ENERGY AUDIT REPORT OF M.L.A. HOSTEL NAGPUR YEAR: JUN – JUL’2004 INSPIRATION & GUIDANCE BY SHRI B.G.JADHAV, CHIEF ENGINEER (ELECTL.) M.E. (Elect.Power System), P.W.D.Mumbai. Submitted by S.B.WANKHADE M.E. (Elect. Power System), FIE CHARTERED ENGINEER Electrical Inspector, IE & L Dept. Nagpur. Phones: (0712) 2521816

description

MLA

Transcript of Mla Hostel Nag p Pur

Page 1: Mla Hostel Nag p Pur

ENERGY AUDIT REPORT OF

M.L.A. HOSTEL NAGPUR

YEAR: JUN – JUL’2004

INSPIRATION & GUIDANCE BY

SHRI B.G.JADHAV, CHIEF ENGINEER (ELECTL.) M.E. (Elect.Power System),

P.W.D.Mumbai.

Submitted by

S.B.WANKHADE M.E. (Elect. Power System), FIE

CHARTERED ENGINEER Electrical Inspector, IE & L Dept.

Nagpur. Phones: (0712) 2521816

Page 2: Mla Hostel Nag p Pur

2

CONTENTS CHAPTER DESCRIPTION PAGES

EXECUTIVE SUMMARY. 1

ENERGY AUDIT TEAM. 1 IMPROTANT RECOMMENDATIONS. 2

A. INTRODUCTION ABOUT THE BUILDING. 3

B. CONSUMPTION PROCESS DESCRIPTION. 4

C. ENERGY AND UTILITY SYSTEM DESCRIPTION. 5

D. ENERGY EFFICIENCY IN UTILITY AND 5 PROCESS SYSTEMS.

E. ENERGY CONSERVATION OPTION AND 6 RECOMMENDATIONS.

MONTHLY BILLING DETAILS 7 COST ANALYSIS. 8 NO INVESTMENT OPERATIONAL 9

IMPROVEMENT AND HOUSE KEEPING. LOW INVESTMENT CONTROL 9

EQUIPMENT MODIFICATION. HIGH INVESTMENT, ENERGY EFFICIENCY 9

DEVICES, MODIFICATIONS AND TECHNOLOGY CHANGE.

ENERGY SAVING CALCULATIONS & 10 COST ECONOMICS.

ENERGY CONSERVATION THROUGH 11 AWARENESS.

F. PROPOSED MEASURE. 12

1) GENERATOR. 13 2) PUMPS. 15 3) WATER HEATER. 15 4) STREET LIGHT. 15 5) PASSAGE LIGHT. 16 6) BATH ROOM LIGHTS. 16 7) ROOM LIGHTS. 17 8) CLASS IV & CLASS III QRTS. 17 9) CANTEEN. 18 10) TRANSFORMER. 18 11) WATER PUMPS 19 12) SOLAR SYSTEM ( Not Feasible ) 20

H. NATIONAL SAVING AT A GLANCE 21

Page 3: Mla Hostel Nag p Pur

3

# A #

EXECUTIVE SUMMARY We have carried out the field work for DETAILED ENERGY AUDIT, during the month of June - July’04. We carried out very, very elaborate measurements for the various areas like Main transformers, pumps, streetlights, etc. We analysed very critical the effectiveness of ENERGY Consumption, in each area. ENERGY AUDIT TEAM:-

a. Shri S.B.Wankhede, electrical Inspector, Nagpur. b. Shri U.K.Dhote, Assistant Electrical Inspector, Nagpur. c. Shri Ulhas Karanjekar, Assistant Engineer, Gr.II, Nagpur. d. Shri Govind Dehadkar, M/s Carways, Nagpur. e. Shri K.P.Dhavad, M/s Instruments & Systems, Nagpur.

f. Shri Vinod Gaurkar, Sectional Engineer, Elec. MLA Hostel Nagpur.

g. Shri M.B.Gawande, M/s Energy Audit Bureau.

Page 4: Mla Hostel Nag p Pur

4

IMPORTANT RECOMMENDATIONS ( Stage No. 1 )

1. Automatic power factor controller / M.D. controller is recommended to be installed at main panel board.

2. If one Generator is installed only for boilers, the shoot up

M.D. (604 KVA) in one month can be controlled. The 11 Month bill based on 75% M.D. (604 KVA) can pay back the generator’s cost only in one year. ( the Generator is to be hired for one month )

3. Only one Transformer of 500 KVA or 250 KVA is to be operated at a time alternately during off session period.

( Stage No. 2 )

4. If all the 1628 no of tube lights in 387 rooms whose total working hours 4380 will consume 199658 units. The pay back period will be two years.

( Stage No. 3 ) 5. If solar system is put in operation then the maximum recorded MD even in session period will be reduced to the Sanctioned MD i.e. 300KVA.

Page 5: Mla Hostel Nag p Pur

5

# B #

1.0 INTRODUCTION ABOUT THE BUILDING: - 1.1 GENERAL BUILDING LOAD DETAILS: -

a. Transformer 3 Nos, 500 KVA X 2 Nos. & 1 No. 250 KVA. b. Water pumps 12 Nos, Total H.P. 75 (50% Standby).

c. Water Heaters 387 Nos. 35 Ltr Capacity.

d. Street Lights 45 Nos. 7.9 KW.

e. Passage Lights 90 Nos. 4.95 KW.

f. Bath Room in all 387 Rooms one tube light of 40W 21.29 KW.

g. All Lights in Rooms and building 1628 Nos 65.12 KW.

h. Class III 12 Nos Quarters 18 KW. (Unmetered supply).

i. Class IV 32 Nos Quarters 32 KW. (Unmetered supply).

j. Canteen Building 6.2 K.W. (25% Billing).

k. Commercial Complex 5 KW .

1.2 COMPONANT OF CONSUMPTION COST:-

a. Electrical Energy. b. Manual operations of water pumps.

Page 6: Mla Hostel Nag p Pur

6

# C #

1.3 MAJOR ENERGY CONSUMPTION AREAS:-

a. Heating Load of Boilers and heaters in session period.. b. Unmetered supply to 44 Nos Quarters.

c. Pumping of Water.

2.0 CONSUMPTION PROCESS DESCRIPTION:

2.1 BRIEF DESCRIPTION OF CONSUMPTION PROCESS:-

a. Water pumps are working in peak hours. b. Unmetered Supply to 44 Nos Quarters.

c. 25% Billing to Canteen and Supply to Commercial Complex.

2.2 MAJOR CONSUMPTION:-

a. Heating Load of Boilers.

2.3 MAJOR INPUTS, QUANTITY AND COSTS.

a. During Session period, the heating load of Water heaters. b. Room heaters. c. Temporary Loads to pendals. Which results into recording of

maximum demand 604 KVA d. The cost of maximum demand recorded (75%) throughout the

year cost Rs.330 X (450-300) = 0.495 Lacs per month i.e. Rs.6.00 Lac per annum.

Page 7: Mla Hostel Nag p Pur

7

# D #

3.0 ENERGY AND UTILITY SYSTEM DESCRIPTION:- 3.1 LIST OF UTILITIES:-

a. Electrical Consumptions as mentioned for the items enlisted in 1.0 above.

3.2. BRIEF DESCRIPTION OF EACH UTILITY:- 3.2.1 ELECTRICITY 3.2.2 Maximum Demand Charges based on the consumption of one month during session period

throughout the year.

4.0 ENERGY EFFICIENCY IN UTILITY AND PROCESS SYSTEMS.

4.1 Specific Energy consumption: Cannot be predicted due to non-

predicted occupancy.

4.2 Thermic fluid heater performance assessment:

(A) Existing Boilers are old & their life is expired so the replacement is necessary. The solar system is put into operation and boiler could be used only as standby arrangement in severe winter season or in cloudy weather.

(B) The setting of thermostate of the entire boiler is changed

from 70 degree centigrade to 50 degree centigrade during the Off Session period.

4.3 Electric Motor Load analysis :

(A) The power factor of the motor was observed to be 0.86. It is improved to 0.95.

(B) Instead of 12 No.s of motors 3 to 4 energy efficient motorsof required capacity are recommended to be installed.

Page 8: Mla Hostel Nag p Pur

8

# E #

(C) No load losses of 15 H.P.Motor was measured as 2 KW. The

supply to the motor given through invertors, which results in to the negligible losses, which can not be recorded.

(D) Existing leakaves in pipeline, overhead storage tanks, avoiding the present No. of tees, elbows, joints and minimizing to the required quantities, repairing to the existing input and output valves.

4.4 Lighting system :

Illumination level in passages and lighting in bath rooms of few rooms is measured and observed to be more than the requirement.

# F #

5 ENERGY CONSERVATION OPTION & RECOMMENDATIONS. 5.1 List of options in terms of No Cost/Low Cost/Medium Cost and

High investment cost, Annual energy and cost savings, and pay back..

5.2 Implementation plan for energy saving measures/Projects. ANNEXURE A-1 List of Energy Audit Worksheets. A-2 List of Vendors and other Technical Details.

Page 9: Mla Hostel Nag p Pur

9

# F # M.L.A.Hostel, Nagpur. Monthly Billing Details

Sr

.No. Month Sanction

ed MD KVA

Charged MD KVA

Recorded MD KVA

Consumed Units

Bill Amou

nt

Power Factor

1 July 2004 300 453 142 45815 301720 0.96

2 June 2004 300 453 140 44485 294457 0.89

3 May 2004 300 453 115 41800 304793 0.91

4 April 2004 300 453 94 34185 253386 0.99

5 March 2004 300 453 210 41475 291686 0.98

6 Feb. 2004 300 453 324 58270 351755 0.96

7 January 2004 300 453 306 56005 342115 0.95

8 December 2003 300 604 604 94385 562824 0.96

9 November 2003 300 432 96 29380 244779 1.00

10 October 2003 300 432 166 45640 300637 1.00

11 September 2003 300 432 166 43025 289041 1.00

12 August 2003 300 432 167 43635 293985 1.00

Total 2530 578100 383118

0

Average / Month 211 48175 319265 0.967

Page 10: Mla Hostel Nag p Pur

10

Worksheet for Energy Audit and Reporting Summary of

energy saving recommendations

COST ANALYSIS

Sr.No. Item Saving in

Lakhs Investment

in Lakhs Pay Back

Saving in 15 Years in Lakhs

1 Transformer No Losses ( 25555 Units ) Rs.0.72 Nil Nil 10.80

2 Generator ( Saving of M.D. ) A. : Hired 100 KVA + 16000 Units. B. : Purchased

Rs.3.50

Rs.3.50

Rs.2.20

Rs.7.25

8 Months 2 Yrs.

78.70

52.50

3 Pumps Rs.2.00 Nil Nil 30.00

4 Water Heater Off Season Change of Thermostat Temperature from 70 degree to 50 degree. 9400 Units.

Rs.2.90 Nil Nil 34.89

5 Street Lights ( 3 No.s Timers ) Implemented. Change of Street Lights

Rs.0.20

Rs.0.58

Rs.0.20

Rs.2.95

1 Yr.

5 Yrs.

2.40

8.85

6 Passage Lights ( 1458 Units – 4 KVA ) CFL Rs.0.75 Rs.0.42 9 Mths 14.60

7 Master Switch ( Key insertion ) @ Rs. 500 x 387

Unpredicted Say Rs.1.93 Rs.1.93 1 Yr. 29.00

8

Bath Room in each Room – 1 CFL of 7 Watt in Bath Room 1 W. Night Lamp in each Room 1089 CFL in all Rooms ( 11 Months ) : 387 Rooms

Rs.0.75

Rs.7.58

Rs.1.95

Rs.10.66

2.6 Yr.

1.5 Yrs.

11.25

113.70

9 Quarters 44 No.s : 4400 Units x 12 x Rs. 2.80 MSEB Supply Rs 3.45 Rs.3.50 1 Yr. 42.00

10 Automatic M.D.Controller/P.F.Controller/ Rs. 5.44 Rs.5.44 1 Year 65.28

Page 11: Mla Hostel Nag p Pur

11

Types and priority of energy saving measures : A. No Investment, operational improvement and

house keeping. Sr.No

. Item Saving Lakhs Investment

1 Transformer No Load Losses Rs. 0.72 Nil 2 Pumps Rs. 2.00 Nil 3 Water Heater Rs. 2.9 Change of Thermostat – Nil 4 Street light ( 3 Nos. Timer ) Rs.0.20 Implemented

B. Low Investment Control Equipment modification :

Sr.No

. Item Saving Lakhs Investment

1 Passage light ( 1458 Units, 4 KVA ) Rs. 0.75 Rs.0.42 Lakhs Cost of CFL for

60 No.s

2 All 387 Rooms Rs. 7.58 Rs. 10.66 Lakhs

3 Quarter 44 No.s 4400 Units x 12 Months x Rs.2.80 Rs. 3.50 Rs. 3.50 Lakhs

D. High Investment, Energy Efficiency Devices,

Modifications and Technology change : Sr.No

. Item Saving Lakhs Investment

1 Generator Purchased Generator Hired.

Rs.3.50 Rs,3.50

Rs.7.25 Lakhs Rs.2.20 Lakhs

2 1628 C,F,L. in all Rooms Rs. 6.60 Rs. 8.71 Lakhs

3 Automatic M.D.Controller / P.F.Controller Rs. 5.44 Rs. 5.44 Lakhs

Page 12: Mla Hostel Nag p Pur

12

ENERGY SAVING CALCULATIONS

& COST ECONOMICS

THE STEPS OF ENERGY AUDIT: Step. 1 Barriars to energy conservation efforts finance, economical

efforts and technical. Step. 2 Identification of potential areas for energy conservation. Step. 3 Issues supporting conservation. Step. 4 Future conservation policy. Step. 5 Results achieved.

Page 13: Mla Hostel Nag p Pur

13

ENERGY CONSERVATION THROUGH AWARENESS

The present tariff structure The 12 Nos. of M.S.E.B. monthly bills were studied in view of energy conservation.

OBSERVATIONS:

1) The M.D. Charged were 575 & 604 KVA in the month of December 2002 & 2003 respectively. Throughout the year M.D. recorded is charged as 453 KVA i.e. 75% of maximum-recorded M.D. only in one month.

2) The actual recorded M.D. during the 11-month is maximum 324 KVA in the month of February 2004 and in remaining 10 months, it is less than 200 KVA.

A. The additional KVA charged per month are (453-300)=153 KVA Amount paid in excess every month is Rs. 153 X 330 = Rs.50490/- & per annum Rs.605880/-.

B. But if peak demand is controlled then the potential of saving will be as follows.

Sr. No.

Recorded Actual M.D.

75% of

Sanctioned M.D.

Additional Burden/Month

Remarks Additional burden in lakhs.

1 604 453 300 153 KVA At Present Rs. 6.05 Lakh

2 500 375 300 75 KVA Can be achieved by Energy

Conservation Rs. 2.97 Lakh.

3 400 300 300 Nil If solar system is working for 20 rooms.

4 300 225 300 Nil Rs. 2.72 Saving.

5

200 150 300

Minimum billing M.D. 50 % of Sanctioned

M.D.

Rs. 5.44 Lakh.

Page 14: Mla Hostel Nag p Pur

14

# G #

PROPOSED MEASURES If one 125 KVA DG set along with AMF panel is provided. The cost of generator will be recovered only in 2 year against the M.D. charges paid at present. The scheduling of load is essential to avoid the M.D. during peak time.

Total connected Load 1050 K.W. Water Heater Load 774 K.W. i.e. 73% of Total Load 1) GENERATOR : ( A ) Hired :-- 125KVA at 0.8 P.F.

Per day units to be generated during session period = 125 X 0.8 X 8 hrs = 800

During session period (20 days) = 16000 units

Cost of Units purchased from MSEB = 0.448 Lakh Cost of M.D. 100 KVA = 0.33 LakhTotal Cost of MD for 11 months = 2.7225 Lakh Total Savings = 3.50 Lakhs

Operational Cost : Rental Charges @ Rs. 5000 x 20 Days = 1.00 Lakh Diesel Cost 25 Ltrs. Per hour x 8 hours X 20 Dys x Rs. 30 = 1.20 Lakhs Total Cost = 2.20 Lakhs ( B ) Purchased : Cost of Generator = Rs. 6.00 Lakhs Operator + Diesel in Session Period = Rs. 1.25 Lakhs ______________________________________________________ Total = Rs. 7.25 Lakhs Saving ( As above ) = Rs. 3.50 Lakhs Pay Back = About 2 Years.

Page 15: Mla Hostel Nag p Pur

15

2) PUMPS:- The Total H.P. of pumps in operation 37.5 H.P. i.e. 28KW. Maintaining power factor as 0.95,KVA demand 29.5 KVA 168 units are consumed by pumps in 6 hour operation per day. Units consumed in one month (5040 Units) if operation time of pump is changed from peak to non peak.

Rebate @ Rs.-0.75 per unit Rs. 3780.00 M.D.Benefit @ Rs. 330 per KVA X 300 KVA Rs. 9990.00 Rs. 13770.00 The Power factor of motor is measured as 0.86 It is proposed to be improved to 0.95 The losses will be reduced by 19% Losses = 1 – (0.86) X (0.86) = i.e. 19% (0.95) X (0.95) 19% of 5040 Units = 958 Units 958 Units @ Rs. 2.8.Per Units = Rs. 2681.00 Total Benefit per month Rs. 16751.00

Annual Saving will be about Rs. 2.0 Lakh.

Page 16: Mla Hostel Nag p Pur

16

FOR FURTHER SAVING(PUMPS)

a) The master tank capacity is to be changed 3 times. At present all tanks are of same capacity.

b) The present number of joints, elbows, tees & valves are recommended to be reduced proportionately.

c) The overflow Indicator & Water Level Indicator in Master Tank are necessary.

d) The required capacity of capacitor, which was needed to be installed, are now installed.

e) The two main valves in outgoing pipeline were out of order since long. The concerned Deputy Engineer PWD (Civil) had replaced the same so that wastage of water is saved. i.e. The required additional energy for pumping the wastewater. Similarly the water leakages in pipes and storage tanks are required to be stopped.

f) One 15 H.P. (11 KW) motor tested in normal conditions and then by installing the invertor for incoming supply. The difference in ‘No Load losses’ are measured as 2 KW.

g) If energy efficient motors of same capacity are installed then minimum saving will be as follows:

37.5 H.P. X 0.746 KW = 28 KW No. of units consumed: = 28 KW X 6 Hrs X 30 X 11 =55440 units + 10800 (during session) = 66240 units.

i. Efficiency of motor is 5% more. So saving in units 3312 i.e. Rs.9274/- Payback period will be around 3 t0 4 years depending upon the hours of operation.

ii. If invertor is used for quality of supply the units saved will be

2 KW X 6 Hrs X 365 days = 4380 i.e. Rs.12264/-. The cost of invertor will be paid back during 3 to 4 years for 15

H.P. motors. The total cost of saving for units consumed = Rs. 31218.00

Page 17: Mla Hostel Nag p Pur

17

3) WATER HEATER:- The thermostats are at present set to 70 degree Celsius. The resetting of thermostat at 50 degree Celsius is made the expected saving in units per water heater 0.813 Units. 20 degree Celsius X 35 Ltr. = 700 Kcal 1 KW = 860 Kcal. Monthly saving

0.813 X 0.2 X 387 X 30 = 9440 Units. (Off session 20 % occupancy)

FOR LIGHTING SYSTEM Step.1 Providing lighting levels as per required tasks. Step.2 Additional sources for difficult tasks. Step.3 Selecting proper lighting sources. Step.4 Control and maintenance.

4) STREET LIGHTS:-

Total load is 9.72 The timer are installed at 3 places which reduces the wastage of consumption for 2 hour. Total saving will be 9.72 X 2 X 30 = 585 Units. i.e. Rs.585 X 12 X 2.8 = Rs.19656/- The cost of 3 nos of timer is Rs.20000/-. The payback period is around one year.

Page 18: Mla Hostel Nag p Pur

18

5) PASSAGE LIGHTS - 90 Nos. :- (40 Watts tube light)

(10 Lights for Each passage) if the CFL (60 Nos) of 2 x 9 Watts are proposed then the Net Saving in units (for 12 hour) will be (90 X 55 X 12 – 60 X 18 X 12) 30 days 1458 Units. Reduction in M.D. (90 X 55 – 60 X 18)/1000 = 3.88KVA i.e. 4KVA Cost of 1 CFL of 2 X 9W is Rs.743/-. Total investment Rs.44580/- Saving 1458 X Rs. 2.8 X 12 months = Rs.49000/-

+ 4KVA X 12 X 330 = Rs.64840/- Payback period 6 months.

6) BATH ROOM LIGHTS - 387 Nos.:-

1 X 40 W Tube light and one night lamp of 10 Watts is existing at present. If in each bathroom CFL of 9 Watts and one Watts Night Lamp is installed the difference in consumption in Each room will be. (55 + 10 – 10) Watts = 55 Watts per room considering the 20% occupancy units saved will be.

0.20 X 387 X 58 X 12 Hour X 30 Day = 1616 Units 1000

Reduction in M.D. = 58 X 0.2 X 387 /1000 = 5 KVA

During Session =25KVA

i.e.8080 Units

Cost of CFL - 7W + 1W (Night Lamps) = Rs.500/- Total cost investment for 387 rooms = Rs.1.95

Lakhs Saving in units in Rs.0.55 Lakhs + Saving in M.D. Rs.

0.20 Lakhs. Payback Period – 2 years and 6 months.

Page 19: Mla Hostel Nag p Pur

19

7) ROOM LIGHT - 387 Nos:-

The Master switch is installed for each room but it is not being used to switch off the lights when the occupant leaves the room. So the sticker on door is pasted in side and outside of the door as

“SWITCH OFF ELECTRIC SUPPLY WHILE LEAVING THE ROOM”

If in each room the master switch is installed which operates if the keys are inserted in, then the cost of installation of such 387 nos. of switches will be @ Rs.500 per switch i.e. Rs.1.94 Lakhs.

8) CLASS IV QRTS (32 Nos) & CLASS III QRTS 12 Nos.:-

The supply to these quarters is unmettered. The separate 44 No. of meter from MSEB are proposed to be installed if MSEB agree for independent & separate supply then the saving will be as follows:

a) Reduction in M.D. for 50 KW Load. Considering the diversity factor as 50% = 25KVA

b) Reduction in units consumption minimum 44 X 100 = 4400 Units. ( Minimum ) If separate 44 Nos of metes are installed by M.S.E.B. The total cost for 44 quarter will be Rs. 3.50 Lakh. The saving will be 25 KVA X 12 X Rs.330 = Rs.1 Lakh The saving in Rs. for units = Rs. 2.5 Lakhs The Payback period will be 12 months.

If the above request is not considered by M.S.E.B as the MLA Hostel is a HT consumer the one additional three phase energy meter is proposed to be installed to recover the charges for the units consumed by individual occupants.

Page 20: Mla Hostel Nag p Pur

20

9) CANTEEN:- The separate meter for canteen is already installed in pump room. But the unit consumption charges are not being fully recovered by Civil Department from the Occupant (Only ¼ th of recorded consumption is recovered).

The consumption of units per month is about 2700 Units.

10) TRANSFORMER:-

The Transformer 3 Nos. are tested for its efficiency and found to be working efficiently.

SR. No.

KVA Rating No Load Losses K.W.

Full Load Losses K.W.

Total Losses K.W.

Efficiency %

1 500 2.574 5.74 7.31

98.35

2 500 1.33 6.9 8.23

98.17

3 250 0.94 2.96 3.9

98

Average no load losses of 1 transformer 1.61KW. No load losses for 11 months for 2 transformer

= 2 X 1.61 X 24 X 30 X 11 = 25555 units. I.e. Rs.0.71 Lakhs

Saving in M.D. 3 KVA for 11 months = 3 x 330 x 11 i.e.Rs. 0.11 Lakhs

Total Saving ( Units + M.D. ) = 0.82 Lakhs.

Page 21: Mla Hostel Nag p Pur

21

WATER PUMPS AT MLA HOSTEL NAGPUR

( LOADING ) Sr. No.

Make H.P. K.W. Sr.No. RPM AMP AMP (R)

AMP (Y)

AMP (B)

% Loading

1 Windel 5 3.75 25196 2880 7.6 7.2 7.2 6.12 94.73

2 Windel 5 3.75 23505 2880 7.6 6.08 4.8 3.42 63.15

3 Windel 5 3.75 25152 2880 7.6 7.01 7.12 6.04 91.28

4 GEC 5 3.75 809 2880 8 6.5 6.14 4.68 76.75

5 Crompton 5 3.75 MWG/0571 2880 7.8 5.3 5.16 4.05 66.15

6 Crompton 5 3.75 MWG/0582 2880 7.8 6.67 6.67 6.8 88.93

7 Kirloskar 7.5 5.5 940501 2900 11.4 13.77 13.07 12.28 114.64

8 Kirloskar 7.5 5.5 910507 2900 11.4 13.7 13.05 12.12 114.47

9 Crompton 10 7.5 BDG/224-P 2865 16 16.26 16.75 14.14 104.68

10 Crompton 10 7.5 BCF/12-FD 2865 16 13.3 13.7 12.78 85.62

NOTE :

1) Transformer’s Magnetic balance needs to be checked. It is observed during testing.

2) Hence, the unbalanced current is observed in B-Phase.

Page 22: Mla Hostel Nag p Pur

22

STATEMENT OF ENERGY CONSERVATION IN GOVT.BUILDINGS USE OF SOLARY SYSTEM.

Name of the Building : M.L.A.Hostel, Nagpur.

Sr.No. Particulars USE OF SOLARS

EXISTING N EW DIFFERENCE

1 Installed Capacity 580

2 No. of Fittings 500 LPD 80 Nos.Units.

3 Output ( Input )

40000 Ltr.Hot Water @ 60

degree Centigrade

4 Working Hours/Yr. 730 hrs. 120 hrs. 610 hrs.

5 Units Consumed ( Required ) 423400 92640 Unit 330760 Units

6 Amount of Bill /Bill

Saved ( Annual ) @ Rs. 4.50

19.05 LACS 4.16 LACS 14.88 LACS

7 Capital Investment ( Initial ) 67.55 Lacs 67.55 Lacs

8 Pay Back ( Months ) 41 Months 41 Months

9 Saving during life ( 15 Year ) 223.2 Lacs 223.2 Lacs

10 Saving in Generation 0.9 MW 0.9 MW

11 Saving in Capital due to Generation 700 Lacs 700 Lacs

12 Total Excess Saving ( During Life ) 476.80

Not feasible

Page 23: Mla Hostel Nag p Pur

23

M.L.A.Hostel

LIFE LONG SAVING ( CALCULATED FOR 15 YEARS )

At National Level

Sr.No. Item

Saving in ( M.D. )

Capital Cost in Lakhs.

Units running

cost ( Cost in Lakhs )

Total in Lakhs Remarks.

1 Transformer 1.6 0.72 2.32 No investment

2 Qrts. 44 No.s - 42.00 42.00 To be implemented by Civil Deptt;

3 Generator 80.00 78.70 158.70 Immediately to be implemented by

Civil Deptt;

4 Pumps - 30.00 30.00 Implemented by change of Timings

5 Water Heater - 34.89 34.89 To be implemented

off the Session Period

6 A ) Street Lights - 2.4 2.4 Implemented

B ) Street Lights - 8.85 8.85 Implementation

Stage-II

7 Passage Lights - 14.60 14.60 -Do -

8 Master Switch - 29.00 29.00 - Do -

9 Bath Rooms 20.00 8.25 28.25 - Do -

10 M.D.Controller 155.00 - 155.00 - Do -

11 All Rooms C.F.L.Fittings - 113.7 113.7 Implementation

Stage III

TOTAL 256.60 363.11 619.71

12 Solar System 476.80 - 476.80 Not Feasible.