Product Support) and product maintenance
– Is a Cost Avoider NOT a Cost Driver!!!
MLR Associates 11-99 7
What are Best CM Practices?
MLR Associates 11-99 8
What are “Best Practices”
Practices that are the benchmark by which similar activities are judged
Methods that– Are effective and efficient – Meet customer requirements– Have rational performance goals– Include performance measurement
standards – Align with corporate business objectives– Position the organization as a leader
Practices that are the benchmark by which similar activities are judged
Methods that– Are effective and efficient – Meet customer requirements– Have rational performance goals– Include performance measurement
standards – Align with corporate business objectives– Position the organization as a leader
MLR Associates 11-99 9
What are Best CM Practices?
Applicable CM Principles
Customer Environment
Supplier Environment
BenchmarkAssessMeasure
Documented CM Process
Integrated inOrganizational Process
MLR Associates 11-99 10
ANSI/EIA-649 Perspective
ANSI/EIA 649 “National (US) Consensus
Standard on Configuration Management”ANSI American National
Standards Institute
EIA Electronic Industries Alliance
MLR Associates 11-99 11
ANSI/EIA-649 Perspective EIA-649 Presents Industry View EIA-649 Presents Industry View
MIL-STD View
Buyer imposed Requirements
649 View
Industry “Best Practices” employing CM principles EIA- 649 Rationale for Performing
CM
– Provides Benefit– Avoids Cost– Best Value
MLR Associates 11-99 12
PurposPurposee
Allows common sense application of CM
principles De-fuses the terminology issue using
Aliases Sells CM on its Merits
– Example: Product attributes are defined»Measurable Performance Parameters»Both Buyer & Seller have common basis
for acquisition & use of the product
Allows common sense application of CM principles
De-fuses the terminology issue using Aliases
Sells CM on its Merits– Example: Product attributes are
defined»Measurable Performance Parameters»Both Buyer & Seller have common basis
for acquisition & use of the product
ANSI/EIA-649 Perspective
BenefitBenefitss
MLR Associates 11-99 13
Fundamental CM Principles
CM Planning & Management
MLR Associates 11-99 14
CM Planning & Management
To assure that the appropriate CM processes and activities are applied
To establish CM organizational responsibilities
To determine the necessary resources and facilities
To provide a basis for continuous improvement
To enhance the maturity of the enterprises process
To assure that the appropriate CM processes and activities are applied
To establish CM organizational responsibilities
To determine the necessary resources and facilities
To provide a basis for continuous improvement
To enhance the maturity of the enterprises process
Purpose and benefits
MLR Associates 11-99 15
Configuration Management Processes (ANSI/EIA 649)
CONFIGURATION CHANGE
MANAGEMENT
Manage changes
CM PLANNING & MANAGEMENT
Selection, tailoring, guidance, oversight
Attributes, identifiers, baselines
CONFIGURATION
IDENTIFICATION
CM information & status
CONFIGURATION
STATUS ACCOUNTING
CONFIGURATION
VERIFICATION/AUDIT
Verify performance & consistency
Assure data integrity
CM OF
DIGITAL DATA
MLR Associates 11-99 16
EIA 649 - CM Principle #1
Plan CM processes for the context and environment in which they are to be performed and manage in accordance with the planning:– Assign Responsibilities/Document
procedures – Train personnel– Measure Performance; and– Assess measurements/trends to
effect process improvements
Plan CM processes for the context and environment in which they are to be performed and manage in accordance with the planning:– Assign Responsibilities/Document
procedures – Train personnel– Measure Performance; and– Assess measurements/trends to
effect process improvements
Be Prepared!
CM Planning & Management
MLR Associates 11-99 17
Consistent with ISO10007 - CM Plan 7.7 Configuration
Management Plan– A CMP provides the CM
procedures that are to be used and states who will undertake these and when
8. Configuration Management System Audit– Determine conformity of
the applied CM practice to the procedures described in the CM plan
7.7 Configuration Management Plan– A CMP provides the CM
procedures that are to be used and states who will undertake these and when
8. Configuration Management System Audit– Determine conformity of
the applied CM practice to the procedures described in the CM plan
1. Plan2. Document
Procedures3. Do what you plan
CM Planning & Management
MLR Associates 11-99 18
Fundamental CM Principles
Configuration IdentificationConfiguration Identification
MLR Associates 11-99 19
Configuration Identification
Configuration identification is the basis from which the configuration of products are defined and verified; products and documents are labeled; changes are managed; and accountability is maintained.
Benefits are realized only if there is consistency between the product and the information about the product
Product attributes are – Defined in configuration documentation– Achieved in the product– Verified for consistency between product
and documentation
Configuration identification is the basis from which the configuration of products are defined and verified; products and documents are labeled; changes are managed; and accountability is maintained.
Benefits are realized only if there is consistency between the product and the information about the product
Product attributes are – Defined in configuration documentation– Achieved in the product– Verified for consistency between product
and documentation
EIA 649 - CM Principle #8
MLR Associates 11-99 20
Purpose and Benefits of Configuration Identification
Determines structure of the product & documentation
Defines performance, interface & other attributes
Provides unique identity to product, components and documentation
Prescribes identification marking Modifies product and document
identifiers to reflect incorporation of major changes
Determines structure of the product & documentation
Defines performance, interface & other attributes
Provides unique identity to product, components and documentation
Prescribes identification marking Modifies product and document
identifiers to reflect incorporation of major changes
MLR Associates 11-99 21
Purpose/Benefits, continued
Maintains release control and baseline definition
Provides reference for changes & corrective actions
Correlates document revision level to product configuration – Enables user to distinguish between
product versions– Enables service person to correlate
product to instructions– Correlates units to warranty/service
life
Maintains release control and baseline definition
Provides reference for changes & corrective actions
Correlates document revision level to product configuration – Enables user to distinguish between
product versions– Enables service person to correlate
product to instructions– Correlates units to warranty/service
life
MLR Associates 11-99 22
Product Structure
Determine CIs
Select Config. DocTypes/Baselines
Identify Documents &
Items
Approve, Release & Baseline
Document-ation
CM Planning Documented CM Process
Contract Provisions
Configuration Documentation Approved, Released and
Baselined for Change Control by the appropriate Configuration Control Authority
Configuration Identification Process Activity Model
Configuration Items selected and Requirements allocated
Document and Item Identifiers assigned
Appropriate Configuration Document Types and Baselines selected
Configuration Documentation
Systems Engineering
-Reqmts/Functional Analysis
-Allocation & Synthesis
Logistics Maintenance Plan
Approved Engineering Changes
MLR Associates 11-99 23
Configuration Identification
Configuration documentation defines the performance, functional and physical attributes of a product. Other product information is derived from configuration documentation.
Two major sets of product information are:– Configuration documentation– Operational Information
Configuration documentation is the product-defining documentation from which operational information and other product information is derived
Configuration documentation defines the performance, functional and physical attributes of a product. Other product information is derived from configuration documentation.
Two major sets of product information are:– Configuration documentation– Operational Information
Configuration documentation is the product-defining documentation from which operational information and other product information is derived
EIA 649 - CM Principle #9
MLR Associates 11-99 24
The Product Information Universe
Product Information
Operational Operational InformationInformation
Operate Maintain
Configuration Configuration DocumentationDocumentation
Reqmts Design
Build & Test
Sales
Distribution
MLR Associates 11-99 25
Configuration Identification
All documents reflecting product performance, functional, or physical requirements and other product information are uniquely identified so that they can be correctly associated with the applicable configuration of the product.
Document identification enables retrieval Common identifiers include:
– Date– Assigned alpha numeric – Revision – Type of document– Title/subject– Originator/Organization– Customer’s contract or PO (if applicable)
All documents reflecting product performance, functional, or physical requirements and other product information are uniquely identified so that they can be correctly associated with the applicable configuration of the product.
Document identification enables retrieval Common identifiers include:
– Date– Assigned alpha numeric – Revision – Type of document– Title/subject– Originator/Organization– Customer’s contract or PO (if applicable)
EIA 649 - CM Principle #15
MLR Associates 11-99 26
Configuration Identification
All products are assigned unique identifiers so that – One product can be distinguished from
other products– One configuration of a product can be
distinguished from another– The source of the product can be
determined– The correct product information can be
retrieved.
All products are assigned unique identifiers so that – One product can be distinguished from
other products– One configuration of a product can be
distinguished from another– The source of the product can be
determined– The correct product information can be
retrieved.
EIA 649 - CM Principle #11
MLR Associates 11-99 27
Configuration Identification
Individual units of a product are assigned a product unit identifier when there is a need to distinguish one unit of the product from another unit of the product.
Typically by Serial Number Units serialized, e.g., when:
– Customer options– Warranties– Individual testing or screening
Individual units of a product are assigned a product unit identifier when there is a need to distinguish one unit of the product from another unit of the product.
Typically by Serial Number Units serialized, e.g., when:
– Customer options– Warranties– Individual testing or screening
EIA 649 - CM Principle #12
MLR Associates 11-99 28
Configuration Identification
When a product is modified, it retains its original unit identifier even though it’s part identifying number is altered to reflect a new configuration.
It is essential that serialization take place using a non-changing identifier as a base
Nothing degrades CM as much as two products with the identical part numbers and identical serial numbers!!
When a product is modified, it retains its original unit identifier even though it’s part identifying number is altered to reflect a new configuration.
It is essential that serialization take place using a non-changing identifier as a base
Nothing degrades CM as much as two products with the identical part numbers and identical serial numbers!!
EIA 649 - CM Principle #13
P/N XYZ, S/N 1???
MLR Associates 11-99 29
Configuration Identification
A series of like units of a product are assigned a product group identifier when it is unnecessary or impractical to identify individual units but nonetheless necessary to correlate units to a process, date, event or test.
Typically, by batch or lot number; In high production, a date code Enables unit to be correlated to
test or process records for the group Also non-changing base
A series of like units of a product are assigned a product group identifier when it is unnecessary or impractical to identify individual units but nonetheless necessary to correlate units to a process, date, event or test.
Typically, by batch or lot number; In high production, a date code Enables unit to be correlated to
test or process records for the group Also non-changing base
EIA 649 - CM Principle #14
MLR Associates 11-99 30
Configuration Identification
A baseline identifies an agreed-to description of the attributes of a product at a point in time and provides a known configuration to which changes are addressed.
EIA 649 Principle #17: Baselines are established by agreeing to the
stated definition of a product’s attributes. Baselines provide
–Assurance of stability & consistency–Common communication of product
definition–Ability to transfer authority
A baseline identifies an agreed-to description of the attributes of a product at a point in time and provides a known configuration to which changes are addressed.
EIA 649 Principle #17: Baselines are established by agreeing to the
stated definition of a product’s attributes. Baselines provide
–Assurance of stability & consistency–Common communication of product
definition–Ability to transfer authority
EIA 649 Principle #16:
N
S
W E
MLR Associates 11-99 31
Configuration Identification
The configuration of any product, or any document, plus the approved changes to be incorporated is the current baseline.
The configuration of any product, or any document, plus the approved changes to be incorporated is the current baseline.
EIA 649 Principle #18:
Product Configuration Baseline
Requirements
Requirements Baseline (Multi-Level)
Requirements Implemented in Design Design
Release Baseline
VerifiedProductConfiguration
MLR Associates 11-99 32
Configuration Identification
For product interfaces external to the enterprise, establish an interface agreement and a mutually agreed-to documentation of common attributes.
In Buyer/Seller relationship, interface definition is part of purchase agreement
If no direct relationship exists, an interface agreement is negotiated
Documentation = ICD Procedures may include an ICWG
For product interfaces external to the enterprise, establish an interface agreement and a mutually agreed-to documentation of common attributes.
In Buyer/Seller relationship, interface definition is part of purchase agreement
If no direct relationship exists, an interface agreement is negotiated
Documentation = ICD Procedures may include an ICWG
EIA 649 Principle #20:
Let’s interface
MLR Associates 11-99 33
Understanding the Levels of Interface
SYSTEM B
A-B Same Contract
SYSTEM C
A-C Same CustomerDifferent Contract
SYSTEM D A-D Different Customer Different Contract
SYSTEM ACI a
CI b
CI c
Assembly Part 12
P4P4P3P2P1
Interfaces within CIs
Interfaces Between CIs
System Interfaces
CI c
P4
Part from
SupplierCI from Supplier
Supplier Interfaces
MLR Associates 11-99 34
Fundamental CM Principles
Configuration Control(Configuration Change
Management)
Configuration Control(Configuration Change
Management)
MLR Associates 11-99 35
Configuration Change Management
Changes to a product are accomplished using a systematic, measurable change process.
Process includes– Identifying need for change– Documenting impact– Evaluation & Coordination– Incorporation of approved change– Verification
Also encompasses management of variances
EIA 649 Principle # 21
MLR Associates 11-99 36
EIA 649Configuration Change Management Purpose and Benefits
– Enable change decisions to be based on knowledge of complete change impact
– Limit changes to those which are necessary or offer significant benefit
– Facilitate evaluation of cost, savings & trade-offs– Ensure customer interests are considered– Provide orderly communication of change information– Preserve configuration control at product interfaces– Maintain and control a current configuration baseline– Maintain consistency between product and
documentation– Document and limit variances– Facilitate continued supportability of the product
after change
MLR Associates 11-99 37
Change Identification
Evaluation & Coordination
Implementation & Verification
New Current Baseline
Need for Change
Documented Change Request
Approved Change
Current Baseline
EIA 649 Change Management Process Model
Configuration Change Management
MLR Associates 11-99 38
Configuration Control Process Activity Model
GovernmentConfiguration Control
Initiation
ContractorConfiguration
Control
ECPs, RFDs
ContractorNeed forChange
ContractualProvisions
ApprovedECPs, RFDs
&Implementing
Direction/Authorization
DocumentedCM Process
C
C
C
CM MgmtCommunication
Requestfor ECP
CurrentConfigurationControlAuthority
Status &ConfigurationInformation
GovernmentConfiguration Control
Evaluation &Disposition (Fig. 4-4)
Need forChange toGovernmentBaseline
Contractor-ResponsibleChange Ident,Documentation& Disposition
Govt.Need forChange
ApprovedConfigurationDocumentation(CurrentBaselines)
C
MLR Associates 11-99 39
Configuration Change Management
Each change is uniquely identified
Objectives of change identification– Description and impact sufficient for
evaluation– Choose appropriate format– Provide unique identifier for the change
1 23 4
EIA 649 Principle #22
MLR Associates 11-99 40
EIA 649 Principle #23
Configuration Change Management
Changes represent opportunities for improvement
Changes initiated to:– Provide new capabilities– Enhance product support– Insert technology– Effect improvements– Correct defects or deficiencies– Reduce cost, improve efficiency
Changes represent opportunities for improvement
Changes initiated to:– Provide new capabilities– Enhance product support– Insert technology– Effect improvements– Correct defects or deficiencies– Reduce cost, improve efficiency
MLR Associates 11-99 41
Configuration Change Management
Classify changes to aid in determining the appropriate levels of review and approval.
Tabulated “best practice”factors differentiate between:– Major & Minor changes– Requirement for external customer
review in addition to internal review
EIA 649 Principle #24
MLR Associates 11-99 42
Configuration Change Management
Consider technical, support, schedule, and cost impacts of a requested change before making a judgment as to whether a change should be approved for implementation and incorporation in the product and its documentation.
Change evaluation and coordination process – Reviewing the preliminary impact assessments– Determining change effectivity– Establishing the cost/price– Dispositioning the change
EIA 649 Principle #26
I thought I knew it all !
MLR Associates 11-99 43
Configuration Change Management
Determine all potential effects of a change and coordinate potential impacts with the impacted areas of responsibility.
Impact Assessment– Details what is affected– Ensures that all potential effects are
known– Is essential to determine effectivity
EIA 649 Principle #27
MLR Associates 11-99 44
Configuration Change Management
Change Boards are a common means of achieving coordination necessary for impact assessment and change evaluation
Change Board characteristics:– Chaired by someone with authority to commit the
resources of the enterprise to implementing the change– Members represent functional activities or product
development teams... and have authority to commit the group they represent
– Agendas & documents ....distributed in advance– Board direction & decisions ...documented and
disseminated Board actions commonly accomplished electronically
MLR Associates 11-99 45
Configuration Change Management
Change documentation delineates which unit(s) of the product are to be changed. Change effectivity includes production break-in and retrofit/recall, as applicable.
A changed product should not be
distributed until its support and service areas are able to support it.
Effectivity determination requires– Knowledge of lead times– Balancing of many factors
EIA 649 Principle #28I like this date, it’s my birthday.
Where’s the instructions?
EIA 649 Principle #29
MLR Associates 11-99 46
Configuration Change Management
Effectivity delineates which units are to be changed
Effectivity is commonly expressed by– Product unit identifying number
(e.g., serial number)– Production date– Product group identifier
(e.g., lot, batch)– Model Year– Model Designation– Version number
MLR Associates 11-99 47
Configuration Change Management
The decision maker is aware of all cost factors in making the decision.
Prerequisites:– Impact assessment– Effectivity
CM process identifies– Immediate cost of change– Expected cost/savings in future
All cost factors are considered
EIA 649 Principle #30
MLR Associates 11-99 48
Configuration Change Management
Change approval decisions are made at an appropriate organizational level with the authority to commit necessary resources to implement the change.
Approval authority delegated to different levels, based on classification
As the life cycle progresses, authority typically transitions toward higher fiscal responsibility
Each organization establishes its own change authority levels
EIA 649 Principle #31
MLR Associates 11-99 49
Implement an approved change in accordance with documented direction approved by the appropriate level of authority.
Planning for change implementation is– Initiated during change evaluation– Detailed after change is approved
Implementation involves– Release of new or revised configuration
documentation and other affected product information
– Change incorporation into product – Update of operation and support elements
EIA 649 Principle #32
Configuration Change Management
MLR Associates 11-99 50
Product
Product Information
EIA 649 Principle #33
Configuration Change Management
Verify implementation of a change to assure consistency between the product, its documentation and its support elements.
Verification may be means of:– Detailed audit of product to documentation– Validation of installation or modification
instructions– Validation of operation and maintenance
instructions– Testing– or, a simple inspection
Verify implementation of a change to assure consistency between the product, its documentation and its support elements.
Verification may be means of:– Detailed audit of product to documentation– Validation of installation or modification
instructions– Validation of operation and maintenance
instructions– Testing– or, a simple inspection
MLR Associates 11-99 51
EIA 649 Principle #34
Who sez I’m different?
Configuration Change Management
If it is considered necessary to temporarily depart from specified baseline requirements, a variance is documented and authorized by appropriate level of authority.
Products that incorporate a known departure from requirements should not be delivered to a customer unless a request for variance has been documented and authorized.
Authorized variances do not constitute a change to configuration documentation
If it is considered necessary to temporarily depart from specified baseline requirements, a variance is documented and authorized by appropriate level of authority.
Products that incorporate a known departure from requirements should not be delivered to a customer unless a request for variance has been documented and authorized.
Authorized variances do not constitute a change to configuration documentation
MLR Associates 11-99 52
ANSI/EIA-649 Request for Variance
The term “variance” is the alias for what is commonly referred to as– Deviation– Waiver
Variances are requested– Prior to manufacture– During manufacture– After manufacture
The term “variance” is the alias for what is commonly referred to as– Deviation– Waiver
Variances are requested– Prior to manufacture– During manufacture– After manufacture
Deviation!!
Waiver...
Deviation, I think!
Poor Form
NO FORM!!!
MLR Associates 11-99 53
Fundamental CM Principles
Configuration Status Accounting
Configuration Status Accounting
MLR Associates 11-99 54
Configuration Status Accounting
An accurate, timely information base concerning a product and its associated product information is required throughout the product life cycle.
CM effectiveness is linked to information flow– Information collected while performing CM
activities– CSA correlates, stores, & maintains an
organized collection of information– CSA provides readily available views
EIA 649 Principle #35
MLR Associates 11-99 55
Configuration Status Accounting TasksApproved
Configuration Documentation
Change Identification,Documentation, Disposition
Configuration Verification
Change Verification & Validation
Action Items
Status
Configuration Information
Performance Measurement
Record the current approved configuration documentation and configuration identifiers associated with each System/CI(s).
Record and report the status of proposed engineering changes from initiation to final approval to contractual implementation
Record and report the status of all critical and major requests for deviation which affect the configuration of a system/CI(s).
Record and report the results of configuration audits to include the status and final disposition of identified discrepancies and action items
Record and report implementation status of authorized changes Provide the traceability of all changes from the original released
configuration documentation of each System/CI(s) Report the effectivity and installation status of configuration
changes to all system/CI(s) at all locations, including design, production, modification, retrofit and maintenance changes
Record the digital data file(s)identifiers and document representations of all revisions/versions of each document and software which has been delivered, or made accessible electronically, in support of the contract.
Contractual Provisions
CSA Activity Model
Communication
Automated CM System based on CM Data Model & Data Element Dictionary
Documented CM process
CM Planning
MLR Associates 11-99 56
Configuration Status Accounting
Purposes and benefits– Enables retrieval of information concerning change decisions– Supports inquiries concerning future planning of design
changes, investigation of design problems, warranties, shelf and operating life calculations, etc.
– Access to complete configuration information on a product, any individual product unit, or group of product units
– Access to accurate identification of each delivered product unit
– Improves capability to identify, produce, inspect, deliver, operate, maintain, repair, and refurbish products
– Enhances availability of accurate information on spare parts and maintenance support
– Source for configuration history
EIA 649
MLR Associates 11-99 57
Configuration Status Accounting over a System Life Cycle
CSA evolves over the product life cycle capturing more detailedinformation and enhancing its value as an information resource
Supporting
Physical
Design
Performance Definition
Solution
Configuration
Element Configuration
Concepts
0I
STATUS
STATUS ACCOUNTING
CAPABILITY
IIIII
Concept Studies Prog. Def
& RiskReduct. Eng &
Mfg Dev
Prod, Field/Deploy& Op Support
SYSTEM/CI LIFECYCLE
ACCOUNTING OBJECTS
MissionNeed
MLR Associates 11-99 58
Fundamental CM Principles
Configuration Verification and Audit
Configuration Verification and Audit
MLR Associates 11-99 59
Configuration Verification & Audit
Verification that a product’s requirement attributes have been met and the product design meeting those attributes has been adequately documented is required to baseline the product configuration.
Configuration verification and audit establishes that:– The performance requirements have
been achieved by the design, and– The design has been accurately
documented in configuration documentation
EIA 649 Principle #39
We did it!
MLR Associates 11-99 60
Configuration Verification & Audit
Purpose and Benefits– Ensure the product design provides the agreed to
performance capabilities– Validate the integrity of the configuration documentation– Verify the consistency between a product and its
configuration documentation– Determine that an adequate process is in place to
provide continuing control of the configuration– Provide confidence in establishing a product baseline– Ensure a known configuration as a basis for operation
and maintenance instructions, training, spares and repair parts.
MLR Associates 11-99 61
VERIFICATION &AUDIT PLANNING*
CONFIGURATIONVERIFICATION
PROCESS
PRE- AUDIT
AUDIT Audit ReportVerification,Validation,Action Items
POST-AUDIT
• Verification Reqd• Audit Schedule
ApprovedConfigDoc.
Status &Config Info(From CSA)
Physical CI /CSCITest Results
Mfg. & Engrg. ToolsDocumentation
DocumentedCM Process
C
Confidence;Verified Product& Validated Process
Contractual Provisions
Verification,Validation,Action Items
(To CSA)
Status(viaCSA)
• Verified Configuration• Verified Changes• Open Items (Action Items)
(ToCSA)
• Agenda• Facilities, Tools• Personnel• Documentation• Availability of
Audit Objects• Certifications
Configuration Verification and Audit Activity Model
MLR Associates 11-99 62
Accomplish &Verify Change
Update ConfigDocumentation
ReviseMfg/Prod/TestInstructions
Authorization toimplementapproved change
UpdateOrderingData**Orders for
• Supportequipment
• Trainers• Training• Spares• Tech. Manuals
Change Implementation and Verification
ProductMfg & Retrofit
Other AffectedSupportElements
Operating &MaintenanceInstructions
MLR Associates 11-99 63
Configuration Verification & Audit
Verification that a design achieves its goals is accomplished by a systematic comparison of requirements with the results of tests, analysis or inspection.
EIA 649 Principle #40
• Incremental• Systematic• Incorporate in process flow• Requirements flow-down tools• Matrix (Results vs Requirement)
MLR Associates 11-99 64
Configuration Verification & Audit
Documentation of a product’s definition must be complete and accurate enough to permit reproduction of the product without further design effort.
The design output must be captured and documented adequately
Documentation content and formality influenced by future procurement and maintenance needs
Verifying the documentation assures that it is adequate for its intended purpose
EIA 649 Principle #41
MLR Associates 11-99 65
Configuration Verification & Audit
Where necessary, verification is accomplished by formal configuration audit.
Resources and material to perform functional and physical audit include:– Audit plan and agenda– Adequate facilities and unencumbered access– Availability of personnel– Applicable documentation, schedules, test results,
inspection records, etc.– Tools and inspection equipment– Isolation of the product and parts to be reviewed
EIA 649 Principle #42
MLR Associates 11-99 66
Configuration Verification & Audit
Periodic reviews verify continued achievement of requirements, identify and document changes in performance, and ensure consistency with documentation.
Ongoing production and processes, are reviewed periodically to determine continued suitability
Operation of products or facilities are reviewed to identify and monitor changes or degradation of performance
Methods range from manual inspection to statistical process control and trend analysis
EIA 649 Principle #43
MLR Associates 11-99 67
Measuring and Benchmarking CM Practices
Process AssessmentProcess Assessment
MLR Associates 11-99 68
Process Assessment Why Process Assessment?
– Quantify process as baseline for measuring improvements/Benchmarking
– Competitiveness; Product Quality; Process Improvement
Options to evaluate the effectiveness of CM Process
– Established Assessment Framework»SEI SW-CMM»EIA-731»Capability Maturity Model Integration (CMMI)
– Develop Internal Assessment
MLR Associates 11-99 69
Process Assessment Capability Maturity Model (CMM)
– Yardstick for judging maturity of an organization’s process
– Identify Areas for Process Improvement CMM Components
– Model (Based on Documented Standard) »Framework for Process Definition »Process requirements (“What” not “How”)»Key elements of an effective process
– Assessment Process - - “How we measure it”»Process Elements - - “What you do” »Maturity Elements - - “How well you do it”
MLR Associates 11-99 70
Internal Assessments
More focused and detailed than CMM’s Detailed Internal Assessment Model
– EIA Process Analysis Tool (PAT) Ver 1.4– Questionnaires and Scoring Sheets– Assessment Plan / Schedule– Training Material (Team & Participants)– Briefing material (Opening & Findings)– Final Report
Internal or Subcontractor Assessment Checklists
MLR Associates 11-99 71
Product Structure Evaluation Checklist
Is the product (System/CIs) structured into a rational hierarchy?
Can the composition of each System/CI be determined from the configuration documentation?
Are subordinate CIs identified at a reasonable level for: – Specification of and measurement of
performance? – Management of the effectivity of changes?– Obtaining spare parts using performance or
design documents?
Is the product (System/CIs) structured into a rational hierarchy?
Can the composition of each System/CI be determined from the configuration documentation?
Are subordinate CIs identified at a reasonable level for: – Specification of and measurement of
performance? – Management of the effectivity of changes?– Obtaining spare parts using performance or
design documents?
MLR Associates 11-99 72
Measuring and Benchmarking CM Practices
BenchmarkingBenchmarking
MLR Associates 11-99 73
Benchmarking Process Plan
– Establish Team– Identify What is to be Benchmarked– Identify Comparative Companies– Determine Data Collection Method
Collect Data Analyze
– Determine/quantify Performance Difference Set Improvement Goals
– Project future performance level and timeframe
– Establish Functional Goals– Develop Action Plans (including metrics)
Gain Acceptance Implement and Monitor Progress Re-assess
Plan– Establish Team– Identify What is to be Benchmarked– Identify Comparative Companies– Determine Data Collection Method
Collect Data Analyze
– Determine/quantify Performance Difference Set Improvement Goals
– Project future performance level and timeframe
– Establish Functional Goals– Develop Action Plans (including metrics)
Gain Acceptance Implement and Monitor Progress Re-assess
Does someone do
it better?
Does someone do
it better?