MKD dust related actions

Viliam SenajTechnical Coordination Meeting

27/01/2015

Page 2: MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.

• Erratic of 2nd family on MKD A/B2 on 18/01 at 6.5 TeV• Presence of some amount of dust inside generators MKD confirmed (B1:

B+N; B2: A+B+N+O)• Cleaning – delicate • Incorrect cleaning - worse• Done during WE 23 -25/01/2015:

– Conditioning up to 6.8 TeV – OK– 1 ES up to 7.1 TeV – OK

• Plan:– 7 days @ 6.8 TeV (cycle test)– If problem again on A/B2 – replacement– If problem on more generators – cleaning of all of them– Otherwise waiting with cleaning till confirmation of possibility to cover the

perforation (overheating?) to obtain “dust proof MKD rack”

Cleaning strategy

Page 3: MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.

Dust proofing the MKD• Reliability run in 2008 – with side panels non-perforated• Perforated panels installed at the beginning of 2009 (cooling reason?) • Temperature stabilisation (Peltier module) added to the GTO stack

compartment during the same period• Self triggering started in July 2009• To avoid dust penetration – blinding of perforation• Test of temperature rise inside “Main capacitor compartment” with

perforation blinded – ongoing in 867• Certain temperature rise expected with some influence to a pulse

current value: main capacitor temperature dependence ~ - 300 ppm/K; +10 deg ~ - 0.15 % of Imax1

• Temperature rise so far observed (after 3h at 2 TeV) ~ + 3 deg ~- 0.05 % on Imax1 (in reality no visible change of magnet current)