MINUTES OF 484TH MEETING OF OPERATION & COORDINATIONSUB-COMMITTEE OF WRPC
HELD ON 14TH JUNE 2016 AT RAIPUR
The 484TH meeting of Operation & Co-ordination Sub-Committee of WRPC was
held on 14th June 2016 at Raipur. The list of participants is enclosed at Annexure-A.
Shri Ravi Shankar S, COO, GCEL(GMR Chhattisgarh) welcomed the delegates of all
constituents of WRPC and wished them a comfortable stay at Raipur.
He made a presentation on highlight of performance of GMR Chhattisgarh. He informed
that Unit no -1(685 MW) is commissioned on 1st June 2015 & Unit no.2 (685 MW) is
commissioned on 1st April 2016. He informed that GMR group is operating total capacity
of 4604 MW throughout the nation including Thermal, Hydro & RES(Solar & wind).
GCEL has a long term PPA with CSPTCo for 35% of the installed capacity (30% on
CERC regulations and 5% on variable cost). For remaining capacity, company is
planning to participate in upcoming case-1 bids.
He thanked Member Secretary, WRPC for providing the opportunity to host the meeting
at Raipur.
Shri S D Taksande, Member Secretary, WRPC extended warm welcome to all the
participants of the 484th OCCM at Raipur.
He appreciated GMR Chhattisgarh, specially Shri Ravi Shankar S, COO, & Shri
Sandeep Pachpor VP(O&M) for their guidance. Shri Pankaj Vaidya & Anusha Gandham
Executive Engineer GCEL(GMR Chhattisgarh) were appreciated for immaculate
arrangement of hospitality and stay at Raipur.
He told that Western region is power surplus region because of continuous addition of
generation. He emphasized that next generation will be facing new challenges due to
addition of large amount of renewable energy sources to grid & urged utilities to brace
themselves to accommodate huge amount of RE power
He further informed about following important events which have taken place since last
month
The 4th amendment to Indian Electricity Grid Code (IEGC), 2010 notified on 6th
April, 2016 requires NLDC to formulate a procedure for taking units under
Reserve Shut Down and identifying generating units to be backed down up to
technical minimum schedule. Comments from WRPC needs to be sent to NLDC
at the earliest.
He informed that now the generators under section 62 can enter into open market
-
2
484th OCC MINUTES
for sell of unrequisitioned power through Power exchanges in line with provisions
of revised tariff policy.
40th SCM was held on 1st June 2016 at NRPC, New Delhi wherein following
important items were discussed:
a. Planning for Transmission System for Ultra Mega Solar Power Park in
different parts of WR.
b. Planning for Interconnection between CGPL UMPP and Adani Mundra
generation plants in Gujarat.
c. Measures to control High fault levels observed in Korba STPS & Wardha
S/S.
A Special Meeting on OPGW connectivity between WRLDC and SLDC Kalwa
was held on 09.06.2016.
A Special Meeting of assessment of status of ULDC equipments (RTUs &
communication equipments) and requirement for their replacement / up gradation
in WR was held on 09.06.2016.
A meeting to discuss the draft DPR on Renewable Energy Management
Centre(REMC) in WR prepared by E & Y consultant was held on 10.06.2016 at
WRLDC Mumbai.
He informed that two more Generating Units added in WR During last month i.e.
Jhabua Power Ltd(600MW) commissioned on 03.05.2016 & TRN unit (300MW)
synchronized on 31.05.2016.
Thereafter he requested SE (OPN), WRPC to take up regular agenda items in seriatim
for discussion.
ITEM No. 1: CONFIRMATION OF THE MINUTES
SE(O), WRPC stated that Minutes of 483rd meeting of Operation & Coordination Sub-
Committee of WRPC held on 12.05.2016 at Jabalpur were forwarded vide letter No.
WRPC/OPN/OCC-Minutes/2016/5399 dated 23.05.2016.
A. PGCIL COMMENT:GM(AM),WRTS-II, PGCIL vide letter dated 08.06.2016 commented on item no. 8.4
regarding a commissioning of assets in advance – certificate from WRPC for claiming of
additional RoE last Para of 483rd OCC MoM:
-
3
484th OCC MINUTES
Quote:“Member Secretary, WRPC suggested WRLDC that based on discussion in OCC, theymay issue a justification letter for 765kV S/C (Quad) Bina-Gwalior Ckt.3 to WRPC forfurther needful at WRPC Secretariat.”
Unquote:
He requested following addition after above para.
“WRLDC has conveyed that as per their system study, addition of 765kV Bina-Gwalior
Ckt.3 element has improved grid stability between WR-NR corridor and network
redundancy, this has benefitted the grid network. After deliberation, all constituents
have agreed that this element meets the criterion of claiming additional ROE and thus
may please be granted”.
GM, WRLDC stated that the matter was already agreed in 483rd OCC forum. WRLDC is
being part of WRPC, there is no need to take separate justification of benefits of the
above elements from WRLDC. He further stated that WRLDC has agreed on benefits of
addition of 765kV Bina-Gwalior Ckt.3, whereas they have not supported the benefits of
765 kV Indore-Vadodara line commissioned before target date & thus additional RoE for
same can’t be granted.
Sub-Committee agreed for above modification.
Member secretary stated that as a practice of earlier two cases on the same subjects,
WRLDC justified the benefits of concern transmission elements.
He suggested that any RoE case onwards shall be discussed in OCC forum of the WRPC,
where views on subject matter from beneficiaries can be taken & after approval of
justification from the forum, WRPC Secretariat shall consider to issue necessary certificate
for claiming additional RoE.
SE(LD), Kalwa, Maharashtra stated that details of completion of work in totality and
benefits accrued should be shared with beneficiaries of WR.
Sub-Committee agreed the above proposal of MS WRPC.
-
4
484th OCC MINUTES
B ADANI COMMENT:GM, APML, commented on last paragraph of item no 9.3 regarding 765/400 kV ICT at
Tirora and 765/400 kV ICT at Akola II -- N-1 non-compliant
Quote:“MEGPTCL informed that approval of MERC for 2nd ICTs at Akola-2 and Tirora had been
obtained and the orders have been placed. Erection and commissioning activities are
being started. It would be completed within 3 months.”
Unquote:
He requested following modification in place of above para.
MERC approval for Tiroda and Akola 2nd ICT is still awaited, Engineering activities hasbeen completed. Erection and commissioning activities can be completed within 6months from the date of MERC approval.
Sub-Committee agreed for above modification.ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF MAY 2016.
SE(OPN),WRPC requested WRLDC to brief the Committee on Grid Operation experiences
during May 2016.
Engineer, WRLDC in the presentation concentrated broadly on the performance of the grid
for month of May 2016 (attached in soft copy).
2.1 Frequency ParticularsThe average frequency during the month of May, 2016 was 50.00 Hz. The maximum
instantaneous frequency was 50.44 Hz at 17:31:30 hrs on 18th May -16 while minimum
instantaneous frequency was 49.56 Hz at 22:12:20 hrs on 26th May -16. The frequency
profile during May, 2016 was as under:
01st May 2016 to 31st May 2016 % time
IEGC band (49.9 < f < 50.05 Hz) 69.78
< 49.9 Hz 07.10
> 50.05 Hz 23.12
The frequency particulars is enclosed at Annex-2.1
The Sub-Committee noted.
-
5
484th OCC MINUTES
2.2 Inter-regional Exchanges
There was a net inter-regional export of 5063.00 MUs by WR against net export schedule
of 5069.00 MUs.
The Sub-Committee noted.
2.3 Voltage Profile
Voltage profile at some of 765/400 kV sub-stations during the month of May 2016
furnished by WRLDC is enclosed at Annex-2.3.
The Sub-Committee noted as above.
2.4 U/F Relay Operations
As per WRLDC records during May 2016 the system frequency didn’t touch 49.2 Hz and
no UFR operation has been reported by WRLDC.
The UFR operation status reported by constituents is enclosed at Annexure-2.4.
The Sub-Committee noted as above.2.5 Power Cuts / Load Restrictions
Details of Power Cuts and Regulatory measures during May 2016 as furnished by the state
utilities are given in Annex. 2.5.
The Sub-Committee agreed to furnish as above.
2.6 Details of Generating Units under Forced outages
Details of generating units under forced outages during May 2016 are given in Annex-2.6.
The Sub-Committee noted as above.
2.7 Details of Generating Units under Planned outages
The details of generating units under Planned Outages during May 2016 are given inAnnex-2.7
The Sub-Committee noted as above.
ITEM NO.3: OPERATIONAL PLANNING
3.1 Proposed Planned maintenance programme of generating units.
The maintenance programme of generating units for June 2016 & July 2016 was discussed.The maintenance programme of generating units for the months June 2016 & July 2016 isgiven in Annex 3.1.The Sub-Committee agreed as above.
-
6
484th OCC MINUTES
3.2 OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS
SE(Opn), WRPC informed that following procedures for transmission elements outages
planning for 483rd OCCM onwards:
1) The OCC held in the current month (M) shall discuss the line outages for the
period from 20th of current Month to 19th of next month.
2) The data for the above line outages shall be positively sent by 3rd workingday of current month for outages of said period. OCC will not entertain therequest after due date.
3) The compiled data shall be e-mailed to WRLDC, SLDCs /utilities for any
comments by 5th working day.
4) The line /element outages are of the following types: Routine Maintenance,
Constructional and Inter-Regional.
5) As per the control areas, IEGC rules and existing practices WR, OCC shall
discuss all 400 kV and 765 kV lines outages, irrespective of ownership, all inter-
regional/ inter-state lines, all 220 kV lines from ISGS stations. Where outage of a
line not covered under the above and wholly under a state, for example a 220 kV
line in Gujarat, the agency seeking the outage shall have to approach Gujarat
STU /SLDC authorities. If there are any problems, WR OCC may be informed for
any assistance required.
6) WR OCC typically meets between10th to 15th of every month. It was decided in 4th
NPC meeting that OCC meeting shall be held by all RPCs not later than 20th of
every month to leave a clear margin of 10 days to plan & coordinate outages for
next month by NLDC.
7) Inter-regional outages shall be planned well in advance so that time for co-
ordination by NLDC/WRLDC can be done. NLDC shall co-ordinate inter-regional
outages under intimation to the concerned RPC/RLDC.
8) For construction related outages the dates cannot be exactly planned in advance
though the tentative month/ dates may be decided and based on real time
conditions the outages can be permitted by WRLDC/SLDC for constructional
related category.
9) Only those elements planned for maintenance shall be taken for outage subjected
to real time condition permitting.
-
7
484th OCC MINUTES
10)Urgent/emergency outages not in the above plan shall be taken as per advice of
SLDC/WRLDC and information of same to all SLDC / WRPC shall be given.
11)Code Giving Procedure: Since short term market clearance depends onavailable transmission capacity & is cleared on day ahead basis, there was a
need for better planning. In this regard following was decided in the previous
OCC meeting and shall be implemented:
(a) All utilities shall confirmed on D-3 through following link about readiness to
avail outages (where D is date of outage):
https://docs.google.com/spreadsheets/d/1M-JeQbm6Cer8dB0uHStyPcGIMs95Us7TqqFrxq77mGY/edit#gid=2078002005
(b) WRLDC shall issue code in real time within reasonable time with best effort
either the code to avail or cancel depending on real time conditions.
(c)All utilities that do not confirm by D-3, those outages shall be deemed
cancelled.
SE(Opn) further informed that as agreed in 481st OCC meeting, most of the constituentshave submitted the transmission elements outage proposal within stipulated time (i.e.three working day).
He further requested to WRLDC/NLDC to submit the proposal on third working day asper guide lines formulated above.
He insisted utilities for times adhere for proposal of submission. In next OCC onwards noother outages list will be considered. He requested all the utilities to coordinate with theirfield engineers for time line submission of the outage proposal.
Any other outages of emergency nature will be directly taken by WRLDC & coordinatedwith WRPC if required.
SE(Opn), WRPC informed that that since the agenda Annexure 3.2 for proposal oftransmission elements outages is circulated on 5th working day of the month, thereforeWRLDC/SLDC shall gone through the annexure before coming to meeting & onlyspecific issues will be discussed during the outage planning meeting.
Maintenance programme for transmission lines for the period of 20th June, 2016 to 19th July
2016 were discussed.
The outages planned agreed during the meeting is given in Annex 3.2.
The Sub-Committee agreed/noted for the same.
-
8
484th OCC MINUTES
3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – JUNE 2016 & JULY– 2016
Details of anticipated restricted & un-restricted demands for the months of June 2016 &
July 2016 are given in Annex 3.3.
The Sub-Committee noted the same.ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF May 2016
The details of actual generation, demand, drawl of power from grid; exchanges etc. are
given in the following Annexures:
Annex 4.1 - Actual Generation and Requirement for May 2016.Annex 4.2 - Peak Demand: Schedule Vs Actual for May 2016.Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines
for May 2016.Annex 4.5- Details of Declared Capacity, Schedules and Injections from Central sector
stations, Drawl Schedules and Entitlements of constituents during May 2016Annex 4.6 - Inter System Exchanges for May 2016.Annex 4.7 – Details of level of Major Reservoirs in Western Region for May 2016.
The Sub-Committee noted as above.
ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month of May
2016. However the details of minor incidences during the month received from WRLDC
are enclosed at Annexure-5.
The Sub-Committee noted as above.
ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system.
Constituents have furnished the status of healthiness of SER/DRs in their systems on thedates below:
Sl No. Name ofconstituents
Date of Receipt
1 PGCIL,WRTS-I 02.06.20162 PGCIL,WRTS-II 14.06.20163 MPPTCL 14.06.20164 NTPC 14.06.20165 CSPTCL 03.06.20166 GETCO 08.06.20167 MSETCL 03.06.2016
The Sub-Committee noted.
-
9
484th OCC MINUTES
ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS, TRANSMISSION LINES ANDGENERATING UNITS IN WR.
7.1 Status of completion of ongoing Schemes for Commissioning of reactors.
The present status regarding schedule and commissioning of reactors is as below:
S.No.
400 kVSub/stn.
Size(MVAR)
Implementing agency
Expected commissioningdate
1 Nanded 125 MVAR MSETCL July – 2016
2 Sholapur 125 MVAR MSETCL July – 2016
3 Kolhapur 125 MVAR MSETCL July – 2016
4 Akola 125 MVAR MSETCL July – 2016
*5 Nagda 125 MVAR MPPTCL July – 2016
6 ISP 125 MVAR NHDC July– 2016 (Expected)
7 Line reactorat Nagda-ISPline at Nagdaend
50MVAR MPPTCL Sept 2016 (Expected)
8 Satpura 50 MVAR MPPGCL Dec-2016
9 Khandwa 125MVAR PGCIL Commissioned on01.04.2016
10 Vindhyachal 125MVAR NTPC Commissioned on06.04.2016
*50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda.
Sub-Committee noted as above.7.2 STATUS OF COMPLETION OF 765/400 KV AND ABOVE ONGOING TRANSMISSION
SCHEMES BEING EXECUTED/IMPLEMENTED BY TRANSMISSION AGENCIES.
The updated status on various ongoing transmission schemes for the current year as per
the current information available is as follows: -
-
10
484th OCC MINUTES
S.No.
Name of the Line TargetCompletionDate
Remarks
POWERGRID1 400 kV Navsari – Kudus D/C Line August -16 ROW/Forest problem2 765 kV Wardha –Nizamabad-
Hyderabad D/CDec -16
3 400 kV Aurangabad - Boisar line D/Cline
Oct -16
4 765 kV Aurangabad (PG) - Padghe(PG) D/C
Dec -16
5 800kV Champa – Kurukshetra Bipole September-16
6 LILO of both circuits of Aurangabad –Pune 400 kV D/c line at Pune 765/400kV GIS
Commissioned on03.04.2016
CHHATTISHGARH1 400 kV DCDS Raipur(Raita)-
Jagdalpur(DCDS)Oct -16
2 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL S/s Raigarh. Idealcharged on 11.8.2015 for no theftreason
Oct -16 Under discussion withOrissa and ERLDC, beingtaken up by WRPC
GUJARAT1 400 kV D/C Vadinar-Amreli line Oct -16
2 400kV APL-Hadala LILO to Halvad Oct -16
3 400 kV D/C Amreli-Kasor line(Part-1) Dec -16
4 400 kV Charanka- Veloda Oct -16
5 400kV Varsana-Halvad Oct -16
MADHYA PRADESH
MAHARASHTRA(STU)1 400 kV Bableshwar-Kudus D/C
(Quad) August -16
STERLITE (RPTCL)1
400 kV Sujalpur(PG)-RAPP(Kota)(IR byRTCL)
Commissioned on26.02.2016(But idlecharged from Sujalpur Endas bays at Rapp end arenot ready)
The Sub-Committee noted as above.7.3 Commissioning of new Generating units in Western Region and the
capacity expected to be commissioned during the current year 2016-17.
The status regarding Generating units, commissioned /expected to be commissionedduring the current year according the available information is as below:
-
11
484th OCC MINUTES
Name of the Power Projects Unit No. Capacity(MW)
Date of Commissioning/Schedule Date
GUJARAT
CHHATTISGARHMARWA 2 500 Date of synchronization -
02.03.2016 yet to be COD.MAHARASHTRACHANDRAPUR 8 500 Synchronized on 29.3.2016.
COD ON 04.06.2016CHANDRAPUR 9 500 Commissioned on
21.03.2016. COD not yetKORADI 9 660 Synchronized on
21.01.2016. COD not yetKORADI 10 660 July -2016
MADHYA PRADESH
M/s Jhabua Power, Seoni 1 600 Synchronized on23.02.2016Cod on 03.05.2016
Essar Power MP Ltd(Mahan) 2 600 July -16
MB Power 2 600 Cod on 07.04.2016
CENTRAL SECTOR/IPP
GMR Chhattisgarh 2 685 Cod on 01.04.2016
KSK 3 600 July – 2016
KSK 4 600 August – 2016
RKM 3 360 Dec 2016
RKM 4 360 Dec 2016
Sub-committee noted as above.
ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS
ITEM NO. 8.1: QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
SE(O), WRPC requested all the constituents to submit the CMP report for the Fourth
quarter (January 2016 to March 2016) for the year 2015-16.
-
12
484th OCC MINUTES
The Sub-Committee noted as above and agreed to furnish the same.
ITEM NO. 8.2: STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR
SE(O), WRPC requested the constituents to submit the Status of physical & cyber security
in Power Sector for the Fourth quarter (January 2016 to March 2016) for the year 2015-16
The Sub-Committee noted as above and agreed to furnish the same.
ITEM NO. 8.3: READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADA/EMS SYSTEMDuring 29th WRPC meeting it was decided that the status of progress of SLDC’s & Back-up SLDC’s of WR constituents /WRLDC would be regularly monitored in monthly OCCmeeting.The matter was discussed during 31st TCC/WRPC meeting and WRTS-II, PGCIL hasbeen assigned the role to coordinate & sort-out the issues at the earliest for timelineimplementation of project with states & LD&C division of PGCIL. WRPC suggested tocall a meeting to expedite the same.Accordingly a meeting on SCADA/EMS was held on 27th April, 2016 with M/s Alstom at
Bhopal. The most of the issues have been resolved by M/s Alstom. Other small punch
points will be resolved by resident engineer of M/s Alstom by the end of September
2016. Representative from M/s Alstom informed regarding resolution & escalation of
project three level of engineers will be deployed viz at site level, at regional level & at all
India level. Issues will be monitored at centralized level & resolving of the issues will be
solved by appropriate level of expertise.
Representatives from Gujarat, MP & Chhattisgarh have agreed to the above
arrangements of punch points resolving & man power deployments by M/s Alstom .
PGCIL confirmed the same for Goa, DD & DNH. The defect liability period will be
started from 1st June 2016 for one year & thereafter AMC will be continued for next five
year as per contracted terms & conditions.
Member Secretary, WRPC suggested to compile all punch points and unresolved issues
and a meeting may be convened accordingly for the same with M/s Alstom. He further
suggest as AMC is on individual basis, SLDC’s shall do their TOC(transfer of control)
individually.
-
13
484th OCC MINUTES
DGM, WRTS-II, Vadodara agreed to convey a meeting at Vadodara to expedite the
same at the earliest.
The latest status of progress of SLDC’s & Back-up SLDC’s of WR constituents /WRLDC
is enclosed at Annexure 8.3.
The sub-Committee noted as above
ITEM NO. 8.4 PERMISSION REQUEST FOR ANTI-THEFT CHARING OF +/- 800 KVHVDC CHAMPA – KURUSHETRA LINE ( IN 2 SECTIONS OF 15 KMS LENGTHIN ANUPUR & DINDORI DISTRICTS OF MP).
GM(AM), WRTS-II, PGCIL Vadodara vide letter dated 26.05.2016 informed that
construction activities of +/- 800 kV Champa – Kurukshetra HVDC line is in advance
state of completion. This shall make an important inter-regional link between WR-NR
and benefit for reliability and bulk energy transfer. One package of line between location
nos.418 to 814 in MP state of Anuppur & Dindori district has been completed. The
charging of subject transmission line is feasible upon readiness of terminal stations at
both ends of line. This is expected to be ready by July 2016.
In this regard, it is pertinent to mention that during last six months, many incidents of
conductor theft in subject line have been encountered under Dindori & Anuppur District
of MP state. This is causing serious execution problem for us due to conductor qty. as
well as rework in transmission line. Hence, it is essential to protect theft of conductor as
well as prevent any damage/break down to tower due to unbalancing, which has
fortunately not happened till date.
He requested for idle charging of part of 800 kV HVDC Champa – Kurukshetra line ( 2
sections of 15 kms each) has been explored in theft affected portion. Thus proposal is
illustrated as below:-
1. Pole-1 of 800 kV HVDC Champa-Kurushetra line proposed to be charged with
Top phase of Ckt.2 of 400 kV Anuppur-Jabalpur line. Detailed sketch of same is
enclosed at annexure 1 (between line loc.no.100/0 & 101/0 of HVDC line and
loc.nos. 30 & 31 of 400 D/C Anuppur-Jabalpur line).
2. Similarly, Pole-II of 800 kV HVDC Champa-Kurushetra line proposed to be
charged with Top phase of Ckt.2 of 400 kV Vindhyachal-Jabalpur line. Detailed
sketch of same is enclosed at annexure 2 (between loc.nos.6/0 & 7/0 of HVDC
line and loc.nos. 898 & 899 of 400 D/C Anuppur-Jabalpur line).
-
14
484th OCC MINUTES
He requested for permission of anti-theft charging of 800 kV HVDC Champa –
Kurukshetra line in above section.
OCC discussed the above matter & opined that permission of anti-theft charging of 800
kV HVDC Champa – Kurukshetra line at Extra high voltage (400kV) is not advisable,
whereas if PGCIL willing to anti-theft charging, it can be done at 11kV, 33kV or 66kV
level.
However GM, WRLDC informed that as per CEA guide line on anti-theft charging,
WRTS-II, PGCIL Vadodara may directly approach to WRLDC. WRLDC will look after the
possibility of anti-theft charging as per the existing CEA standards/guidelines.
The Sub-Committee noted as above.
ITEM NO. 8.5 PROPOSAL FOR PSDF
Following utilities have approached WRPC Secretariat for recommendation of their
projects to the Appraisal Committee for funding from PSDF(Copy attached at Annexure
8.5):
Sr.No. Name of project Organisation
1 Installation of capacitors bank in MGVCL &UGVCL
MGVCL & UGVCL
GUJARAT
2 Replacement of existing 14 Nos. ABB makesRADSS (static) scheme by Numerical Bus barProtection schemes at various 400/220KV ClassSubstation & Supply and commissioning ofNumerical bus bar protection scheme (14 Nos. ofscheme provided at 132KV Class) underRenovation & modernization (R&M) scheme”
GETCO
3 Installation and Commissioning of Capacitorbanks at various EHV substations under Nashik &Pune Zone in MSETCL
MSETCL
In 29th WRPC meeting it was decided to form committee comprise of MS WRPC, GM
WRLDC, ED/CE (STU) from the constituents, ED POWERGRID, ED NTPC for
recommending the projects to the appraisal Committee.
Member Secretary, WRPC suggested to call a meeting of above members for
recommendation of above projects to appraisal committee. Also he requested for
submitting any such proposal at the earliest so that there could be included for
discussion in proposed meeting.
The Sub-Committee noted as above.
-
15
484th OCC MINUTES
ITEM NO. 8.6 SHEDULE FOR NTPC JHANOR GPP FOR GGF GAS UTILISATION.DGM NTPC HQ-I informed that at present Jhanor station is getting schedule so the
GGF is getting utilized. It is requested to facilitate and support Jhanor minimum one GT
operation to continue the GGF consumption in Manson/low demand perioed as well. If
The Jhanor gas station goes under close reserve due to less /no requisition from
beneficiaries constituents. This will be resulting in non utilisation of GGF Gandhar gas
field gas.
He informed that non-availability of generation schedule, the station is not able to draw
any ONGC’s South Gujarat gas from GAIL which can only be taken at Jhanor Gandhar
GPS. The gas suppliers are compelled to flare gas due to low off take by consumers.
GAIL has issued letters mentioning that the continuous off take of GGF gas to be
ensured otherwise, they would be constrained to raise Take-or-Pay clause in line with
the contractual obligations. The GGF is in APM category which is the cheapest gas in
the country, any shortfall in its drawl may lead the Govt. to reduce allocation of the
same.
The matter was discussed in 28th WRPC meeting dated 04.03 2015 and subsequent
OCCM, the utilisation of the GGF was in principal agreed and constituents were advised
to give schedule accordingly.
In view of above, he requested that sufficient generation schedule may be given to
Jhanor-Gandhar station so that the station can operate at least at its technical minimum
load (149 MW) in combined cycle mode and can draw the committed gas from GAIL to
avoid Take-or-Pay situation.
Please note that if M/S GAIL if invokes take or pay clause than such amount will have
to be loaded to fuel cost to be recovered from beneficiaries.
GM, NTPC expressed that the point has been agreed in previous WRPC/TCC/OCC
meetings and all the beneficiaries must support for the same. He once again requested
all the beneficiaries for giving schedule to Gandhar for one GT technical minimum
schedule (149MW) as agreed in previous forums. This is in the interest of all the
beneficiaries, GGF being the cheap gas power is available to them and also important
for the utilisation of the natural resource which is otherwise wastefully flared up.
-
16
484th OCC MINUTES
Member Secretary, informed that in the coming monsoon season would be difficult for
beneficiaries to schedule Kawas/Gandhar GS & also informed that as per Office
Memorandum dated 09th May 2016 from MoP wherein State Govt / State DISCOM were
advised to use para 6..2(1) provision of Tariff policy and give their consent to the
respective Generating stations for sale of such URS Power in the market through Power
Exchange. NTPC can also avail this facilities.
The Sub-Committee noted as above.
ITEM NO. 8.7. MOUDA STAGE II POWER EVACUATION 400KV MOUDA –BETUL PGLINES READINESS.
DGM NTPC HQ-I informed that Mouda Stage II ,Unit-3 test synchronized and COD likely
by July 2016 and Unit-4 by the year end. Presently Mouda power evacuation is only by
Mouda-Wardha 400KV double ckt lines. Mouda –Betul DC line is under erection. Early
readiness of the lines may please be ensured to facilitate power evacuation.
PGCIL intimated that the line will commissioned by the September 2016.
NTPC representative requested Powergird adhere to schedule commitment given by
them.
Member Secretary requested PGCIL to expedite the same.
The Sub-Committee noted as above.
ITEM NO. 8.8 MOUDA UNIT-1 SCHEDULE FOR BOILER PG TEST.DGM NTPC HQ-I informed that Mouda Unit#1 PG test for Boiler part-I completed,
for Boiler part II PG test BHEL preparation is in progress, programme for the same will
be informed . Beneficiaries are requested to provide the generation schedule for PG
test.
Member Secretary requested beneficiaries to support for the PG test as it is contractual
requirement of station.
The Sub-Committee noted as above.
ITEM NO. 8.9 PROBLEMS IN WEB SCHEDULINGChief Engineer, SLDC Chhattisgarh informed that while scheduling through WRLDC new
web scheduling software, some problems/suggestions were forwarded to WRLDC, needs
to be resolved/incorporated:
-
17
484th OCC MINUTES
(a) For preparation of requisition by State for ISGS entitlement, the pages related to
every ISGS stations are to be opened separately which is quite inconvenient
and time consuming. If the same is provided State wise, incorporating
entitlement of all central sector stations in a single page, preparation and
submission of requisition will be much easier and convenient.
If the above is not possible then in the requisition & schedule menu, the
sequence of central sector ISGS in drop box may be kept same as that is
being uploaded in the website of WRLDC which will ease the down loading
the same for further use.
(b) Drawl Schedule Display in WRLDC Website:-The drawl schedule of differentStates with their embedded entity are presently being displayed in the WRLDC
website needs to be simplified by adding some suffix to the name of ISGS
station. This will help in using these data further in our internal software. At
present the share of the State in ISGS as well as in bundled solar power are
being displayed with the same name of ISGS station. Similarly the share & URS
of embedded entity of CSEB i.e. BSP and State share in NSPCL also needs to be
displayed by adding some suffix to it.
GM, WRLDC ensured that the above points suggested by SLDC, Chhattisgarhcan be considered & accordingly try to accommodate on the new software.
(c) Despite discussion in last OCCM, the issue of data from Raipur & Bhatapara
PGCIL stations in midnight has not been resolved.
PGCIL informed that being above sub stations are unmanned, therefore it will be
difficult to provide the data at midnight.
Member Secretary suggested that CSPTCL can commissioned AMR at above sub
stations to get the online data & requested PGCIL to find some amicable solution for
furnishing the data from above stations.
The Sub-Committee noted as above.
-
18
484th OCC MINUTES
ITEM NO. 8.10 DETAILED DRAFT OPERATING PROCEDURE FOR TAKING UNITSUNDER RSD AND IDENTIFYING GENERATING STATIONS TO BE BACK DOWN UPTO TECHNICAL MINIMUM
Executive Director, NLDC New Delhi informed that the 4th amendment to Indian
Electricity Grid Code (IEGC),2010 notified on 6th April,2016 requires NLDC to formulate
a procedure for taking units under Reserve Shut Down and identifying generating units
to be backed down up to technical minimum schedule. The relevant extracts are given
below:-
“NLDC shall prepare a Detailed Operating Procedure in consultation with the generators
and beneficiaries at RPC forums within 2 months’ time and submit to the Commission for
approval. The Detailed Operating Procedure shall contain the role of different agencies,
data requirements, procedure for taking the units under reserve shut down and the
methodology for identifying the generating stations or units thereof to be backed down
upto the technical minimum in specific Grid conditions such as low system demand,
Regulation of Power Supply and incidence of high renewables etc., based on merit order
stacking”.
Accordingly, draft operating procedure (enclosed at Annexure – 8.10) has been
formulated. He requested that the draft procedure may be discussed with the
generators and beneficiaries at the respective RPC level and the comments on the
procedure may be sent to NLDC at the earliest so that the same could be considered
and the final procedure submitted to the Central Electricity Regulatory Commission
(CERC).
Member Secretary, suggested that a meeting would be arranged on 23.06.2016 at
WRPC Mumbai & following issues will be discussed in the meeting & requested all
concerned to participates & discuss the matter in detail.
1. To submit comments on the draft detailed procedure for taking units under RSD and
identifying generating stations to be back down up to technical minimum framed by
NLDC.
2. Sale of Un requisitioned surplus (URS) Power in respect of generators undersection 62 of IE Act 2003, in line with provisions of Revised tariff policy.
The outcome of the meeting will be sent as a WRPC comment to NLDC for their further
consideration.
The Sub-Committee noted as above.
-
19
484th OCC MINUTES
ITEM NO. 9: WRLDC ITEMS9.1Telemetry Issues
The locations having major telemetry issues are as under:
a) Non availability of data from VSTPS stage 3Data is not coming since 30-March-2016. The matter was escalated time and
again. During last meeting, it was informed that Converter is under purchase from
Kalkitech. Present status to be reviewed.
Representative from NTPC informed that converter has been purchased and is
likely to be received at site soon .Telemetry from VSTPS- st-3 would be available
before next OCC.
b) Highly intermittent data from Kolhapur GIS400kV Kolhapur GIS-Kudgi-D/C data is also being used to calculate the drawl of
Maharashtra. Data from Kolhapur goes to Mapusa on OPGW. From Mapusa to
Nagpur it goes on Reliance. From Nagpur to WRLDC it comes on PowerTel.
During last meeting POWERGRID agreed to procure the alternate channel in 3-4
months. Present status to be reviewed.
Representative from PGCIL informed that action for procurement of alternate
channel already initiated and the alternate channel will be available by July’16
end .
Gateway problems at SolapurBoth gateways hanged on 16.04.16 which resulted incorrect computation of
drawal of Maharashtra. POWERGRID WRTS1 during last meeting informed that
these gateways have been procured . There is some License issue before making
it online. Present Status to be reviewed.
Representative from PGCIL informed that gateway commissioning is done
however some Licence issue is pending.Telemetry data would be available by
July’16 end .
c) Intermittent data from ChampaReal time data from Chama is received through GPRS which is highly
intermittent. PowerGrid to indicate the present status of connectivity through
Fibre.
Representative from PGCIL informed that Fibre connectivity is in advance stage ofcompletion and data through Fibre would be available by July’16 end .
-
20
484th OCC MINUTES
d) Intermittent data from DharjaygarhReal time data from Dharamjaygarh is received through GPRS and POWERGRID
Intranet which is highly intermittent. POWERGRID to indicate the present status
of connectivity through Fibre.
Representative from PGCIL informed that Fibre connectivity is in advance stage ofcompletion and data through Fibre would be available by July’16 end .
e) Non-availability of telemetry for elements from MSETCL stationsAvailability of telemetry of following elements from MSETCL end at WRLDC is as
follows:
400 / 220 kV ICTsSr.No. Station name ICT no.
Status
1 Waluj 3Data availablefrom 10.6.16
2 Dhule 3
3 Kalwa 3Data availablefrom 10.6.16
4 Kolhapur 3
5 Parli 3Data availablefrom 10.6.16
6 Padghe 47 Solapur 2
8 Jejuri 1Data availablefrom 10.6.16
9 Jejuri 2Data availablefrom 10.6.16
10 Akola 1Data availablefrom 10.6.16
11 Akola 2
12 New Koyna 2Data availablefrom 10.6.16
13 Bhusawal (400/220)3(MVAR)
14 Koradi 2 2
LinesSr.No. From station To station
ckt.No. Untelemetered end
Status
1AurangabadMH
AurangabadPG 1 Aurangabad MH
2AurangabadMH
AurangabadPG 2 Aurangabad MH
-
21
484th OCC MINUTES
LinesSr.No. From station To station
ckt.No. Untelemetered end
Status
3Parli MH Parli PG
1Parli MH
Dataavailablefrom 10.6.16
4Parli MH Parli PG
2Parli MH
Dataavailablefrom 10.6.16
5AurangabadMH Pune 1 Aurangabad MH
6AurangabadMH Pune 2 Aurangabad MH
7AurangabadMH Deepnagar 1 Aurangabad MH
8AurangabadMH Taptitanda 1 Aurangabad MH
9 Akola Akola 2 1 Akola10 Akola Akola 2 2 Akola
11Bableshwar IB Nashik
1Bableshwar
Dataavailablefrom 10.6.16
12Bableshwar IB Nashik
2Bableshwar
Dataavailablefrom 10.6.16
13 New Koyna RGPPL 1 New Koyna14 New Koyna RGPPL 2 New Koyna15 New Koyna Koyna4 1 New Koyna16 New Koyna Koyna4 2 New Koyna17 New Koyna Jaigad 1 New Koyna18 New Koyna Jaigad 2 New Koyna19 Karad Jaigad 1 Karad20 Karad Jaigad 2 Karad21 Kolhapur Solapur PG 1 Kolhapur22 Kolhapur Solapur PG 2 Kolhapur23 Bhusawal Deepnagar 1 Bhusawal24 Bhusawal Deepnagar 2 Bhusawal
25Koradi Khaparkheda
2Koradi
Dataavailablefrom 10.6.16
26 Dhule MH Dhule BDTCL 1 Dhule MH27 Dhule MH Dhule BDTCL 2 Dhule MH28 Nagothane Padghe 2 Nagothane
Further, SLDC, MSETCL informed that the actions are being taken and telemetry
data of 11 more stations would be available by June’16 end. Balance by July’16
end.
-
22
484th OCC MINUTES
9.2Sale of Un requisitioned surplus (URS) Power in line with provisions ofRevised tariff policy —
Reference is invited to Office Memorandum dated 09th May 2016 from
MoP(Copies enclosed at Annexure-9.2) wherein State Govt / State DISCOM
were advised to use para 6..2(1) provision of Tariff policy and give their consent
to the respective Generating stations for sale of such URS Power in the market
through Power Exchange. Relevant extracts from the Tariff Policy are quoted
below:
"Power stations are required to be available and ready to dispatch at all times.
Notwithstanding any provision contained in the Power Purchase Agreement
(PPA), in order to ensure better utilization of un-requisitioned generating capacity
of generating stations, based on regulated tariff under Section 62 of the Electricity
Act 2003, the procurer shall communicate, at least twenty four hours before 00.00
hours of the day when the power and quantum thereof is not requisitioned by it
enabling the generating stations to sell the same in the market in consonance
with laid down policy of Central Government in this regard. The developer and the
procurers signing the PPA would share the gains realized from sale, if any, of
such un-requisitioned power in market in the ratio of 50:50, if not already provided
in the PPA. Such gain will be calculated as the difference between selling price of
such power and fuel charge. It should, however, be ensured that such merchant
sale does not result in adverse impact on the original beneficiary(ies) including in
the form of higher average energy charge vis-a-vis the energy charge payable
without the merchant sale. For the projects under section 63 of the Act, the
methodology for such sale may be decided by the Appropriate Commission on
mutually agreed terms between procurer and generator or unless already
specified in the PPA."
Member Secretary, WRPC proposed to hold a separate meeting on 23.6.16 to
discuss sale of URS of generators under section 62 in Power exchange along
with the meeting on Draft Procedure prepared by NLDC for RSD mechanism.
-
23
484th OCC MINUTES
9.3Mechanism for compensation for station heat rate and auxiliary energyconsumption for low unit loading and for start-stop during RSD
4th Amendment of IEGC issued by CERC on 6th April 2016, provides as under:
6.3 B (3) “Where the CGS or ISGS, whose tariff is either determined or adopted
by the Commission, is directed by the concerned RLDC to operate below
normative plant availability factor but at or above technical minimum, the CGS or
ISGS may be compensated depending on the average unit loading duly taking
into account the forced outages, planned outages, PLF, generation at generator
terminal, energy sent out ex-bus, number of start-stop, secondary fuel oil
consumption and auxiliary energy consumption, in due consideration of actual
and normative operating parameters of station heat rate, auxiliary energy
consumption and secondary fuel oil consumption etc. on monthly basis duly
supported by relevant data verified by RLDC or SLDC, as the case may be.”
6.3B (3) (iii) “Where the scheduled generation falls below the technical minimum
schedule, the concerned CGS or ISGS shall have the option to go for reserve
shut down and in such cases, start-up fuel cost over and above seven (7) start /
stop in a year shall be considered as additional compensation based on following
norms or actual, whichever is lower:”
6.3 (3) (vi)“The compensation shall be borne by the entity who has caused the
plant to be operated at schedule lower than corresponding to Normative Plant
Availability Factor up to technical minimum based on the compensation
mechanism”
6.3B (7)”The RPCs shall work out a mechanism for compensation for station heat
rate and auxiliary energy consumption for low unit loading on monthly basis in
terms of energy charges and compensation for secondary fuel oil consumption
over and above the norm of 0.5 ml/kWh for additional start-ups in excess of 7
start-ups, in consultation with generators and beneficiaries at RPC forum and its
sharing by the beneficiaries finalized by the RPCs.”
Member Secretary, WRPC advised NTPC to prepare the draft mechanism for
compensation and put up in next CCM. If possible the issue could also be
included in a special meeting scheduled on 23.06.2016 for RSD & URS
mechanism.
-
24
484th OCC MINUTES
9.4Telemetry issues from Maharashtra Stations StationsTelemetry issues from Maharashtra Stations have been flagged in various WRPC /
OCC meetings (since Dec’13). There is very close monitoring on Telemetry issues by
Hon’ble CERC. CERC order vide dt 29.1.16, directs all utilities to up-date telemetry
status in their system within one month of this order with an advance copy to NLDC,
respective RLDC and RPC. RLDC have been directed by CERC to monitor the
implementation of telemetry and in case of any difficulty, the matter has to be
discussed and sorted out in the RPC meetings. If any entities does not submit the
information, the concerned RLDC has to file application before the Commission
against the said entities under Section 142 of the Act. The status of telemetry for all
WR constituents is uploaded in the WRLDC Website. The present status of telemetry
in Maharashtra is tabulated below:
Number ofstationswhose
telemetryshould be
available atWRLDC
Number ofstationswhose
telemetry isnot
integrated inWR-SCADA
Number ofstations whose
telemetry isintermittent /
unreliable
% observability ofstations underjurisdiction ofMaharashtraSTU/SLDC
at WRLDC
A B C (A – (B+ C)/AGenerating
Stations 32 0 4** 87.50%765/400 kV
TransmissionSubstations
19 2* 4***73.68%
220 kVTransmissionsubstations
178 8 5862.92%
Total 229 10 66 67.25%
Telemetry not available from *Chandrapur(ii), Lonikhand(II): During the March OCC
it was informed that it will be made available by end March16. During the April OCC,
it was informed that telemetry from Chandrapur2 is established upto Kalwa and will
be extended upto WRLDC shortly and Lonikhand will be made available by April end.
Present status to be updated by MSETCL.
** Jaigarh, Trombay, Koyna, Deepnagar- MSETCL to give status for resolving the
issue of intermittency.These are important Generating stations .
*** Bableswar, Khargar, Nagothane, Jejuri- MSETCL to give status for resolving the
issue of intermittency. These are important Load points
-
25
484th OCC MINUTES
On 10 May 2016 at 01:09 Hrs, due to lightning and rain the Neutral displacement relay of
400/220 kV ICT 1 & 2 of Lonikhand2 Sub-station along with 400/220 kV ICT 1 at
Lonikhand sub-station has tripped.
WRLDC remained ignorant of tripping of Lonikhand ICT because the telemetry from
Lonikhand2 is not available. SLDC Kalwa also failed to report the event to WRLDC.
SLDC Kalwa to examine the case and ensure prompt sharing of information for reliable
operation.
SLDC, Maharashtra representative informed that telemetry data of Chandrapur(II)
Switchyard & Lonikhand(II) Switchyard will be available by June’16 end.
9.5Implementation of SPS in Maharashtra stations as advised by NLDCImplementation of following SPS is still pending in Maharashtra stations
SPSName
Final Logic SPS Action Status on 25th April 2016
SPS-5 400kV Wardha -Parli D/C:
Tripping of anyone circuit of400 kVWardha -Parli D/C andflow on othercircuit > 750MW
- 800MW Gen Back down inWR: Tirora-200 MW, Koradi –70 MW, Chandrapur – 250MW, Mauda – 100MW,Khaperkheda– 150 MW,Indiabulls – 30 MW
- Load Shedding:- 800 MW in SR.- 200-300 MW in Western
Maharashtra
- Only Tiroda and Maudawired for SPS action.
- Wiring of SPS forgeneration backing down atKoradi, Chandrapur,Khaparkheda and RattanIndia yet to be implementedby Maharashtra.
- Wiring for 200 – 300 MWload shedding in WesternMaharashtra yet to beimplemented.
SPS-6 400kV Parli –Sholapur D/C:
Flow on eithercircuit of 400kV Parli –Sholapur D/Ccrossing 800MW andremainingabove thisvalue for 2.5seconds
- 800 MW Gen Back down inWR: JPL-150 MW, JPL Extn –150 MW, KSK – 100 MW,LANCO – 100MW, DB Power– 100 MW, KWPCL – 100 MW,BALCO – 50 MW, NSPCL – 50MW
- Load of 800 MW shall beshed in SR.
- 200-300 MW load shedding in
- Wiring of Gen Back downat all Stations implemented
-- Wiring of SPS for 200-300
MW automatic loadshedding in Maharashtrayet to be implemented.
-
26
484th OCC MINUTES
OrTripping of any
one circuit of400 kV Parli –Sholapur D/Cand flow onother circuit >700 MW
Western Maharashtra
GM, WRLDC stated that NLDC has replied to SLDC, MSETCL letter and insisted on
implementing the suggested SPS in full.
Member Secretary, WRPC requested MSETCL to expedite the above SPS Scheme.
9.6Extension of SPS signal to KWPCL from Kotra after permanent connectivity toKotra
SPS signal was extended to 400 kV KWPCL through PLCC from Raipur SS, now
said Line has been de-LiLoed and rerouting of signal is required. Matter was
discussed with POWERGRID Kotra and they were advised them to extend the signal
to KWPCL via Raipur SS -Raigarh SS - Kotra PS.
Vide their email dated 20-May-2016, POWERGRID informed that in conventional SS,
PLCC panel are placed nearby hence modification in SPS signal is easy but
Kotra PS has distributed PLCC panels due to which back to back connection is
challenging. Accordingly it was suggested that SPS transmission could be as below -
"SPS Signal to be traveled either through Raipur or directlty from origin through fiber
and further distribution will be done at Kotra PS."
Representative from KWPCL and POWERGRID has confirmed that the SPS signal is
extended up to KWPCL and generator backing down will be observed as per the
scheme.
9.7Frequency Response Characteristic of Major Generators in WRThe FRC of the major generating stations (500 MW and above)is being reviewed
regularly since DEC 15 starting with 478th, 479th, 480th, 481st, 482nd OCC and 483rd
meetings. FRC of following events have been already been analyzed.
-
27
484th OCC MINUTES
Event Date Time Frequency Change Desirableactions
1 26 Oct 15 14:41Hrs0.27 Hz Rise : 50.02 to50.29 Gen reduction
2 21 Feb 16 16:46Hrs0.16 Hz Rise : 49.96 to50.12 Gen reduction
3 06 Mar 16 06:47Hrs0.16 Hz Dip: 50.02 to49.86 Gen pick up
4 14 Mar 16 01:36Hrs0.17 Hz Dip: 50.00 to49.83 Gen pick up
5 14 Apr 16 13:29Hrs0.13 Hz Dip : 49.90 to49.77 Gen pick up
6 17 Apr 16 01:09Hrs0.21 Hz Dip : 49.98 to49.77 Gen pick up
7 18 May1617:31Hrs
0.40 Hz rise : 50.04 to50.43 Gen reduction
On 18 May 2016, there was a major event when it was observed that the grid
frequency increased from 50.04 Hz (at 17:31:02 hrs) to 50.43 Hz (at 17:31:19 hrs) of
18.05.2016 due to sudden load throw off of ~ 3500 MW in Northern Region. This
implies a frequency rise of more than 0.4 Hz (within 17 seconds).
Frequency remained outside the IEGC band for a considerable period of time
causing sudden rise in bus voltage and threat to grid security. The event could have
caused Nuclear / Thermal units to trip on overspeed and EHV Lines to trip on OV.
Thus it was a "near-miss" grid event. It is expected that such large and sudden
variation in frequency is arrested by automatic load reduction in generating units
through governor response. This is mandated by IEGC regulation 5.2 as RGMO /
FGMO which has to be complied by all entities.
All Regional Entities were requested by WRLDC to submit the data of frequency vsMW of the units on bar. The response of various entities to be discussed.
A. The data was furnished by all the regional entity generators except the following:I. ESSAR MAHAN: data is still pending
II. BALCO: data is still pending
III. DB POWER: Data received , but there is no response.
IV. APL MUNDRA: data is still pending
-
28
484th OCC MINUTES
B. Inferences on the response of RGMO and FGMO based on data submitted for 18-
May-16
1) Generators who are participating---
a) NTPC VINDHYACHAL STAGE -2
b) NTPC VINDHYACHAL STAGE 3
c) NTPC VINDHYACHAL STAGE 5
d) NTPC SIPAT STAGE1
e) NTPC SIPAT STAGE 2
f) NTPC MOUDA--BEST
g) KORBA STAGE-2
h) KWPCL
i) SASAN
j) LANCO(300 MW)
k) NSPCL (250 MW)
l) Dhariwal (300 MW)
2) Generators who are not participating
a) NTPC VINDHYACHAL STAGE 4 : data of 18th May’2016 and 9th
June’2016 was shared but RGMO response not observed
b) KSK : 18-may-2016 data shared and RGMO response observed.But
delayed response.
c) MB POWER : RGMO installed. Response will be observed from next event
d) ESSAR MAHAN: data not shared, inspite of repeated calls and email frm
WRLDC.
e) GMR CHATTISGARH:RGMO Logic implemented, Unit was under SD
f) TIRODA: Data submission pending, inspite of repetitive call and email
g) JINDAL STAGE 1: Unit-1 was under shutdown, but assure the response
from next event
h) CGPL: Member not present
i) JP NIGRIE: Fine tuning is required, response will be observed from next
month
OCC deliberated on the following issues:
Non-compliance of WRLDC directions by Generating Stations under category-A
regarding submission data.
-
29
484th OCC MINUTES
Generating Station under Category B-2 to appraise the actions being taken to tune
their governor in compliance with provisions of IEGC.
SLDCs to intimate the response of major generating units within their jurisdiction:
It was decided that each state would do similar exercise for generators above 500MW
and share the RGMO response in each OCCM forum.
9.8Implementation of Web-based Scheduling softwareThe real-time operation of Web-based Scheduling software has commenced w.e.f.
00:00 hrs of 30.05.2016. The progress of activities is as under:
Activity Responsibility Status/RemarkSubmission of DC All regional Entity
Generating StationsNow all stations includingAtomic Power Stationsare filling the data
Submission of requisition All regional entityStates/beneficiaries
All except GOA are fillingthe data. Goa hasinformed that they willstart filling online aftershifting of SLDC to newbuilding.
Validation andScheduling uploading
WRLDC The schedules preparedfrom WBES and from ourown software arematching. However twoissues that are causingmismatch are as under– URS scheduling-Application of InjectingLosses on generatorsoutside the regionBoth these issues havebeen taken up with PwCand they shall beresolved.
Preparation of RPCreports and public report
WRLDC This works shall also becompleted soon.
All regional entity constituents are requested to continue their participation for
complete switch over to the WBES as soon as possible.
GM, WRLDC informed that the New Software on Web Based Energy Scheduling is
successfully running in parallel with the old software since 30-May-2016. It is
-
30
484th OCC MINUTES
observed that during this time, utilities has accustomed themselves with the new
system and the issues raised during this process are being addressed.
Considering the benefit of Web based scheduling software, it was agreed to migrate
to new web based software from 1st July’2016. Further, data entry as per the IEGC
time-line need to be entered by concerned utilities.
The Sub –committee noted as above.
ITEM NO. 11: DATE AND VENUE OF NEXT OCC MEETING
484th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10.
As per roster 485th OCC meeting will be held on 15th July 2016 hosted by KSK Mahanadi
Chhattisgarh. KSK Mahanadi confirmed the same.
The 486th OCC meeting would be hosted by Jaypee Nigri in the month of August 2016.
The Sub- Committee noted as above
*****************************
-
ANNEXURE -A
Sl.No. Organisation, Name & Designation Mobile No. E-mail Address
I WRPC1 Shri S.D. Taksande, M.S. 9820878384 [email protected] Shri V.K. Gupta, S.E. 9960792316 [email protected] Shri L.K.S. Rathore, D.D. 9833371844 [email protected] Shri P.D. Lone, E.E. 9867622823 [email protected]
II MSETCL / MSEDCL/MahaGenco/MSPGCL5 Shri D.K. Rokade, S.E. 9167831551 [email protected]
III MPPTCL / MPPGCL6 Shri K.K. Parbhakar, Addl.C.E. 9425805267 [email protected] Shri P.K. Saxena, S.E. 9425806609 [email protected] Shri Jayant Agasty, E.E. 9425806822 [email protected]
IV CSPTCL / CSPGCL9 Shri W.R. Wankhede, C.E. 9425562412 [email protected]
10 Shri H.K. Deota, S.E. 9893150920 [email protected] Shri Y. Krishna Rao, E.E. 9826518820 [email protected] Shri V.G. Eklla, E.E. 9407703686 [email protected]
V NPCIL13 Shri Sanjeev Gadre, Opn. Supdtg. 8007982777 [email protected]
VI WRLDC / POWERGRID14 Shri V.K. Shrivastava, G.M.15 Shri Kuleshwar Sahoo, A.G.M. 9425294214 [email protected] Shri P.R. Wankhede, D.G.M. 9422811668 [email protected] Shri C. Sunil Kumar, D.G.M. 9409103968 [email protected] Smt. Pushpa Seshadri, C.M. 9869404482 [email protected] Shri D. Bruhananda, C,M. 9428504279 [email protected] Shri Ravi Wadyalkar, C.M. 9423762547 [email protected] Shri Abhishek Gupta, Mgr.
VII NTPC22 Shri P. Sreenivas, G.M. 900467757323 Shri D. Shrikhande, A.G.M. 9004497016 [email protected] Shri H. Harchandani, A.G.M. 9424209158 [email protected] Shri P. Mukherjee, A.G.M. 9425178058 [email protected] Shri M.L. Patra, A.G.M. 9425281282 [email protected] Shri Shri A. Krishna RaJ, A.G.M. 9418024074 [email protected] Shri A.K. Chandeliya, D.G.M. 9004497151 [email protected] Shri N.P. Agrawal, D.G.M. 9413354371 [email protected] Shri Arvind Patle, D.G.M. 9425178284 [email protected]
VIII REL.INFRA31 Shri Ghanashyam A. Raut, G.M. (Opn.) 9325119787 [email protected] Shri Satya Kanaparthi, Manager 9300145996 [email protected]
IX APML33 Shri Manoj Taunk, G.M. 9099005517 [email protected] Shri A. Mathhur, G.M. 9870663062 [email protected]
LIST OF PARTICIPANTS OF 484 th OCC MEETING OF WRPC HELDAT RAIPUR
-
X TATA POWER35 Shri P.R. Gadave, Head G.O. 9223553341 [email protected]
XI KSK Mahanadi36 Shri Chandresh Saxena, Sr. D.G.M. 9755549270 [email protected] Shri Ramakant Upadhyay, Dy. Mgr. 7869916080 [email protected]
XII RKM POWER GEN.38 Shri T. Rajesh Kumar 8435000779 [email protected]
XIII M B POWER39 Shri Vijay Amin, D.G.M. 7773011731 vijaykumar.amin@npppl,in
XIV STERLITE POWER40 Shri Ankit Agrawal 8966903752 [email protected]
XV NSPCL41 Shri A.A. Prasad, A.G.M. 9425293583 [email protected] Shri Sudhir Kumar Sahu, D.G.M. 9109139119 [email protected]
XVI JPL43 Shri Binod Sahoo, G.M. 7898902620 [email protected] Shri Subir Biswas, A.G.M. 9329444832 [email protected]
XVII GMR / GCEL45 Shri A.K. Prusty, Executive V.P. 9811808470 [email protected] Shri Sandeep Pachpor, V.P.47 Shri Ravi Shankar, C.O.O.48 Shri Manoj Mishra, G.M. 8550953421 [email protected] Shri Mukul B. Patwardhan, G.M. 7773012680 [email protected] Shri Shashank Sharma, G.M. 7898919605 [email protected] Shri Ravi Motwani, C. & I. 7698911714 [email protected] Shri Ravi Kaslikar, A.G.M. 9630042534 [email protected] Shri Manish Kumar Singh, A.G.M. 7898919080 [email protected] Shri Chandan Sinha, A.M. 8826887775 chandankumar.sinha @gmrgroup.in
XVIII ESSAR POWER55 Shri Sandeep Gupta, Mgr. 8959593553 [email protected] Shri Ajay Chandra, Dy. Mgr. 9926905365 [email protected]
XIX JAYPEE NIGRI57 Shri Vipin Dubey, Sr. Eng. 9473984724 [email protected]
XX NCA58 Shri M.A.K. P. Singh, Member 9425066437 [email protected]
XXI SASAN POWER LTD.59 Shri Anshuman Ojha, Sr.Mgr. 7828290800 [email protected]
XXII D.B. POWER60 Saroj Garhwal, A.M. 9522200492 [email protected]
-
Anaulagnak 2.1
maah ma[- 2016
1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY 50.20 Hz. BETWEEN 1700 Hrs & 1800 Hrs Hrs. ON 08.05.2016
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY 49.78 Hz. BETWEEN 1800 Hrs & 1900 Hrs Hrs. ON 14.05.2016
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY 50.00 Hz.
AaOsat AavaRi%t
2. INSTANTANEOUS ta%kailak
2.1 MAXIMUM FREQUENCY 50.44 Hz. AT 17:31:30 Hrs. ON 18.05.2016
AiQaktma AavaRi%t
2.2 MINIMUM FREQUENCY 49.56 Hz. AT22:12:20 hrs Hrs. ON 26.05.2016
nyaUnatma AavaRi%t
3. %AGE OF TIME WHEN FREQUENCY WAS MAY 2016 APRIL 2016 MARCH 2016
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz. 0.00 0.00 0.00
48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00
48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00
48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00
49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.14 0.16 0.10
49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 6.96 12.91 8.59
49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 69.78 69.94 70.02
49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 23.12 16.98 21.29
50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00
51.5 hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI
maoM AavaRi%t ko AaMkD,aoM ka ivavarNa
FREQUENCY PARTICULARS DURING MAY 2016
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)
-
मई 2016 Voltage Profile during the month of May 2016 Annex-2.3
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 420 400 428 410 416 399 426 410 424 407 421 411 427 419 421 4102 416 400 426 410 413 399 423 410 421 407 418 405 426 412 417 4093 414 404 427 411 415 400 425 410 423 410 419 410 425 418 419 4104 409 400 424 414 416 400 427 409 415 415 420 410 425 416 420 4105 416 399 431 415 417 398 431 411 425 406 420 408 425 415 420 4086 416 401 429 409 416 401 425 412 423 408 420 409 427 419 421 4117 414 399 426 409 413 398 424 409 423 405 418 410 425 418 419 4118 417 404 430 413 418 403 427 409 425 409 422 414 428 421 422 4139 417 404 428 412 417 402 428 409 423 406 426 409 426 418 420 411
10 416 398 428 407 415 397 422 407 423 400 426 414 427 418 421 41111 413 396 428 410 413 396 420 402 421 402 424 416 426 419 420 411
रायगढ़ Raigarh Bhilai400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
भोपाल Bhopal खंडवा Khandwa इटारसी Itarsi दमोह Damoh नागदा Nagda रायपुर Raipur
11 413 396 428 410 413 396 420 402 421 402 424 416 426 419 420 41112 414 398 425 410 414 396 422 405 420 404 422 414 424 419 418 41013 414 397 429 408 413 394 420 405 421 402 422 412 425 417 418 40714 414 399 426 408 412 396 423 407 421 403 423 412 425 416 418 40815 414 399 427 411 414 398 424 408 421 406 423 413 423 415 419 40916 410 397 425 410 409 395 420 408 419 403 418 410 423 413 414 40617 412 395 424 409 410 394 421 403 419 402 421 412 424 417 417 40818 416 400 429 410 413 398 425 408 422 404 421 412 426 419 420 41219 418 397 429 406 413 393 422 407 425 401 425 408 425 413 420 40620 419 402 427 412 413 400 424 410 423 408 424 411 426 414 420 40821 416 403 429 412 414 400 427 410 424 409 423 411 423 415 419 40822 414 400 427 411 413 399 424 409 424 409 422 413 421 416 410 41023 416 402 427 408 416 399 422 410 424 402 422 410 424 414 418 40824 414 397 427 409 413 396 425 407 422 404 421 411 422 413 418 40725 418 396 427 406 416 395 425 402 423 401 422 410 422 413 415 40126 413 395 427 408 413 394 424 401 422 402 420 413 422 415 417 40127 414 395 428 409 414 394 422 400 423 405 423 412 423 414 415 39828 416 397 428 408 414 395 420 402 422 404 423 411 425 413 417 40829 421 402 423 408 418 400 427 406 425 407 425 415 427 415 418 39930 414 395 427 406 414 392 416 399 421 400 421 409 426 414 417 40931 410 397 422 406 409 394 411 399 419 399 417 408 422 415 415 40731 410 397 422 406 409 394 411 399 419 399 417 408 422 415 415 407
421 395 431 406 418 392 431 399 425 399 426 405 428 412 422 398
-
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 425 412 423 406 428 408 422 409 410 403 416 404 426 416 421 4142 424 411 420 402 427 399 420 399 412 395 414 400 425 412 421 4123 424 412 422 402 426 399 420 401 414 397 415 401 426 413 422 4114 425 410 419 400 427 396 412 396 412 390 415 399 426 412 421 4095 426 408 421 396 427 395 418 395 413 389 414 398 423 410 421 4096 425 408 421 390 427 392 418 400 405 388 414 396 425 408 420 4097 421 409 418 399 424 397 419 397 404 384 414 395 424 406 421 4098 425 412 422 401 428 399 418 401 409 391 415 401 426 412 424 4139 423 409 417 399 424 394 416 397 407 391 412 397 423 408 424 412
10 426 407 424 393 430 395 421 399 413 388 415 390 425 403 422 41011 426 410 421 398 427 397 420 398 412 394 413 393 423 406 425 411
देहगाम Dehgam कासोर Kasor400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
Wardha धुले Dhule Parli बोईसर Boisar कलवा Kalwa असोज Asoj
10 426 407 424 393 430 395 421 399 413 388 415 390 425 403 422 41011 426 410 421 398 427 397 420 398 412 394 413 393 423 406 425 41112 422 411 417 399 423 397 416 398 412 392 412 395 424 408 423 41113 424 408 421 398 426 397 417 401 411 394 412 396 424 408 421 40914 424 409 420 401 429 399 421 400 415 396 412 399 423 409 421 40915 424 412 422 403 431 405 420 404 412 397 413 399 418 418 421 41016 421 409 419 402 424 401 418 395 408 388 411 394 424 406 420 40917 423 410 420 400 425 397 414 394 407 387 412 396 424 408 419 40618 424 414 421 403 429 404 416 397 413 393 415 397 425 407 419 40819 422 405 420 397 431 400 419 400 413 394 415 393 425 406 418 40520 425 409 419 405 427 403 420 404 413 394 414 396 425 406 417 40621 425 408 423 402 430 404 419 397 406 399 413 394 422 403 419 40822 423 408 421 400 428 405 414 400 406 406 414 400 422 409 421 40723 423 406 426 404 431 401 419 397 425 395 415 392 425 401 421 40624 422 407 427 402 428 399 414 392 418 394 412 393 422 402 417 40625 420 403 429 398 427 399 415 389 418 389 413 390 421 401 420 40326 419 406 428 402 426 404 421 397 420 396 413 391 419 401 419 40527 422 403 431 401 429 395 416 401 424 398 413 389 419 401 412 41228 424 406 427 401 427 398 422 395 423 394 413 391 410 410 412 40929 426 411 431 404 431 404 420 400 423 402 415 398 421 410 411 41130 424 405 427 400 428 392 419 393 406 383 412 390 426 410 411 41031 423 403 429 397 428 395 418 392 408 381 411 395 421 408 417 40831 423 403 429 397 428 395 418 392 408 381 411 395 421 408 417 408
426 403 431 390 431 392 422 389 425 381 416 389 426 401 425 403
-
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 414 405 418 410 416 406 774 759 794 766 804 769 796 758 782 7452 414 404 418 402 416 398 774 759 795 766 804 768 793 759 781 7453 412 404 416 406 417 398 772 760 793 767 802 773 791 762 783 7534 412 403 416 404 415 393 773 759 795 766 805 769 792 761 781 7455 414 405 417 405 416 391 772 756 793 761 804 765 792 759 783 7466 413 402 418 406 412 391 774 759 792 764 805 763 792 760 781 7497 413 404 418 402 412 387 772 761 787 766 799 767 786 758 774 7408 416 405 422 407 412 393 777 764 796 772 803 773 794 766 780 7519 413 403 419 411 411 391 775 760 794 763 803 764 790 764 775 747
10 415 401 421 407 415 390 775 758 794 759 805 764 791 762 777 746
बीना Bina इंदौर Indore400kV 400kV 400kV 765kV 765kV 765kV 765kV 765kV
जेतपुर Jetpur Amreli वापी Vapi सीपत Sipat Seoni Wardha
10 415 401 421 407 415 390 775 758 794 759 805 764 791 762 777 74611 415 403 420 404 415 392 772 758 792 766 810 770 791 750 778 74412 412 400 418 404 414 393 768 755 786 762 798 773 788 756 782 74413 414 403 418 406 415 397 770 754 788 756 798 763 786 753 781 73814 413 402 418 405 417 397 769 755 788 758 801 765 782 758 782 74215 414 404 418 409 414 399 771 759 792 765 801 770 792 760 782 74816 414 400 417 403 413 389 770 754 786 758 796 765 783 756 774 74517 413 403 418 402 410 390 769 756 788 761 804 771 779 753 775 73918 416 403 422 407 409 394 773 759 796 761 810 777 790 758 785 75419 413 403 418 408 417 394 769 749 789 749 798 754 788 751 786 74320 413 404 418 410 416 397 772 754 794 763 805 766 793 765 779 75021 413 403 419 409 412 392 770 753 792 764 802 767 790 758 781 74522 414 401 419 409 410 393 767 754 790 763 799 765 792 755 775 74623 415 402 423 401 412 390 768 751 791 758 801 760 794 760 784 74724 413 399 418 404 409 387 767 753 786 761 801 761 786 749 781 74125 413 402 418 408 410 385 767 748 784 751 794 751 792 736 783 74126 412 402 418 407 417 391 765 752 781 756 793 753 779 744 782 73927 412 401 418 406 415 391 770 755 784 750 802 752 783 746 784 73928 412 402 418 406 415 388 774 758 791 757 800 760 787 749 782 74329 412 402 419 407 415 393 778 762 797 760 807 771 795 754 784 74730 412 397 417 401 410 385 772 757 789 755 804 761 786 749 784 73130 412 397 417 401 410 385 772 757 789 755 804 761 786 749 784 73131 412 403 418 401 411 381 770 758 785 755 801 754 780 759 775 738
416 397 423 401 417 381 778 748 797 749 810 751 796 736 786 731
-
Date
Max Min Max Min Max Min Max Min Max Min1 780 760 792 759 805 790 806 790 796 7862 775 761 786 759 805 789 805 789 798 7743 774 760 784 758 803 790 803 790 798 7884 779 760 786 759 803 788 802 790 798 7795 777 759 787 760 803 784 804 782 798 7796 775 762 784 759 806 791 807 790 806 7877 777 763 782 757 803 791 802 789 798 7888 778 763 787 764 807 794 808 794 806 7879 780 767 787 765 809 791 809 791 797 786
10 776 764 786 763 809 790 809 789 805 77411 779 755 786 749 809 793 809 792 804 785
765kV 765kV 765kV 765kV 765kV
सासन Sasan सतना Satna तमनार Tamnar कोटरा Kotra Durg
10 776 764 786 763 809 790 809 789 805 77411 779 755 786 749 809 793 809 792 804 78512 774 755 781 755 805 793 805 793 796 78613 771 757 776 753 806 788 806 787 799 78114 769 757 773 756 806 784 806 783 792 77115 776 752 783 758 797 781 796 780 790 77116 771 751 777 757 793 777 795 775 798 77117 768 757 772 755 804 785 805 784 799 78018 775 755 786 757 807 793 806 791 796 78219 772 757 778 755 804 780 803 778 792 77320 778 763 785 762 810 780 808 778 801 77021 784 744 789 760 800 782 798 779 788 77022 784 764 794 765 795 781 793 780 782 77323 785 749 800 769 800 778 800 776 793 75924 787 757 795 756 794 779 793 777 778 76825 784 741 791 745 794 777 794 776 787 76426 775 752 781 745 799 780 797 778 783 76427 773 754 779 749 795 777 795 776 787 75928 776 753 783 749 803 779 804 777 798 76829 781 763 794 760 808 786 809 786 797 77830 778 756 785 751 808 780 809 779 800 77031 766 758 773 757 797 782 797 778 789 77031 766 758 773 757 797 782 797 778 789 770
787 741 800 745 810 777 809 775 806 759
-
No. ofOccasions
Max Load Reliefat 49.2 Hz
No. ofOccasions
Max Load Reliefat 49.2 Hz
No. ofOccasions
Max Load Reliefat 49.2 Hz
No. ofOccasions
Max Load Reliefat 49.2 Hz
1 01-May-16 0 0 0 0 0 0 0 02 02-May-16 0 0 0 0 0 0 0 03 03-May-16 0 0 0 0 0 0 0 04 04-May-16 0 0 0 0 0 0 0 05 05-May-16 0 0 0 0 0 0 0 06 06-May-16 0 0 0 0 0 0 0 07 07-May-16 0 0 0 0 0 0 0 08 08-May-16 0 0 0 0 0 0 0 09 09-May-16 0 0 0 0 0 0 0 0
10 10-May-16 0 0 0 0 0 0 0 011 11-May-16 0 0 0 0 0 0 0 012 12-May-16 0 0 0 0 0 0 0 013 13-May-16 0 0 0 0 0 0 0 014 14-May-16 0 0 0 0 0 0 0 015 15-May-16 0 0 0 0 0 0 0 016 16-May-16 0 0 0 0 0 0 0 017 17-May-16 0 0 0 0 0 0 0 018 18-May-16 0 0 0 0 0 0 019 19-May-16 NIL 0 NIL NIL NIL 020 20-May-16 0 0 0 0 0 0 0 021 21-May-16 0 0 0 0 0 0 0 022 22-May-16 0 0 0 0 0 0 0 023 23-May-16 0 0 0 0 0 0 0 024 24-May-16 0 0 0 0 0 0 0 025 25-May-16 0 0 0 0 0 0 0 026 26-May-16 0 0 0 0 0 0 0 027 27-May-16 0 0 0 0 0 0 0 028 28-May-16 0 0 0 0 0 0 0 029 29-May-16 0 0 0 0 0 0 0 030 30-May-16 0 0 0 0 0 0 0 031 31-May-16 0 0 0 0 0 0 0 0
1025 91 490 851
ANNEX -2.4
DateSl. No Madhya Pradesh( Compiled from the data received from the constituents)
Chhattisgarh
Under Frequency Operation in various Constituent System of Western Region during the month MAY- 2016
Recommonded Load relief at49.2 Hz / 49.0/48.8/48.6 Hz
Gujarat Maharashtra
-
ANNEXURE 2.5ma[- 2016 ko daOrana piScama xao~ maoM ivaVut kTaOityaaM/ pabMaidyaaM
Power Cut/Restrictions in Western Region for the month of May-2016
k : gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut/ Restriction on Industriesa) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.b) All industries are required to keep their recess timings staggered.
2 kRiYa va gaàmaINa xao~aoM kao ivaVut AapUit-2. Power supply to Agricultural & Rural Sectors
a) 08 Hrs. power supply in staggered form in rotation of day & night is given to Ag. (However, in MGVCL14 hrs. power supply to AG in Kheda & Anand district from 13th Apr'16 & 10 Hrs. AG supply in Vadodaradistrict from 27th Apr'16.) Single Phase supply given during rest of 16 Hrs by providing LSTC..
b) Jyotigram Yojana 24 hrs.
3 Anya jaanakarI3. Any other information: NIL.K : maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula }jaa- kTaOtITotal Energy Cut
(MUs /daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HT/LT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1.Weekly Off2.Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector: -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-PhaseSupply(DLF)
01.05.2016 31.05.2016 23:35 22:29 23:09
2.1 Three-PhaseSupply(Irrigation)
01.05.2016 31.05.2016 09:52 09:10 09:37
2.1 Three-PhaseSupply(Mixed)
01.05.2016 31.05.2016 23:28 22:09 22:53
-
3 Anya jaanakarI3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max.(Hrs)
Min. (Hrs) Average (Hrs)
3.1 Commissionary H. Qtrs. 01.05.2016 31.05.2016 23:49 23:13 23:373.2 District Head Qtrs. 01.05.2016 31.05.2016 23:54 23:14 23:443.3 Tehsil Head Qtrs. 01.05.2016 31.05.2016 23:48 23:06 23:31
ga : maharaYT/ Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pìt idna kula }jaa- kTaOtITotal Energy Cut
(MUs /dayFrom To
(a) Power Cuts/Restriction on HT/LT Industries(b) Load SheddingFrom 01.05.16 to 31.05.16
SaUnya Nil
@ 0-864 MW
SaUnya Nil
00.00
SaUnya Nil
24.00
SaUnya Nil
@ 0.545 MUs/day
(c) Any other information1.Weekly Off2. Staggering of power supplyIndustrial Staggering LSwithdrawn from 03/02/2012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max. (Hrs) Min. (Hrs) Average (Hrs)2.1 Three-Phase Supply 01.05.2016 31.05.2016 10:00 08:00 09:00
2.2 Single-Phase Supply 01.05.2016 31.05.2016 18:00 18:00 18:003 Anya jaanakarI Any other information:There is no load shedding on industrial feeders in Maharashtra
-
Ga : C%tIsagaZ, Chhattisgarh:1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kula}jaa- kTaOtI
TotalEnergy Cut(MUs /day)
sao From tkTo
(A) Scheduled(a) (i) Power Cuts/Restriction on HT Industries(ii) Power Cuts/Restrictionon LT Industries(iii) Power Cuts/Restrictionon Rural(iv) Agriculture pump*
(v)Urban/ Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
00.00(Av)
00.00(Av)
00.00 (Av)00.00 (Av)00.00(Av)00.00 (Av)
1.Rural 58.95 MW(Av) For 13.38 Hrs.2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
-
-
-00.00
--
-
-
-
-00.00
--
-
-
-
-
-0.00
--
0.026
-
3. Industries 70.83 (Av) For 15.18 Hrs.0.032
Total Energy Cut/day 0.058( b) Any other information1.Weekly Off/staggering ofpower supply
1day (In a week as perconsumer’s option) 50MW(Av.) - - -
2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.05.2016 to 31.05.2016, 6.00Hrs (Power cut)
18.00
2.2 Single-Phase Supply - - - - -2.3 Remarks/Note/ - - - - -
3 Anya jaanakarI / Any other information: SaUnya Nil
-
Annex-2.6
( )
,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)
Western Regional Load Despatch Centre,Mumbai
मई 2016Details of forced unit outages during the month of May 2016
अनु
Sl.No
Unitसंघटक
Constituent/IPP
मतामेगावॉटCap.MW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Date
1. ESSAR-2 GSECL 172 12:12 22-02-2013 Still out Still out No Schedule
2. GTPS-2 GSECL 120 01:30 09-04-2016 Still out Still out Long restoration period
3. GTPS-1 GSECL 120 01:30 09-04-2016 Still out Still out Long restoration period
4. Pipavav 1 GSECL 350 00:00 03-04-2015 Still out Still out RSD
5. सूजन SUGEN 1 GSECL 138 23:26 05-04-2016 20:58 14-05-2016 RSD6. उकई Ukai 6 GSECL 500 21:28 06-04-2016 13:11 19-05-2016 GT protection operated7. उकाई Ukai-2 GSECL 120 16:00 09-04-2016 Still out Still out Long restoration period8. जीपेक GPEC 1 GSECL 218 16:23 13-04-2016 21:33 24-05-2016 RSD Costly Generation9. जीपेक GPEC 2 GSECL 218 15:41 19-04-2016 06:35 24-05-2016 RSD10. डीजीबीपी DGBP 1 GSECL 107 07:42 27-04-2016 09:16 14-05-2016 Cooling fan problem11. Pipavav 2 GSECL 350 00:30 29-04-2016 Still out Still out RSD
12. जीआईपीसीएल GIPCLSTG 2
GSECL 165 19:24 30-04-2016 09:30 13-05-2016 RSD
13. उकई Ukai 1 GSECL 120 11:00 01-05-2016 10:43 04-05-2016 Boiler tube leakage14. STPS 1 GSECL 120 19:30 01-05-2016 Still out Still out Bottom Ash Problem
15. जीपेक GPEC 3 GSECL 218 07:53 04-05-2016 04:57 08-05-2016 RSD16. उतरण UTRAN STG II-1 GSECL 375 16:42 04-05-2016 05:02 19-05-2016 RSD17. एसएलपीपी SLPP 2 GSECL 125 19:30 06-05-2016 15:16 10-05-2016 BTL18. उकई Ukai 1 GSECL 120 03:18 07-05-2016 Still out Still out Excitation problem19. एस STPS 3 GSECL 250 23:53 11-05-2016 05:44 17-05-2016 Station Transformer trip20. डीजीबीपी DGBP 2 GSECL 112 11:45 14-05-2016 08:39 03-06-2016 RSD, Costly generation21. उकई Ukai 5 GSECL 210 10:44 16-05-2016 Still out Still out BTL22. डीजीबीपी DGBP 1 GSECL 107 23:28 17-05-2016 07:15 31-05-2016 RSD23. एसएलपीपी SLPP 4 GSECL 125 20:53 18-05-2016 12:24 22-05-2016 BTL24. Wanakbori 7 GSECL 210 22:08 18-05-2016 Still out Still out BUS-2 R-PH CT FLASHOVER
25. जीपेक GPEC 3 GSECL 218 14:37 19-05-2016 Still out Still out RSD26. उतरण UTRAN STG II 1 GSECL 375 15:13 19-05-2016 08:33 01-06-2016 RSD
-
27. जीआईपीसीएल GIPCLSTG 2
GSECL 165 15:46 19-05-2016 08:20 01-06-2016 RSD
28. GTPS-3 GSECL 210 09:32 20-05-2016 04:40 04-06-2016 RSD
29. Wanakbori 1 GSECL 210 11:12 20-05-2016 00:26 03-06-2016 RSD
30. STPS 2 GSECL 120 12:30 20-05-2016 Still out Still out RSD
31. GTPS-4 GSECL 120 12:50 20-05-2016 04:20 25-05-2016 RSD
32. Wanakbori 5 GSECL 210 18:06 20-05-2016 18:32 31-05-2016 RSD
33. Wanakbori 2 GSECL 210 18:20 20-05-2016 23:08 03-06-2016 RSD
34. Wanakbori 6 GSECL 210 10:30 21-05-2016 00:45 02-06-2016 RSD/ Unit out since18.05.2016
35. STPS 3 GSECL 250 18:42 21-05-2016 Still out Still out RSD
36. Wanakbori 4 GSECL 210 20:00 21-05-2016 05:07 01-06-2016 RSD
37. उकई Ukai 4 GSECL 200 11:21 22-05-2016 05:52 25-05-2016 RSD38. ALTPS 1 GSECL 125 00:00 24-05-2016 Still out Still out Maintenance works
39. जीपेक GPEC 2 GSECL 218 01:52 25-05-2016 05:02 31-05-2016 RSD40. जीपेक GPEC 1 GSECL 218 10:11 27-05-2016 22:34 31-05-2016 RSD41. उकई Ukai 3 GSECL 200 14:53 27-05-2016 06:35 30-05-2016 BTL42. एसएलपीपी SLPP 1 GSECL 125 12:00 31-05-2016 17:07 04-06-2016 BTL43.
Chandrapur-1MAHAGENCO 210 7:15 28-08-2014 Still out Still out BTL/ economic shutdown.
44. Parli 6 MAHAGENCO 250 15:07 25-06-2015 Still out Still out Water shortage
45. कोराडी Koradi-6 MAHAGENCO 210 01:02 20-03-2015 Still out Still out Economic shutdown46. Parli-3 MAHAGENCO 210 12:52 14.06.2015 Still out Still out Water shortage
47. Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Water shortage
48. Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Water shortage.
49. Parli 7 MAHAGENCO 250 12:07 08-07-2015 Still out Still out Water shortage
50. Chandrapur 2 MAHAGENCO 210 04:42 12-01-2016 Still out Still out BTL
51. WPCL 1 MAHAGENCO 135 17:03 16-02-2016 Still out Still out Low Schedule
52. कोराडी Koradi 5 MAHAGENCO 200 11:21 18-02-2016 18:42 16-05-2016 Less schedule53. WPCL 2
MAHAGENCO135 21:46 29-02-2016 Still out Still out
Change over against unit-3 as per scheduleddispatch
54. कोराडी Koradi-7 MAHAGENCO 210 23:55 01-03-2016 19:54 13-05-2016 RSD55. उरणUran 8 MAHAGENCO 108 14:47 02-05-2016 07:12 21-05-2016 Gas shortage56. WPCL 4 MAHAGENCO 135 23:59 02-05-2016 01:28 03-06-2016 ESP Pressure High
57. भुसावल Bhusawal 2 MAHAGENCO 210 11:25 07-05-2016 07:12 12-05-2016 Control valve problem58. Chandrapur 5 MAHAGENCO 500 22:42 12-05-2016 05:04 17-05-2016 Air heater problem
59. खापरखेड़ा Khaparkheda 1 MAHAGENCO 210 15:04 14-05-2016 05:24 16-05-2016 BTL60. Chandrapur 7 MAHAGENCO 500 15:41 18-05-2016 16:52 21-05-2016 Boiler tube leakage
61. पारस Paras 3 MAHAGENCO 250 16:24 19-05-2016 06:58 23-05-2016 BTL62. भुसावल Bhusawal 2 MAHAGENCO 210 00:05 20-05-2016 02:18 24-05-2016 BTL63. उरणUran 5 MAHAGENCO 108 18:05 22-05-2016 21:00 27-05-2016 Gas Shortage64. कोराडी Koradi 5 MAHAGENCO 200 00:05 24-05-2016 07:00 31-05-2016 No schedule
-
65. उरण Uran 7 MAHAGENCO 108 17:42 24-05-2016 Still out Still out Generator bearingvibration high66. Chandrapur 6 MAHAGENCO 500 22:00 26-05-2016 02:20 30-05-2016 Clinker formation
67. उरणUran 8 MAHAGENCO 108 23:17 29-05-2016 21:22 05-06-2016 Gas Shortage68. Chandrapur 5 MAHAGENCO 07:05 30-05-2016 23:58 02-06-2016 BTL
69. आरजीपीपीएलRGPPL-1B
RGPPL 320 23:00 31-03-2014 Still out Still outDry preservation/Gasshortage
70. आरजीपीपीएलRGPPL-1A RGPPL 320 13:30 8-07-2014 Still out Still out Less requisition71. आरजीपीपीएल
RGPPL 2BRGPPL 205 13:12 26-04-2016 00:58 08-05-2016 Pre-monsoon work
72. आरजीपीपीएलRGPPL 3B
RGPPL 205 12:05 03-05-2016 09:39 10-05-2016 Process disturbance
73. आरजीपीपीएलRGPPL 3A
RGPPL 205 18:40 07-05-2016 Still out Still out Vacuum Pressure Low
74. आरजीपीपीएलRGPPL 2B
RGPPL 205 14:26 10-05-2016 14:59 01-06-2016To Maintain RunningHours/Changeover withother GT
75.अमरावती
AMRAVATITPP(INDIABULL)-1
RATTANPOWER
INDIA LTD270 17:14 20-04-2016 13:31 15-05-2016
Change over with Unit-4/No schedule
76.अमरावती
AMRAVATITPP(INDIABULL)-3
RATTANPOWER
INDIA LTD270 20:50 20-04-2016 22:43 17-05-2016
Change over with Unit-5/No schedule
77.अमरावती
AMRAVATITPP(INDIABULL)-4
RATTANPOWER INDIA
LTD270 16:15 21-05-2016 08:14 02-06-2016 No schedule
78.अमरावती
AMRAVATITPP(INDIABULL)-3
RATTANPOWER INDIA
LTD270 18:10 21-05-2016 09:09 01-06-2016 No schedule
79.अमरावती
AMRAVATITPP(INDIABULL)-1
RATTANPOWER INDIA
LTD270 00:00 24-05-2016 05:32 01-06-2016 No schedule
80.अमरावती
AMRAVATITPP(INDIABULL)-5
RATTANPOWER INDIA
LTD270 00:12 24-05-2016 Still out Still out No schedule
81. एपीएल मुँदराAPL Mundra 5
Adani PowerLtd
660 04:39 04-04-2016 18:58 20-05-2016 ID fan problem
82. एपीएमएल तीरोड़ाAPML Tiroda 3
Adani PowerLtd
660 03:33 20-04-2016 09:00 17-05-2016 Furnace pressure high
83. एपीएमएल तीरोड़ाAPML Tiroda 5
Adani PowerLtd
660 23:09 05-05-2016 Still out Still out Water shortage
84. एपीएल मुँदराAPL Mundra 8
Adani PowerLtd
660 18:34 11-05-2016 06:56 17-05-2016EH oil leakage/Declaredon BTL at the time ofrestoration
85. एपीएमएल तीरोड़ाAPML Tiroda 1
Adani PowerLtd
660 22:53 13-05-2016 Still