MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE...

20
BassGas s Offshore Environme ent Plan Su ummary Yolla M MLE Construction Ca ampaign OEUP-T5 5100-PLN-E ENV-006 BassG Gas Offshore En nviron nment t Plan n Su umma ary for Yolla a MLE E Construction C Camp paign O OEUP P-T510 00-PL LN-ENV-006 6 Decembe er 2011 Process Owne er: Southern Australi ia Asset Operations M Manager Rev No: 1 Issue Date: 13/12 2/2011 Page 1 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed, this is no longer a c controlled document t.

Transcript of MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE...

Page 1: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary Yolla MMLE Construction Caampaign

OEUP-T55100-PLN-EENV-006

BassGGas Offshore Ennvironnmentt Plann Suummaary

for

Yollaa MLEE Construction CCamppaign

OOEUPP-T51000-PLLN-ENV-0066

Decembeer 2011

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 1 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 2: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 2 of 20

Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

 

 

 

 

 

 

 

  

 

 

 

   

 

 

 

  

 

 

 

 

 

 

 

   

BassGass Offshore Environmeent Plan Suummary Yolla MMLE Construction Caampaign

OEUP-T55100-PLN-EENV-006

Table of Conteents

1. Executive SSummary........................................................................................ 3

1.1 MMarine Enviroonment ........................................................................... 3

2. Yolla and MMLE Construcction Activityy Descriptionn .................................................... 5

2.1 Location ..... .................................................................................... 5 2.2 MMLE Construcction Overvieew.................................................................. 6

3. Environme ntal Impact Assessment ...................................................................... 7

3.1 RRisk Assessmeent Outcomees .................................................................. 8

4. Implementtation Strate gy ................................................................................ 16

4.1 BBassGas Healtth Safety and Environmeent Managemment System (HSEMS) .... ........ 16

5. Environme ntal Reportinng ................................................................................ 19

5.1 RReportable annd Recordabble Incidents ..................................................... 19

6. Environme nt Plan Conssultation ......................................................................... 20

6.1 Employee Connsultation ....................................................................... 20 6.2 OOngoing Community Conssultation .... ..................................................... 20 6.3 RRegulatory Coonsultation...................................................................... 20

Page 3: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary Yolla MMLE Construction Caampaign

OEUP-T55100-PLN-EENV-006

1. Executiive Summmary

Origin Ennergy Resourrces Ltd (Oriigin Energy) is the majorrity owner annd operator of the BassGGas Project. The BassGa s project inccludes the ‘YYolla’ offshore platform, located in BBass Strait 1447 kilometrres south of Kilcunda, a ggas pipeline and an onshhore gas plannt near Lang Lang in Victtoria.

Commerrcial producttion of gas coommenced inn June 2006 and is curreently produceed from the Yolla platformm via two prooduction wellls, Yolla-3 aand Yolla-4. The offshoree facilities hhave been deesigned to incorpporate addittional producction wells frrom the Yoll a field and aalso to tie-inn other gas discoverries in the reegion.

The Yolla Mid-Life Exxtension (MLLE) project SStage 1 Consttruction is addding comprression facilities to the platfform to mainntain producction levels aand is also coonverting thee platform, wwith the adddition of an accommmodation bblock, to a n ormally mannned facility.

Construcction activitiies are schedduled to starrt offshore inn December 2011 and wi ll last approximately six montths. A constrruction suppoort vessel, thhe Jascon 255, operated bby the Sea TTrucks Group (STG) will provvide construcction accommodation annd heavy lift facilities duuring the cammpaign.

The MLEE project Sta ge 2 Drilling will drill, innstall and tiee-in two addiitional produuction wells; the details ssurrounding tthis campaiggn are yet to be fully resolved and arre not part oof this documment.

The Yolla platform aand pipeline have a goveernment-app roved Enviroonment Plan (EP) in placee (approveed in February 2011, thee BassGas Offfshore EP [O EUP-T5100-PPLN-ENV-0055]). It has beeen updated in draft to rreflect the f uture operattion of the faacility (i.e. aas a mannedd facility) andd was submitteed along withh this EP forr review and will be re-suubmitted to governmentt for approvaal.

This doccument coverrs the constrruction activvities and offfshore work associated wwith the MLE project.

Origin Ennergy is commmitted to alll aspects of environmen tal protectioon and biodivversity conseervation as it relaates to its buusiness. This commitmennt is expresseed in the commpany’s Heaalth, Safety aand Environmment (HSE) PPolicy and Standards, whhich form thee foundation of its mana gement pracctices, and the performancee that must be attained by all operations and as sociated conntractors. A vvital part of tthe implementation of thhe HSE Policyy and Standaards is the OOrigin Energy HSE Manageement System ((HSEMS). Thee Yolla MLE pproject is beeing implemeented under Origin Energgy’s HSE Poliicy, Standardds and the H SEMS.

The ongooing compliaance monitorring, auditing and reportting against legislative a nd Origin En ergy operatioonal criteria is an integraal part of thee planning annd operationn of the Bass Gas project and Origin Ennergy’s commmitment to eensure that aall adverse eeffects on thhe environmeent resultingg from Origin Ennergy activitties (associattes and sub-ccontractors) are identifi ed, assessedd and as far aas reasonabbly practicabble, eliminatted or minimmised.

1.1 Marine EEnvironment The BasssGas Environnment Effectts Statementt/Environmenntal Impact SStatement (EEES/EIS) doccument (Origin EEnergy, 20022), provides aan extensivee description of the mari ne environmment and bioddiversity within Bass Strait that is proximaal to the Yollla Platform and associatted pipeline infrastructure.

Seabed ssurveys havee been conduucted at the Yolla A Plat form (the pllatform) locaation and aloong the pipeline route. Bathhymetric ma ps indicate tthat the seaffloor is gentlly sloping, d ropping graddually to water deepths of abo ut 80 metress at the plattform locatioon. Survey ddata collecteed by Thales GeoSolutions (2001) indicates thhat the seabeed is comprissed of sandyy, silty and clayey sedimeents, with roccky outcrops in one or twwo locations.

Benthic sampling in Bass Strait hhas consistenntly shown a highly diverrse array of i invertebrate fauna, with sevveral polychaaete familiess, pycnogonidds, pericaridd crustacean s, opisthobraanch mollusccs, bryozoanns and brachhiopods beingg the most pprolific speci es. There wwere no signi ficant seabeed featuress identified, such as activve shelves, oor edge reef systems witthin the direcct vicinity off the platformm, or along thhe pipeline rroute.

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 3 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 4: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

f

BassGass Offshore Environmeent Plan Suummary Yolla MMLE Construction Caampaign

OEUP-T55100-PLN-EENV-006

There arre no marinee reserves, WWorld Heritagge propertie s, or areas liisted or nomminated on thhe Register of the Natioonal Estate, or listed Rammsar wetlandds near the ooffshore faciilities. Speccies that are listeed under the Commonwealth Environ ment Protecction and Bioodiversity Coonservation (EPBC) Act 19999 may migratte or move tthrough the pproject area , including tthe blue whaale, southernn right whale, ffin whale, huumpback whaale, grey nurrse shark (eaastern), greaat white sharrk and southeern elephantt seal. Howeever, none oof the speciees listed are dependent uupon the areea for food o r reproducction.

The operation of thee platform iss considered unlikely to hhave any signnificant imp act on the movemeents of migraatory speciess. A noise asssessment waas undertakeen in 2004, wwith the inteention of monitoriing noise durring construcction and op erational ac tivities (Curttin Universitty, 2005). Nooise was only monnitored durinng constructtion due to d elays in commmissioning. Several whaale species wwere evident in the recorddings, wheree true and pyygmy blue wwhales were rrecorded andd at least onne whale was in close vicinity to the receiiver (based oon high signaal levels receeived) on onee occasion (CCurtin Universitty, 2005). TThe identified movementt of vessels tto and from tthe project aarea was ideentified as the mmain potentiaal impact on migrating wwhales. The movement oof vessels waas a minor rissk and was conssidered unlikkely to have any ongoingg significant impact on wwhale migratiing behaviouur.

Great whhite sharks aare uncommoon and are nnot known too specificallyy breed, or be resident inn the area, buut are generaally known too frequent wwaters aroun d seal coloniies. Grey nuurse sharks hhave been repported from around mostt of the soutthern half of the contineent, but are uuncommon in Tasmani an waters.

Four speecies of turtlles (loggerheead, green, hhawksbill andd leatherbacck), which arre listed as endangeered or vulneerable under the EPBC Acct, have beeen observed iin Bass Straitt. These aree primarilyy at risk fromm entanglemment in fishinng nets, inciddental by-ca tch and ingeesting marinee debris. The waste managemment programm (including aadherence t o the Internaational Convvention for thhe Preventiion of Pollutiion from Ships (MARPOL 1973/78) onn the platform will avoid increasing mmarine debris.

Migratorry seabirds protected by internationaal agreementts such as thhe Bonn Convvention, Japan-Australiaa Migratory BBird Agreemeent (JAMBA) and China-AAustralia Miggratory Bird AAgreement ( CAMBA) may pass through orr near to the well locatioon on route tto islands in Bass Strait aand/or Tasmaania. Foragingg groups of seeabirds weree also sporaddically sighteed in the areea. There arre however, no seabird bbreeding collonies locateed in the perrmit area.

Disturbaance to the CCommonweallth marine area is limited to a potenntial hydrocaarbon spill annd the disposal of producedd formation wwater for thee platform loocation. In tthe event off an oil spill, the BassGas Oil Spill Conntingency Plaan (OSCP) [OOEUP-T5100-PLN-PFM-0044] will be immplemented.

Additionnally, there aare considereed to be no iimpacts fromm activities aassociated wwith the Bass Gas Project oon World Heeritage propeerty, Ramsarr wetlands, liisted migrat ory species, their habitaats or threatenned ecologicaal communitties, or Commmonwealth lland, and it iis consideredd highly unlikely that any threeatened speccies have beeen or will bee impacted by drilling or platform ac tivities. Conservaation areas aare located ooutside the ppermit area as are know n historic sh ipwreck sitees.

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 4 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 5: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

The Yolla A Platformm is a self-insstalling ‘Dril l-Ace’ platfoorm (designeed by Arup) wwith a stictioon type skirted jjacket foundation designn to account for the geottechnical connditions at thhe platform location .

Followinng the MLE p roject, the ooffshore plattform facilitiies will compprise the folllowing:

� Yolla A Platform i n 80.5 m waater depth;

� Accommmodation faacilities for up to 37, noormally only 5-8;

� 8 condductors (2 innstalled for eexisting prodduction wellss);

� Two pproduction wwells, trees aand chokes;

BassGass Offshore Environmeent Plan Suummary Yolla MMLE Construction Caampaign

OEUP-T55100-PLN-EENV-006

2. Yolla annd MLE CConstructtion Activvity Desccription

2.1 Location The Yolla field lies i n Productionn Licence T/ L1, located in the Bass BBasin. The T//L1 Productiion Licence comprises foour whole accreage blockks (blocks 32662, 3334, 33 35 and 3467 ). Figure 2-1 illustratees the locatiion with resppect to the VVictorian andd Tasmanian coastline. TThe location of the Yolla A PPlatform is LLatitude 39º 50’ 40.5”, Loongitude 1455º 49’ 06.3” or 5,588,8244 North, 3988,910 East (GDDA94, Zone 555).

Figure 2-1 Location of Yolla Gass Field, T/L11 Productionn Licence, BBass Basin

The raw gas pipelinee runs from tthe Yolla A PPlatform in CCentral Bass Strait to thee gas plant inn Victoria and has a total lengtth of 180 kmm. The offshoore section oof the pipelinne is 147.5 k m in length.

The pipeeline horizonntal directionnal drill (HDDD) shore crosssing entry ppoint is approoximately 1 km east of the toown of Kilcunnda at 368,2270 East and 573,1120 Noorth.

2.1.1 System OOverview

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 5 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 6: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary Yolla MMLE Construction Caampaign

OEUP-T55100-PLN-EENV-006

� Produuction manifoold;

� Produuction facilitiies for separration and deehydration oof gas and liqquids;

� Compression facil ities;

� Condeensate pumpping;

� Drainss;

� Produuced Water facilities and Dump Caissson;

� Flare System;

� Diesell Storage;

� Chemical Storage and Injectioon; and

� Powerr Generationn.

Followinng the MLE p roject the offfshore platfform will be a normally mmanned facility. During uun­manned periods, it wwill be contrrolled via thee telemetry link from thee onshore gaas plant.

The Yolla platform ffacility is sel f sufficient, in terms of power generration, fuel ggas conditionning and instrumeent air facilitties. It also has a full saafety shutdowwn system inncluding a flaare, closed aand open drain sysstems and prrovision for rreprocessingg of liquids.

Chemicaal injection ffacilities are provided onn the platform for times of upset connditions or a bnormal operatioon where meethanol may be required to mitigate against hydrrate formatioon or used as a preventaative measurre during staartup. Other chemicals inncluding demmulsifier, revverse demulssifier and corrrosion inhibittor are also pprovided.

2.2 MLE Consstruction Overview This secttion providess an overvieww of the majjor activitiess to be perfoormed as a ppart of the Yoolla MLE project. A general o verview of t he constructtion campaiggn steps are as follows:

• JJascon 25 unndertakes dyynamic positiioning (DP) ttrials prior too entering thhe Yolla fieldd 500 m eexclusion zoone;

• JJascon 25 ennters the Yollla field and gangway co nnection to Yolla;

• Platform preeparation/prre-constructiion activitiess, gangway cconnected;

• CConstructionn/modificatioon works commmence, ga ngway conneected;

• JJascon 25 m oves to the north face oof Yolla to peerform heavyy lifts of acco ommodation n module, ganngway disconnnected;

• AAccommoda tion hook-upp and commiissioning (HUUC), preparattion for commpressor and ccondensate module instaallation, ganngway conne cted;

• JJascon 25 leeaves platforrm to pick upp compressorr module (froom Bell Bay in Tasmaniaa, DumbBarge in the field or oth er suitable location);

• JJascon 25 m oves to the wwest face off Yolla to liftt on the commpression andd condensatee pump modules, ga ngway disco nnected;

• OOngoing construction (brrownfield) and hook up aactivities witth the Jascon 25 on eastt face of platform, gaangway conn ected;

• Platform prooducing withh ongoing connstruction/c ommissioninng activity, J ascon 25 ganngway cconnected;

• AAccommoda tion fully commissioned,, Jascon 25 ddeparture; and

• CCommissioniing and handdover of commpressor and condensate pumps to opperations, peersonnel aaccommodatted on Yolla.

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 6 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 7: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary Yolla MMLE Construction Caampaign

OEUP-T55100-PLN-EENV-006

3. Environnmental IImpact AAssessment

The main environmeental impactss that could occur duringg the Yolla MMLE construcction campaign relate to the foollowing actiivities/sourcces:

• OOverboard looss of constrruction mateerials and waaste;

• RRoutine and minor wastee discharges : o Effluuent dischargges includingg treated sewwage and doomestic food wastes fromm the

consstruction suppport vessel;

o Gaseeous emissio ns from consstruction suppport vessel and Yolla coonstruction; and

o Bilgee water and deck washdoown; and

• PPhysical pressence of vesssels: o Noisse;

o Light emissions;

o Seabbed disturba nce;

o Interference witth commerci al shipping aand fishing v essels; and

o Introoduction andd spread of innvasive mariine species.

• OOverboard sppill of diesell or hazardouus wastes duuring equipmment fuel trannsfers and/oor vessel bbunkering.

Table 3-1 details thee environmental hazardss and controlls associatedd with the Yoolla platformm operatioons and MLE constructionn campaign.

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 7 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 8: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

o

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

33.1 Risk Assessment Outccomes TTable 3-1 providess a summary of thhe findings from t he construction ccampaign Environ ment Risk Assessmment (ERA) conduucted on the 8th oof June 2011. The risk asseessment workshopp involved a multti disciplinary teamm including repreesentatives from OOrigin Management, Operations (SSupervisors, Techhnicians and Healtth and Safety Reppresentatives), HSSE and Sea Truckss Group, the operrator of the Jasco n 25. The risk asssessment wworkshop findings were recorded innto the BassGas E nvironment Risk RRegister [OEUP-V 5000-REG-ENV-0001], which is baseed on the Origin E nergy CCorporate Risk Reggister template. AAll risks identifiedd were assessed aand in some casess, additional cont rols implementedd in order to demoonstrate thhat the risk is ALAARP. Please notee the risks summa rised below refle ct the Risk Registter records at thee time of submissiion of this EP. Ass the Risk RRegister is a live syystem, refer to OOEUP-V5000-REG-EENV-001 for the mmost up to date e nvironmental riskks associated withh the constructionn operations.

TTable 3-1 Environnmental Risk Ass essment Summarry

Riskk Event Cauuses / Consequennces Consequ Categ

uence gory

Likelih Ratin

ood ng

Risk Level CControls

Solid MMaterial and Wastte Overb oard Cause: 1/Minnor 3/Unlikkely Low ¾ BassGas WWaste Managemennt Plan [OEUP-V51100-PLN-SAF-005]]. dispossal of Inadeequate waste storrage (ALARP) ¾ Vessel Waaste Management Plan [STF-OPS-0006-J25]. solid wwastes facili ties, poor transfeer ¾ Use of ap proved and licenssed waste contracctors. and littter, such proceedures, inapproprriate ¾ Contractoor Management Syystem. as emppty pails labelling. ¾ Waste Traacking Records. and saacks, bottlees, drums, Consequence: etc. Marinne Pollution, physsical (Platfoorm and impa ct wildlife or toxiic vessel) effec

hazar plank

cts from any resid rdous products on kton, fish, etc.

dual n

Liquid Wastes

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 8 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 9: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

Risk k Event Cauuses / Consequen nces Consequ uence oLikelih ood Risk Level C Controls Categ gory Ratin ng

Deck d drainage - Caus e: 1/Minnor 4/Possiible Medium ¾ Deck area as drain to open/c closed drain syste em. System storm water High concentrations o f oil (ALARP) adequate ly sized to manag ged drainage.

runoff f, deck conta amination in deck k ¾ Deck drai nage on the platf form and vessel ro outed to the oil­wash-d down drain nage from poor water sep parator for treatm ment (to <30 ppm ) prior to overboa ard water , and the house ekeeping, drips, l leaks discharge . draina age from and s spills. ¾ Bunding a around process are eas, chemical tan nks and other machi nery and chemical storage areas. work a areas. Cons equence: ¾ SOPEP oil spill bins onboar rd the platform an nd vessel for (Platfo orm and Poten ntial impact on th he immediat te clean up of spillls. vessel ) marin ne environment. ¾ Spills will not be washed o overboard.

Regu latory non­ ¾ Minor dec ck spillages of oils s or chemicals wil ll be cleaned up b by comp pliance. the use of f absorbent mate rials. The contam minated sorbent Note : Deck wash-down n materials would be stored in appropriate co ontainers for wate r may contain sm mall transport to shore for dispo osal at an approv ved location in quan tities of oil and accordanc ce with Origin’s W Waste Managemen nt Plan [OEUP­deter rgents, but the V5100-PLN N-SAF-005]. volum mes and conce entrations in the wate r that would be disch harged overboard would d be very low. Temp porary and localis sed reduc ction in water qua ality. Physi iological damage to marin ne fauna ingesting g conta aminated water.

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 9 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 10: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

o

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

Riskk Event Cauuses / Consequennces Consequ Categ

uence gory

Likelih Ratin

ood ng

Risk Level CControls

Dispos sewag putres wastes (Vesse

(see B Offsho dispos platfo

sal of ge and scible s.

el only)

BassGas ore EP for sal from orm)

Caus Treat to se

Cons Temp decre due t enric Modif habit speci

e: ted sewage dispos a.

equence: porary and localis ease in water qua to nutrient chment. fication in feedin ts of pelagic fish ies.

sed

sed ality

g

1/Minnor 3/Unlikkely Low (ALARP)

¾ Food wast disposal.

¾ Vessel has holding ta

¾ Effluents standards

¾ Biodegrad ¾ Equipmen

maintena treatment

¾ In the eve bagged an

te to be macerate

s an IMO-complia ank. will be discharge

s (regarding distan dable detergents w nt will be maintai nce program (i.e. t plant). ent of macerator nd sent to shore f

ed to <25 mm dia

nt sewage treatm

ed in accordance w nce from shore). will be used on ve ned in accordanc ., kitchen macera

malfunction, food for disposal.

ameter prior to

ment plant and

with MARPOL

essel. e with the planne

ator, sewage

d waste will be

ed

Releasse of oil Cause: 1/Minnor 1/Remoote Low ¾ Vessel Preeventative Mainteenance System (STTAR IPS). and grrease Bund overfill and rele aase (ALARP) ¾ Oil, fuel aand chemical storrage areas bundedd. from mmachine to maarine environmennt. ¾ Oily water directed to oilyy water separator prior to discharg e areas to overboardd, meeting 15 ppmm oil in water conntent. Captured ooil marinee Consequence: to be contained and dispossed of onshore us ing port facilitiess. enviroonment. Wateer pollution leadinng to ¾ Oily water tank emptied prior to constructi on to ensure (Vesseel only) incre

locali plank

ease in nutrients w ised effect on kton.

with sufficient ¾ Fully stoc ¾ No washin

storage capacity cked SOPEP kits on ng of deck spills o

y. n board to clean d overboard.

deck spills.

Air Emmissions Uncon flaring comm (Platfo

ntrolled g during issioning. orm only)

Caus Flare failur corro temp embr

e: e ignition system re / flare piping osion / low perature rittlement

1/Minnor 4/Possiible Medium (ALARP)

¾ Only mino testing or

¾ Platform ¾ Flare rate ¾ Volume of ¾ Flared gas

reviewed

or volumes of flar r plant trips. designed and app

es continuously m f flared gas minim s records included regularly for any

ring likely, due to

proved for continu onitored.

mised to lowest p d in daily product

y significant variat

o blow-down syste

uous flaring.

ractical level. tion reports and tions in fuel gas

em

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 10 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 11: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

o

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

Riskk Event Cauuses / Consequennces Consequ Categ

uence gory

Likelih Ratin

ood ng

Risk Level CControls

Cons Local reduc

equence: lised and minor ction in air qualitty.

usage. ¾ Flare desi ¾ Safety Ins ¾ Flare flam

(CCTV). ¾ Flaring ra

operating

ign and Asset Inte strumented System me-out monitored

ates to be within r g procedures.

egrity System. m.

d via Closed Circui

regulatory limits s

it Television

specified in

Excesssive Cause: 1/Minnor 4/Unlikkely Low ¾ Maintenannce system in pla ce for all vessel eequipment. diesel Machhinery or engine faailure (ALARP) ¾ Equipmennt fuel consumptioon monitored andd assessed for combuustion. or maalfunction. performannce requirementss by the Barge Enggineer. (Vesseel only)

Cons Local reduc the p locat shore consi

equence: lised and minor ction in air qualit platform is remote ted (147 kms from e), the impact is idered to be mino

ty - as ely

m

or.

¾ Marine die generatio

¾ Diesel use and repor gas emiss

esel is low in sulp on of SOx. e and greenhouse rted to governmen ions.

phur content, min

gas emissions rec nt agencies for an

nimising the

corded by Origin nnual greenhousee

Other

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 11 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 12: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

o

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

Riskk Event Cauuses / Consequennces Consequ Categ

uence gory

Likelih Ratin

ood ng

Risk Level CControls

Noise. Cause: 1/Minnor 3/Unlikkely Low ¾ Helicopteers are required too maintain a distaance of 1,000 (Vesseel only) Noise

thrus overf const

Cons Distu sensi (such which ‘thre

e from vessel sters, helicopter flights and genera truction activities

equence: rbance to noise­tive marine speci

h as whales, most h are listed as

eatened’).

al s.

ies of

(ALARP) metres fro ¾ Project is

threatene ¾ Vessel mo

restricted

om whales in acc s not located in a ed whale species. ovements near the d.

ordance with the key breeding or f

e platform will ge

e EPBC Act. feeding area for

enerally be

Collisi cetace (Vesse

on with eans. el only)

Caus Vesse Vesse or wh vesse

Cons Cetac

e: el strike caused b el Master inattent hale approaching el.

equence: cean injury or dea

by tion

ath.

1/Minnor 2/High Unlike

hly ely

Low (ALARP)

¾ Cetaceans sources of

¾ The Maste with the a presence responsib minimise

¾ Should wh knowingly

s will generally av f noise. ers of the supply v activities of whale is detected, all e ilities to the safe any interference

hales be sighted, y approach to wit

void approaching

vessels shall not k es, dolphins, and

efforts, in keeping ety his crew, will b

with their activit the supply/suppo hin a distance of

undesirable

knowingly interfe seals. When the

g with the Master be made to ties. ort vessels shall n 500 metres.

ere eir r’s

ot

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 12 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 13: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

o

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

Riskk Event Cauuses / Consequennces Consequ Categ

uence gory

Likelih Ratin

ood ng

Risk Level CControls

Materi handli (Platfo

ials ing. orm only)

Caus Spill store (e.g. demu demu

Cons Marin Regu comp

e: of chemicals rout

ed on the platform , corrosion inhibit ulsifier, reverse­ulsifier and metha

equence: ne pollution. latory non­

pliance.

tinely m tor,

anol).

1/Minnor 3/Unlikkely Low (ALARP)

¾ Bulk chem during day JHA proce

¾ Hazardou accordanc codes and

¾ Discharge ¾ SOPEP kit

micals and fuels a ylight hours. All t edures. s goods and chem ce with Internatio d requirements. es Overboard Proc ts available on bo

re transferred on transfers are care

micals are shipped onal Maritime Org

cedure [OEUP-V51 ard.

nly in calm weathe efully managed us

d to the platform ganisation (IMO)

00-PRO-SAF-014]

er, sing

in

.

Diesel (Platfo vessel

spill. orm and )

Caus Equip hose refue resul ruptu

Cons Sea p likely well migra cetac Regu comp Temp reduc quali

e: pment failure, los control during at

elling, vessel colli ting in fuel tank ure.

equence: pollution; birds m y to be effected a as pelagic fish, atory species incl ceans and plankto latory non­

pliance. porary and localis ction in surface w ty.

ss of t-sea ision

ost as

uding on.

sed water

1/Minnor 3/Unlikkely Low (ALARP)

¾ Jascon 25 ¾ Dry break

minimisin ¾ Re-fuellin

platform Operation

¾ Fuel trans Refer to A V5100-PRO

¾ Equipmen platform

¾ SOPEP kit ¾ Origin OSC

5 Refuelling Proce k connections are ng spillage. ng operations invo are managed in a ns Procedure [OEU sfers only occur d Adverse Weather O-SAF-157].

nt inspection and and vessel.

ts available on bo CP in place [OEUP

edure [STF-PRO-J2 used on fuel tran

olving the transfe accordance with B UP-T5100-PRO-PF during suitable we Management Proc

maintenance sch

ard vessel and pla P-T5100-PLN-PFM

25-018]. nsfer lines,

r of fuels to the Bunkering FM-146]. eather conditions cedure [OEUP­

edule on the

atform. M-004].

.

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 13 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 14: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

o

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

Riskk Event Cauuses / Consequennces Consequ Categ

uence gory

Likelih Ratin

ood ng

Risk Level CControls

Physi marin conta

iological damage ne fauna ingesting aminated water.

to g

Collisi vessel (freigh or sup platfo (Vesse

on of s ht, fishing pply) with rm.

els only)

Caus Vesse Failu platfo

Cons Fuel pollu to be pelag speci Regu comp

e: el loss of control. re of lighting on orm.

equence: oil Spillage - Sea tion; birds most l

e effected as well gic fish, migratory ies, and plankton latory non­

pliance.

likely l as y .

4/Maajor 1/Remoote Medium (ALARP)

¾ Platform impact fro

¾ The poten damage to lighting a platform

¾ OSCP in p ¾ ERP in pla

is designed to wit om a 1,200 tonne ntial for accidenta o the facility is le nd the presence o marked on naviga

place [OEUP-T5100 ace [OEUP-V5100­

thstand an accide e vessel (typical s al discharge arisin essened by the pr of a 500 m exclus ational charts. 0-PLN-PFM-004]. -PLN-ERS-002].

ental broadside upply vessel size) ng from structura resence of hazard sion zone around

). al

the

Introd uction of Cause: 3/Seriious 1/Remoote Low ¾ Supply vessels to be preferrentially sourced locally (from Bas s invasivve marine Vesseel biofouling. (ALARP) Strait), thhereby minimisingg risk of introduci ing invasive pests speciees. from foreeign ballast water or from hull bioffouling.(Vesseel only) Cons

Estab intro Strait nativ

equence: blishment of duced pests in Ba t. Displacement o

ve species.

ass of

¾ Where ve with AQIS assessmen

ssels are sourced S requirements inc nts and inspection

from elsewhere, cluding ballast wa ns.

they will compl y ater management

y t,

Dropp object (Platfo vessel

ed ts. orm and )

Caus Crane unloa

e: e operations/vess ading operations.

sel 1/Minnor 3/Unlikkely Low

(ALARP) ¾ Procedure

V5000-PRO ¾ Adverse W

SAF-157].

e Cranes – Plannin O-SAF-001].

Weather Managem

ng, Setup and Ope

ment Procedure [O

eration Of [OEUP-

OEUP-V5100-PRO­

-

-

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 14 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 15: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

o

BassGas Offshhore Environmeent Plan Summmary OEUP-T55100-PLN-ENV-006

Yoolla MLE Consttruction Campaaign

Riskk Event Cauuses / Consequennces Consequ Categ

uence gory

Likelih Ratin

ood ng

Risk Level CControls

Cons Dama equip Pollu

equence: age to pment/pipeline a tion to sea floor.

sset.

¾ Permit to ¾ Job Hazar ¾ Jascon 25 ¾ Risk Asses ¾ Crane Mai ¾ Certified ¾ Competen

Work System. rd Analysis (JHA). 5 Task Risk Assess ssment. intenance. and inspected rig nt Crane Operato

. ments (TRAs).

gging. rs.

Third party Cause: 3/Seriious 2/Highhly Medium ¾ Designateed exclusion zone (500m around plaatform). influennces. Sabottage/equipment Unlikeely (ALARP) ¾ Closed Cirrcuit Television (CCCTV) monitoringg for access to (Platfoorm only) dama

Cons Relea marin Impa biodi

age.

equence: ase of contaminan ne environment. ct on marine versity.

nts to

platform. ¾ Chained a ¾ Emergenc ¾ Plans to in

access gate to sea cy shutdown syste nstall a proximity

a deck. ems. y switch alarm on access gate.

Prrocess Owner: BassGas Operaations Manager Rev No: 1 Issue Date: 13/12/2011 Page 15 of 20 Orrigin Energy Resources Limiteed: ABN 66 007 845 338 When printed, this is no longerr a controlled document.

Page 16: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary OEUP-T55100-PLN-EENV-006

Yolla MMLE Construction Caampaign

4. Implementationn Strategyy

The primmary goals off the implemmentation strrategy is to ddirect, revieww and mana ge operationns so that envvironmental iimpacts and risks are co ntinually redduced to a leevel that is AAs Low As Reeasonably Practica ble (ALARP),, and performmance objecctives and sttandards are met over thhe life of thee activity.

4.1 BassGas Health Saffety and EEnvironmeent Manageement Sysstem (HSEMMS) All operaations at Yollla are underrtaken in acccordance witth the Originn HSEMS. Thee HSEMS doc uments the HSE policy, HSE Standards annd the key HHSE processe s and requir ements for aall activities . It providess a managemment framew ork for achieeving the reqquirements i n a systemattic way, but allows sufficiennt flexibility for the operrating unit too achieve thiis in a mann er that best suits the buusiness, while maaintaining hiigh HSE standdards.

The BasssGas HSEMS aaddresses thhe Governancce requiremeents set by OOrigin includ ing the Systeem Structure, Performance Standardds as well ass the Divisionnal and Assett Management Processess, Procedu res and Accoountabilities to meet thoose requiremments and speecific legislaative requireements applicabble to the Assset.

The BasssGas HSEMS iis an extensiion of that oof the parentt company, OOrigin Energyy’s HSEMS. TThe System sstructure is iillustrated inn Figure 4-1. The Origin HHSE Policy, sshown near tthe top of thhe triangle,, demonstrattes the commmitment andd intentions oof the Comp any. In subseequent tiers, the Origin H SE standardss and Directiives detail coorporate exppectations onn the implemmentation off the Policy annd HSE risk mmanagementt across the CCompany. Att the Businesss level, the System is complemmented by Assset and Sitee proceduress and major pplans such ass the Facilityy Specific Saafety Cases, thhe Pipeline MManagementt Plan, the AAsset Integritty Plan, Emergency Respoonse Plan (E RP) and Environmment Plan (EEP).

Figuree 4-1 HSE MManagement System Struucture

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 16 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 17: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary OEUP-T55100-PLN-EENV-006

Yolla MMLE Construction Caampaign

The implementationn of the Origiin HSEMS at BassGas exteends the ele ments and eexpectations of the Companyy processes, the Upstreaam Oil & Gass divisional reequirementss and specificc regulatory licence requiremments to the BassGas Opeerations.

Implemeenting and coomplying witth these requirements iss the responssibility of eveeryone assocciated with thee BassGas Opperations. Fuurther detail on the BassGGas HSEMS ccan be refereenced in the BassGas HSEMS MManual [OEUPP-V5100-PLNN-SAF-003].

4.1.1 Incident Managemment The Origgin Incident MManagementt Process is aapplied for aall incident aand accident analysis andd reportin g for the BasssGas facilitiies [HSE-PRCC-004]. The rrequirementss of incidentt analysis andd investigaations are deetailed in Origin Directir vve - Incident Managemen t. This Direcctive describbes the steps to be taken aftter an incideent has occu rred or a hazzard has beeen identified.

The purppose of an annalysis is to determine t he causes off incidents (i ncluding neaar misses) orr to correctlyy determine hazards thaat have not bbeen adequattely identifieed, assessed or controlleed. Having vverified the uunderlying causes, an annalysis must tthen recommmend how too prevent a recurrennce.

The poteential of all iincidents and hazards is assessed an d categoriseed on a scalee ranging fromm ‘low’ to ‘extreeme’ in accoordance withh the Origin RRisk Matrix. The analysiss and reporti ng requiremments are determinned by the ppotential of tthe event to cause harm .

The nummber of outsttanding actioons is reporteed monthly oon a 12 mon th rolling baasis as a key performance measurre which is ppublished in the Divisionaal monthly reeport. Incideent reports aand correctivve actions wwill be managged using thee Origin corpporate Originn Collective IIntelligence System (OCIS) database (Inccident Managgement Moduule).

The corpporate HSE GGroup reviewws all incidennts and haza rds to ensuree a consistennt approach..

The HSE Incidents annd Hazards nnotification ssystem (Elec tronic reporrting via OCISS or the papeer Notificattion Form) eenables indivviduals to repport any hazaards that theey identify aand which caannot be eliminatted at the timme of discovvery. These hhard copy nootification foorms are submmitted to th e Immediaate Supervisoor or Team LLeader for in itial review who then foorwards themm to the HSE Advisor who alsoo reviews theem and reco rds the hazaard details annd agreed acctions into thhe OCIS dataabase where thhey are trackked until cloosed out. Whhere approprriate, superv isors table t he forms at daily meeting s, such as thhe Daily PTWW Coordinatioon Meeting foor general d iscussion andd informatioon.

Incident s involving s erious injuryy, significantt environmenntal damage, or asset/buusiness loss, shall be immediaately reporteed to relevannt Regulatoryy Authoritiess together wwith internal Origin incideent escalatioon process a s specified i n the Origin Incident Ma nagement Prrocedure.

At the Divisional andd Corporate levels investtigation of si gnificant inccidents are sshared with oother Businesss areas and leeanings are uused to imprrove systemss and processses to preve nt recurrencce.

4.1.2 Performaance Meassurement and Reporrting Reports giving detaills of HSE perrformance sttatistics are prepared to meet internnal company requiremments and appplicable reggulatory requuirements. Such reports are used to benchmark tthe BassGas operation’s current perfformance aggainst past peerformance and that of oother peer ggroup organisaations

Key Perfformance Inddicators (KPI ’s) related tto HSE perforrmance are ddefined in thhe BassGas HHSE Action PPlan [OEUP-VV5100-PLN-BUUS-001] withh performancce against thhese KPIs beiing measuredd monthly. The relevaance and effeectiveness off these KPIs are reviewe d annually aand where appropriiate, the KPIIs redefined for the comiing year.

Communnication of HHSE performaance to persoonnel is madde by internaal employee communicattion vehicles , the intraneet where thee monthly coompanywide target is displayed and uup-dated moonthly, internal presentatio n by the exeecutive manaagement andd Asset Mana gers and finaally through the annual ssustainabilityy report.

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 17 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 18: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary OEUP-T55100-PLN-EENV-006

Yolla MMLE Construction Caampaign

The resuults from mo nitoring, auddits and reviiews will be incorporatedd into appro priate work plans, procedures, work insstructions annd/or traininng, to facilitaate the conttinuous improovement of operatioons. As part oof these proccesses, new procedures will be deveeloped from ttime to timee and/or existing procedures modified or renamed. Coommunicatioon and consuultation mecchanisms are in place to involvve the approopriate persoonnel in this process.

4.1.3 Crisis annd Emergeency Mana gement An Emerrgency Respoonse Plan (ERRP) [OEUP-V55100-PLN-ERRS-002] has bbeen developped describinng the actions tto be taken iin the event of all identiified incidennts, or mediccal emergenccies occurrinng at a BassGas facility.

Developmment of the ERP involved input fromm a broad rannge of sourcees including onsite staff,, HSRs, relevantt emergency services. Al l BassGas staaff receive t raining in th e ERP and deetails of the ERP have beeen made avaailable to emmergency servvices and re levant municcipal authoriities.

Reportinng relationshhips for commmand, controol and commmunications aare specifiedd in the ERP ttogether with inteerfaces to emmergency seervices speciaalist responsse groups, st atutory authhorities and oother externall bodies. Thee roles and reesponsibiliti es are detailled for onshoore and offshhore personnnel involvedd in an emerggency, includding the respponse teamss, onshore suupport teamss, visitors, contracttors and empployees.

The ERP defines the communication requiremments to nottify both thee company annd external bodies of the inncident so ass to obtain asssistance whhere needed and to fulfill reporting o bligations.

The ERP is periodicaally reviewedd to establishh its effectivveness and u pdated, as nnecessary, too incorporrate lessons llearned fromm training, exxercises andd incidents, bboth interna lly to BassGaas and externallly.

Emergenncy responsee training andd exercises wwill be conduucted both oonshore and offshore. Thhey will allow peersonnel to ddevelop comppetence andd proficiency in fulfilling their assigneed roles and responsi bilities undeer the ERP.

A plan shhowing whenn all exercisees and drills are scheduleed to take pplace has beeen developedd [OEUP­V5100-PLN-SAF-017] and will be complied wiith. The resuults of such eexercises andd drills will bbe recordedd and utilise d to make immprovement s to proceduures, systemss and equipmment as apprropriate.

Systems will be esta blished to p rovide effec tive manageement in the event of a ddischarge of hydrocarrbons to the marine enviironment. Suuch processees will includde initial respponse, reporrting requiremments, and the involvement of third parties havi ng the approopriate skillss and facilitiees necessarry to respondd effectivelyy to oil spill iissues (refer to the Oil Spill Contingeency Plan (OSCP) [OEUP-TT5100-PLN-PFFM-004]).

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 18 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 19: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary OEUP-T55100-PLN-EENV-006

Yolla MMLE Construction Caampaign

5. Environnmental RReportinng

This secttion summarrises the envvironmental rreporting arrrangements for the MLE Constructionn campaiggn. The Origi n Southern AAustralia Asssets Operatioons Manager is responsib le for ensuriing that all BassGGas environmmental reporrting requiremments are mmet.

5.1 Reportabble and Reecordable Incidents All offshore environmmental incid ents must bee reported too the Operattions Manageer and are investigaated in accordance with the BassGass Hazard andd Incident Reeporting, Reccording and Investigaation Proceddure [OEUP-VV5100-PRO-SAAF-050].

The Offsshore Petroleeum and Greeenhouse Ga s Storage (Ennvironment) Regulationss 2009 definee incident s to be reco rded and, w here appropriate, reportted to the Deesignated Auuthority as foollows:

• Recoordable inciddent: for an operator of an activity, means an in ncident arisinng from the aactivity thatt:

(a) breaches a pperformancee objective oor standard inn the Environnment Plan tthat applies to thhe activity; aand

(b) is not a repoortable incid ent.

• Repoortable inciddent: for an ooperator of aan activity, means an inccident relatiing to an activvity that hass caused, or has the poteential to cause, moderat te to significaant environmental ddamage.

In the coontext of thee Origin Enerrgy Corporatte Risk Matrixx and the Ennvironment RRisk Assessmeent (ERA) coompleted forr the Yolla MMLE constructtion activitiees (Table 8.1), a ‘moderaate to signifiicant’ risk is deefined as anyy incident off consequencce category 22 or greater . The risk evvents/incidennts identifieed as having a consequennce categoryy of 2 or greaater are as foollows:

• Colliision with thhe platform bby shipping, fishing, or s upply vessel s;

• Third party Influuences; and

• Deckk drainage – stormwater runoff, deckk wash-downn water, and drainage froom mac hinery and wwork areas.

In additiion, the folloowing incide nts must als o be reporteed to Designaated Authori ty irrespectiive of how their risk has beeen assessedd:

• An uncontained sspill of oil orr diesel greaater than 80 litres.

• An uncontrolled release of h ydrocarbonss.

• An unplanned gaaseous releasse over 500 mm3.

• Injurry or damagee to or deathh of a threattened species (e.g., listeed cetaceans ).

• Causses any unplaanned impacct to a matteer of Nationaal Environmeental Significcance

A recorddable environnment incideent is an inciident arisingg from an acttivity that brreaches an Environmment Plan (EEP) performaance standardd or objectivve but that is not classifiied as a repoortable incident .

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 19 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.

Page 20: MLE Construction BassGas Offshore Environment Plan ... Offshore Environment Plan Summary Yolla MLE Construction Campaign OEUP-T5100-PLN-ENV-006 1. Executive Summary Origin Energy Resources

BassGass Offshore Environmeent Plan Suummary OEUP-T55100-PLN-EENV-006

Yolla MMLE Construction Caampaign

6. Environnment Plaan Consuultation

6.1 Employee Consultaation Consultaation with emmployees in the developmment of the Environment Plan (EP) ccan be demoonstrated through employee paarticipation in the camppaign-specificc ERA conduccted in Junee 2011. The rrisk assessmeent was a woorkshop-baseed approach for reviewinng the risk evvents previoously identifi ed and for identtifying new rrisks associatted with thee constructioon campaign.. The workshhop involved a multi­disciplin ary team inccluding repreesentatives ffrom Origin aand Sea Truccks Group. TThe Implementation Strategyy for the EP wwas developeed based on the outcomes of the Envvironment R isk Assessmeent (ERA).

As part oof the projecct induction that all offs hore projectt personnel mmust attend,, Origin’s HSSE expectattions, the m ain environmmental issuess, their controls and the reporting reequirements will all be preseented and disscussed. Possters will alsoo be developped for use ooffshore, hig hlighting thee EP and the key issues. Envirronmental isssues are enccouraged to bbe raised du ring ‘toolboxx talks’ and JHAs.

6.2 Ongoing Communitty Consulttation Origin Ennergy has deeveloped systtems to reguularly assess the general community’’s expectatioons of Origin Ennergy as a coorporate citiizen. A commmunity Enviroonmental Liaaison Group (ELG) meetiing forum haas been estaablished to reespond to exxternal feedbback and enggage with th e general communnity and key regulators. TThe meetinggs, held on a quarterly baasis at the B assGas faciliity, are open to the general community and key stakkeholders an d act as a coonsultation fforum to communnicate Origin Energy’s HSSE goals and performancee. The commmunity consuultation meettings ensure tthat HSE mannagement isssues arising ffrom the opeeration of thhe BassGas prroject are mmanaged to the saatisfaction of the relevannt regulatoryy authoritiess and the loccal communitty. The MLE project has beenn presented and discusseed at these mmeetings andd project proogress has beeen added ass an item on the aagenda.

The MLEE Project hass also develo ped a speciffic stakeholdder consultattion plan [OEEUP-5100-PLN-BUS­001] aimmed at stakehholders who may be imppacted by thee offshore coonstruction aactivities, e. g. regulatoory bodies, coommercial f ishers and B ass Strait shiipping trafficc. The stakeeholder consuultation plan proovides detailss of the conssultation proovided to theese stakeholdders.

6.3 Regulatoory Consulttation The Origgin Energy M LE project teeam has maiintained opeen communiccation with tthe regulatorr throughoout the projeect planning process andd will continuue to do so dduring constrruction and ppost­construcction throughh the necessary close-ou t reporting.

Process Owneer: Southern Australiia Asset Operations MManager Rev No: 1 Issue Date: 13/122/2011 Page 20 of 20 Origin Energy Resources Limited: ABN 66 007 845 338 When printed , this is no longer a ccontrolled documentt.