HISTORICAL DREDGING FREQUENCY: Annual LAST DREDGED: 2016 TYPE OF DREDGE: Cutterhead/ Hopper ESTIMATED QUANTITY: 18,000,000 CY ESTIMATED COST: $54,000,000 ADVERTISE: Jan 2017 (Cutterhead/ Hopper) OPEN BIDS: Feb 2017 AWARD: Feb 2017 START WORK: Feb 2017 DURATION: 7 Months DREDGING REACH: Mile 10.0 AHP to 22.0 BHP DISPOSAL AREA: Hopper Dredge: HDDA (Mile 10.0 AHP to 11.0 BHP), ODMDS (Mile 11.0 BHP to 22.0 BHP), Agitation Cutterhead Dredge: Shallow open water areas & behind foreshore rock DISPOSAL TYPE: Open Water/Wetland Dev. SEDIMENT CHARACTERISTICS: Sand: 25% Silt: 50% Clay: 25% DESCRIPTION OF WORK: Maintain 45' x 750' channel from mile 10.0 AHP to mile 17.5 BHP, transitioning to 45' x 600' between mile 17.5 BHP and mile 18 BHP, and continuing to mile 22.0 BHP. PROJECT: Mississippi River Baton Rouge to the Gulf of Mexico, LA. REACH: Southwest Pass OPERATIONS MANAGER: Michelle Kornick PHONE: (504) 862-1842 LOCAL SPONSOR: State of Louisiana FY 2017 MAINTENANCE DREDGING MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO SOUTHWEST PASS

Transcript of MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO ... · PROJECT: Mississippi River . Baton...

Page 1: MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO ... · PROJECT: Mississippi River . Baton Rouge to the Gulf of Mexico, LA. REACH: Southwest Pass OPERATIONS MANAGER: Michelle

HISTORICAL DREDGING FREQUENCY: AnnualLAST DREDGED: 2016TYPE OF DREDGE: Cutterhead/ HopperESTIMATED QUANTITY: 18,000,000 CYESTIMATED COST: $54,000,000

ADVERTISE: Jan 2017 (Cutterhead/ Hopper)OPEN BIDS: Feb 2017AWARD: Feb 2017START WORK: Feb 2017DURATION: 7 Months

DREDGING REACH: Mile 10.0 AHP to 22.0 BHPDISPOSAL AREA: Hopper Dredge: HDDA (Mile 10.0 AHP to 11.0 BHP), ODMDS (Mile 11.0 BHP to 22.0 BHP), AgitationCutterhead Dredge: Shallow open water areas & behind foreshore rockDISPOSAL TYPE: Open Water/Wetland Dev.SEDIMENT CHARACTERISTICS:Sand: 25% Silt: 50% Clay: 25%

DESCRIPTION OF WORK:Maintain 45' x 750' channel from mile 10.0 AHP to mile 17.5 BHP, transitioning to 45' x 600' between mile 17.5 BHP and mile 18 BHP, and continuing to mile 22.0 BHP.

PROJECT: Mississippi River Baton Rouge to the Gulf of Mexico, LA. REACH: Southwest PassOPERATIONS MANAGER: Michelle KornickPHONE: (504) 862-1842LOCAL SPONSOR: State of Louisiana

FY 2017 MAINTENANCE DREDGING

MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICOSOUTHWEST PASS

Page 2: MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO ... · PROJECT: Mississippi River . Baton Rouge to the Gulf of Mexico, LA. REACH: Southwest Pass OPERATIONS MANAGER: Michelle

BENEFICIAL USE OF DREDGED MATERIALMISSISSIPPI RIVER, BATON ROUGE

TO THE GULF OF MEXICOSOUTHWEST PASS

Fiscal Year

Contract No.

Disposal Area

Dredging Quantity

(CY)Acres

Pre-1985 WD/BS 8,670

1985-93 WD/BS 73,551,651 1,895

1994 94-C-0036 WD/BS 5,748,715 273

1995 95-C-0061 WD/BS 3,300,751 259

1996 96-C-0045 WD/BS 4,080,055 158

1997 97-C-003097-C-0039 WD/BS 4,129,765 189

1998 98-C-0037 WD/BS 2,675,616 190

1999 99-C-0032 WD 1,691,935 76

2000 NO CUTTERHEAD DREDGING

2001 01-C-0032 WD/BS 3,194,981 62

2002 02-C-0037 WD/BS 1,529,439 712003-

08 NO CUTTERHEAD DREDGING

2009 09-C-0025 WD/BS 2,896,991 46

2010 10-C-0028 WD/BS 3,192,431 50

2011 11-C-0024 WD/BS 3,586,342 102

2012 12-C-001412-C-0021 WD/BS 5,660,955 530

2013 13-C-0021 WD/BS 5,656,851 228

2014 14-C-0023 WD 5,011,355 273

2014 14-C-0028 WD 2,966,585 146

2015 15-C-0005 WD 4,989,906 95

2015 15-C-0012 WD 5,983,584 339

WD= Wetlands Development

Venice

Actual Placement Areas

Environmentally Cleared AreasEstimated 14,397

Acres Created

Page 3: MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO ... · PROJECT: Mississippi River . Baton Rouge to the Gulf of Mexico, LA. REACH: Southwest Pass OPERATIONS MANAGER: Michelle

HISTORICAL DREDGING FREQUENCY: 1-3 yearsLAST DREDGED: 2015TYPE OF DREDGE: CutterheadESTIMATED QUANTITY: 4,000,000-8,000,000 CY

ESTIMATED COST: $10,000,000-$20,000,000ADVERTISE: TBDOPEN BIDS: TBDAWARD: TBDSTART WORK: TBDDURATION: 7 Months

DREDGING REACH: HDDADISPOSAL AREA: Delta NWR/West Bay/

Pass a Loutre WMADISPOSAL TYPE: Wetland DevelopmentSEDIMENT CHARACTERISTICS:Sand: 25% Silt: 50% Clay: 25%

DESCRIPTION OF WORK:Excavate within HDDA boundaries to a depth of -30 to -40 feet Mean Low Gulf to provide continued use of the site by hopper dredge

PROJECT: Mississippi River Baton Rouge to the Gulf of Mexico, LA.

REACH: HOPPER DREDGE DISPOSAL AREA(HDDA)

OPERATIONS MANAGER: Michelle KornickPHONE: (504) 862-1842LOCAL SPONSOR: State of Louisiana

FY 2017 MAINTENANCE DREDGING

MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICOHOPPER DREDGE DISPOSAL AREA

West Bay

Page 4: MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO ... · PROJECT: Mississippi River . Baton Rouge to the Gulf of Mexico, LA. REACH: Southwest Pass OPERATIONS MANAGER: Michelle

BENEFICIAL USE OF DREDGED MATERIALMISSISSIPPI RIVER, BATON ROUGE

TO THE GULF OF MEXICOSOUTHWEST PASS

Fiscal Year

Contract No.

Disposal Area

Dredging Quantity

(CY)Acres

1998 97-C-0081 WD 1,051,661 197

2004 03-C-0061 WD 4,183,821 274

2007 07-C-0022 WD 4,266,078 340

2008 08-C-0039 WD 4,013,912 388

2010 09-C-0071 WD 6,527,685 466

2011 09-C-0071 WD 1,805,022 70

20122013 12-C-0034 WD 8,032,978 851

2015 14-C-0055

Delta NWR A

9,646,404

97

Delta NWR B 146Mile 1.5AHP 285

West Bay 80

Pass A Loutre

HDDA

FY 08FY 07 Estimated 3,194

Acres Created

FY 04

FY 10FY 11

FY 12-13

FY 98

WD= Wetlands DevelopmentFY 15

West Bay

LCA BUDMATPass a Loutre

HDDA

Delta National Wildlife Refuge