MINUTES OF BID OPENING MEETING
Agenda Item: SUBMISSION OF PROPOSALS (TECHNICAL & FINANCIAL) AND
OPENING OF TECHNICAL PROPOSALS SUBMITTED BY BIDDERS FOR
THE PROJECT “ACCESS TO CLEAN ENERGY PROGRAM-
SOLARIZATION OF 8000 SCHOOLS AND 187 HEALTH FACILITIES IN
KHYBER PAKHTUNKHWA”
Venue Committee Room PEDO House Peshawar, Pakistan
Date & Time Tuesday, 24th October, 2019 @ 03:00 PM
PARTICIPANTS
Committee Members / Representatives:
1. Mr. Khurram Durrani Project Director (Solar), PEDO (Member)
2. Miss Musafa Irum Representative Director (F&A),
PEDO (Member)
3. Mr. Usman ali Khan Representative P&F, PEDO (Member)
4. Mr. Mustafa Kamal Assistant Manager Procurement (Solar),
PEDO (Member)
5. Mr. Fazli Rahim Khan Manager F&A , Solar PEDO
The attendance sheet is attached at (Annex-I)
Consultant Members/Representatives:
6. Mr. Asad Ali Director Contract, Barg Engineering
7. Mr. Aamir Shah Project Coordinator, Barg Engineering
8. Mr. Umar Iftikhar Deputy Team Leader, Barg Engineering
9. Mr. Ihsan Elahi Project Manager, Ultimate Engineering Consultants
The attendance sheet is attached at (Annex-I)
1. The meeting regarding subject noted above chaired by Project Director (Solar), dated:
24/10/2019, held in committee Room of PEDO. The Chair welcomed the committee members
and briefed them about the agenda project.
2. The names of bidders were announced package wise and their technical proposals were opened
in the presence of their representatives. The technical proposals of the following thirty (30)
intending bidders were opened.
3. The committee members signed the opened technical proposals and sealed financial proposals
accordingly.
4. The detail of the bidders applied for the packages are as under;
Page 2 of 5
S # FIRM NAME
PACKAGE # Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Region Name
Ch
arsa
dd
a
Mar
dan
No
wsh
era
Pe
shaw
ar
Swab
i
Ban
nu
D I
Kh
an &
Tan
k
Han
gu
Kar
ak
Ko
hat
Lakk
i
Ab
bo
ttab
ad
Bat
tagr
am
Har
ipu
r
Ko
hsi
tan
Man
seh
ra
Torg
har
Bu
ne
r
Ch
itra
l
Dir
Bal
a
Dir
Pay
ee
n &
Mal
akan
d
Shan
gla
Swat
KO
HIS
TAN
, HA
RIP
UR
, BA
TTA
GR
AM
,
MA
NSE
HR
A, A
BB
OTT
AB
AD
, TO
RG
HA
R
KO
HA
T, L
AK
KI M
AR
WA
T, K
AR
AK
, HA
NG
U,
TAN
K, D
I K
HA
N, B
AN
NU
CH
AR
SAD
DA
, MA
RD
AN
, PES
HA
WA
R,
SWA
BI,
NO
WSH
ERA
SHA
NG
LA, D
IR-U
PP
ER, D
IR-L
OW
ER, S
WA
T,
MA
LAK
AN
D, B
UN
ER, C
HIT
RA
L
1 M/s Shafqat Shereen JV TSK Engineering International Pvt Ltd
Yes Yes 2
2 Dynamic Green Pvt Ltd Yes Yes Yes 3
3 Lean Automation Pvt Ltd Yes 1
4 Ali Haider & Brothers Pvt Ltd Yes Yes Yes Yes Yes 5
5 Tesla Industries Pvt Ltd JV Sun Save
Yes 1
6 Fazli Khaliq & Co Yes Yes Yes 3
7 M/s Sohail Iqbal Awan Yes 1
8 Exide Pakistan Limited JV Rising Technologies
Yes Yes Yes 3
9 Associated Technologies Pvt Ltd
Yes Yes Yes Yes 4
10 Royal Builders Pvt Ltd Yes Yes Yes 3
11 Cititek Pvt Ltd Yes 1
12 PAK Atlantis Pumps Pvt Ltd Yes 1
13 Catkin JV Zonergy Yes Yes Yes Yes Yes Yes Yes Yes Yes 9
14 Akhuzada Associates Pvt Ltd Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 11
15 Enertech Engineering Yes Yes Yes Yes Yes Yes Yes 7
16 Wazir and Brothers Yes 1
17 QRI JV PAK Reliable Yes 1
18 United Business System Yes Yes Yes 3
19 Integrated Techno Yes 1
20 Haseeb Enterprises Yes 1
21 M. Shafeeq Yes 1
22 Skygreen Engineering Pvt Ltd Yes Yes Yes 3
23 TSK Engineering International Pvt Ltd
Yes Yes Yes 3
24 Solar Tech Pvt Ltd Yes 1
25 Green Edge Yes Yes Yes Yes 4
26 Renewable Power Pvt Ltd Yes 1
27 Peshawar Pipe & Construction Pvt Ltd
Yes Yes Yes Yes 4
28 Tesla JV SPK Yes Yes Yes Yes Yes Yes Yes 7
29 NRTC Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 27
30 Shaheen Construction Yes 1
Total bidders applied in each Package 2 4 7 4 7 4 2 9 4 7 2 5 6 6 2 5 3 6 2 3 5 4 2 2 1 3 7
The attendance sheet is attached at (Annex-II)
Page 3 of 5
5. While opening of technical proposals of bidders it was noted that some of the bidders didn’t submit
the technical proposals copy as required in the bidding documents. The detail are as under;
S# Package Contractor Remarks
1 2 FAZAL KHALIQ & CO ENGINEERS &
BUILDERS
Copy of the Technical Proposal was
not submitted
2 3 FAZAL KHALIQ & CO ENGINEERS &
BUILDERS
Copy of the Technical Proposal was
not submitted
3
5
FAZAL KHALIQ & CO ENGINEERS &
BUILDERS
Copy of the Technical Proposal was
not submitted
4 GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was
not submitted
5 6 WAZIR & BROTHERS Copy of the Technical Proposal was
not submitted
6 7 TESLA JV SYS Copy of the Technical Proposal was
not submitted
7
8
GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was
not submitted
8 LEAN AUTOMATION Copy of the Technical Proposal was
not submitted
9
9
M/S HASEEB ENTERPRISES Copy of the Technical Proposal was
not submitted
10 TESLA JV SYS Copy of the Technical Proposal was
not submitted
11
10
MUHAMMAD SHAFIQUE & BROTHERS Copy of the Technical Proposal was
not submitted
12 GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was
not submitted
13 11 TESLA JV SYS Copy of the Technical Proposal was
not submitted
14 12 PAK ATLANTIS PUMPS (PVT) Copy of the Technical Proposal was
not submitted
15 15 TESLA JV SYS Copy of the Technical Proposal was
not submitted
16 22 TESLA JV SYS Copy of the Technical Proposal was
not submitted
17 24 TESLA JV SYS Copy of the Technical Proposal was
not submitted
18 27 GREEN EDGE ENGINEERING (PVT) LTD Copy of the Technical Proposal was
not submitted
6. The meeting ended with a note of thanks from the chair.