Minnesota Department of Transportation 2011 Twin Cities...

5
Dakota Scott Anoka Hennepin Carver Chisago Washington Ramsey April 2011 Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects 20 169 61 694 95 5 36 95 95 494 94 96 61 35E 5 120 61 61 10 156 291 61 316 61 50 55 52 52 96 3 149 35E 77 50 35 3 52 5 62 100 494 494 94 694 94 100 7 5 41 7 101 169 169 55 55 12 169 169 284 282 394 94 35W 35W 280 5 51 55 65 244 36 47 252 13 19 21 13 169 25 212 212 25 94 101 169 65 610 47 10 10 35E 35W 65 61 97 8 243 95 35 N Highway Interstate 2011 Project Sites 2 8 10 6 1 7 13 5 3 13 14 17 15 11 20 19 18 12 16 21 26 27 22 25 23 24 37 32 35 34 33 40 38 39 30 36 31 29 41 44 47 45 46 42 48 43 55 53 52 51 54 50 56 49 57 63 61 60 59 62 58 64 65 66 67 73 71 70 69 72 68 74 75 78 76 77 79 80 4 28 80 80

Transcript of Minnesota Department of Transportation 2011 Twin Cities...

Page 1: Minnesota Department of Transportation 2011 Twin Cities ...stmedia.startribune.com/documents/ROADS0407metro.pdf · 2011 Construction Program 1 Hwy 3 Location: Hwy 3 at 194th St W

Dakota

Scott

Anoka

Hennepin

Carver

Chisago

Washington

Ramsey

April 2011

Minnesota Department of Transportation 2011 Twin Cities Metro Area

Construction Projects

20

169

61

694

95

5

36

95

95

49494

96

6135E

5

120

61

6110

156

291

61

316

6150

55

52

52

96

3

149

35E77

50

35

352

562

100

494

494 94 694

94100

7

5

41

7

101

169

169

55

55

12

169

169

284

282

39494

35W

35W280

5

51

55

65

244

36

47252

13

19

21

13

169

25

212

212

25

94

101

16965

610

47

10

10

35E

35W

65

6197

8

243

95

35

NHighway

Interstate

2011 Project Sites

2

8

10

6

1

7

13

5

3

1314

17

15

11

2019

18

12

16

21 2627

22

2523 24

37

3235

3433

40

38

39

30

3631

29

4144

47

45

46

42

48

43

5553

52

51

54

50

56

49

57

63

61

60

59

6258

64

65

6667

7371 70

69

72

68

74

75

78

76

77

7980

4

28

80

80

Page 2: Minnesota Department of Transportation 2011 Twin Cities ...stmedia.startribune.com/documents/ROADS0407metro.pdf · 2011 Construction Program 1 Hwy 3 Location: Hwy 3 at 194th St W

2011 Construction Program 1 Hwy 3 Location: Hwy 3 at 194th St W in Empire Twp and Canadian RR Description: Replace culverts Dates: Dec 2011-June 2012 Cost: $260,000 Impacts: Medium Contact: James Gillach 2 Hwy 7 Location: At Baker Rd and Lake St Exit in Minnetonka Description: Replace lighting system Dates: May-July 2011 Cost: $125,000 Impacts: Medium Contact: Breanna Magee 3 Hwy 7 Location: West of CR 101 to I-494 in Minnetonka Description: Resurface road Dates: May-July 2011 Cost: $1.5 million Impacts: Medium Contact: Breanna Magee 4 Hwy 8 Location: I-35 to Karmel Ave (CR 80) in Forest Lake, Wyoming, Chisago Description: Resurface road Dates: June-July 2011 Cost: $1.8 million Impacts: Medium Contact: Beth Petrowske HUwww.dot.state.mn.us/metro/projects/hwy8forestlakeU 5 Hwy 8 Location: East of west jct with Hwy 95 in Taylors Falls Description: Resurface road Dates: July-Sept 2011 Cost: $200,000 Impacts: High Contact: Beth Petrowske 6 Hwy 10 Location: At CR 7 (7th Ave ramps) in Anoka Description: Rebuild ramp signal Dates: July-Sept 2011

Cost: $400,000 Impacts: Low Contact: Kent Barnard 7 Hwy 10 Location: On WB Hwy 10 exit loop to Foley Blvd (CR 11) in Coon Rapids Description: Add dual right turn lanes, revise signal, remove free right to SB Foley Blvd Dates: July-Sept 2011 Cost: $708,500 Impacts: Medium Contact: Kent Barnard 8 Hwy 12 Location: At CR 6 and Wayzata Blvd interchanges in Orono Description: Landscaping Dates: Sept 2009-June 2012 Cost: $50,530 Impacts: Low Contact: Breanna Magee 9 Hwy 13 Location: North of I-494 in Eagan Description: Resurface road, install guardrail, drainage work Dates: May-June 2011 Cost: $290,000 Impacts: Medium Contacts: James Gillach 10 Hwy 13 Location: Hwy 13 and Hwy 101 in Savage Description: Construct new interchange to replace existing Hwy 101/13 at-grade intersection in Savage Dates: March 2011-June 2012 Total Cost: $19,037,000 2011 Cost: $15,037,000 Impacts: High Contact: James Gillach 11 Hwy 20 Location: From Hwy 50 to Hwy 19 (Main St) in Cannon Falls and Douglas Twp Description: Replace signs Dates: Oct-Nov 2011 Cost: $200,000 Impacts: Low Contact: James Gillach

12 I-35 Location: From 0.8 miles north of Hwy 8 to Hwy 95 in North Branch, Wyoming, Stacy Description: Pavement preservation, misc drainage, safety improvements (remaining ARRA funds) Dates: April-July 2011 Cost: $9,105,186 Impacts: Medium Contact: Beth Petrowske HUwww.dot.state.mn.us/metro/projects/i35northbranch/U 13 I-35 Location: At Chisago CR 17 interchange south of North Branch Description: Living snow fence landscaping Dates: April 2010-June 2012 Cost: $75,668 Impacts: Low Contact: Beth Petrowske 14 I-35 Location: At CR 2 and Hwy 61 in Forest Lake Description: Interchange reconstruction and revision Dates: April-Aug 2011 Cost: $17 million Impacts: Medium Contact: Beth Petrowske 15 I-35E Location: At CR 14 in Lino Lakes Description: Reconstruct interchange and build new CR 14 bridge over I-35E Dates: April 2010-June 2011 Total Cost: $12.3 million 2011 Cost: $2,781,070 Impacts: Medium Contact: Kent Barnard HUww2.anokacounty.us/v3_highway/MainStreetAtI-35E.aspxU 16 I-35E Location: South of Ramsey CR 96 to north jct of I-35W and I-35E Description: Concrete overlay, drainage corrections, cable median barrier Dates: May-Oct 2011 Cost: $22 million Impacts: High

Contact: Kent Barnard HUwww.dot.state.mn.us/metro/projects/i35eforestlake/U 17 I-35E Location: From County Rd E to Edgerton Rd, I-694 from Hwy 61 to Edgerton Rd (Unweave the weave) Description: Landscaping Dates: Aug 2011-July 2012 Cost: $337,500 Impacts: Low Contact: Kent Barnard 18 I-35E Location: Lone Oak Rd in Eagan to W 7th St in St. Paul Description: Overlay and concrete pavement repair Dates: July-Nov 2011 Cost: $7.3 million Impacts: High Contact: Kent Barnard 19 I-35W Location: I-35W between 66th St and 42nd St, Hwy 62 between Penn Ave and Portland Ave in Mpls and Richfield Description: Construct HOV lanes for Bus Rapid Transit as part of Crosstown Commons project Dates: June 2007-June 2011 Total Cost: $286,748,220 2011 Cost: $500,000 Impacts: High Contact: Kevin Walker 20 I-35W Location: From 42nd St to 35th St in Mpls Description: Landscaping Dates: April 2010-June 2012 Cost: $73,798 Impacts: Low Contact: Kevin Walker 21 I-35W Location: At County Rd D in Roseville Description: Rebuild signal Dates: Sept-Nov 2011 Cost: $450,000 Impacts: Low Contact: Kent Barnard

2011 Twin Cities Metro Area Construction Projects

1

Page 3: Minnesota Department of Transportation 2011 Twin Cities ...stmedia.startribune.com/documents/ROADS0407metro.pdf · 2011 Construction Program 1 Hwy 3 Location: Hwy 3 at 194th St W

22 I-35W Location: From Blackdog Rd to 90th St in Bloomington Description: Rehabilitate/replace drainage structures Dates: Sept-Nov 2011 Cost: $295,000 Impacts: Low Contact: James Gillach 23 I-35W Location: MnPass and Smart Lanes extension project, NB only from the I-35E/I-35W split to Burnsville Pkwy Description: Construct MnPASS Smart Lane in median, convert rural median to urban, construct median barrier Dates: July-Oct 2011 Cost: $12,664,000 Impacts: High Contact: James Gillach 24 I-35W Location: SB from Burnsville Pkwy to Hwy 13 in Burnsville (part of MnPass Extension project) Description: Resurface road Dates: April-Oct 2011 Cost: $635,000 Impacts: High Contact: James Gillach 25 I-35W Location: From Burnsville Pkwy to I-494 in Burnsville and Richfield Description: Replace signs Dates: Oct-Nov 2011 Cost: $450,000 Impacts: Low Contact: Beth Petrowske 26 Hwy 36 Location: At Rice St in Roseville, Little Canada Description: Replace Rice St bridge, reconstruct interchange Dates: July 2010-Nov 2011 Total Cost: $16.6 million 2011 Cost: $6,680,864 Impacts: Medium Contact: Kent Barnard 27 Hwy 36 Location: At Commerce St and Hamline Ave in Roseville Description: Rebuild traffic signal Dates: Spring 2011 Cost: $250,000 Impacts: Low Contact: Kent Barnard

28 Hwy 36 Location: From White Bear Ave to Hwy 120 in Maplewood, North St. Paul Description: Landscaping Dates: Sept 2011-July 2012 Cost: $75,000 Impacts: Low Contact: Kent Barnard 29 Hwy 41 Location: At 4th St in Chaska Description: Rebuild traffic signal Dates: May-June 2011 Cost: $250,000 Impacts: Medium Contact: James Gillach 30 Hwy 50 Location: From Hwy 3 to Hwy 61 in Farmington, Empire Twp, Castle Rock Twp, Vermillion Twp, Hampton Twp, New Trier Twp, Douglas Twp Description: Micro-surface Dates: May-June 2011 Cost: $1.1 million Impacts: Medium Contact: James Gillach 31 Hwy 51 Location: From Pierce Butler Route to Como Ave in St. Paul Description: Repair concrete pavement and drainage Dates: Sept-Oct 2011 Cost: $750,000 Impacts: Medium Contact: Kent Barnard 32 I-494, Hwy 52 Location: From I-494 in Inver Grove Heights to Belvedere St in St. Paul Description: Repair deck on nine bridges Dates: April-July 2011 Cost: $1,475,520 Impacts: High Contact: James Gillach, Kent Barnard 33 Hwy 52 Location: Along Southview Blvd (CR 14) in South St. Paul Description: Install pedestrian walkway Dates: Aug 2011-Feb 2012 Cost: $43,200 Impacts: Low Contact: James Gillach 34 Hwy 52 Location: Eaton St, Plato Blvd, Concord St bridges Description: Re-deck Eaton St, Plato Blvd and repair deck on Concord St Dates: Summer 2011

Cost: Included in Project 35 (Lafayette Bridge replacement) Impacts: High Contact: Kent Barnard Website: HUwww.dot.state.mn.us/metro/projects/hwy52-stpaul/U

35 Hwy 52 Location: St. Paul Description: Replace the Lafayette Bridge and roadway approaches Dates: Jan 2011-Nov 2014 Total Cost: $130,381,000 2011 Cost: $93,795,106 Impacts: High Contact: Kent Barnard HUwww.dot.state.mn.us/metro/projects/hwy52-stpaul/U 36 Hwy 52 Location: At Wentworth Ave and Thompson Ave in West St. Paul, South St. Paul Description: Landscaping Dates: April 2010-June 2012 Cost: $45,056 Impacts: Low Contact: James Gillach 37 Hwy 52 Location: Near CR 46 in Coates Description: Landscaping Dates: Sept 2010-Nov 2012 Cost: $55,320 Impacts: Low Contact: James Gillach 38 Hwy 55 Location: North jct of Hwy 149 (Dodd Rd) Description: Replace signal Dates: Dec 2011-June 2012 Cost: $250,000 Impacts: Medium Contact: James Gillach 39 Hwy 61 Location: Hwy 61 bridge and approaches spanning the Mississippi River in Hastings Description: Construct new bridge, approaches, access roads, connecting trails Dates: Oct 2010-June 2013 Total Cost: $120 million 2011 Cost: $46,669,336 Impacts: Low Contact: James Gillach HUwww.dot.state.mn.us/hastingsbridge/U 40 Hwy 61 Location: Hwy 61 in Gem Lake Description: Replace BNSF railroad bridge spanning Hwy 61, reconstruct roadway Dates: May 2010-May 2011

Total Cost: $3,634,830 2011 Cost: $10,000 Impacts: Medium Contact: Kent Barnard 41 Hwy 61 Location: Hwy 61 from 20th St to Carver Ave; I-494 from Maxwell to Lake Rd; I-494/Hwy 61 interchange (Wakota project) in Newport, St. Paul, Maplewood, Woodbury Description: Landscaping Dates: April 2010-Nov 2012 Cost: $471,276 Impacts: Low Contact: Beth Petrowske 42 Hwy 61 Location: Jct of Hwy 61 and Minnehaha Ave in St. Paul Description: Reconstruct traffic control signal Dates: April-Oct 2011 Cost: $224,651 Impacts: Low Contact: Kent Barnard 43 Hwy 61 Location: Jct of Hwy 61 and Hwy 95 in Cottage Grove Description: Reconstruct intersection, reconstruct / lengthen west frontage road Dates: May-Nov 2011 Cost: $1.2 million Impacts: Low Contact: Beth Petrowske 44 Hwy 62 Location: At Hwy 62 / Hwy 77 interchange in Mpls Description: Replace lighting Dates: Nov 2010-May 2011 Cost: $435,000 Impacts: Medium Contact: Breanna Magee 45 Hwy 65 Location: Near CR 14 in Blaine Description: Landscaping Dates: Sept 2011-June 2012 Cost: $125,000 Impacts: Low Contact: Kent Barnard 46 Hwy 65 Location: At 169th Ave in Ham Lake Description: Convert median openings, add U-turn access in downstream directions Dates: Aug-Nov 2011 Cost: $1,050,000 Impacts: Medium Contact: Kent Barnard

2

Page 4: Minnesota Department of Transportation 2011 Twin Cities ...stmedia.startribune.com/documents/ROADS0407metro.pdf · 2011 Construction Program 1 Hwy 3 Location: Hwy 3 at 194th St W

47 Hwy 65 Location: From I-694 to CR 24/237th Ave NE in Fridley, Spring Lake Park, Blaine, East Bethel Description: Signal timing, install fiber optics and cameras at various signalized intersections Dates: Aug-Nov 2011 Cost: $1.4 million Impacts: Medium Contact: Kent Barnard 48 Hwy 65 Location: East side of Hwy 65 between 153rd Ave and 159th Ave in Ham Lake Description: Restrict and close access points to Hwy 65—this is a 2010 access management set-aside project Dates: Aug 2011-Feb 2012 Total Cost: $1.3 million 2011 Cost: $800,000 Impacts: Low Contact: Kent Barnard 49 Hwy 77 Location: Under Old Shakopee Rd (CR 1) in Bloomington Description: Repair bridge deck, complete water resource work and pedestrian ramp Dates: July-Nov 2011 Cost: $640,000 Impacts: Medium Contact: Breanna Magee 50 I-94 Location: From just east of Hwy 101 in Rogers to Maple Grove Description: Resurface, rehabilitate interstate Dates: April 2010-July 2011 Total Cost: $16,795,052 2011 Cost: $1,355,173 Impacts: High Contact: Breanna Magee HUwww.dot.state.mn.us/metro/projects/hwy101/index.htmlU 51 I-94 Location: Between 49th Ave and Shingle Creek Pkwy from Mpls to Brooklyn Center Description: Paint 13 bridges Dates: May-July 2011 Cost: $2,850,000 Impacts: High Contact: Breanna Magee 52 I-94 Location: EB from NB Hwy 61 to White Bear Ave in St. Paul Description: Auxiliary lane EB I-94, ramp metering Dates: July-Oct 2011 Cost: $2.5 million

Impacts: High Contact: Kent Barnard 53 I-94 Location: From Nicollet Ave in Mpls to Cretin//Vandalia in St. Paul Description: Resurface road, repair concrete pavement, work on bridge piers, install noise wall and traffic management device Dates: April-Sept 2011 Cost: $25,665,000 Impacts: High Contact: Breanna Magee HUwww.dot.state.mn.us/metro/projects/i94resurfacing/phase2.htmlU 54 I-94 Location: From jct of I-494 in Maple Grove to CR 152 (Brooklyn Blvd) in Brooklyn Park Description: Landscaping Dates: Sept 2009-June 2012 Cost: $197,723 Impacts: Low Contacts: Breanna Magee 55 I-94 Location: From the Lowry Ave bridge to the 1st Ave bridge in Mpls Description: Resurface frontage road Dates: Aug-Sept 2011 Cost: $300,000 Impacts: Low Contact: Breanna Magee 56 I-94 Location: At Shingle Creek Pkwy in Brooklyn Park Description: Rebuild signal Dates: May-July 2011 Cost: $336,935 Impacts: Low Contact: Breanna Magee 57 Hwy 95 Location: Hwy 8 in Franconia Twp to Hwy 97 in New Scandia Twp Description: Resurface road, repair drainage and guardrail, add WB right turn lane on Hwy 243 to NB Hwy 95 Dates: July-Sept 2011 Cost: $4,345,000 Impacts: High Contact: Beth Petrowske HUwww.dot.state.mn.us/metro/projects/hwy95taylorsfallsU 58 Hwy 100 Location: From west 50th St/Vernon Ave to Hwy 55 in St. Louis Park, Edina and Golden Valley Description: Replace signs Dates: June-Oct 2011

Cost: $450,000 Impacts: Low Contact: Breanna Magee 59 Hwy 100 Location: From Brooklyn Blvd (CR 152) to over I-94 EB in Brooklyn Center Description: Resurface road Dates: July-Sept 2011 Cost: $500,000 Impacts: Medium Contact: Breanna Magee 60 Hwy 101 Location: From Bramble Dr to Pioneer Trail in Chanhassen Description: Reconstruct road Dates: July-Aug 2011 Cost: $180,000 Impacts: High Contact: James Gillach 61 Hwy 120 Location: At Century College entrance in White Bear Lake Description: Rebuild signal Dates: July-Aug 2011 Cost: $184,915 Impacts: Low Contact: Kent Barnard 62 Hwy 149 Location: From north of Mendota Heights Rd to Smith Ave in Mendota Heights, West St. Paul Description: Seal road Dates: Sept-Oct 2011 Cost: $400,000 Impacts: Medium Contact: James Gillach 63 Hwy 169 Location: At I-494 north and south ramps and at Highwood Drive Description: Remove signals, reconstruct interchange Dates: Nov 2010-Nov 2012 Total Cost: $125,275,000 2011 Cost: $42,326,154 Impacts: High Contact: Breanna Magee HUwww.dot.state.mn.us/metro/projects/169/U 64 Hwy 169 Location: From Rockford Rd to 36th Ave N in New Hope Description: Install noise wall Dates: June-Dec 2011 Cost: $1.4 million Impacts: Low Contact: Breanna Magee 65 Hwy 169 Location: At CR 81 and CR 109 in Brooklyn Park (Triangle Project)

Description: Landscaping Dates: Sept 2011-June 2012 Cost: $150,000 Impacts: Low Contact: Breanna Magee 66 Hwy 169 Location: At CR 64 in Belle Plaine Description: Landscaping Dates: Oct 2010-June 2013 Cost: $47,664 Impacts: Low Contact: James Gillach 67 Hwy 169 Location: At 173rd St in Sandcreek Twp Description: Revise intersection, close access, reconstruct backage road Dates: May-July 2011 Cost: $594,000 Impacts: Low Contact: James Gillach 68 Hwy 169 Location: At Bren Rd in Minnetonka, Edina Description: Reconstruct interchange, replace bridge Dates: April-Nov 2011 Cost: $7,650,000 (Mn/DOT share) Impacts: Medium Contact: Breanna Magee HUwww.eminnetonka.com/169Bren.cfmU 69 Hwy 169 Location: Hwy 169, CR 81 and 85th Ave in Brooklyn Park, Osseo Description: Construct new interchange bridges Dates: July 2008-July 2011 Total Cost: $49,983,757 2011 Cost: $1,829,669 Impacts: High Contact: Breanna Magee HUwww.dot.state.mn.us/metro/projects/hwy169triangle/U 70 Hwy 212 Location: Hennepin CR 4 and Dell Rd in Eden Prairie Description: Landscaping Dates: Sept 2009-June 2012 Cost: $189,440 Impacts: Low Contact: Breanna Magee

3

Page 5: Minnesota Department of Transportation 2011 Twin Cities ...stmedia.startribune.com/documents/ROADS0407metro.pdf · 2011 Construction Program 1 Hwy 3 Location: Hwy 3 at 194th St W

4

71 Hwy 212 Location: Hwy 101 and Carver CR 17 (Powers Blvd) interchanges in Chanhassen Description: Landscaping Dates: Sept 2009-June 2012 Cost: $222,286 Impacts: Low Contact: James Gillach 72 Hwy 212 Location: Hwy 41, Carver CR 10 (Engler Blvd) and Carver CR 11 interchanges in Chaska Description: Landscaping Dates: Sept 2009-June 2012 Cost: $335,652 Impacts: Low Contact: James Gillach 73 Hwy 284 Location: 10th St to Hwy 5 in Waconia Description: Add medians and replace signal Dates: June-Dec 2011 Cost: $1,085,000 Impacts: Medium Contact: James Gillach 74 I-494 Location: Hwy 5 in Eden Prairie to I-394 in Minnetonka Description: Landscaping Dates: Sept 2009-June 2012 Cost: $537,135 Impacts: Low Contact: Breanna Magee 75 I-494 Location: Nicollet Ave bridge and 2nd Ave pedestrian bridge in Richfield, Bloomington Description: Resurface and update bridges Dates: July 2011 Cost: $1.2 million Impacts: High Contact: Breanna Magee 76 Hwy 610 Location: From Hwy 169 in Brooklyn Park to CR 81 in Maple Grove Description: Construct three new miles of Hwy 610 Dates: Sept 2009-July 2011 Total Cost: $47,827,580 2011 Cost: $34,547,868 Impacts: Medium Contact: Breanna Magee HUwww.dot.state.mn.us/metro/projects/610/U 77 I-694 Location: 40th St to Hwy 61 in Oakdale, Vadnais Heights, White Bear Lake, Maplewood Description: Concrete overlay Dates: Oct 2011-Oct 2012

Total Cost: $18 million 2011 Cost: $3 million Impacts: High Contact: Beth Petrowske HUwww.dot.state.mn.us/metro/projects/i694oakdaleU 78 I-694 Location: Hwy 10 SB to EB left lane entrance to I-694 and merge to Snelling Ave and SB Hamline Ave to EB I-694 Description: Reconstruct interchange Dates: Aug 2011-Sept 2013 Total Cost: $45 million 2011 Cost: $10 million Impacts: High Contact: Kent Barnard HUwww.dot.state.mn.us/metro/projects/694expand/U 79 I-694 Location: At CR 10 in Oakdale Description: Replace lighting system Dates: Aug-Sept 2011 Cost: $139,305 Impacts: Low Contact: Beth Petrowske 80 I-394, Hwy 55, Hwy 7 Location: I-394 from Park Place/Xenia Ave to Central Ave/CR 101; Hwy 7 from Ottawa Ave S to Hazeltine Blvd/Hwy 41; Hwy 55 from Theodore Wirth Pkwy to Arrowhead Dr Description: Signal timing, install fiber optics and cameras at various intersections in Hennepin County Dates: March-Oct 2011 Cost: $2,570,398 Impacts: Low Contact: Breanna Magee ------------------------------------------- ULegend: CR – County Road Jct – Junction HOV – High occupancy vehicle, or carpool lanes ARRA – American Recovery and Reinvestment Act SB – Southbound NB – Northbound WB – Westbound EB – Eastbound UContact Info: Kent Barnard 651-234-7504 James Gillach 651-234-7503 Breanna Magee 651-234-7502 Beth Petrowske 651-234-7508 Kevin Walker 651-234-7509