Page 1 of 5 MINUTES OF BID OPENING MEETING Agenda Item: SUBMISSION OF PROPOSALS (TECHNICAL & FINANCIAL) AND OPENING OF TECHNICAL PROPOSALS SUBMITTED BY BIDDERS FOR THE PROJECT “ACCESS TO CLEAN ENERGY PROGRAM- SOLARIZATION OF 8000 SCHOOLS AND 187 HEALTH FACILITIES IN KHYBER PAKHTUNKHWA” Venue Committee Room PEDO House Peshawar, Pakistan Date & Time Tuesday, 24 th October, 2019 @ 03:00 PM PARTICIPANTS Committee Members / Representatives: 1. Mr. Khurram Durrani Project Director (Solar), PEDO (Member) 2. Miss Musafa Irum Representative Director (F&A), PEDO (Member) 3. Mr. Usman ali Khan Representative P&F, PEDO (Member) 4. Mr. Mustafa Kamal Assistant Manager Procurement (Solar), PEDO (Member) 5. Mr. Fazli Rahim Khan Manager F&A , Solar PEDO The attendance sheet is attached at (Annex-I) Consultant Members/Representatives: 6. Mr. Asad Ali Director Contract, Barg Engineering 7. Mr. Aamir Shah Project Coordinator, Barg Engineering 8. Mr. Umar Iftikhar Deputy Team Leader, Barg Engineering 9. Mr. Ihsan Elahi Project Manager, Ultimate Engineering Consultants The attendance sheet is attached at (Annex-I) 1. The meeting regarding subject noted above chaired by Project Director (Solar), dated: 24/10/2019, held in committee Room of PEDO. The Chair welcomed the committee members and briefed them about the agenda project. 2. The names of bidders were announced package wise and their technical proposals were opened in the presence of their representatives. The technical proposals of the following thirty (30) intending bidders were opened. 3. The committee members signed the opened technical proposals and sealed financial proposals accordingly. 4. The detail of the bidders applied for the packages are as under;

Transcript of MINUTES OF BID OPENING MEETINGpedo.pk/uploads/news/Final_Copy_of_MoM_of_Techncial... ·...

Page 1: MINUTES OF BID OPENING MEETINGpedo.pk/uploads/news/Final_Copy_of_MoM_of_Techncial... · 2019-10-29 · page 1 of 5 minutes of bid opening meeting agenda item: submission of proposals

Page 1 of 5

MINUTES OF BID OPENING MEETING

Agenda Item: SUBMISSION OF PROPOSALS (TECHNICAL & FINANCIAL) AND

OPENING OF TECHNICAL PROPOSALS SUBMITTED BY BIDDERS FOR

THE PROJECT “ACCESS TO CLEAN ENERGY PROGRAM-

SOLARIZATION OF 8000 SCHOOLS AND 187 HEALTH FACILITIES IN

KHYBER PAKHTUNKHWA”

Venue Committee Room PEDO House Peshawar, Pakistan

Date & Time Tuesday, 24th October, 2019 @ 03:00 PM

PARTICIPANTS

Committee Members / Representatives:

1. Mr. Khurram Durrani Project Director (Solar), PEDO (Member)

2. Miss Musafa Irum Representative Director (F&A),

PEDO (Member)

3. Mr. Usman ali Khan Representative P&F, PEDO (Member)

4. Mr. Mustafa Kamal Assistant Manager Procurement (Solar),

PEDO (Member)

5. Mr. Fazli Rahim Khan Manager F&A , Solar PEDO

The attendance sheet is attached at (Annex-I)

Consultant Members/Representatives:

6. Mr. Asad Ali Director Contract, Barg Engineering

7. Mr. Aamir Shah Project Coordinator, Barg Engineering

8. Mr. Umar Iftikhar Deputy Team Leader, Barg Engineering

9. Mr. Ihsan Elahi Project Manager, Ultimate Engineering Consultants

The attendance sheet is attached at (Annex-I)

1. The meeting regarding subject noted above chaired by Project Director (Solar), dated:

24/10/2019, held in committee Room of PEDO. The Chair welcomed the committee members

and briefed them about the agenda project.

2. The names of bidders were announced package wise and their technical proposals were opened

in the presence of their representatives. The technical proposals of the following thirty (30)

intending bidders were opened.

3. The committee members signed the opened technical proposals and sealed financial proposals

accordingly.

4. The detail of the bidders applied for the packages are as under;

Page 2: MINUTES OF BID OPENING MEETINGpedo.pk/uploads/news/Final_Copy_of_MoM_of_Techncial... · 2019-10-29 · page 1 of 5 minutes of bid opening meeting agenda item: submission of proposals

Page 2 of 5

S # FIRM NAME

PACKAGE # Total

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Region Name

Ch

arsa

dd

a

Mar

dan

No

wsh

era

Pe

shaw

ar

Swab

i

Ban

nu

D I

Kh

an &

Tan

k

Han

gu

Kar

ak

Ko

hat

Lakk

i

Ab

bo

ttab

ad

Bat

tagr

am

Har

ipu

r

Ko

hsi

tan

Man

seh

ra

Torg

har

Bu

ne

r

Ch

itra

l

Dir

Bal

a

Dir

Pay

ee

n &

Mal

akan

d

Shan

gla

Swat

KO

HIS

TAN

, HA

RIP

UR

, BA

TTA

GR

AM

,

MA

NSE

HR

A, A

BB

OTT

AB

AD

, TO

RG

HA

R

KO

HA

T, L

AK

KI M

AR

WA

T, K

AR

AK

, HA

NG

U,

TAN

K, D

I K

HA

N, B

AN

NU

CH

AR

SAD

DA

, MA

RD

AN

, PES

HA

WA

R,

SWA

BI,

NO

WSH

ERA

SHA

NG

LA, D

IR-U

PP

ER, D

IR-L

OW

ER, S

WA

T,

MA

LAK

AN

D, B

UN

ER, C

HIT

RA

L

1 M/s Shafqat Shereen JV TSK Engineering International Pvt Ltd

Yes Yes 2

2 Dynamic Green Pvt Ltd Yes Yes Yes 3

3 Lean Automation Pvt Ltd Yes 1

4 Ali Haider & Brothers Pvt Ltd Yes Yes Yes Yes Yes 5

5 Tesla Industries Pvt Ltd JV Sun Save

Yes 1

6 Fazli Khaliq & Co Yes Yes Yes 3

7 M/s Sohail Iqbal Awan Yes 1

8 Exide Pakistan Limited JV Rising Technologies

Yes Yes Yes 3

9 Associated Technologies Pvt Ltd

Yes Yes Yes Yes 4

10 Royal Builders Pvt Ltd Yes Yes Yes 3

11 Cititek Pvt Ltd Yes 1

12 PAK Atlantis Pumps Pvt Ltd Yes 1

13 Catkin JV Zonergy Yes Yes Yes Yes Yes Yes Yes Yes Yes 9

14 Akhuzada Associates Pvt Ltd Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 11

15 Enertech Engineering Yes Yes Yes Yes Yes Yes Yes 7

16 Wazir and Brothers Yes 1

17 QRI JV PAK Reliable Yes 1

18 United Business System Yes Yes Yes 3

19 Integrated Techno Yes 1

20 Haseeb Enterprises Yes 1

21 M. Shafeeq Yes 1

22 Skygreen Engineering Pvt Ltd Yes Yes Yes 3

23 TSK Engineering International Pvt Ltd

Yes Yes Yes 3

24 Solar Tech Pvt Ltd Yes 1

25 Green Edge Yes Yes Yes Yes 4

26 Renewable Power Pvt Ltd Yes 1

27 Peshawar Pipe & Construction Pvt Ltd

Yes Yes Yes Yes 4

28 Tesla JV SPK Yes Yes Yes Yes Yes Yes Yes 7

29 NRTC Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 27

30 Shaheen Construction Yes 1

Total bidders applied in each Package 2 4 7 4 7 4 2 9 4 7 2 5 6 6 2 5 3 6 2 3 5 4 2 2 1 3 7

The attendance sheet is attached at (Annex-II)

Page 3: MINUTES OF BID OPENING MEETINGpedo.pk/uploads/news/Final_Copy_of_MoM_of_Techncial... · 2019-10-29 · page 1 of 5 minutes of bid opening meeting agenda item: submission of proposals

Page 3 of 5

5. While opening of technical proposals of bidders it was noted that some of the bidders didn’t submit

the technical proposals copy as required in the bidding documents. The detail are as under;

S# Package Contractor Remarks

1 2 FAZAL KHALIQ & CO ENGINEERS &

BUILDERS

Copy of the Technical Proposal was

not submitted

2 3 FAZAL KHALIQ & CO ENGINEERS &

BUILDERS

Copy of the Technical Proposal was

not submitted

3

5

FAZAL KHALIQ & CO ENGINEERS &

BUILDERS

Copy of the Technical Proposal was

not submitted

4 GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was

not submitted

5 6 WAZIR & BROTHERS Copy of the Technical Proposal was

not submitted

6 7 TESLA JV SYS Copy of the Technical Proposal was

not submitted

7

8

GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was

not submitted

8 LEAN AUTOMATION Copy of the Technical Proposal was

not submitted

9

9

M/S HASEEB ENTERPRISES Copy of the Technical Proposal was

not submitted

10 TESLA JV SYS Copy of the Technical Proposal was

not submitted

11

10

MUHAMMAD SHAFIQUE & BROTHERS Copy of the Technical Proposal was

not submitted

12 GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was

not submitted

13 11 TESLA JV SYS Copy of the Technical Proposal was

not submitted

14 12 PAK ATLANTIS PUMPS (PVT) Copy of the Technical Proposal was

not submitted

15 15 TESLA JV SYS Copy of the Technical Proposal was

not submitted

16 22 TESLA JV SYS Copy of the Technical Proposal was

not submitted

17 24 TESLA JV SYS Copy of the Technical Proposal was

not submitted

18 27 GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was

not submitted

6. The meeting ended with a note of thanks from the chair.

Page 4: MINUTES OF BID OPENING MEETINGpedo.pk/uploads/news/Final_Copy_of_MoM_of_Techncial... · 2019-10-29 · page 1 of 5 minutes of bid opening meeting agenda item: submission of proposals

Page 4 of 5

ANNEX-I

Page 5: MINUTES OF BID OPENING MEETINGpedo.pk/uploads/news/Final_Copy_of_MoM_of_Techncial... · 2019-10-29 · page 1 of 5 minutes of bid opening meeting agenda item: submission of proposals

Page 5 of 5

Annex-II (Attached)