RWF MINUTES Minutes of Quarterly WTA meeting held with representatives of RWF on 06.01.2012 in Rail Bhawan, New Delhi for planning the requirement of WTA items for the IVth Quarter (January –March, 2012).
General EDRS(P) welcomed all the participants from Rail Wheel Factory, DSP/SAIL, Zonal Railways and Production Units to the meeting. He stated that supply performance of Rail Wheel Factory/Bangalore for all the WTA items was commendable not only during last quarter i.e. October-December, 2011 but also for the whole year upto December,2011. RWF has helped Railways to meet the increased requirement of wheelsets needed for wagon production.
EDRS(P) stated that DSP/SAIL is lagging behind in supply of wheels and axles. DSP has supplied only 33,000 loose wheels (all types) in 9 months of 2011-12 so far against their commitment of 67,000 wheels and only 4802 axles so far against the committed quantity of 12000 axles in entire year 2011-12. There is a proportionate shortfall of about 17,000 wheels on account of DSP/SAIL. Thus supply performance of SAIL/DSP is unsatisfactory. EDRS(P) advised SAIL/DSP to improve their supply performance.
It was stated that wagon production during the last two months has been around 1000 per month on an average. Wagon production will pick up to the level of 2000 wagons per month on finalization of wagon tender. With this, requirement of wagon wheelsets will increase. It was hoped that RWF/Bangalore will be able to meet the wheelsets requirement fully. EDRS(P) stated that Board has finalized four global tenders to meet the shortfall requirement of about 14,000 axles. Supplies of axles from import is expected by May/June,2012.
EDRS(P) stated that delay in clearance of cast EMU wheels by RDSO
has started affecting the availability of EMU wheels. It was requested that RDSO may be directed for early clearance of cast EMU wheels. It was also requested that final decision on the acceptance/rejection based on batch criteria for the wheels produced by DSP/SAIL should be taken.
He also requested EDME(W) to take up matter with RDSO for clearance
of cast wheels for EMU applications. It was also indicated that production programme of RWF for the year 2012-13 has been finalised. In the production
-2- programme of RWF there is no provision of MG coach wheels whereas various Railways i.e. North Eastern, Western and NF Rlys have expressed urgency of MG wheels both for loco and coaches. Thus MG chg wheels were allotted to RWF for this quarter. EDRS(P) stated that indents are not being sent by various Railways by the scheduled date. He advised Railways to ensure sending the indents in time so as to enable Board to process the procurement in time. Railway units have already been advised vide Board’s letter No. 2011/RS(WTA)-149/Procurement Calender (WTA items) dt. 06/12/2011 the time schedule for the submission of indents. Indents for the year 2013-14, have already been delayed Railways were advised that if no indent is received by 31/01/2012, their requirement will be taken as NIL.
Address by AM (ME) AM.(ME) wished a happy new year to all the participants. He stated that WTA meeting is very important meeting to review the overall requirement of vital items for the rolling stock and plan the needs based requirement of the same. He commended the good performance of Rail Wheel Factory/Bangalore . He stated that as soon as wagon tender is finalised the requirement of wheelsets for wagons will increase. He advised CME/RWF to effect one time supply of MG wheels to NE,NF & W Rlys. He stated that carriage wheel discs supplied by RWF are not as per RDSO drawing.AM (ME) advised EDME(W) to expedite clearance of EMU cast wheels and also to look into the issue of rejection/acceptance of DSP/SAIL wheels based on batch criteria. In future WTA meetings user dept’s representative i.e. CWE/CMP(pl) on mechanical wing and electrical officer from CLW at SAG level may be included. Address by CME/RWF CME/RWF stated that WDM2 loco wheels have been cleared by RDSO. These wheels have been supplied by RWF to SR, CR & ER for application on WDM2 locos. CME/RWF stated that RWF is required to produce 73000 wheelsets in 2012-13. Presently this much pressing capacity is not available. (ii)In order to produce 73000 wheelsets, we have to finish machine 73000 axles. The pressing capacity will just fall short of this, but work can be managed if additional staff for third machining line is sanctioned for which staff proposal is in Board.
-3- (iii)The tender for new wheel assembly complex has already been opened and in long term, RWF will have spare capacity of pressing wheelsets. In case, the pressing capacity requirement is going to remain at this level or increase further, additional machining line will be needed. RWF has two new machining line and one condemned machining line is also being used upto rough turning stage on regular basis. For consistent out turn, it is necessary that one more machining line is given to RWF. RWF will need directions from Board to process the case in M&P Programme 2013-14. (iv) As per gazette notification of Ministry of Labour issued in 1999 work in six activities cannot be outsourced by RWF. These activities include cutting of scrap, furnace lining, ladle lining, material handling, packing and painting of wheels, maintenance of factory premises etc. In 2006-07 with steep increase in production some of these activities were outsourced. RWF’s request for relaxation for a period of three years was turned down and CACLB as a very special case has granted relaxation for one year, which will end in March,2012. A proposal for creation of 266 posts is pending with Railway Board. In case these posts are sanctioned, RWF will approach CACLB to extend the dead line for further one year. There is hope that CACLB will grant some more time, provided Board sanctions these posts. Decision from Board is urgently required. In case extension is not granted by CACLB, the entire production plan for the year 2012-13 will have to be drastically cut down.
AM (ME) advised EDME(W) to examine the RWF’s request in this regard and take further necessary action.
Address by COS/RWF
COS/RWF stated that RWF is not getting required scrap from various
Railways. Various Railways are not dispatching rails. COS/RWF is not in a position to go to various locations to collect rails and WTA scrap. He requested that instructions may be issued to these railways to ensure timely dispatch of the required WTA scrap and condemned rails to RWF to enable them to manufacture WTA items. EDRS/C advised RWF that necessary instructions will be issued to railways to ensure dispatch of scrap to RWF. He also advised Railways not to send light melting scrap.
It was stated by EDRS(P) that the allotment of wagon wheelsets for this quarter (January – March, 2012) on RWF has been restricted to 14000 since loose wheels & axles are to be supplied to Zonal Rlys & PUs urgently
-4- eventhough requirement of wagon wheelset is much higher. Thus RWF was advised by EDRS/P to maximize production of BOXN wagon wheelsets. Wagon production will pick up on finalization of wagon tender.
It was requested by Railways that RWF should also explore possibility of
manufacturing MG loco and coaching axles for which allotment for NF, NE & Western Rlys will be regularized later on.
The position regarding supplies made by RWF during the previous
quarter i.e. October - December, 2011 was discussed. The same is tabulated as under:-
SUPPLIES DURING OCTOBER - DECEMBER, 2011
No. Item Quantity Planned (Oct. - Dec., 2011)
Actual Supplies (Oct. – Dec., 2011)
Variation (+) excess (-) shortfall
Total Supplies from April – December, 2011
A LOOSE WHEELS (i) BOX ‘N’ Wheels
W/WL-4764/R 6598 4401 -2197 9252
(ii) MG Chg. Wheels MG/T-0-1-004 (W/WL-770/R) (WAP-W-031)
0 78 78 801
(iii) BG Chg. Wheels W/WL-1660/R
11150 11537 387 29387
(iv) BG Loco Wheels W/WL-4984/R
0 0 0 0
(v) MG Loco Wheels W/WL-4955/R
0 0 0 0
(vi) 840 mm dia wheels for CONCOR
980 1193 213 2220
(vii) EMU/DMU Wheels to Drg. No. K-4004
0 0 0 0
(vii) Wheels for BVZC Wagons to Drg. No. W/WL-4747
0 0 0 0
TOTAL WHEELS 18728 17209 -1519 41660 B LOOSE AXLES
(i) Nos. 6905 5293 -1612 16713 (ii) Equated Box ‘N’ Units 9027 6881 -2147 20314 C WHEELSETS (i) 16T BG Chg.
Wheelsets 250 54 -196 401
(ii) Wheelsets for BCN 200 169 -31 169 (iii) BOX ‘N’ W/sets
include Wagon Builders & BLC Wagons
14000 14394 394 51208
(iv) EMU W/sets for Trailer Coaches
0 0 0 0
TOTALWHEELSETS
14450 14617 167 51778
The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-I.
The item-wise planning for January – March, 2012 is shown in Annexure - II.
ANNEXURE - I Position regarding quantities planned vis a - vis actual supplies made by RWF/Bangalore during the IIIrd Quarter (October - December, 2011).
S.NOS. DRAWING &
DESCRIPTION RLY./CONSIGNEE QTY.
PLANNED (OCT. - DEC.,11)
QTY. SUPPLIED (OCT. - DEC.,11)
VARIATION (+) EXCESS (-) SHORTFALL
WHEELS 1 Wheel disc. BOX 'N'
Type to Drg. No. W/WL-4764/R (WAP/SK/M-155)
CR/PR 200 223 23ER/JMP/HLR 648 114 -534NR/JUDW 800 749 -51NCR/JHS 1600 849 -751NFR/NBQ 300 142 -158NWR/AII 300 378 78SCR/RYPS 1500 909 -591SECR/RWSS 600 558 -42SWR/UBL 150 164 14WR/DHD 500 315 -185Total 6598 4401 -2197
2 BG Chg. Wheels to
Drg. No.W/WL-1660/R
CR/MTN 500 564 64CR/PR(For BEML) 100 104 4ER/LLH/HLR 1200 1244 44Eco.R/MCS 400 418 18NR/AMV/ASR 700 611 -89NR/ASR(For BVZI) 150 172 22NER/GKP 600 707 107NFR/NBQ 200 198 -2NWR/AII 400 416 16SR/CW/PER/ LW/PER/GOC
1000 1045 45
SCR/TPTY/LGD 800 760 -40SER/KGP 600 596 -4SWR/UBL 500 495 -5SWR/UBL(For BVZI) 200 270 70WR/PL 200 283 83WR/PL(For BEML) 600 605 5WCR/BPL 300 332 32ICF 1500 1484 -16RCF 1200 1233 33Total 11150 11537 387
3 MG Coaching
Wheels to RDSO's Drg. No.CG-K 6099 (WAP-W-031)
WR/BVP 0 78 78Total 0 78 78
4 840 dia wheel for CONCOR for BLC wagon
CR/PR 100 126 26NR/JUDW 600 599 -1NCR/JHS 200 338 138SER/KGP 80 130 50Total 980 1193 213
TOTAL WHEELS 18728 17209 -1519 AXLES
1 Axle for WDG-2 A (Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt 'b' part No.11231622
NR/CB 25 10 -15SCR/TPTY 10 0 -10DLW 55 0 -55DMW 180 181 1Total 270 191 -79
2 Axle rough turned for WAP-4 loco to Drg. No.03/2/11/55 Alt. 1
WR/DHD 10 13 3
CLW 112 120 8
Total 122 133 11
3 Axle rough for WDS-6 to Drg. No. TPL-2585
DLW 60 5 -55
Total 60 5 -55
4 Axle driving rough
turned for WDM-2C & WDM-3A Locos to Drg. No.D/WL-5058/R Alt. NIL
DMW 246 222 -24SR/GOC 12 11 -1Total 258 233 -25
5 Axles for WAG-9 &
WAP-7 (Rough machined) to CLW's Drg. No.1209-01-011-002
CLW 300 180 -120
CR/BSL 40 40 0
NCR/CNB 6 0 -6
SCR/LGD 6 0 -6
Total 352 220 -132
6 Axle (3-phase) for WAP-5 loco to CLW's Drg. No. 1210-01-311-025
CR/BSL 6 0 -6
CLW 30 0 -30
Total 36 0 -36
7 Axle rough
machined for WDG-2, WDG-3A, WDM-3D Locos to Drg. No. TPL-6292
SR/GOC 18 14 -4
Total 18 14 -4
8 Axle rough
machined for WDG-2 & WAG-7 to DRg. No.06/2/11/2
ER/KPA 11 0 -11NR/LDH 20 24 4NCR/JHS 6 0 -6SR/LW/PER 15 0 -15SER/KGP 20 20 0WR/DHD 15 6 -9CLW 320 293 -27BHEL 120 106 -14Total 527 449 -78
9 Axle rough for WDG-4 & WDP-4 to EMS-804 to Drg. No. 5061/R RWF-A-194
DLW 500 351 -149
8 0 -8
SCR/TPTY 0 6 6
SWR/UBL 0 14 14
Total 508 371 -137
10 Axle rough GM Loco to EMD Pt.No.40077315 (Geared) & DLW Part No.17230019
SWR/UBL 10 0 -10
SCR/TPTY 6 0 -6
Total 16 0 -16
11 Axle for WDG-5 locos to DLW's part No.17230330
DLW 33 37 4
Total 33 37 4
12 Axle driving rough machined for WDG-3A loco to Drg. No. TPL-5005 Alt. 'd' or latest
NFR/NBQ 10 0 -10
Total 10 0 -10
13 Axle rough turned for 140T Crane CR/808
ER/JMP 6 0 -6
Total 6 0 -6
14 Axle rough machined for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516
ER/KPA 50 47 -3
Total 50 47 -3
TOTAL AXLES (1) TO (14) IN NOS.
2266 1700 -566
TOTAL AXLES IN EQUATED NOS. (X by 1.9)=
4305 3230 -1075
15 BG EMU Motor Coach Axles to Drg. No.DC/EMU-M-0-1-005
CR/MTN 24 29 5SER/KGP 15 12 -3Total 39 41 2
16 Axle for AC Motor
Coach to Drg. No. EMU/MC-1-025
ER/HLR 12 0 -12Total 12 0 -12
17 EMU Motor Coach
Axles to Drg. No.AC/DC-EMU/B-02-002 Alt. A/2 item 1 (WAP's Drg. No. WAP-A-087)
ICF 300 203 -97
NR/CB 0 12 12
JESSOP 12 12 0
BEML 36 0 -36
BHEL 12 16 4
BESCO/KPA 4 4 0
Total 364 247 -117
TOTAL EMU AXLES IN NOS.
415 288 -127
TOTAL EMU AXLES IN EQUATED NOS. (X by 1.2)=
498 346 -152.4
18 BG EMU Axle to Drg. No. W/WL-4784/R
SR/CW/PER 15 0 -15
Total 15 0 -15
19 EMU Axles for Trailor Coaches to Drg. No. AC/DC/EMU/02/204-001 00/RWF-A-157
JESSOP 24 24 0BEML 60 0 -60BHEL 24 0 -24BESCO/KPA 8 6 -2NR/CB 0 30 30SCR/LGD 10 0 -10Total 126 60 -66
19 Axle rough turned for Trailer Coach for Kolkata Metro to Drg. No. MRB-0-1-002 alt.4/b
Metro 40 0 -40
Total 40 0 -40
20 BG MEMU TC Axles
to Drg. No. WTAC3-0-2-303 Alt.F
RCF 300 0 -300NR/GZB 20 0 -20SCR/BZA 4 0 -4Total 324 0 -324
21 Axle for YDM-4 Loco to Drg. No. D/WL-4984
NER/IZN 15 0 -15
Total 15 0 -15
22 Axle for Box 'N'/BCN wagon to Drg. No WD-92039/S-1, Item-1, Alt.2
ER/JMP 24 0 -24
Total 24 0 -24
23 Axles for BOX'N' to Drg. No.W/WL-4901/R (WD-89025/SL-2)
ER/JMP 50 0 -50
Total 50 0 -50
24 Axles for LHB coaches to Drg. No.LW 021049
RCF/KXH 180 390 210
ER/LLH 40 65 25
WR/PL 20 42 22
Total 240 497 257
25 Rough turned axle to use with UIC MTBU to RCF Drg. No. 02128 ALT. NIL (IRY Coaches)
NR/JUDW 25 31 6
Total 25 31 6
26 Axle driving 20T Crane to Drg. No. NR/9076/R
ER/JMP 10 0 -10
Total 10 0 -10
27 Axle Idler 20T Crane to Drg. No. NR/9076/R
ER/JMP 30 0 -30
Total 30 0 -30
28 BG Coaching Axles to Drg. No.WTAC-3-02-303
CR/MTN 100 86 -14
CR/PR(For BEML) 50 84 34
ER/LLH 150 110 -40
NR/AMV 75 55 -20
NR/ASR(For BVZI) 100 110 10
NER/GKP 150 148 -2
NWR/JU/AII 75 109 34
SR/CW/PER 150 148 -2
SCR/TPTY 100 86 -14
SWR/UBL/AP 150 103 -47
SWR/UBL(For BVZI) 50 53 3
WR/PL(For BEML) 400 154 -246
WCR/BPL 75 86 11
ICF 800 709 -91
RCF 900 676 -224
Total 3325 2717 -608
TOTAL AXLES S.NOS. 18 to 28 IN NOS.
4224 3305 -919
GRAND TOTAL
AXLES IN NOS.= 6905 5293 -1612
GRAND TOTAL
AXLES IN EQUATED UNITS =
9027 6881 -2146.8
WHEELSETS 1 16T BG
CHG.Wheelsets NFR/NBQ 150 0 -150NWR/JU/AII 0 54 54WR/PL 100 0 -100Total 250 54 -196
2 BOX 'N' Wheelsets Wagon Builders 14000 14394 394
Total 14000 14394 394
3 Wheelsets for BCN wagons
NFR/NBQ 200 169 -31Total 200 169 -31
TOTAL WHEELSETS
14450 14617 167
ANNEXURE - II
Allocation sheet for supply of WTA items for the IVth quarter i.e. January - March, 2012 on RWF/Bangalore.
S.NOS. DRAWING & DESCRIPTION
RLYS./PUs QTY. PLANNED
(JAN. - MARCH, 2012
Consignee Remarks
WHEELS 1 Wheel disc. BOX 'N'
Type to Drg. No. W/WL-4764/R (WAP/SK/M-155)
CR 100 PR ER 1200 200-HLR
800-JMP 200-LLH
NR 500 450-JUDW 50-ASR
NCR 2000 JHS NFR 400 NBQ NWR 300 AII SCR 1400 GTPL SECR 1000 RWSS SWR 50 UBL WR 600 DHD Total 7550
2 BG Chg. Wheels to Drg. No.W/WL-1660/R
CR 300 MTN ER 900 LLH Eco.R 600 MCS NR 800 AMV NER 500 GKP NFR 400 DBRT NWR 600 400-AII
200-JU
SR 1300 1000-CW/PER 300-LW/PER
SCR 1000 500-LGD 500-TPTY
SER 500 KGP SECR 150 RWSS SWR 500 UBL 300 UBL For BVZI WCR 300 BPL ICF 2200 RCF 1100 Total 11450
3 MG Coaching Wheels to Drg. No. CG-K 6099 Alt. latest (WAP-W-031)
NER 300 IZN NWR 136 BKN WR 75 BVP RCF 28 KGP Total 539
TOTAL WHEELS 19539 AXLES
1 BG DSL Loco axle to Drg. No.W/WL-4973/R (WAP/SK/MA-245)
SR 8 AJJ Total 8
2 Axle for WDG-2 A (Axle
RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt. 'b' part No. 11231622
DMW 300 Total 300
3 Axle rough turned for
WAP-4 Loco to Drg. No.03/2/11/55
CLW 150
Total 150
4 Axle driving rough
turned for WDM-2C Locos to Drg. No. D/WL-5058/R Alt. NIL
DMW 230 Total 230
5 Axle rough machined for
WDG-2 & WAG-7 to Drg. No.06/2/11/2
ER 19 KPA
SCR 10 TPTY
CLW 300
BHEL 120
Total 449
6 Axle rugh for WDS-6 to
Drg. No. TPL-2585 DLW 50
Total 50
7 Axles for WAG-9 &
WAP-7 (Rough machined) to CLW's Drg. No. 1209-01-011-002 Alt.
CLW 200 CR 30 BSL SCR 6 ELS/LGD Total 236
8 Axle rough for WDG-4 &
WDP-4 to EMS-804 Drg. No.D/WL-5061/R
DLW 420 Total 420
9 Axle rough machined
for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516
CR 50 BSL ER 50 KPA NR 50 GZB SCR 50 ELS/BZA WR 25 DHD Total 225
TOTAL AXLES (1) TO (9) IN NOS.
2068
TOTAL AXLES IN EQUATED NOS. (X by 1.9)=
3929
10 BG EMU MTR Coach
Axles to Drg. No. DC/EMU-M-0-1-005
CR 40 MTN Total 40
11 Axle for AC Motor
Coach to Drg. No. EMU/MC-1-025
ER 18 HLR Total 18
12 EMU Axles for Motor
Coaches to Drg. No. AC/DC/EMU/B-02-002 Alt. A/2 item 1 (WAP-A-087)
ICF 250 JESSOP 12 KPA BESCO 8 KPA BHEL 12 CB Total 282
13 Axle for MEMU/DMC to Drg. No.EMU/M-0-1-025 Alt. a
RCF 50
SCR 6 LGD
Total 56
14 Axle rough turned for Motor Coach to Drg. No. MRB/DMC-0-2-004 COL. 1 Alt. Nil
ICF 25
Total 25
TOTAL EMU AXLES IN NOS.
421
TOTAL EMU AXLES IN EQUATED NOS. (X by 1.2)=
505
15 BG EMU Axle to Drg. No. W/WL-4784/R
SR 20 CW/PER
Total 20
16 EMU Axles for Trailor Coaches to Drg. No. AC/DC/EMU/02/204-001 00/RWF-A-157
JESSOP 24 KPA
BESCO 16 KPA
BHEL 24 CB
ICF 300
SR 40 20-CW/PER 20-TBM
SCR 10 LGD
Total 414
17 BG MEMU TC Axles to
Drg. No. WTAC3-0-2-303 Alt.F
RCF 300 SCR 4 ELS/BZA Total 304
18 D/WL-4984 YDM-4 Loco NER 15 IZN
NFR 70 NBQ
Total 85
19 BOX 'N' Axles to Drg. No. W/WL-4901/R (WD-89025/SL-2)
CR 25 PR
NR 60 JUDW
NFR 50 NBQ
NWR 10 AII
SR 50 CW/PER
SECR 50 RWSS
WCR 50 KTT
Total 295
20 MG ICF Axles to Drg. No. MG/T-0-2-023 Alt. Nil or latest
NWR 100 BKN
Total 100
21 MG ICF Axles to Drg. No. MG/T-02-017 Alt. Nil or latest
NER 60 IZN
WR 30 BVP
Total 90
22 Axles for LHB Coaches to Drg. No.LW 021049
RCF 1000 KXH ER 30 LLH NR 40 JUDW
Total 1070
23 16 T BG Coaching Axles to Drg. No. CG-K 6015
CR 100 MTN
ER 100 LLH
NR 200 AMV
150 ASR For BVZI
NER 150 GKP
NFR 50 NBQ
SR 300 200-CW/PER 100-GOC
SCR 110 LGD
SER 60 KGP
SWR 150 100-AP 50-UBL
150 UBL For BVZI
ICF 800
RCF 500
Total 2820
TOTAL AXLES S.NOS. 15 to 23 IN NOS.
5198
GRAND TOTAL AXLES
IN NOS.= 7687
GRAND TOTAL AXLES
IN EQUATED UNITS = 9632
WHEELSETS
1 16T BG Coaching W/sets
BEML 800 Will be sent to Hubli for machining.
NFR 150 NBQ WR 292 PL Total 1242
2 BOX 'N' Wheelsets Wagon
Builders 14000
Consignee to be advised by DRS(W)
ECR 200120-MGS
80-DHN
Total 14200
3 Wheelsets for Cast Steel Bogie of BLC Wagon to Drg. No.COTR-9404-S/12 Alt.3
ER 100 JMP NR 200 JUDW
Total 300
4 Wheelsets for BCN wagons
NFR 31 NBQ Total 31
TOTAL WHEELSETS 15773
7. GM(I), M/s RITES (ER), Quality Assurance Division, Central Station Building (Metro), 56, CR Avenue, 3rd Floor, Kolkata – 700 012.
8. S.I.E(M) Incharge, Inspection Wing, M/s RITES c/o DSP, Durgapur-713203. 9. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata – 700 028. 10. M/s Titagarh Wagons Ltd., 113, Park Street, Kolkata – 700 016. 11. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office
Complex, Lodhi Road, New Delhi-110 003 12. M/s BESCO Ltd., Wagon Division, Baruipur Works, Railway Station, Baruipur,
Eastern Railway, West Bengal. 13. AM/RS, AM/ME, AM/PU, Adv(L)RS, EDRS(P), EDRS ( C), EDME(W),
EDEE(RS), DME(PU), DME(P)-I, DRS(W), DRS(M) & RS(WTA) Branch.
DSP Minutes Minutes of Quarterly WTA meeting held with representatives of M/s SAIL/DSP on 06.01.2012 in Rail Bhawan, New Delhi for planning the requirement of WTA items for the IVth Quarter (January – March, 2012). General EDRS(P) welcomed all the participants from Rail Wheel Factory, DSP/SAIL, Zonal Railways and Production Units to the meeting. He stated that supply performance of Rail Wheel Factory/Bangalore for all the WTA items was commendable not only during last quarter i.e. October-December, 2011 but also for the whole year upto December,2011. RWF has helped Railways to meet the increased requirement of wheelsets needed for wagon production.
EDRS(P) stated that DSP/SAIL is lagging behind in supply of wheels and axles. DSP has supplied only 33,000 loose wheels (all types) in 9 months of 2011-12 so far against their commitment of 67,000 wheels and only 4802 axles so far against the committed quantity of 12000 axles in entire year 2011-12. There is a proportionate shortfall of about 17,000 wheels on account of DSP/SAIL. Thus supply performance of SAIL/DSP is unsatisfactory. EDRS(P) advised SAIL/DSP to improve their supply performance.
It was stated that wagon production during the last two months has been around 1000 per month on an average. Wagon production will pick up to the level of 2000 wagons per month on finalization of wagon tender. With this, requirement of wagon wheelsets will increase. It was hoped that RWF/Bangalore will be able to meet the wheelsets requirement fully. EDRS(P) stated that Board has finalized four global tenders to meet the shortfall requirement of about 14,000 axles. Supplies of axles from import is expected by May/June,2012.
EDRS(P) stated that delay in clearance of cast EMU wheels by RDSO
has started affecting the availability of EMU wheels. It was requested that RDSO may be directed for early clearance of cast EMU wheels. It was also requested that final decision on the acceptance/rejection based on batch criteria for the wheels produced by DSP/SAIL should be taken.
-2- He also requested EDME(W) to take up matter with RDSO for clearance
of cast wheels for EMU applications. It was also indicated that production programme of RWF for the year 2012-13 has been finalised. In the production programme of RWF there is no provision of MG coach wheels whereas various Railways i.e. North Eastern, Western and NF Rlys have expressed urgency of MG wheels both for loco and coaches. Thus MG chg wheels were allotted to RWF for this quarter. EDRS(P) stated that indents are not being sent by various Railways by the scheduled date. He advised Railways to ensure sending the indents in time so as to enable Board to process the procurement in time. Railway units have already been advised vide Board’s letter No. 2011/RS(WTA)-149/Procurement Calender (WTA items) dt. 06/12/2011 the time schedule for the submission of indents. Indents for the year 2013-14, have already been delayed Railways were advised that if no indent is received by 31/01/2012, their requirement will be taken as NIL.
Address by AM (ME) AM.(ME) wished a happy new year to all the participants. He stated that WTA meeting is very important meeting to review the overall requirement of vital items for the rolling stock and plan the needs based requirement of the same. He commended the good performance of Rail Wheel Factory/Bangalore. He stated that as soon as wagon tender is finalised the requirement of wheelsets for wagons will increase. He advised CME/RWF to effect one time supply of MG wheels to NE,NF & W Rlys. He stated that carriage wheel discs supplied by RWF are not as per RDSO drawing.AM (ME) advised EDME(W) to expedite clearance of EMU cast wheels and also to look into the issue of rejection/acceptance of DSP/SAIL wheels based on batch criteria. In future WTA meetings user dept’s representative i.e. CWE/CMP(pl) on mechanical wing and electrical officer from CLW at SAG level may be included. Address by CME/RWF CME/RWF stated that WDM2 loco wheels have been cleared by RDSO. These wheels have been supplied by RWF to SR, CR & ER for application on WDM2 locos. CME/RWF stated that RWF is required to produce 73000 wheelsets in 2012-13. Presently this much pressing capacity is not available. (ii)In order to produce 73000 wheelsets, we have to finish machine 73000 axles. The pressing capacity will just fall short of this, but work can be managed if
-3- additional staff for third machining line is sanctioned for which staff proposal is in Board. (iii)The tender for new wheel assembly complex has already been opened and in long term, RWF will have spare capacity of pressing wheelsets. In case, the pressing capacity requirement is going to remain at this level or increase further, additional machining line will be needed. RWF has two new machining line and one condemned machining line is also being used upto rough turning stage on regular basis. For consistent out turn, it is necessary that one more machining line is given to RWF. RWF will need directions from Board to process the case in M&P Programme 2013-14. (iv) As per gazette notification of Ministry of Labour issued in 1999 work in six activities cannot be outsourced by RWF. These activities include cutting of scrap, furnace lining, ladle lining, material handling, packing and painting of wheels, maintenance of factory premises etc. In 2006-07 with steep increase in production some of these activities were outsourced. RWF’s request for relaxation for a period of three years was turned down and CACLB as a very special case has granted relaxation for one year, which will end in March,2012. A proposal for creation of 266 posts is pending with Railway Board. In case these posts are sanctioned, RWF will approach CACLB to extend the dead line for further one year. There is hope that CACLB will grant some more time, provided Board sanctions these posts. Decision from Board is urgently required. In case extension is not granted by CACLB, the entire production plan for the year 2012-13 will have to be drastically cut down.
AM (ME) advised EDME(W) to examine the RWF’s request in this
regard and take further necessary action.
Address by COS/RWF
COS/RWF stated that RWF is not getting required scrap from various
Railways. Various Railways are not dispatching rails. COS/RWF is not in a
position to go to various locations to collect rails and WTA scrap. He requested
that instructions may be issued to these railways to ensure timely dispatch of the
-4-
required WTA scrap and condemned rails to RWF to enable them to
manufacture WTA items. EDRS/C advised RWF that necessary instructions
will be issued to railways to ensure dispatch of scrap to RWF. He also advised
Railways not to send light melting scrap.
It was stated by EDRS(P) that the allotment of wagon wheelsets for this
quarter (January – March, 2012) on RWF has been restricted to 14000 since
loose wheels & axles are to be supplied to Zonal Rlys & PUs urgently
eventhough requirement of wagon wheelset is much higher. Thus RWF was
advised by EDRS/P to maximize production of BOXN wagon wheelsets.
Wagon production will pick up on finalization of wagon tender.
It was requested by Railways that RWF should also explore possibility of
manufacturing MG loco and coaching axles for which allotment for NF, NE &
Western Rlys will be regularized later on.
The position regarding supplies made by M/s SAIL/DSP during the
previous quarter i.e. October - December, 2011 was discussed. The same is tabulated as under:-
SUPPLIES DURING OCTOBER - DECEMBER, 2011 S.Nos. Item Quantity
Planned (Oct. – Dec.,
2011)
Actual Supplies (Oct. –
Dec., 2011)
Variation (+) excess (-) shortfall
Total Supplies
from April, – December,
2011 A
ASSEMBLED WHEELSETS
(i) 16T BG Coaching Wheelsets
350 196 -154 548
B LOOSE WHEELS
(i) BG Chg. Wheels W/WL-1660/R
7250 4093 -3157 14635
(ii) BG Loco Wheels W/WL-4948/R
4930 2796 -2134 10861
(iii) BG Loco Wheels “S” Shaped
3047 1532 -1515 5030
(iv) MG Loco Wheels W/WL-4955/R
560 309 -251 632
(v) EMU/DEMU Wheels to Drg. No.K-4004
2416 281 2135 1065
TOTAL WHEELS
18203 9011 -9192 32223
C LOOSE AXLES
(i) 16T BG Coaching Axles WTAC-3-02-303
2308 1908 -400 4255
(ii) Axles forgings (heat treated and tempered but without machining)
0 0 0 0
TOTAL AXLES 2308 1908 -400 4255
The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-I.
The item-wise planning for January – March, 2012 is shown in Annexure - II.
ANNEXURE - I
Position regarding quantities planned vis a - vis actual supplies made by M/s SAIL/DSP during the IIIrd Quarter (October - December, 2011).
S.NOS. DRAWING & DESCRIPTION
RLY./CONSIGNEE QTY. PLANNED (OCT. - DEC., 11)
QTY. SUPPLIED (OCT. - DEC., 11)
VARIATION (+) EXCESS (-) SHORTFALL
AXLES 1 BG Chg. Axles
to Drg. No. WTAC-3-02-303
ER/LLH 200 200 0Eco.R/MCS 80 53 -27NR/AMV 50 40 -10NR/ASR(For BVZI) 50 40 -10NER/GKP 100 72 -28NFR/NBQ/DBRT 100 83 -17SR/GOC 100 0 -100SCR/LGD 150 150 0SER/KGP 60 0 -60SECR/RWSS 18 0 -18SWR/UBL 200 173 -27WR/PL(For BEML) 200 194 -6ICF 500 459 -41RCF 500 444 -56TOTAL 2308 1908 -400
TOTAL AXLES 2308 1908 -400 WHEELS
1 BG Chg. Wheels to Drg. No.W/WL-1660/R
CR/MTN 200 187 -13ER/LLH 1000 751 -249Eco.R/MCS 500 174 -326NR/JUDW/ASR 400 150 -250NR/ASR(For BVZI) 100 0 -100NER/GKP 300 264 -36NFR/DBRT 400 92 -308NWR/JU 300 299 -1SR/GOC 500 447 -53SCR/LGD/TPTY 600 382 -218SER/KGP 500 184 -316SECR/RWSS 150 147 -3SWR/AP 300 0 -300SW/UBL (For BVZI) 200 169 -31WR/PL 450 137 -313WCR/BPL 150 150 0ICF 500 366 -134RCF 700 194 -506TOTAL 7250 4093 -3157
2 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to
CR/BSL/PR 700 208 -492ER/KPA/JMP 700 591 -109
NR/CB/ASR 800 288 -512NCR/CNB 135 93 -42NWR/AII 105 101 -4SR/GOC/LW/PER 500 405 -95
Drg. No. D/WL-4948/R
SCR/GTPL 600 298 -302
SECR/RWSS 150 124 -26SWR/AP 100 0 -100WR/DHD 400 288 -112CLW 400 400 0DMW 100 0 -100BHEL/JHS 240 0 -240TOTAL 4930 2796 -2134
3 BG Loco
Wheels "S" Shaped to Drg. No. D/WL-5060/R
CLW 1000 210 -790DLW 400 0 -400DMW 647 439 -208TOTAL 2047 649 -1398
4 BG Loco
Wheels "S" Shaped to DLW's Drg. No. 17230251 "C"
SWR/UBL 200 196 -4DLW 800 687 -113TOTAL 1000 883 -117
5 MG Loco
Wheels to Drg. No.W/WL-4955/R
NER/IZN 200 40 -160NFR/NBQ 100 100 0NWR/AII 60 57 -3SR/GOC 100 54 -46WR/SBI 100 58 -42TOTAL 560 309 -251
6 EMU/DEMU
Wheels to Drg. No.K-4004
CR/MTN 300 0 -300NR/GZB 300 148 -152NWR/AII 54 0 -54SR/CW/PER 400 0 -400SCR/LGD 100 0 -100ICF 250 0 -250RCF 700 0 -700JESSOP/KPA 72 0 -72BESCO/KPA 24 0 -24BEML/MYSS 216 133 -83TOTAL 2416 281 -2135
TOTAL WHEELS 18203 9011 -9192 WHEELSETS
1 16T BG Coaching Wheelsets
RCF 350 196 -154TOTAL 350 196 -154
ANNEXURE - II Allocation sheet for supply of WTA items for the IVth quarter i.e. January - March, 2012 on M/s SAIL/DSP.
S.NOS. DRAWING & DESCRIPTION
RLYS./PUs QTY. PLANNED
(JAN. - MARCH,
2012)
Consignee Remarks
AXLES 1 BG Chg. Axles to Drg.
No. WTAC-3-02-303 ER 300 LLH Eco.R 110 MCS NR 350 100-ASR
150-JUDW 100-AMV
NER 98 GKP NFR 50 DBRT NWR 168 100-AII
68-JU
SCR 55 TPTY WCR 165 BPL ICF 900 RCF 300 TOTAL 2496
WHEELS 1 BG Chg. Wheels to
Drg. No.W/WL-1660/R CR 100 MTN ER 300 LLH
Eco.R 200 MCS
NR 400 200-JUDW 200-AMV
NER 300 GKP
NFR 300 NBQ
NWR 300 100-JU 200-AII
SR 500 GOC
SCR 400 200-LGD 200-TPTY
SER 300 KGP
SWR 200 MYSS
WCR 300 BPL
ICF 800 RCF 400 TOTAL 4800
2 MG Loco Wheels to Drg. No.W/WL-4955/R
NER 200 IZN NFR 50 NBQ NWR 60 AII
SR 90 GOC TOTAL 400
3 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. W/WL-4948/R
CR 700 300-PR 400-BSL
ER 700 KPA
NR 500 300-CB 200-ASR
NCR 100 CNB NWR 150 AII
SR 600 400-GOC 200-LW/PER
SCR 300 250-GTPL 50-TPTY
SECR 100 RWSS SWR 60 AP WR 400 DHD CLW 900 DMW 200 BHEL 240 TOTAL 4950
4 BG Loco Wheels "S" Shaped to Drg. No. D/WL-5060/R
CR 300 250-BSL 50-PR
ER 300 JMP NR 200 CB SR 200 LW/PER WR 200 DHD CLW 300 DLW 300 DMW 800 TOTAL 2600
5 BG Loco Wheels "S" Shaped to Drg. No. 17230251 "C"
NWR 75 AII SCR 92 TPTY SWR 400 300-UBL
100-MYSS
DLW 720 TOTAL 1287
6 EMU/DEMU Wheels to Drg. No. K-4004
CR 300 MTN
NR 200 150-GZB 50-CB
NWR 54 AII
SR 900 CW/PER
SCR 110 TPTY
ICF 500
RCF 650
JESSOP 72 KPA