REPUBLIC OF KENYA

MINISTRY OF EAST AFRICAN COMMUNITY

AND

REGIONAL DEVELOPMENT

STRATEGIC PLAN 2018-2022

Theme: Deepening and widening East African Integration and enhancing

Regional development for improved livelihoods for all Kenyans

Page 2: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

ii

ABBREVIATIONS

ACU Aids Control Unit

AfCFTA African Continental Free Trade Area

AGOA African Growth and Opportunity Act

AGPO Access to Government Procurement Opportunities

AU African Union

BIC Budget Implementation Committee

CBTAs Cross Border Trade Associations

CCTV Closed Circuit Television

CD Council Directive

CDA Coast Development Authority

CFO Chief Finance Officer

CFTA Continental Free Trade Area

CNC Coordinator Northern Corridor

COK Constitution of Kenya

COMESA Common Market for Eastern and Southern Africa

CPPMU Central Planning and Project Monitoring Unit

DA Director Administration

EAC East African Community

EALA East African Legislative Assembly

EAMS East African Monitoring System

ENNDA Ewaso Ng’iro North Development Authority

ENSDA Ewaso Ng’iro South Development Authority

EPAs Economic Partnership Agreements

EU European Union

FAQs Frequently Asked Questions

Page 3: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

iii

FTA Free Trade Area

GBV Gender Based Violence

GoK Government of Kenya

HIV/AIDS Human Immunodeficiency Virus and Acquired Immunodeficiency

Syndrome

HRM&D Human Resource Management & Development

ICT Information and Communication Technology

IGAD Inter-Governmental Authority on Development

IS Integration Secretary

ISO International Organization for Standardization

ITTLS Immigration, Tourism, Trade, Labour and Services

KOSFIP Kimira-Oluch Smallholder Farm Improvement Project

KVDA Kerio Valley Development Authority

LAN Local Area Network

LBDA Lake Basin Development Authority

M&E Monitoring and Evaluation

MCDAs Ministries, Counties, Departments and Agencies

MDAs Ministries, Departments and Agencies

MEAC Ministry of East African Community

MEAC&RD Ministry of East African Community & Regional Development

MISHDP Malindi Integrated Social Health Development Project

MTEF Medium-Term Expenditure Framework

MTP Medium Term Plan

NCIP Northern Corridor Integration Projects

NIMES National Integrated Monitoring and Evaluation System

NTBs Non-Tariff Barriers

PAS Performance Appraisal System

Page 4: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

iv

PESTEL Political, Economic, Social, Technological, Environment & Legal

PS Principal Secretary

PWDs Persons With Disabilities

QMS Quality Management Systems

RDAs Regional Development Authorities

RECs Regional Economic Communities

RNCD Regional and Northern Corridor Development

SACU Southern African Custom Union

SADC Southern African Development Community

SCM Supply Chain Management

SDEAA State Department for East African Affairs

SDEACI State Department for East African Community Integration

SDGs Sustainable Development Goals

SQMT Standards, Quality Assurance, Metrology and Testing

SRD Secretary Regional Development

SWOT Strengths, Weaknesses, Opportunities and Threats

TARDA Tana and Athi Rivers Development Authority

TNA Training Needs Assessments

UN United Nations

US United States

VAT Value Added Tax

Page 5: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

v

Contents

ABBREVIATIONS ..................................................................................................................... ii

FOREWORD ........................................................................................................................... viii

PREFACE ................................................................................................................................... x

ACKNOWLEDGEMENT ........................................................................................................ xi

EXECUTIVE SUMMARY ...................................................................................................... xii

CHAPTER ONE: INTRODUCTION AND OVERVIEW OF THE MINISTRY ............. 1

1.0 Introduction ........................................................................................................................... 1

1.2 Background of the Ministry .................................................................................................. 1

1.3 Mandate of the Ministry ..................................................................................................... 4

1.4 Kenya’s Development Context .............................................................................................. 5

1.5 Rationale for the Strategic Plan 2018 - 2022 .................................................................. 5

1.5 Methodology ........................................................................................................................... 6

CHAPTER TWO: SITUATIONAL ANALYSIS .................................................................... 7

2.0 Introduction ........................................................................................................................... 7

2.1 Performance Review under the Strategic Plan 2013-2017 ..................................... 7

2.1.1 Target: Service Delivery Improvement ............................................................................. 7

2.1.2 Target: Increase total exports from Kshs. 127 to 130 billion through effective

implementation of the EAC Customs Union and Common Market Protocols ............... 8

2.1.3 Target: To enhance the effectiveness of stakeholder consultations and

engagement in EAC .......................................................................................................................... 8

2.1.4 Target: Sustain regulatory and policy reforms to deepen EAC integration ........ 9

2.1.5 Target: To strengthen the Coordination of the participation of the

implementing agencies in EAC activities and pillars of integration including cross-

cutting priority areas .....................................................................................................................11

2.1.6 Target: To maintain reliable information and communication management

for decision making and integrated mechanism in assessing Kenya’s interests in

the EAC integration ........................................................................................................................12

2.1.7 Target: To support the harmonization of EAC’s integration agenda with those

of other Regional Economic Communities ..............................................................................13

Page 6: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

vi

2.1.8 Target: To ensure nationwide publicity and advocacy on EAC integration and

its benefits .........................................................................................................................................13

2.1.9 Target: To put in place a policy framework to create an enabling environment

for promotion of Gender equality and mainstreaming of disability ................................13

2.1.10 Target: To build and improve organisational capacity and infrastructure for

sustained efficiency and effective service delivery ................................................................13

2.1.11 Strengthen integrated regional development programs, operational

efficiency, resource mobilization, collaboration and partnerships. ................................14

2.2 Challenges ............................................................................................................................ 15

2.3 Lessons learnt in implementing Strategic Plan 2013 – 2017 ................................... 15

2.4 Current Status .................................................................................................................... 16

2.4.1EAC Customs Union ............................................................................................................16

2.4.2 EAC Common Market .........................................................................................................16

2.4.3EAC Monetary Union ...........................................................................................................16

2.4.4 EAC Political Federation ....................................................................................................17

2.5 SWOT Analysis .................................................................................................................... 17

Table 1: The Ministry’s SWOT Analysis .................................................................................. 18

2.5 PESTEL .................................................................................................................................. 20

2.6 Internal and External Stakeholder analysis .............................................................. 22

Table 2: Stakeholder Analysis .................................................................................................... 22

CHAPTER THREE: STRATEGIC MODEL...................................................................... 26

3.0 Introduction .............................................................................................................................. 26

3.1 Ministry’s Core Functions: .............................................................................................. 27

3.2 Ministry’s Vision and Mission: ........................................................................................... 27

3. 2.1 Ministry’s Mission Statement ........................................................................................ 28

3.3 Core Values............................................................................................................................... 28

3.4 Summary of Key Result Area .............................................................................................. 28

3.4.1 Key Result Areas, Strategic Objectives and Interventions......................................29

3.5 The National Priorities – “The Big Four” Agenda .......................................................... 34

Table 3. Strategy Implementation matrix............................................................................... 35

CHAPTER FOUR: IMPLEMENTATION AND COORDINATION FRAMEWORK .. 55

Page 7: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

vii

4.1 Introduction ......................................................................................................................... 55

4.2 Strategy Implementation Matrix ................................................................................... 55

4.3 Resources Allocation and Mobilization ....................................................................... 55

4.4 Implementation Matrix ..................................................................................................... 55

4.5 Organizational Structure and Chart ............................................................................ 55

CHAPTER FIVE: MONITORING, EVALUATION AND REPORTING ...................... 56

5.1 Introduction ......................................................................................................................... 56

5.2 Responsibility and Accountability ................................................................................ 56

5.3 Risk Analysis and Critical Assumptions .................................................................... 56

Table 4: Strategic Plan Implementation Risks Assessment and Mitigation ..... 57

5.4 Monitoring and Evaluation ............................................................................................. 59

5.4.1 Monitoring ............................................................................................................................ 59

5.4.2 Evaluation ............................................................................................................................ 59

Appendix I: ORGANIZATION STRUCTURE FOR THE MINISTRY OF EAST AFRICAN

COMMUNITY AND REGIONAL DEVELOPMENT .................................................................. 60

Appendix II: Staffing Levels......................................................................................................... 61

Page 8: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

viii

FOREWORD

The Strategic Plan 2018-2022 for the Ministry of East African Community and

Regional Development (MEAC&RD) prioritizes East African Community (EAC)

Integration and Regional & Northern Corridor Development (RNCD) at the

national level as a significant policy instrument for initiating and fast-tracking

economic growth for the Government of Kenya. The involvement of Kenya in the

EAC regional integration process, the Northern Corridor Integration Projects

(NCIPs) and Regional Development Authorities (RDAs) will contribute towards

Government efforts in the implementation and achievement of Vision 2030 and

also the National priorities on the “Big Four Agenda” (Food Security, Affordable

Housing, Manufacturing and Affordable Healthcare for all). The Ministry is

mandated, to coordinate East African affairs, implement EAC treaty and facilitate

the implementation of EAC projects and programmes in Kenya in addition to

coordinating Regional Development Authorities, and to monitor and evaluate the

implementation of Northern Corridor Integration Projects, among others.

The plan takes cognizance of the existing macro-economic environment and

Kenya’s participation in the EAC and other allied regional bodies that impact on

the Ministry’s operations. During the last Strategic Plan 2013-2017 the then

Ministry of East African Community successfully led and coordinated the

implementation of EAC treaty. Generally, EAC made tremendous progress in

increasing the volume of intra-regional trade under the Customs Union and the

signing of Mutual Recognition Agreements to ease movement of trade in services

under the Common Market Protocol.

The third Strategic Plan 2018-2022 is built on a solid and stable foundation

guided by the Constitution of Kenya, 2010, Kenya Vision 2030, Medium-Term

Plan (MTP) III (2018 – 2022) and the Government’s Big Four Agenda. With this

commitment, MEAC & RD will strive to spearhead the implementation of intended

and prioritized activities in line with Government and EAC directives.

The Plan articulates the Mandate, Vision and Mission of MEAC &RD with the

necessary strategies and activities that need to be carried out in order to achieve

the planned objectives. It provides rational structures for steadily executing the

Ministry’s mandate as spelt out in the Executive Order No.1 of June

2018(Revised), while taking cognizance of the Vision 2030 and other policies

intended at harnessing of skills to build synergy towards stimulating

development. The Strategic Plan also provides the basis for developing the

Medium-Term Expenditure Framework (MTEF), and subsequently performance

Page 9: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

ix

contract targets for the employees of MEAC &RD, which are essential for an

effective performance management system.

The implementation of the Plan is expected to contribute to acceleration of

economic growth and development by promoting regional programmes and

projects in the Pillars of EAC Integration namely; Customs Union, Common

Market, Monetary Union and Political Federation. In line with National Priorities,

implementation of the Plan will contribute to the achievements of the “Big Four”

initiatives under the projects and programmes being implemented by the Regional

Development Authorities. It will also promote integrated regional development

and continental integration initiatives including the COMESA-EAC-SADC

Tripartite and African Continental Free Trade Area.

To ensure that focus is on the achievement of the planned objectives, an

implementation matrix with performance targets and indicators has been

prepared. The indicators will be used for monitoring and evaluating performance

at appropriate intervals. The Strategic Plan will therefore enable the Ministry to

improve performance by carrying out planned activities and consequently achieve

the intended objectives. The Ministry will constantly review its operations to

facilitate the smooth implementation of this Strategic Plan.

The preparation of this Strategic Plan has been made possible by valuable

contributions from Departments, Directorates and Units within the Ministry

under the leadership and guidance of the Principal Secretary. I would like to

particularly acknowledge and commend the Strategic Plan Development Team

that was responsible for preparing this document.

It is therefore remarkable that the implementation period of this Strategic Plan

coincides with the life of the current Government and has taken into cognizance

the Government’s development priorities under the “Big Four” Agenda. The

synergy in implementation of projects and programmes under Regional

Development Authorities and the County Governments will play a critical role

towards achieving the desired results for Kenya. It is my sincere hope that the

full implementation of this plan will make a significant contribution to Kenya’s

socio-economic development.

ADAN MOHAMED, EGH

CABINET SECRETARY

MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL DEVELOPMENT

Page 10: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

x

PREFACE

This Strategic Plan succeeds the second-generation Strategic Plans, 2013 – 2017

for the Ministry of East African Community and Regional Development. The Plan

has been developed through a participatory process involving Departments,

Directorates and Units in the Ministry, the Regional Development Authorities and

other Ministries, Departments and Agencies. The participatory approach was

useful in enriching the strategies, objectives and activities in the Plan.

The goal of this Strategic Plan is to guide the Ministry’s operations in the quest

for effective and efficient service delivery to Kenyans. To Sharpen its focus, the

Plan identifies 12 Key Result Areas namely: Finance and Human Resource

Management and Development; National Consultations and engagement of

stakeholders on EAC and Regional and Northern Corridor Development activities;

Coordination and participation in the formulation and implementation of EAC

and RNCD policies, decisions and directives; Implementation of the EAC Pillars

of Integration; Institutionalize Knowledge Management; Upgrading of ICT

infrastructure within the Ministry; National publicity and advocacy on EAC

integration and its benefits; Emerging issues in regional integration; Gender,

Youth and Disability mainstreaming; Deepen and widen the market access for

goods and services within the context of Northern Corridor Integration Projects

(NCIPs); Coordination of Regional Development Authorities; and Sustainability of

the Regional Development Authorities.

The Ministry appreciates that effective implementation of the Plan will contribute

to the delivery of the desired results to Kenyans. Management of the

implementation Process will be guided by the Ministry’s vision, mission and core

values. In addition, the Ministry will ensure that implementation of this Plan is

in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary

cycle and will also take into consideration the resources available to the Ministry

in each financial year.

Finally, the Ministry is aware of the challenges and possible risks that it is likely

to face in the process of implementing this Plan and fulfilling its mandate in

general. This notwithstanding, The Ministry of EAC and Regional Development is

committed to the development of mitigation measures to address the risks as and

challenges that may arise thereof.

HON. KEN OBURA CHIEF ADMINISTRATIVE SECRETARY MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL DEVELOPMENT

Page 11: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

xi

ACKNOWLEDGEMENT

The development of this strategic plan 2018 – 2022 has been a consolidated effort

that benefited from the valuable contribution by the leadership of the Ministry of

East African Community and Regional Development, the staff and other

stakeholders.

I acknowledge the support by all the stakeholders from Ministries, Departments

and Agencies; EAC Organs and Institutions; Development Partners; and the

Private Sector. Their contributions and inputs were indeed valuable in making

the Strategic Plan a comprehensive document. I sincerely thank them all for the

excellent work.

I also extend my appreciation to the Strategic Plan Development Committee that

was coordinated by the Central Planning and Project Monitoring Unit for

preparing and coordinating the whole process towards development of the Plan.

The team comprised of Ms. Anne Kariithi, Mr. Peter Chege, Mr. Raphael Kanothi,

Mr. Philip Gathuya, Mr. Samuel Mwangi, Mr. James Munyu, Mr. Joseph Chirchir,

Mr. Joseph Mung’ere, Ms. Maureen Oganga, Ms. Jackline Kanini, Mr. Edward

Owango, and Mr. Leonard Kwinga. I extend my gratitude to all staff for their

support in ensuring that the document was compiled, edited and finalized.

The Strategic Plan will provide overall guidance and support to departments,

directorates, and units in the development of their annual work plans and

performance targets. Regular inter-departmental meetings will be convened to

provide complementary support in the implementation process. The Ministry will

also sustain existing linkages with other government ministries, counties,

departments and agencies (MCDAs) as well as other stakeholders to ensure

coherence and enhance synergy as it seeks to contribute to the broad national

development goals under the third Medium Term Plan of the Kenya Vision 2030.

To this end, I appreciate the Hon. Cabinet Secretary, Ministry of East African

Community and Regional Development, Hon. Adan Mohammed, EGH for his

overall guidance and leadership in the development of the Strategic Plan.

DR. SUSAN J. KOECH

PRINCIPAL SECRETARY

STATE DEPARTMENT FOR EAST AFRICAN COMMUNITY

Page 12: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

xii

EXECUTIVE SUMMARY

The Strategic Plan 2018 -2022 is a roadmap and a pledge by the Ministry to

deliver quality services to the Kenyan citizens, the general public and the Private

Sector which is the engine of economic growth and development. The Strategic

Plan outlines the Ministry’s role towards East African Community Policies

including Regional and Northern Corridor Development (RNCD). The strategic

plan is structured into five chapters.

Chapter one outlines the background of the Ministry, its mandate as derived from

the Executive Order No. 1/2018 of June 2018 (Revised), Constitution of Kenya

2010, and the Treaty for the Establishment of the East African Community. The

Chapter further outlines the rationale of the Plan within Kenya’s development

context.

Chapter two presents the situational analysis on performance of the previous

strategic plan 2013-2017, challenges in implementation of the Plan and lessons

learnt. It also highlights the Strengths, Weaknesses, Opportunities and Threats

(SWOT). Further, it covers the Political, Economic, Social, Technological,

Environmental and Legal (PESTEL) arena within which implementation will be

realized. The Chapter also gives an analysis of the Ministry’s internal and external

stakeholders.

Chapter three outlines the detailed Ministry’s Mandate, core functions, vision,

Mission and core values. It further articulates the key result areas that the

Ministry will address to achieve its strategic objectives for the Plan period. It also

outlines the strategies that will be applied to meet the strategic objectives and the

Ministry’s contributions on the “Big Four” Agenda. The key result areas have been

derived from Chapter two.

Chapter four contains the strategy implementation plan. The plan embraces

performance management and teamwork in the Ministry in order to enhance

service delivery. The Chapter also deals with the strategic implementation matrix

in terms of strategies, activities, outputs, outcomes, performance indicators,

timeframe, estimated budget and responsibility. The Section further highlights

the resource allocation and mobilization to implement the strategic plan and the

Ministry’s organization structure and staff establishment.

Chapter five covers monitoring, evaluation and reporting. This includes

implementation approach, responsibility and accountability and the risk analysis

Page 13: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

xiii

and critical assumptions. It also highlights in details the strategy risk

assessments and the proposed mitigation actions.

Finally, the plan has two sets of Appendices. Appendix I is the Ministry’s

Organizational structure while Appendix II is the proposed staffing levels to

actualize the strategic plan.

Page 14: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

1

CHAPTER ONE: INTRODUCTION AND OVERVIEW OF THE

MINISTRY

1.0 Introduction

The 2018 – 2022 Strategic Plan demonstrates the overarching goal of the

Ministry of East African Community and Regional Development to deliver quality

services to the Kenyan Citizens, general public and the Private Sector. The Plan

outlines the Ministry’s role in the realization of the East African Community

Integration process and Regional and Northern Corridor Development (RNCD). It

is anchored on: Kenya’s Constitution 2010, Third Medium Term Plan of the Kenya

Vision 2030, and Government priorities on the “Big Four’ Agenda, the 5th EAC

Development Strategy, EAC Vision 2050, Sustainable Development Goals, and

African Union (AU) Agenda 2063 among other policy documents. The Plan further

identifies strategic objectives, strategies, activities, expected outputs and

outcomes that the Ministry intends to pursue and achieve in the next five years.

The implementation of the Plan is expected to accelerate economic growth and

development by promoting regional programmes and projects in the Pillars of EAC

Integration, Regional Development Authorities and the Northern Corridor

Integration projects.

In line with National Priorities, implementation of the Plan will also contribute to

the achievements of the “Big Four” Agenda. It will also promote integrated regional

development and continental initiatives including the COMESA-EAC-SADC

Tripartite and Continental Free Trade Areas (CFTA).

1.2 Background of the Ministry

1.2.1Background on the State Department for East African

Community

In 1998, the Government of Kenya established the Ministry of East African and

Regional Cooperation to coordinate the affairs of the EAC, Common Market for

Eastern and Southern Africa (COMESA) and Inter-Governmental Authority on

Development (IGAD). In 1999, the Ministry’s functions were transferred to a

department within the Ministry of Tourism, Trade and Industry and later in 2003,

as a department in the Ministry of Foreign Affairs. In 2004 the Ministry of East

African Community and Regional Cooperation was established and later renamed

the Ministry of East African Community (MEAC) in 2006.

Page 15: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

2

In 2013, following the reorganization of government in line with the 2010

Constitution, the EAC functions were placed under the State Department of East

African Affairs (SDEAA) within the Ministry of East African Affairs, Commerce and

Tourism. The Department was later renamed the State Department of East

African Community Integration (SDEACI) in 2016 under the Ministry of East

African Community, Labour and Social Protection. Following the re-organization

of the Government in June, 2018, the Ministry of East African Community and

Regional Development was created.

The creation of the Ministry is also in line with the Treaty for establishment of

EAC and Directives of the EAC Heads of State Summit.

In line with the mandate of the Ministry, the implementation of the Plan will focus

on coordinating Kenya’s engagement in the EAC integration and Northern

Corridor Development programmes as well as coordination of Regional

Development. This involves working closely with the Ministries, Counties,

Departments and Agencies (MCDAs); Private Sector; civil society; and engagement

with Kenyan Citizenry, EAC Secretariat, Organs and Institutions and the other

Partner State.

1.2.2 Background on the State Department for Regional and

Northern Corridor Development

1.2.2.1 Background on Regional Development

The Directorate of Regional Development was formed in 2009 as a result of the

creation of the former Ministry of Regional Development Authorities which was

established through Presidential Circular No. 3/2003. The Directorate’s mandate

included among others; Development and review of policies, strategies and

regulations to guide the Regional Development Authorities (RDAs); Coordination

and Oversight managements of the RDAs; Resource mobilization for RDAs

projects and programs, and Monitoring and evaluation of RDAs projects and

programmes.

The six Regional Development Authorities were established by various acts of

Parliament namely; Tana and Athi Rivers Development Authority (TARDA) Cap.

443 of 1974; Kerio Valley Development Authority (KVDA) Cap. 441 of 1979; Lake

Basin Development Authority (LBDA) Cap. 442 of 1979; Ewaso Ng’iro North

Development Authority (ENNDA) Cap. 448 of 1989; Ewaso Ng’iro South

Development Authority (ENSDA) Cap. 447 of 1989; and Coast Development

Authority (CDA) Cap. 449 of 1990.

Page 16: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

3

In 2013, the government, in line with the Constitution, rationalized the functions

of all the Ministries, Departments and Agencies (MDAs). Subsequently, the

Ministries of Environment and Mineral Resources, Water and Irrigation, Forestry

and Wildlife and Regional Development vide Executive Order No. 2/2013 of May

2013 were merged to form the Ministry of Environment, Water and Natural

Resources.

The Ministry of Environment, Water and Natural Resources was therefore

mandated to undertake protection, conservation, rehabilitation and development

of environment and natural resources for sustainable development. Previously,

this mandate had been undertaken by Ministries of Regional Development,

Environment and Mineral Resources, Forestry and wildlife and Water and

Irrigation as defined in the Presidential Circular No. 1 of February 2008.

The Directorate was further transferred to the Ministry of Devolution and

Planning after the re-organization of government in 2016. The Directorate

remained in the Ministry of Devolution and Planning until June 2018 when it was

moved to the Ministry of East African Community and Regional Development

through Executive Order No.1 of June 2018 (Revised), as a State Department for

Regional and Northern Corridor Development.

1.2.2.2 Background for Northern Corridor Integration Projects (NCIP)

The Northern Corridor Integration Projects (NCIP) initiative was established in

2013 to provide a platform for fast tracking implementation of projects,

programmes and activities agreed upon at the EAC. NCIP is anchored in the treaty

under the principle of variable geometry which allows for progression,

incorporation among a sub-group of members in a larger integration scheme in a

variety of areas and at different speeds. The NCIP projects were informed by

among others the need to co-operate and accelerate development in the region

particularly on improvement of infrastructure to ease the movement of people and

goods. The main concern was the long time it was taking to transport cargo to

and from the maritime port of Mombasa. Initially the focus was the SGR and

construction of one common Crude Oil Pipeline & one common Refined Pipeline

to serve the new oil discovered in the region and reduce the cost of transportation.

The other areas of interest were the need to simplify labour and immigration

requirements, customs procedures and cooperate in marketing the region as a

single tourism destination. The NCIP initiative implements projects under

fourteen (14) clusters namely;

Page 17: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

4

i. Standard Gauge Railway.

ii. Land for infrastructure development.

iii. Single Customs Territory.

iv. ICT Infrastructure.

v. Mutual defence cooperation.

vi. Oil Refinery Development.

vii. Human Resource Capacity Building.

viii. Immigration, Tourism, Trade, Labour and Services (ITTLS).

ix. Financing and Private Sector.

x. Power Generation, Transmission and Interconnectivity.

xi. Refined Petroleum Products Pipeline Development.

xii. Commodities Exchange.

xiii. Mutual Peace and Security Cooperation.

xiv. Air Space Management.

1.3 Mandate of the Ministry

The Ministry derives its mandate from the Executive Order No.1 of June,

2018(Revised). Following the reorganization of Government in June, 2018, the

Ministry of East African Community and Regional Development was established

with the following mandate;

i. Policy on East African Community.

ii. East African Community Affairs.

iii. Implementation of the East African Treaty.

iv. Co-ordination of implementation of EAC Regional programmes and

projects.

v. Promotion and fast tracking of EAC integration.

vi. Co-ordination of Government’s participation in East African Community

Affairs.

vii. East African Community Meetings and Institutions.

viii. Co-ordination of Regional Development Authorities.

ix. Monitoring and Evaluation of the implementation of Northern Corridor

Development.

x. Providing Secretariat Service during Ministerial and Head of States

Summit Meetings on Northern Corridor Development.

Page 18: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

5

1.4 Kenya’s Development Context

Kenya’s economy is influenced by the global economic dynamics as well as

development in the region. It is equally affected by socio-political developments

and adverse effects of climate change.

The value of Kenya’s exports to EAC region was on an upward trend up to 2012

(Kshs.152.9 billion) registering a significant decline in 2013 (Kshs.141.7billion)

followed by a slight increase in 2014 (Kshs.145.6 billion). Since then it has been

on a declining trend recording Kshs 131.6 billion in 2017.

Imports fluctuated over the period from 2012(Kshs.30.9 billion) declining to

Kshs.28.8 billion (2013), and thereafter increasing to Kshs. 40.2 billion in 2015.

It declined to Kshs. 32.9 billion in 2016 and thereafter rose significantly to Kshs.

61 billion in 2017. The declining trend in exports to the EAC has been attributed

to various factors including among others non-tariff barriers (NTBs), differences

in cost of production of similar products and increased competitions from imports

from China and India. However, the economy was resilient and grew by 4.9 % in

2017.

The unique development needs of different regions of the country led the

government to create Regional Development Authorities (RDAs) with mandates to

address those development needs. However, the RDAs have not been able to

implement some of the planned projects due to inadequate institutional capacity,

budgetary constraints, adverse weather conditions among others.

1.5 Rationale for the Strategic Plan 2018 - 2022

Following the expiry of the 2013 - 2017 Strategic Plan and the reorganization of

the Government of the Republic of Kenya in 2018, it became imperative to

formulate a Strategic Plan for the Ministry for the period 2018 - 2022. This Plan

has been formulated in line with the 3rd MTP, the EAC Treaty and National

Policies as anchored in Kenya Vision 2030, the “Big Four” Agenda and the

mandate of the Ministry as stipulated in the Executive Order No. 1 of June,

2018(Revised).

The Plan defines the Ministry’s vision, mission, core functions, policy priorities,

strategic objectives, structure and resource requirements as well as the

Monitoring and Evaluation Framework based on its mandate and the prevailing

socio-economic environment. In addition, it identifies the necessary reforms that

need to be undertaken to ensure that the medium-term objectives are achieved

as well as mainstreaming the Sustainable Development Goals (SDGs) in the

Ministry’s programmes and projects.

Page 19: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

6

1.5 Methodology

The process towards development of this Plan was consultative and involved

review of the progress made in the implementation of the previous Strategic Plan

2013 -2017, Constitution of Kenya 2010, Economic Survey 2018, detailed

analysis of Kenya’s Vision 2030, MTP III (2018 -2022), Executive Order No. 1 of

June 2018, the performance contracting guidelines, Presidential Directives on the

“Big Four” Agenda, Regional Development Authorities Policy, Treaty for the

establishment of the East African Community, the 5th EAC Development Strategy

2018-2022, EAC Vision 2050, COMESA-EAC-SADC Tripartite FTA, AU Agenda

2063, UN Sustainable Development Goals, the National Integration Monitoring

and Evaluation System and other policy documents.

The review and analysis involved the following steps; Ministry’s processes and

capacity, strengths, weaknesses, opportunities and threats (SWOT), Political,

Economic, Social, Technological, Environmental and Legal (PESTEL) as well as

stakeholders’ analysis and consultations. Key strategic issues were then

identified and the Vision and Mission statements reviewed. Subsequently,

strategic objectives were formulated with corresponding strategies and activities,

which formed the basis for the development of the implementation matrix and the

monitoring and evaluation mechanisms. The overarching objective of this

strategic plan 2018 – 2022 is to establish key priorities for the Ministry in the

next five-year planning period.

Page 20: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

7

CHAPTER TWO: SITUATIONAL ANALYSIS

2.0 Introduction

This chapter presents the situational analysis on the achievements realized under

the previous Strategic plan 2013 -2017, lessons learnt from the Plan

implementation as well as an analysis of the current operational environment in

the Ministry. The analysis identifies the key internal and external factors that

may influence the operations and performance of the Ministry.

2.1 Performance Review under the Strategic Plan 2013-2017

The Strategic objectives as contained in the Ministry’s Strategic Plan 2013 -2017

were:

i. To strengthen the coordination of the participation of the implementing

agencies in EAC activities and pillars of integration including cross-cutting

priority areas.

ii. To maintain reliable information and communication management for

decision making and integrated mechanism in assessing Kenya’s interests

in the EAC integration.

iii. To enhance the effectiveness of stakeholder consultations and engagement

in EAC activities.

iv. To ensure nationwide publicity and advocacy on EAC integration and its

benefits.

v. To support the harmonization of EAC’s integration agenda with those of

other Regional Economic Communities.

vi. To enhance access to water and sanitation in order to improve health, and

to spur Socio-economic growth and development.

vii. To strengthen integrated regional development programmes, operational

efficiency, resource mobilization, collaboration and partnerships.

During the period under review the Ministry’s general performance was as

follows: -

2.1.1 Target: Service Delivery Improvement

i. Developed an online system (e-briefcase) to enhance service delivery.

ii. Launched Quality Management Systems (QMS) in line with ISO 9001:

2008 Certification.

iii. The State Department for EAC Affairs was ISO 9001:2008 Certified.

Page 21: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

8

iv. Installed and launched Video Conferencing facility at the Ministry to

enhance communication between Partner States and the EAC Secretariat.

v. Developed and installed an SMS reporting module on manifestation of

Non-Tariff Barriers (NTBs) to facilitate flow of trade.

2.1.2 Target: Increase total exports from Kshs. 127 to 130 billion through

effective implementation of the EAC Customs Union and Common Market

Protocols

i. Commissioned the One-Stop-Border-Post in Taveta.

ii. Facilitated the removal of nine (9) Non-Tariff Barriers in form of road blocks

located at Mtito-Andei, Emali, Kibwezi, Salama, Machakos junction,

Naivasha, Eldoret, Webuye and Amagoro.

iii. Six capacity building workshops on Cross Border Trade Associations

(CBTAs) held in Malaba, Busia, Isebania, Namanga, Lungalunga and

Taveta.

iv. The value of Kenya’s exports to EAC increased during the review period

from Kshs 141.7 billion in 2013 to Kshs. 145.6 billion in 2014 before

declining to Kshs 131.6 billion in 2017. The decline was occasioned by

competition of products from Asian countries and import substitution

where Partner States are establishing manufacturing plants to produce

similar products initially exported by Kenya. In addition, the existence and

emergence of NTBs have also contributed to the decline in value of exports.

v. Developed and disseminated a simplified guide to EAC Trade Rules,

Regulations and Procedures for Cross Border Women Traders, Youth,

PWDs and Service Providers.

2.1.3 Target: To enhance the effectiveness of stakeholder consultations

and engagement in EAC

i. Several sensitization and consultative fora were held as follows;

a. Two (2) for youths on available EAC opportunities in Maseno and Africa

Nazarene Universities.

b. Four (4) for youths in the Counties of Nyeri, Nyamira, Kakamega and

Kiambu.

c. One (1) each for Cross Border traders and women on Business

opportunities within EAC Common Market Protocol.

d. Six (6) Consultative meetings on Customs Union, Common Market,

Monetary Union and Political Federation.

e. One (1) National workshop for cross border traders in Mombasa.

Page 22: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

9

f. Six (6) consultative meetings for Joint Cross Border Committees in Busia,

Namanga, Isebania, Malaba, Taita Taveta and Lungalunga.

g. Ten (10) trade fairs in Nairobi, Mombasa, Kisumu, Nakuru and Nyeri.

h. Two (2) Speaker’s Round Tables bringing together Members of Parliament

and EALA

i. Two EAC Round Table meetings bringing together MDAs at the county

governments

j. Five (5) Mara Day Celebrations bringing together the National Government

and Mara River Basin counties held on rotational basis between United

Republic of Tanzania and Republic of Kenya.

k. One workshop with EALA and Parliament on Health.

l. One Workshop with Parliament and EALA to develop a framework for

sustainable engagements.

m. One Friends of EAC meeting in 2017 to sensitise MDAs and counties on

the developed strategy on reengineering engagements in EAC integration.

n. 21 County Governments engaged on the role of EALA in regional legislation

and public sensitization on EAC integration.

o. 9 national Public Hearings on proposed EAC Bills.

ii. Continuous communication to stakeholders on EAC activities as per EAC calendar of activities and the Department’s programmes.

iii. Database of 147 stakeholders developed and operationalized.

iv. Focal points were established in all counties along the borders with neighbouring EAC Partner States.

v. Three Research Assistants were engaged to support the Ministry on research related activities.

vi. One study on reasons for declining Kenya’s exports to EAC Partner States

was undertaken. vii. The Department hosted one EAC Heads of State Summit on 20th February,

2015 and one meeting of EAC Council of Ministers on 28th November, 2014 which increased visibility of EAC integration Process.

2.1.4 Target: Sustain regulatory and policy reforms to deepen EAC

integration

i. Coordinated the ratification of the EAC Protocol on Immunities and

Privileges and deposited the instruments on ratification with the EAC

Secretary General. Kenya ratified the protocol on 11th October,2017.

ii. Developed and presented a Cabinet Memorandum on the amendment of

Article 24(2) of the EAC Custom Union Protocol to the Cabinet for approval.

Page 23: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

10

iii. Developed and Ratified the EAC Protocol on Sanitary and Phyto-Sanitary

Measures (SPS) which seeks to harmonize standards in trade in the

agricultural sector products.

iv. Two Policy frameworks for harmonization of domestic taxes, namely; “Policy

for Harmonization of Income Taxes within the East African Community”

and “Policy for harmonization of VAT & Excise duties” were developed.

v. An EAC framework on harmonization of domestic taxes has been finalized

and is currently being used as an input to the on-going process of

developing EAC Tax Policy on harmonization of domestic taxes.

vi. EAC Tax Treaty Policy was finalized and adopted by the Sectoral Council

on Finance and Economic Affairs. The policy sets out policy positions that

should be adopted in future and in current tax treaties when negotiating

the tax treaties with 3rd parties.

vii. EAC Model Tax Treaty was developed, adopted and is under

implementation. It will guide negotiations of Tax treaties with the 3rd

parties.

viii. Council Directive (CD) on harmonized tax procedures was developed and

adopted by the Council in September, 2014.

ix. To ease cross-border movement of persons, separate counters to serve East

African nationals in all international airports and crossing points were

established. Single Immigration Departure/Entry cards that are currently

being used by Partner States were also adopted.

x. Developed an Inter-State Pass to facilitate movement of persons using

Identity Cards between Kenya, Uganda and Rwanda.

xi. Establishment and operationalization of the East African Kidney Institute

in 2015 based at Kenyatta National Hospital to boost capacity in training,

research and provision of renal services.

xii. Harmonization of the registration of medicine and health technologies

through the EAC Medicines Regulation Harmonization Programme making

it easier for the pharmaceutical industries to do business in the region.

xiii. A regional Pharmaceutical Manufacturing Plan of Action developed so as to

reduce dependence on imported medicines and health technologies.

xiv. Initiated implementation of the EAC Agricultural and Rural Development

Policy for attainment of sustainable food security through increased

agricultural production, processing, storage and marketing.

xv. Mainstreamed the EAC Food Security Action Plan, 2011 – 2015 which

provides strategic areas of cooperation in ensuring food security in the

EAC.

Page 24: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

11

xvi. Initiated implementation of the EAC Industrialization Policy and Strategy

for value addition in agricultural products.

xvii. Developed and operationalized the EAC Climate Change Policy and Strategy

that provides for mitigating negative effects of climate change on agriculture

and food security.

xviii. Developed the EAC Food and Nutrition Policy.

xix. Developed a draft Policy on Harmonization of National Laws in the EAC

Context. The Policy proposes to set up a Multi-Agency Standing Committee

comprising of representatives from the key Ministries, Departments and

Agencies in the harmonization process.

xx. Coordinated development of OSBP procedures manual to support the OSBP

Act.

2.1.5 Target: To strengthen the Coordination of the participation of the

implementing agencies in EAC activities and pillars of integration

including cross-cutting priority areas

i. Sixteen (16) Cabinet Memos and ninety-two (92) Policy Briefs on EAC

prepared, considered and approved by the Cabinet: These are: -

a. Cabinet Paper on Sectors allocated to Kenya for spearheading under the

Northern Corridor

b. Cabinet Paper on the EAC Institutional Review.

c. Cabinet Paper on the EAC Financing Options.

d. Cabinet Paper on the outstanding EAC Decisions.

e. Cabinet Paper on EPA.

f. Cabinet Paper on hosting of EAC Institutions.

g. Cabinet Paper on the integration process in EAC.

h. Cabinet Memo on the EAC Political Confederation.

i. Cabinet Memo on ratification of the EAC Protocol on Privileges and

Immunities.

j. Cabinet Memo on ratification of the EAC Protocol on ICT.

k. Cabinet Memo on ratification of the EAC Protocol on the Amendment of the

Protocol on Customs Union.

l. Cabinet Memo on ratification of the EAC Protocol on the Extended

Jurisdiction of the East African Court of Justice.

m. Cabinet Memo on EAC Anthem and Flag.

n. Cabinet Memo on ratification of the EAC Protocol on Cooperation in Defence.

o. Cabinet Memo on ratification of the EAC Protocol on Peace and Security.

p. Implementation of the EAC Protocol on Peace and Security.

Page 25: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

12

q. Implementation of the EAC Protocol on Cooperation in Defence.

r. Development of Protocol on Privileges and Immunities.

ii. One hundred and eighty-five (185) Country Position papers were prepared

for Council, Summit and Sectoral council meetings as per EAC Calendar

of Activities.

iii. Two research topics were undertaken on Reasons for Declining Kenya’s

Exports to EAC Partner States and on cross border trade in agricultural

commodities.

iv. E-briefcase and East African Monitoring System (EAMS) were developed

and operationalized, 100 reports uploaded into the e-briefcase and 700

EAC Council Decisions and directives were uploaded into EAMS.

2.1.6 Target: To maintain reliable information and communication

management for decision making and integrated mechanism in assessing

Kenya’s interests in the EAC integration

i. 4 officers trained on ICT (1 on International Computer Driving License, 1

on Certified Information System Security Professional and 2 on Certified

Ethical Hacker).

ii. An online NTB monitoring and reporting system was developed and

operationalized.

iii. The NTB Act 2017 has been finalized and ratified by all Partner States.

iv. Website was redesigned to incorporate an interactive public portal

(www.meac.go.ke).

v. 35,000 copies of (seven) 7 different Booklets (IEC materials) developed,

printed and disseminated to stakeholders.

vi. 20,000 copies of Frequently Asked Questions (FAQs) Brochures developed,

printed and disseminated to stakeholders.

vii. Daily media analysis and reviews were done. viii. Two hundred and fifty-four (254) Business Editors and Journalists were

sensitized on the EAC integration process in Nairobi, Mombasa, Kisumu

and Naivasha.

ix. Developed a video documentary on the EAC integration and placed media

supplements in major newspapers to support the EAC Summit of 2014 in

Nairobi.

x. EAMS-Kenya was developed and operationalized.

xi. Six annual training sessions were held to build capacity of staff on M & E.

Page 26: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

13

2.1.7 Target: To support the harmonization of EAC’s integration agenda

with those of other Regional Economic Communities

i. Negotiations on the EAC-COMESA-SADC Tripartite Agreement was

conducted and the agreement signed in 2015.

ii. The EAC-EU EPA negotiations were completed. Kenya signed the

agreement in 2016 and subsequently ratified it in September, 2016.

iii. Negotiations on the extension of EAC-AGOA were concluded in 2017 and

the agreement extended to 2025.

iv. Initiated negotiations on tariff offers under the COMESA-EAC-SADC

Tripartite FTA. During the process, EAC identified tariff lines for offer to the

SACU after several negotiation sessions.

i. Initiated negotiations on EAC-US Trade and Investment Partnership

Agreement for mutual benefits on trade and investment.

2.1.8 Target: To ensure nationwide publicity and advocacy on EAC

integration and its benefits

i. Committee on harmonization of the Ministry’s Publicity and advocacy

programmes was established and operationalized.

ii. A draft media engagement plan was developed.

iii. Fifty (50) Sensitizations and publicity campaigns held.

2.1.9 Target: To put in place a policy framework to create an enabling

environment for promotion of Gender equality and mainstreaming of

disability

i. Workplace policy on Gender Equality and Gender Based Violence (GBV)

were developed and disseminated.

ii. Policy developed transcribed into Braille and disseminated.

iii. Sex and age disaggregated data continually collected. iv. Staff Sensitized on Gender mainstreaming annually.

v. Staff sensitized annually on service provisions to Persons with Disabilities

(PWDs).

2.1.10 Target: To build and improve organisational capacity and

infrastructure for sustained efficiency and effective service delivery.

i. TNA was undertaken, gaps identified and training projections drawn. Several Interventions were implemented and reports prepared.

ii. Individual and group trainings were done.

iii. The Scheme of service for Regional Integration officers continued to be

administered.

iv. Continuous deployment of staff carried out on need basis.

Page 27: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

14

v. Staff were recognised through awards and commendations. vi. 38 officers were promoted on merit (7 drivers, 7 Cleaning supervisors,

Clerical officers, 3 Secretaries, 1Receptionist, 3 ICT officers, 1Records

Management Officer, 3 State Counsel officers, 2 Supply Chain Management

Officers, 1Finance Officer, 3 Integration Officers, 4 Economists, and 1

Accountant, 2 Administration officers).

vii. Staff welfare association established. viii. Four Team building exercises were held. ix. Employee and Work Environment Surveys carried out in 2013/2014,

2014/2015 and 2016/2017 where 13 survey recommendations were

implemented.

2.1.11 Strengthen integrated regional development programs, operational

efficiency, resource mobilization, collaboration and partnerships.

i. Implementation of various development partners co-funded projects and

programmes e.g. Wei Wei Phase III and catchment management

component of Mwache multipurpose dam project.

ii. Process of identification of investors / financiers initiated for High Grand

Falls implementation.

iii. Undertook review of various Public Private Partnership (PPP) projects to

attract funding, e.g. Arror and Kimwarer multipurpose dams

iv. Various food security projects initiated, e.g. Turkana Napuu irrigation

project, Kieni Irrigation project, Lower Muranga Integrated project)

v. Implementation of the National Drought Mitigation Programme such as

construction of water pans and rehabilitation of boreholes (over 100

check dams/water pans completed)

vi. Construction of commercial facilities for sustainability and improvement

of business environment e.g. ENSDA Milk Cooling Plant and Leather

Factory, KVDA & CDA Fruit Processing Factory and LBDA Mall

vii. Development of monitoring and evaluation delivery framework (RDAs

M&E action Plan)

viii. Environmental Conservation programmes and projects initiated e.g.

Ewaso Ngi'ro North Catchment conservation Project (2013), Daua River

Transboundary management programme

ix. Various Boreholes Rehabilitated and Constructed, and Water trucking

and Water Pumps supplied across all drought affected area within the

RDAs areas of jurisdiction

x. Completion of LBDA shopping mall in Kisumu County

xi. Analysis of functions of the RDAs and review of policy for regional

development and legal framework for the RDAs in conformity with

requirements of COK 2010 including devolution

Page 28: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

15

2.2 Challenges

During the implementation of the 2013 – 2017 Strategic Plan, the following challenges were experienced: -

i. Budgetary Constraints.

ii. Staff establishment. The Ministry’s staff establishment had many gaps, hence compromising performance due to work overload. In addition, the

department lacked a comprehensive HR plan to address succession, staff skills gap and motivation.

iii. Inadequate office accommodation and furniture, inadequate office and

ICT facilities. iv. Inadequate vehicles and equipment.

v. Weak inter-departmental linkages and information sharing within the Department.

vi. Inadequate coordination and inconsistent Stakeholder Participation in

country preparatory meetings.

vii. Slow pace of implementation of EAC decisions and Directives by all Partner States.

viii. Low level of awareness among Kenyans on EAC integration process and the accruing benefits.

ix. Inadequate research on East African Community activities to inform policy.

x. Changing dynamics and context in the EAC whereby Partner States

focus more on their national interests at the expense of regional interests.

xi. Production of similar manufactured and agricultural products in the

EAC.

xii. Unharmonized domestic tax regimes in EAC Partner States.

xiii. Inadequate funding of regional programmes.

xiv. Frequent reorganization of the Ministries.

xv. Fluctuation of the exchange rate which affected subscription to EAC

budget.

xvi. Climate change and environmental degradation.

2.3 Lessons learnt in implementing Strategic Plan 2013 – 2017

i. Explore alternative funding options through innovative resource

mobilization strategies in order to successfully implement the strategic plan.

ii. Develop a robust human resource plan. iii. Provide a conducive work environment to enhance service delivery

and performance.

Page 29: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

16

iv. Acquire adequate and serviceable vehicles to facilitate execution of the Ministry’s mandate.

v. Ensure adequate consultations and seamless flow of information

across the departments, directorates, units and sections. vi. Inculcate an efficient system for making decisions at the regional

level.

vii. Enhance sensitization of the citizenry on the EAC integration process.

viii. Mobilize adequate resources for research on regional integration. ix. Develop a strategy to reengineer Kenya’s engagement in the EAC

Integration process.

2.4 Current Status

The EAC Integration process is anchored on four pillars namely Customs Union,

Common Market, Monetary Union and Political Federation. The current status of

the EAC Pillars of Integration as at December, 2018 is as follows.

2.4.1EAC Customs Union

The EAC Customs Union pillar provides for establishment of Common External

Tariff (CET), elimination of internal tariffs and Non-tariff Barriers (NTBs) within

the EAC customs territory. To address NTBs, the Community has put in place

mechanisms, including national and regional committees to identify and monitor

their elimination. Other activities that are currently ongoing towards fully

implementation of CU include review of CET, tax harmonization and the

operationalization of the EAC Single Customs Territory (SCT) at the port of

Mombasa and Dar es Salaam. The amendment to the EAC Customs Management

Act has been passed by EALA.

2.4.2 EAC Common Market

The Common Market Protocol (CMP) is the 2nd pillar of the EAC integration

process and provides for free movement of goods and services, persons, labour

and capital as well as right of establishment and residence in the EAC region. The

aspirations of the CMP have been achieved to a large extent. However pending

issues appertains to trade in services, standards harmonization, issuance of work

permits, Mutual Recognition Agreements (MRAs) as well as removal of restrictive

measures on rights of residence and establishment.

2.4.3EAC Monetary Union

The Protocol on the establishment of the East African Community Monetary

Union was signed on 30th November, 2013 by the Summit of EAC Heads in

Kampala Uganda. The Protocol became effective in 2015 upon deposit of

instruments of ratification by all EAC Partner States. According to the Road Map

Page 30: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

17

on the implementation of the Protocol, a single currency is expected to be

introduced in 2024 after at least three (3) Partner States achieve the prerequisites

for the establishment of the monetary union. The Protocol provides for the

establishment of four institution, namely: -

i. East African Statistics Bureau.

ii. East African Financial services commission.

iii. East African Monetary institute.

iv. East African surveillance, compliance and enforcement commission.

As of now, only the EAC Monetary Institute Bill has been passed by EALA and

forwarded to the Partner States for assent. The Bill for the establishment of EAC

Statistics Institute is currently before EALA.

2.4.4 EAC Political Federation

During 33rd Council of Ministers meeting held in Arusha, Tanzania in February,

2016, all Partner States converged on a Confederation Model for the East African

federation. The confederation was understood to mean the gradual, incremental

collaboration in specified areas in accordance with Article 5 (2) of the Treaty. The

Partner States would therefore, pool their sovereignty in the specific and agreed

areas of cooperation. Partner States will retain their sovereignty and only transfer

some capacity in the identified areas.

The 18th Ordinary Summit of Heads of State held in May, 2017 adopted the

Political Confederation as a Transition Model for the East African Political

Federation and further directed the Council of Ministers to constitute a team of

Constitutional Experts to draft the Constitution for the EAC Political

Confederation and report to the 19th Summit.

Five of the Partner States have nominated three (3) experts to the Committee in

line with the Summit and Council directives. The first meeting of the

Constitutional experts was held in September, 2018 in Arusha, Tanzania.

2.5 SWOT Analysis

The SWOT analysis is a strategic planning tool used to evaluate the strengths,

weaknesses, opportunities and threats that face an organisation. The tool

identifies the internal factors (strengths and weaknesses) and external factors

(opportunities and threats) that are either favourable or unfavourable towards

achievement of set objectives.

Table 1 profiles the Ministry’s strengths, weaknesses, opportunities and threats.

The strategic issues identified have informed the strategic direction the Ministry

will take for the next five years in developing the activities in the strategy

Page 31: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

18

implementation matrix to provide synergy within the Ministry. In reporting on the

weaknesses and threats, mitigating measures have been considered.

Opportunities for the Ministry were identified within the context of the existing

Regional Economic Communities (RECs), evolving political landscape, a growing

economy, a modern services sector, an agricultural economy that is yet to realise

its full potential through transformation, and a resilient industry base. It is

anticipated that the integration process may face threats from restraining forces,

and mitigation measures and strategic actions will be activated to sustain the

momentum towards the full realization of EAC integration and Regional

Development.

Table 1: The Ministry’s SWOT Analysis

Internal Environment Analysis

Strengths:

Supportive leadership and

management

Qualified and Competent

staff

Improved Public Sector

Reform initiatives

Effective linkages,

partnerships and networks with line Ministries,

Counties, Departments and Agencies, EAC organs and institutions, private sector

and other relevant stakeholders

A conducive environment for investment and wealth

creation

Political goodwill

Functional information

management system.

Functional Regional

Integration Centres and Technology centres.

Weaknesses:

Inadequate budgetary allocation

Inadequate office accommodation, equipment and other facilities

Inadequate disability responsive amenities

Unfavourable work environment

Inadequate staffing levels

Lack of Staff succession management plan

Inadequate capacity to undertake

monitoring and evaluation of projects and programmes

Inadequate sensitisation and awareness creation of Kenyans on EAC Integration

process

Page 32: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

19

External environment Analysis

Opportunities:

Existing Political goodwill

towards the EAC integration

Expanding democratic space

A pro-active and

knowledgeable civil society

Strong cooperative

movement

A well-developed print and

electronic media

A growing entrepreneurial

youthful population

A vibrant service sector

A dynamic and fast-growing ICT sector

A conducive environment for investment

Well-developed Research and Development

institutions

Kenya’s strategic location

with well-developed transport and communication network

Diaspora remittances

Potential for support from

Development Partners

Expanding EAC Market size

Robust industrial and

manufacturing sector

Effective Collaborative

Partnerships

Integrated basin-based

planning

Integrated basin-based

development coordination

Availability of 200,000 Ha. of

land resource

Operational NIMES (National

Integrated Monitoring and Evaluation System)

Threats:

Fear of loss of national sovereignty by the

EAC Partner States

Multiple membership of EAC Partner States

to other regional blocs

Influx of exports into the Region from

emerging major trading nations like China and India

Insecurity, political instability, porous borders, terrorism and piracy

Slow implementation of EAC decisions by the Partner States due to conflict between

National and Regional Interests

Perceived prevalence of corruption

Vulnerability to drought, floods and other natural disasters

Inadequate funding for EAC activities

High poverty and unemployment levels in

the region

Poor infrastructure in the region

HIV/AIDS, and Non-communicable

diseases

Emerging pests and diseases and trans-

boundary animal diseases

Perceived mistrust and suspicion among

Partner States

Unfavourable Geo-politics

Competition of manufactured products from emerging world economic powers

Fluctuating exchange rates

Role of RDAs versus County Government

BREXIT

Page 33: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

20

2.5 PESTEL

The Ministry operates within a global, regional, and national environment. Events

that take place in the Political, Economic, Social, Technological, Environmental

and Legal (PESTEL) arena impact on her performance. In the development of the

Ministry’s Strategic Plan for the period 2018-2022, the conditions in the external

environment stated above were analysed. The analysis of the external

environment revealed the following;

a. Political factor

There is a growing global and regional political goodwill that favours EAC

integration process. The EAC Heads of State Summit continues to give directions

and impetus on EAC Integration Agenda while at the National level Kenya has

identified Regional Integration as a strategic national interest. The Republic of

Kenya has also continually aligned the policy for Regional Development

Authorities to reflect the requirements of the Constitution of Kenya.

b. Economic Factor

At the global level, factors that will impact on integration include the finalization

of Economic Partnership Agreements (EPAs), Africa Continental Free Trade Area

(AfCFTA), Brexit, AGOA, COMESA-EAC-SADC Tripartite Agreement, various

bilateral agreements and emerging markets such as China and India. At the

regional level, implementation of the Customs Union, Common Market and

Monetary Union will be of great significance. In addition, as the community

pursues joint development of infrastructure, joint promotion and marketing of

the EAC as single market, development of extractive industries and natural

resources, will ultimately impact on the economic environment. Kenya’s Vision

2030 supports regional integration as contained in the Medium-Term Plans. The

“Big Four” national priorities on food security, affordable housing, manufacturing

and affordable health care are in line with the EAC regional integration priorities.

The Regional Development Authorities will contribute towards this government

initiative through integrated development programmes as well as through

formulating policies geared towards realization of the “Big Four” Agenda.

However, several factors may negatively impact on the success of integration

process including Non-Tariff Barriers (NTB’s), protectionist policies, resource-

based conflicts, climate change, terrorism and unstable fuel prices among others.

Page 34: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

21

c. Social-cultural factor

Globalization will continue to have both positive and negative impacts on the

cultural fabrics of the population. Under the implementation of the EAC Common

Market Protocol provisions, cross-border movements of people and the existence

of trans-boundary communities continue to be witnessed bringing about cross-

cultural marriages and development of multicultural dynamics.

On the negative side there is a growing threat of insecurity by porous borders and

smuggling of small arms and light weapons, organised crimes like terrorism, drug

and human trafficking, cyber-crime and increased pressure on cross border

social amenities and communicable diseases. However, with increased

awareness on inclusivity, regional strategies continue to be developed to facilitate

effective participation of women, youth, children, PWDs and Civil Society

Organizations in the EAC integration process.

d. Technological factor With the global advancement in Information Communication Technology (ICT),

the Ministry has continued to leverage on the same to improve processing and

transmission of information in real time, improve service delivery and reduce the

cost of doing business. This will impact positively on job creation, investments in

both human and capital, technology transfer and adoption, and market

expansion.

e. Environmental factor Increased awareness on environmental issues and climatic change continue to

influence policies in the region. Regional cooperation in the sustainable

management of the environment will play a critical role in addressing the

associated impacts of climate change and environmental degradation. A joint

trans-boundary of management of Natural Resources will enhance sustainability

of trans-boundary resources and ecosystems.

f. Legal factor Several legislation continues to be developed providing for enabling environment

for regional integration. These pieces of legislation require enactment by the East

African Legislative Assembly (EALA) as well as ratification by the National

Parliaments of the Partner States. Consequently, citizens must be made aware of

the EAC legal and regulatory environment including legislative reforms and laws

passed at the regional level.

Page 35: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

22

The RDA’s policy and Bill are being reviewed within the context of the Constitution.

2.6 Internal and External Stakeholder analysis

The stakeholders’ analysis assists in identifying the internal and external

stakeholders the Ministry collaborates or interacts with for the efficient and

effective delivery of services. The Ministry will continue to work with all

stakeholders through collaboration and partnership during the implementation

of the strategic plan. The success of the strategic plan will therefore ultimately be

reflected in the satisfaction of the stakeholders.

Table 2 provides the key stakeholders and their expected roles.

Table 2: Stakeholder Analysis

S/no. STAKEHOLDER ROLES OF THE STAKEHOLDER

Internal Stakeholder Analysis

1. Cabinet Secretary Overseeing the overall running of the Ministry Strategic policy formulation and direction of

the Ministry

Linkage between the Ministry, President and

Parliament

Authorised officer for the Ministry

Participate in EAC Council of Ministers fora

Participate in the business of EALA as an ex-

official member

Provides regular briefs to the Parliament on

regional integration matters

Provide regular briefs on Regional Development

Authorities bill and Policy

Appoints Board Members of the RDA’s

Coordinate Northern Corridor Developments

Projects and Programmes

Give approval on critical policy documents

2 Chief

Administrative

Secretary

Assisting the Cabinet Secretary in;

Providing policy direction, coordination and

overall supervision and performance of the

Portfolio assigned to him

Providing liaison with National Assembly and

Senate

Page 36: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

23

Providing liaison with County Governments on

matters of concurrent mandate

Providing inter-ministerial/sectoral

coordination

Furtherance of the interest of the Ministry

3 Principal

Secretaries

Chief administrators of the State Departments

Accounting officers for the State Departments

Oversee the implementation of programmes

and projects

Coordinate the Departments performance

management

Coordinate formulation of policies,

programmes and projects

Provide overall leadership, guidance and

coordination of Kenya’s participation in the

EAC Integration

Ensure Kenya meets her EAC regional

obligations

Safeguard Kenya’s interest in the EAC

Integration

Coordinate Regional Development Authorities

Monitoring and Evaluation of the

implementation of Northern Corridor

Development

Providing Secretariat service during Ministerial

and Head of Summit Meetings for Northern

Corridor Development

Page 37: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

24

4. Ministry’s Staff

Coordinate and monitor implementation of

Decisions/Directives, programmes and

projects

Coordination of Regional and Northern

Corridor Development activities

Formulation of integrated Regional

Development projects and programmes

Coordination of EAC activities

Participate in the formulation of policies,

programmes and projects

Provide guidance in Kenya’s participation in

the EAC Integration

Safeguard Kenya’s interest in the EAC

Integration

Provide administrative function

Processing of budgetary requests

Management of procurement

Submission of expenditure returns

Accountability of funds

ICT support services

Planning, Monitoring and evaluation

Human resource management and

development

External Stakeholder Analysis

5. The Presidency Provides the overall leadership and political goodwill

Assigns mandate through an Executive Order Participate in EAC Head of State Summit Assents to bills

Appoints the Chairpersons of the Regional Development Authorities Boards

6. The Cabinet Give guidance on critical matters of integration

Give approval for ratification of EAC protocols

Give guidance in Regional Development policy

and Bill

7 The National

Treasury

Provide guidelines and leadership in the

budget making process and release of funds as

per the budget and Ministry’s needs

Management of Public Finance

Ensure timely remittances of the Statutory

EAC subscriptions

Page 38: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

25

8. Government

Ministries,

Departments and

Agencies

Participate in the formulation of Sectoral

policies, programmes and projects

Implement the agreed EAC

decisions/directives, programmes and projects

Monitor and evaluate sectoral programmes and

projects

Participate in formulation and implementation

of bilateral agreements

9. The Parliament Legislate

Ratify regional protocols

Review, approve and oversee the

implementation of the Budget

Oversight role in the implementation of the

Sectoral programmes and projects

Consider bills and reports of debates from

EALA

Approve regional instruments

10. County

Government

Create an enabling environment to support

EAC Integration and NCIP

Collaborate in the implementation of Regional

Development Programmes and projects

11. Regional Economic

and Trading Blocs

Harmonization of policies, standards and

regulations

Provide accessibility to a wider range of

products and services and offer larger market

Provide for free movement of labour, capital,

persons, goods and services

12. EAC Secretariat,

Organs and

Institutions and

Partner States

Ratify/domesticate and implement EAC bills

and Protocols

Harmonize policies and laws touching on EAC

integration

Ensure consistency, clarity and commitment

on the agreed EAC policy issues

Timely removal of NTBs

Ensure timely remittance on financial

obligations

Timely implementation of EAC decisions and

directives

Enact Bills

Oversight on expenditure

Page 39: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

26

CHAPTER THREE: STRATEGIC MODEL

3.0 Introduction

This chapter outlines the Ministry’s Mandate, core functions, vision, Mission and

core values. It further articulates the key result areas that the Ministry will

address to achieve its strategic objectives for the Plan period. It also outlines the

strategies that will be applied to meet the strategic objectives. The key result areas

have been derived from Chapter two.

13. Development

Partners

Provide technical and financial support

Capacity building and creation of synergies

14. Private Sector Advocate for improvement of business

environment

Invest, create wealth and employment

Participate in the Public-Private Partnership

initiatives

Provide timely and accurate business

information, quality goods and services

Ensure self-regulation within the business

community

Innovation and technology transfer for

sustainability

15. Civil Society

Organizations

Advocacy and awareness creation on consumer

rights protection.

Contribute to policy formulation and play

oversight role in implementation process.

Support sensitization and advocacy on various

Sectoral matters

16. Academia Provide information to guide policy formulation

Undertake research to inform policy on

regional Integration and Regional Development

Develop relevant innovations and technologies

Human resource development

17. Media Disseminate information on regional policies

and programmes

Create public awareness on EAC, NCIP and

Regional Development

18. The General Public Participate in sectoral Policy consultative

forums

Own and support sectoral Programmes and

projects

Page 40: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

27

3.1 Ministry’s Core Functions:

The Ministry’s core functions include:

i. Liaison with the EAC Organs and Institutions and the Partner States. ii. Coordination of Ministries, Counties, Departments and Agencies (MCDAs),

the private sector and Non-State Actors to participate effectively in the EAC integration process.

iii. Capacity building of the citizenry to maximize the benefits of EAC

integration. iv. Communication and dissemination of information on the integration

process and opportunities arising thereof. v. To facilitate, oversee and coordinate the planning and direction of national

policies and resources to create conditions favourable for the development

and achievement of the objectives of the East African Community and implementation of the provisions of the EAC Treaty and protocols.

vi. To facilitate, coordinate and oversee the negotiations on Customs Union,

the Common Market, the Monetary Union and the Political Federation. vii. To facilitate, coordinate and oversee all EAC regional projects and

programme. viii. To facilitate, coordinate and oversee Integrated Regional Development

projects and programmes.

ix. To enhance the Ministry’s capacity to effectively perform her functions and create awareness for the benefit of all Kenyans.

x. To coordinate Kenya’s participation in EAC–SADC–COMESA tripartite and

the African Continental Free Trade Area (CFTA) negotiations. xi. To Coordinate Northern Corridor Integration Projects in collaboration with

implementing Ministries and Agencies. xii. To monitor, evaluate and report on the implementation of the Northern

Corridor Integration Projects.

xiii. To coordinate and oversee the Regional Development Authorities. xiv. Formulate and review regional development policies.

xv. Coordinate resource mobilization to facilitate RDAs on the implementation

of integrated development projects and investments.

xvi. Provide technical support to the RDAs.

3.2 Ministry’s Vision and Mission:

The content and spirit of the Ministry’s Vision and Mission in the period 2018-

2022 will be inspired by the larger purpose of serving the combined internal and

external stakeholders of Kenya and East Africa as a whole. The Vision is: -

“A Champion on Regional Integration matters for Sustainable

Development”

Page 41: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

28

3. 2.1 Ministry’s Mission Statement

“To Deepen and widen East African Integration and enhance regional

development for improved livelihoods for all Kenyans”

3.3 Core Values

In order to realize the Vision and Mission, the Ministry will be guided by the

following core values.

i. Customer focus and Results-Oriented

Results will legitimize the existence and effectiveness of the Ministry by

reinforcing behaviour that engenders top performance of the workforce to the satisfaction of stakeholders.

ii. Innovativeness and creativity The Ministry operates in a dynamic environment and shall embrace best

practice and continuous innovation in all its activities to ensure

effectiveness and efficiency.

iii. Integrity The Ministry’s business will be conducted with transparency, accountability, trustworthiness, commitment and objectivity.

iv. Teamwork and Respect for Diversity

The pivotal and central role of the Ministry renders itself to teamwork and

will be sustained by embracing the value chain principle that guarantees

internal connectivity and seamless service to external stakeholders.

v. Equity and fairness

The Ministry undertakes to recognize and promote the rights of and be impartial to all stakeholders and serve all without discrimination

vi. Professionalism

High professionalism will be maintained through continuous skills

development, training and accountability.

3.4 Summary of Key Result Area

From the SWOT, PESTEL and Stakeholder analysis in Chapter two, the following

key result areas were identified:

i. Financial Constraints (low budgetary allocations to the Ministry.

ii. Institutional Capacity (e.g. Levels of staffing, office accommodation,

disability responsive amenities, inadequate vehicles).

iii. Lack of Staff Succession Management Plan.

Page 42: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

29

iv. Inadequate sensitisation and awareness creation of Kenyans on EAC

Integration process.

v. Protectionist policies by Partner States.

vi. Declining market share.

vii. Changing regional dynamics.

viii. Product homogeneity.

ix. Informal trade.

x. Climate change, environmental degradation and trans-boundary

management of natural resources.

xi. Increased pressure on cross border social amenities and Management

and control of diseases (communicable and zoonotic diseases).

xii. Inadequate legal and institutional frameworks to govern implementation

of NCIPs.

xiii. Ineffective business plans by the RDAs hence over reliance on the

exchequer.

xiv. Overlapping mandate between RDAs and County Governments.

3.4.1 Key Result Areas, Strategic Objectives and Interventions

Key Result Area 1: Finance and Human Resource management and development

Strategic Objective 1 (a) To lobby for enhanced budgetary allocation for the

Ministry

Strategic interventions

i. Constitute a technical budget preparation working group.

ii. Build Capacity of the technical budget preparation working group.

iii. Hold inter departmental activity planning and budgeting meetings.

iv. Identify potential development partners.

v. Prioritize the projects and programmes to be supported by the development

partners.

vi. Negotiate for favourable funding by development partners.

vii. Prepare a summary presentation of the budget proposal.

viii. Hold consultative meetings with Parliament and the National Treasury.

ix. Present budget proposals to the National Treasury.

x. Participate in Sector negotiations.

xi. Establish a Budget Implementation Committee (BIC).

xii. Build capacity of the BIC members.

xiii. Carry out monthly monitoring of budget implementation.

Strategic Objective 1(b): To enhance institutional capacity for sustained efficiency and effective service delivery

Strategic interventions:

Page 43: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

30

i. Develop a comprehensive Human Resource Management and Development

plan.

ii. Undertake Training Needs Assessment (TNA).

iii. Train and Develop Staff.

iv. Recruit, appoint and promote staff.

Strategic Objective 1(c): To enhance work environment for sustained efficiency and effective service delivery

Strategic interventions:

i. Acquire additional office accommodation.

ii. Procure adequate office furniture and equipment.

iii. Procure additional vehicles.

Key Result Area 2: National Consultations and engagement of stakeholders on EAC and Regional and Northern Corridor Development activities.

Strategic Objective 2: To enhance the effectiveness of stakeholder consultations and engagement.

Strategic interventions:

i. Develop and implement stakeholders Engagement Strategy.

ii. Review and update the stakeholders’ data base. iii. Review and Identify additional focal points for EAC and Regional and

Northern Corridor Development activities. iv. Organise consultative and sensitization fora for stakeholders.

v. Provide timely communication and information to stakeholders on EAC and

Regional and Northern Corridor Development activities.

vi. Hold consultative fora with Parliament, County Governments and EALA(K)

Chapter.

vii. Involve Parliament in EAC and RNCD Policy meetings.

Key Result Area 3: Coordination and participation in the formulation and

implementation of EAC and RNCD policies, decisions and directives

Strategic Objective 3: To strengthen the coordination and participation in the

formulation and implementation of EAC and RNCD policies, decisions and

directives

Strategic interventions:

i. Convene country consultative meetings with relevant stakeholders and

prepare Country position Papers.

Page 44: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

31

ii. Coordinate and participate in negotiations in regional meetings.

iii. Follow-up on the implementation of Decisions and Directives.

iv. Update the EAMS on implementation status on EAC Decisions and

Directives.

v. Coordinate and participate in the activities of EALA(K) Chapter.

vi. Coordinate and participate in the Northern Corridor Integration projects.

vii. Establish, train and operationalize a ministerial M&E committee.

viii. Coordinate and participate in Regional Development Authorities initiatives.

ix. Build capacity of SDEAC staff and MCDAs on EAMS.

x. Undertake M & E on the Ministry’s programmes and projects.

Key Result Area 4: Implementation of the EAC Pillars of Integration

Strategic Objective 4: To deepen and widen implementation of the EAC Pillars

of integration (Customs Union, Common Market, Monetary Union and Political

Federation)

Strategic Interventions:

i. Conclude review of the EAC CET and the Rules of Origin.

ii. Conclude the review of the EAC Customs Management Act.

iii. Eliminate identified Non-Tariff Barriers (NTBs).

iv. Operationalize established One Stop Border Posts (OSBP).

v. Strengthen management of trans-boundary natural resources.

vi. Undertake M&E on implementation of the Common Market protocol.

vii. Finalize the Bills establishing EAMU Institutions.

viii. Finalize negotiations on the EAC Political Confederation Constitution.

Key Result Area 5: Institutionalize Knowledge Management

Strategic Objective 5: To enhance knowledge management within the Ministry

Strategic interventions:

i. Develop and operationalize a knowledge management information system.

ii. Develop the Ministry’s communication strategy.

iii. Hold annual Team building exercises.

iv. Hold Quarterly information sharing meetings for all staff.

Page 45: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

32

v. Establish a research unit and build its capacity to undertake Research on

thematic areas.

vi. Digitize the Ministry’s resource centre.

vii. Hold bi-annual meeting for all focal points on EAC and RNCD.

viii. Identify and capture knowledge in the Ministry.

Key Result Area 6: Upgrading of ICT infrastructure within the Ministry

Strategic Objective 6: To modernise ICT infrastructure and increase uptake

Strategic interventions:

i. Develop and operationalize an ICT policy.

ii. Upgrade the Local Area Network (LAN).

iii. Deploy internet link failover solution to maximise the two sources of

internet.

iv. Acquire modern servers.

v. Procure computers and other ICT equipment.

vi. Acquire and upgrade Computer software.

vii. Develop a stores management system.

viii. Digitize records and information resources.

ix. Establish a modernized air-conditioned server room.

x. Build capacity of staff on emerging technologies in ICT.

Key Result Area 7: National publicity and advocacy on EAC integration and its

benefits

Strategic Objective 7: To upscale nationwide publicity and advocacy on EAC

integration and its benefits

Strategic interventions:

i. Constitute a publicity and advocacy committee to coordinate national

sensitization and awareness creation programmes.

ii. Develop and implement comprehensive media engagement plan to sustain

publicity on EAC integration process.

iii. Carry out nationwide publicity and advocacy on EAC affairs.

iv. Participate in symposia, Conferences, trade fairs, Jua Kali/Nguvu Kazi

exhibitions and Mara day celebrations.

v. Explore the use of social media platforms to create awareness.

Key Result Area 8: Emerging issues in regional integration

Strategic Objective 8: To re-engineer Kenya’s engagement in regional integration for optimization of benefits from the integration process

Page 46: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

33

Strategic interventions:

i. Review and implement the strategy on Kenya’s engagements in EAC.

ii. Hold high level Cabinet Meetings on EAC integration process.

iii. Enter into cooperative partnerships with all the Partner States and others.

Key Result Area 9 Gender, Youth and Disability mainstreaming

Strategic Objective 9: To Create an enabling environment for promotion of

Gender equality, Youth and disability mainstreaming

Strategic interventions:

i. Review and implement a work place policy on Gender and Gender Based

Violence (GBV) policy.

ii. Review and implement a disability mainstreaming policy.

iii. Implement EAC Youth Policy and EAC Gender Policy.

iv. Collect sex and age disaggregated data to guide in planning.

v. Capacity build staff on Youth, Gender and disability Mainstreaming.

vi. Undertake youth, women and PWDs empowerment on access to

government procurement opportunities.

Key Result Area 10: Deepen and widen the market access for goods and services

within the context of Northern Corridor Integration Projects (NCIPs)

Strategic Objective 10: To optimize the benefits accruing from the NCIPs

Strategic interventions:

i. Develop and implement an NCIP engagement strategy.

ii. Strengthen legal and regulatory framework that governs engagement

with NCIP Partner States.

iii. Conclude negotiations of additional commitments on trade in services.

iv. Implement additional measures for free movement of people and labour.

v. Coordinate the organization of Ministerial and Heads of State Summit

level meetings.

vi. Host periodic NCIP country cluster programmes.

vii. Monitor, evaluate and report on coordination and implementation

process of the projects.

Key Result Area 11: Coordination of Regional Development Authorities

Strategic Objective 11: To improve coordination and oversight of RDA’s

Strategic interventions

i. Finalize review of bills and Policy.

Page 47: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

34

ii. Establish project monitoring units and steering committees.

iii. Undertake quarterly Monitoring and Evaluation of RDAs projects and

programmes.

Key Result Area 12: Sustainability of the Regional Development Authorities

Strategic Objective 12: To enhance sustainability of Regional Development

Authorities

Strategic interventions

i. Develop a resource mobilization strategy for RDA’s.

ii. Develop and implement a stakeholders engagement plan on projects

implemented by RDA’s.

iii. Conserve RDA’s water catchment areas.

iv. Strengthen Collaboration, Partnerships and Networks.

v. Expand acreage under irrigation.

vi. Establish and operationalise a climate change unit.

3.5 The National Priorities – “The Big Four” Agenda

The Government has Prioritized four broad areas of focus during the next five years. These areas are;

i. Food security. ii. Affordable housing.

iii. Manufacturing. iv. Affordable health care for all.

Most of the Ministry’s programmes and projects are in line with the four broad national priorities. During the implementation period of this development strategy the Ministry will coordinate formulation of policies that will contribute to

the implementation of the projects contained in the four broad areas. These policies will be addressed through the EAC integration process and Regional

Development Authorities.

In addition, the implementation of these policies, programmes and projects will be regularly monitored under the Ministry’s monitoring and evaluation

framework.

Page 48: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

35

Table 3. Strategy Implementation matrix

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Key Result Area 1: Finance and Human Resource management and development

Strategic Objective 1 (a) To lobby for enhanced budgetary allocation for the Ministry

Enhance budget

preparation

process within

the Ministry

Constitute a technical

budget preparation

working group

Budget

preparation

working group

in place

Enhanced

budget

proposal

Appointment

letters

Minutes of the

meetings

- - - - - - PS

Build Capacity of the

technical budget

preparation working

group

Enhanced

capacity of

the technical

working group

Improved

budgetary

preparation

process

Training report 2 2 2 2 2 10 PS

Hold inter

departmental activity

planning and

budgeting meetings

Validated

budget report

Budget

ownership

Minutes of the

meetings

0.2 0.2 0.2 0.2 0.2 1 IS

Undertake

resource

mobilization

from

development

partners

Identify potential

development partners

and investors

Database of

potential

development

partners and

investors,

Bankable

project

proposals

Projects

funded

Development

Partners

engagement

framework/MoU

5 5 5 5 5 25 PS

Page 49: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

36

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Prioritize the projects

and programmes to be

supported by the

development partners

Prioritized

projects and

programmes

Enhanced

implementatio

n of projects

and

programmes

Reports on

Prioritized

projects and

programmes

0.1 0.1 0.1 0.1 0.1 0.5 PS

Negotiate for

favourable funding by

development partners

Reports of

negotiation

meetings

Favourable

funding

agreements

Development

Partners

commitment/Lett

ers of

commitments/Fi

nancing

agreements

0.2 0.2 0.2 0.2 0.2 1

Prepare a summary

presentation of the

budget proposal

Summary

Budget

presentation

Clear

understandin

g of the

Ministry’s

budgetary

requirements

Report 0.1 0.1 0.1 0.1 0.1 0.5 PS

Hold consultative

meetings with

Parliament and the

National Treasury

Meeting

reports

Enhanced

budget of the

Ministry

List of

participants

Report of the

meeting

5 5 5 5 5 25 PS

Enhance

monitoring of

budget

Implementation

Present budget

proposals to the

National Treasury

Budget

presented to

the National

Treasury

Enhanced

budget of the

Ministry

Correspondence

to the National

Treasury

0.2 0.2 0.2 0.2 0.2 1 PS

Page 50: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

37

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Participate in Sector

negotiations

Sector

negotiation

reports

Enhanced

budget of the

Ministry

Sector reports 4 4 4 4 4 20

Establish a Budget

Implementation

Committee (BIC)

Committee in

place

Effective

budget

implementatio

n monitoring

Appointment

letters

0.1 0.1 0.1 0.1 0.1 0.5 CFO

Build capacity of the

BIC

Training

report

Effective

budget

implementatio

n monitoring

Training report

Expenditure

returns

0.5 0.5 0.5 0.5 0.5 2.5 PS

Carry out monthly

monitoring of budget

implementation

BIC monthly

reports

Effective

budget

implementatio

n monitoring

Monthly reports

Minutes of

meetings

0.1 0.1 0.1 0.1 0.1 0.5 CFO

Strategic Objective 1(b): To enhance institutional capacity for sustained efficiency and effective service delivery

Enhance

institutional

capacity of the

Ministry

Develop a

comprehensive

Human Resource

Management and

Development plan

Comprehensiv

e Human

Resource

Management

and

Development

plan

Enhanced

Human

Resource

capacity

Comprehensive

Human Resource

Management and

Development

plan

2.5 2.5 - - - 5 PS

Page 51: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

38

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Recruit, appoint and

promote staff

Optimal

staffing levels

Effective

service

delivery

Appointment

letters

85 85 85 85 85 425 PS,DHRM & D

Undertake Training

Needs Assessment

(TNA)

TNA report Demand

driven

training for

enhanced

service

delivery

Identified training

projections

TNA reports

2 2 2 2 2 10 PS

Train and develop

staff

Training

reports

Enhanced HR

capacity

No of officers

trained

20 25 25 30 30 130 PS

Strategic Objective 1 (c): To enhance work environment for sustained efficiency and effective service delivery

Acquire additional

office accommodation

Additional

accommodatio

n space

acquired

Conducive

work

environment

Signed Lease

agreement

20 20 20 20 20 100 PS

Improve work

environment

Procure adequate

office furniture and

equipment

Adequate

office

furniture and

equipment

Conducive

work

environment

Inventory of

newly acquired

furniture &

equipment

20 20 20 20 20 100 PS

Procure additional

vehicles

Additional

vehicles

Efficient

service

delivery

No of additional

vehicles procured

25 25 25 25 25 125 PS

Page 52: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

39

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Key Result Area 2: National Consultations and engagement of stakeholders on EAC, Northern Corridor and Regional Development Authorities activities

Strategic Objective 2: To enhance the effectiveness of stakeholder consultations and engagement

Stakeholders’

sustained

involvement in

preparation for

and

participation in

EAC and

Develop and

implement

stakeholders

engagement strategy

Stakeholders

engagement

strategy

Well-

coordinated

stakeholders

engagement

Approved

Strategy

3 3 3 3 3 15 PS

Review and update

the stakeholder

database

Accurate

database

Accurate and

reliable

database

No. of

stakeholders

0.1 0.1 0.1 0.1 0.1 0.5 IS, DA, SRD,

Coordinator

NCIP

Review and identify

focal points for EAC

and Regional and

Northern Corridor

development activities

Database of

focal point

officers

Consistent

representatio

n

No of focal point

officers

Appointment

letters

0.1 0.1 0.1 0.1 0.1 0.5 IS, DA, SRD,

Coordinator

NCIP

Organize consultative

and sensitization fora

for stakeholders

Sensitization

reports and

meetings held

Enhanced

capacity of

stakeholder to

handle EAC

and Northern

Corridor

development

Attendance

Register and No.

of reports

Minutes of

meetings held

20 20 20 20 20 100 IS, Finance,

SCMS, SRD

Provide timely

communication and

information to

stakeholders on EAC,

Regional and

Corresponden

ce and

Reports

Improved

participation

on EAC and

Northern

Corridor

Mail delivery

Registers,

Reports, Emails

0.5 0.5 0.5 0.5 0.5 2.5 IS, DA, SRD,

Coordinator

NCIP

Page 53: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

40

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Northern Corridor

Development activities

Development

activities

Strengthen

linkages with

Parliament,

EALA (K)

Chapter and

County

Governments

Hold consultative fora

with the Parliament,

EALA(K) Chapter and

County Governments

Consultative

meeting

reports

Cordial

working

relations with

Parliament,

EALA (K)

Chapter and

County

Governments

List of attendance

Workshop reports

20 20 20 20 20 100 PS

Involve Parliament in

EAC and RNCD Policy

meetings

EAC and

RNCD Policy

meeting

reports

Enhanced

participation

of Parliament

in EAC and

RNCD policy

meetings

Reports

Invitation letters

5 5 5 5 5 25 PS

Page 54: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

41

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Key Result Area 3: Coordination and participation in the formulation and implementation of EAC and RNCD policies, decisions and directives

Strategic Objective 3: To strengthen the coordination and participation in the formulation and implementation of EAC and RNCD policies, decisions and

directives

Coordinate

Kenya’s

participation in

the EAC and

RNCD activities

Convene country

consultative meetings

with relevant

stakeholders and

prepare country

position papers

Country

position

papers

Reports of the

EAC/RNCD

activities/mee

tings

Effective

participation

in policy

formulation

Country position

papers, Minutes

of Meetings

4 4 4 4 4 20 IS, SRD, CNC

Coordinate and

participate in

negotiations in

regional meetings

Negotiation

meeting

reports

Effective

participation

in Policy

formulation

Reports 100 100 100 100 100 500 PS, CNC

Follow up on the

implementation of

Decisions and

Directives

Implementatio

n status

reports

Timely

implementatio

n of Decisions

and directives

Status Reports 0.1 0.1 0.1 0.1 0.1 0.5 IS, CNC, SRD

Update EAMS on

implementation

status on EAC

Decisions and

Directives

Updated

EAMS

Timely

implementatio

n

Updated EAMS 0.02 0.02 0.02 0.02 0.02 0.1 IS

Coordinate and

participate in the

Periodic

reports of

Effective

participation

EALA Hansard 30 30 30 30 30 150 IS

Page 55: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

42

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

activities of EALA(K)

Chapter

EALA (K)

activities

in EALA

legislation

Coordinate and

participate in the

Northern Corridor

Integration Projects

(NCIPs)

Project

implementatio

n status

reports

Enhanced

implementatio

n of NCIPs

Reports 20 20 20 20 20 100 CNC

Coordinate and

participate in Regional

Development

Authorities Initiatives

Project

implementatio

n status

reports

Enhanced

implementatio

n of RDAs

Reports 20 20 20 20 20 100 SRD, DRD,

Strengthen

M&E framework

Establish, train and

operationalize a

Ministerial M&E

Committee

M&E

Committee

Effective M&E M&E framework

and Reports

5 5 5 5 5 25 PS

Build capacity of

SDEAC staff and

MCDAs on EAMS

Staff trained

on EAMS

Effective M&E Training Report

No. of SDEAC

staff and MCDAs

trained

1 1 1 1 1 5 PS

Undertake M & E on

the Ministry’s projects

and programmes

M & E reports

Efficient and

effective

implementatio

n of projects

and

programmes

M & E reports 5 5 5 5 5 25 PS

Page 56: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

43

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Key Result area 4: Implementation of the EAC Pillars of integration

Strategic Objective 4: To deepen and widen implementation of EAC Pillars of Integration (Customs Union, Common Market, Monetary Union and Political

Federation)

Deepen and

widen EAC

Integration

Conclude review of

the EAC CET and the

Rules of Origin (RoO)

Revised CET

Document

Improved

business

environment

Reviewed EAC

CET and RoO

10 10 10 10 10 50 PS

Conclude the review

of the EAC Customs

Management Act

Revised EAC

Customs

Management

Act

Improved

business

environment

Reviewed EAC

Customs

Management Act

10 10 10 10 10 50 PS

Eliminate identified

NTBs

NTBs

eliminated

Improved

trade

facilitation

No of NTBs

eliminated

5 5 5 5 5 25 PS

Operationalize

established One Stop

Border Posts (OSBP)

Operational

One Stop

Border Posts

Ease of

movement of

people,

labour, goods

and services

No of OSBPs

operationalised

2 2 2 2 2 10 PS

Strengthen

management of trans-

boundary natural

resources

Trans-

boundary

natural

resources

management

plan

Sustainable

use of trans-

boundary

natural

resources

Reports

Management

plan

1 1 1 1 1 5 IS

Undertake M & E on

implementation of

Common

Market

Protocol

Enhanced

Implementatio

n of the

Implementation

status reports

2 2

2 2 2 10 IS

Page 57: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

44

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

common Market

protocol

implementatio

n Framework

Common

Market

Protocol

Finalize the Bills

establishing EAMU

institutions

Bills on

EAMU

Institutions

EAMU

institutions

established

No. of Assented

Bills

1 1 1 1 1 5 IS

Finalize negotiations

on the EAC Political

Confederation

Constitution

EAC Political

Confederation

Constitution

Enhanced

Integration

process

Reports 2 2 5 5 5 19 IS

Establish Jumuiya

Markets at One Stop

Border Posts in Busia,

Namanga, Malaba,

Taveta, Isebania and

Lungalunga

Jumuiya

Markets

Established in

OSBPs

Trade

facilitation

and enhanced

cohesiveness

among

Partner States

No. of Jumuiya

markets

established

1,000 1,000 1,000 1,000 1,000 5,000 PS

Key Result area 5: Institutionalize Knowledge Management

Strategic Objective 5: To enhance knowledge management within the Ministry

Build and

strengthen the

Ministry’s

linkages and

information

sharing

platforms

Develop and

operationalize a

knowledge

management

information system

Knowledge

management

system

Enhanced

knowledge

management

Reports of

meetings

Appointment

letters

2 2 2 2 2 10 PS

Develop the Ministry’s

communication

strategy

Communicati

on strategy

Effective

communicatio

n

Reports of

meetings

3 3 3 3 3 15 PS

Page 58: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

45

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Communication

strategy

Hold annual Team

Building exercises

Effective

teamwork and

Knowledge

sharing

Enhanced

service

delivery

Team building

report

3 3 3 3 3 15 PS

Hold quarterly

information sharing

meetings for all staff

Information

sharing

Enhanced

service

delivery

Reports 1 1 1 1 1 5 PS

Strengthen

information

gathering and

sharing

Establish a research

unit and build its

capacity to undertake

research on thematic

areas

Research Unit

established

Informed

decision

making

No. of research

reports

5 5 5 5 5 25 PS

Digitize the Ministry’s

resource centre

Digital Library Informed

decision

making

No. of documents

digitized

Software

10 10 10 10 10 50 PS

Hold bi-annual

meeting for all focal

points on EAC and

RNCD

Bi-annual

meetings

Effective

decision

making

Reports 4 4 4 4 4 20 PS

Identify and capture

knowledge in the

Ministry

Knowledge

database

Effective

decision

making

Database 5 5 5 5 5 25 PS

Page 59: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

46

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Key Result Area 6: Upgrading of ICT infrastructure within the Ministry

Strategic Objective 6: To modernize ICT infrastructure and increase uptake

Upgrading of

ICT

infrastructure

within the

Ministry and

increasing ICT

usage

Develop and

operationalise an ICT

Policy

ICT Policy Increased

uptake of ICT

ICT Policy - 1 1 1 - 3 Head ICT

Upgrade the Local

Area Network (LAN)

Upgraded LAN Effective

service

delivery

Completion

certificate

10 10 10 10 - 40 Head ICT

Deploy internet link

failover solution to

maximise the two

sources of internet

Non-

interruptible

internet

availability

internet

reliability

completion

certificate

- 2 - - - 2 Head ICT,

Head SCMU

Acquire modern

servers

Modern

servers

Effective

service

delivery

Completion

certificate

- 5 - 5 - 10 Head ICT,

Head SCMU

Procure computers

and other ICT

equipment

Modernise ICT

facilities

Effective

service

delivery

No. of computers

and ICT

equipment

procured

8 10 10 10 2 40 Head ICT Head

SCMU

Acquire and upgrade

Computer software

Upgraded

computer

software

Effective

service

delivery

Certificate of

upgrading

- 5 - 5 - 10 Head ICT,

Head SCMU

Develop a stores

management system

Stores

Management

system

Digitized

procurement

processes

Stores

Management

System in place

- 5 - - - 5 Head ICT

Page 60: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

47

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Digitize records and

information resources

Digitized

records and

Information

resources

Enhanced

service

delivery

Certificate of

completion

- 10 - - - 10 Head ICT

Establish a

modernized air-

conditioned server

and video conference

room

Modernised

air-

conditioned

server room

Effective

Service

delivery

Completion

certificate

- 2 - - - 2 PS

Build capacity of staff

on emerging

technologies in ICT

Staff Trained Enhanced

service

delivery

No. of staff

trained

2 2 2 2 2 10 DHRM & D

Head ICT

Key Result area 7: National Publicity and advocacy on EAC Integration and its benefits

Strategic Objective 7: To upscale nationwide publicity and advocacy on EAC integration and its benefits

Strengthen

National

Publicity and

Advocacy on

EAC Integration

Constitute a publicity

and advocacy

committee to

coordinate national

sensitization and

awareness creation

programmes

Publicity and

Advocacy

Committee

Increased

awareness on

EAC

integration

Reports, IEC

materials

0.1 0.1 0.1 0.1 0.1 0.5 IS

Develop and

implement

comprehensive media

engagement plan to

sustain publicity on

Media

engagement

plan

Enhanced

Media

engagement

Media

engagement

reports

10 10 10 10 10 50 DA

Page 61: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

48

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

EAC integration

process

Carry out nationwide

publicity and

advocacy on EAC

affairs

Publicity and

advocacy

campaigns

Increased

awareness on

EAC

Integration

Publicity and

advocacy Reports

100 100 100 100 100 500 IS

Participate in

Symposia,

conferences, trade

fairs, Jua kali/Nguvu

Kazi exhibitions and

Mara day celebrations

Reports on

symposia,

conference,

trade fairs,

exhibitions

and Mara day

Enhanced

stakeholders/

public

engagements

No. of Reports on

symposia,

Conference,

Trade fairs,

Exhibitions and

Mara day

20 20 20 20 20 100 CNC, IS, DA,

DRD

Explore the use of

social media

platforms to create

awareness

Operationalize

d Social

media

platforms

Increased

awareness on

EAC and

RNCD

projects and

programmes

Reports on social

media platforms

No. of social

media platforms

operationalized

and Hits

7 7 7 7 7 35 PS

Key Result Area 8: Emerging issues in Regional Integration

Strategic Objective 8: To re-engineer Kenya’s engagement in Regional Integration for optimization of benefits from the integration process

Reengineer

Kenya’s

engagement in

the EAC

Review and

implement the

strategy on Kenya’s

engagements with

EAC

Strategy

implemented

Effective

engagement of

Kenya in EAC

integration

Agenda

Reviewed

Strategy

Implementation

reports

4 4 4 4 4 20 PS

Page 62: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

49

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Hold high level

Cabinet meetings on

EAC integration

process

Improved

information

sharing and

participation

in EAC

activities

Enhanced

level of

engagement

Reports on

Cabinet Issues

5 5 5 5 5 25 CS

Enter into cooperative

partnerships with all

the Partner States

and others

Reports of

engagements

Enhanced

bilateral

engagement

with Partner

States

No. of

Agreements/MoU

s signed

10 10 10 10 10 50 PS

Key result area 9: Gender, Youth and Disability Mainstreaming

Strategic Objective 9: To Create an enabling environment for promotion of Gender Equality, Youth and Disability Mainstreaming

Put in place a

policy

framework to

create enabling

environment for

promotion of

Gender

equality, youth

and disability

mainstreaming

Review and

implement a work

place policy on

Gender Based

Violence (GBV)

Reviewed

work place

policy on

Gender

Respect for

gender

diversity

No. of

consultative

reports

Reviewed policies

Implementation

reports

- 4 - - - 4 DA

Review and

implement a disability

mainstreaming policy

Reviewed

Disability

mainstreamin

g policy

Improved

access to

services for

PWDs

No. of

consultative

reports

Reviewed policies

and Reports

- 3 - - - 3 DA

Page 63: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

50

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Implement EAC youth

Policy and EAC

Gender policy

EAC youth

and EAC

gender

policies

implemented

Increased

youth and

women

participation

in EAC

programmes

Youth and gender

mainstreaming

Reports

4 4 4 4 4 20 DA

Strengthen

Gender and

Disability

mainstreaming

in budgeting

Collect and analyse

sex and age

disaggregated data to

guide in planning

Sex and age

disaggregated

data

Youth and

Gender

mainstreamed

Reports on youth

and gender

mainstreaming

0.1 0.1 0.1 0.1 0.1 0.5 DA

Capacity build staff

on youth, Gender and

Disability

mainstreaming

Sensitized

staff

Effective

service

delivery

No. of staff

sensitized

Reports on

sensitization

0.5 0.5 0.5 0.5 0.5 2.5 DA, DHRM&D

Undertake youth,

women and PWDs

empowerment on

access to government

procurement

opportunities

Empowered

women, youth

and PWDs

Increased

access to

AGPO

AGPO reports 0.1 0.1 0.1 0.1 0.1 0.5 DA, Head

SCMU

Key result area 10: Deepen and widen the market access for goods and services within the context of Northern Corridor Integration projects Strategic Objective 10: To optimize the benefits accruing from the NCIPs

Strengthen

coordination

and

Develop and

implement an NCIP

engagement strategy

NCIP

engagement

strategy

Enhanced

engagement

on NCIP

Developed

strategy

5 5 5 5 5 25 CNC

Page 64: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

51

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

implementation

of NCIPs

Strengthen legal and

regulatory framework

that governs

engagement with

NCIP Partner States

Legal and

regulatory

framework

Legal and

regulatory

framework

strengthened

No. of legal and

regulatory

frameworks

developed

5 5 5 5 5 25 CNC

Conclude negotiations of additional commitments on trade in services

Concluded

MRAs

Enhanced

trade in

services

No. of additional

MRAs signed

5 5 5 5 5 25 PS,CNC

Implement additional

measures for free

movement of people

and labour

Additional

agreements

on free

movement of

people and

labour

Enhanced free

movement of

people and

labour

No. of additional

agreements on

free movement of

people and labour

5 5 5 5 5 25 CNC

Coordinate the

organization of

Ministerial and Heads

of State Summit level

meetings

Policy

guidance and

direction on

NCIP

Improved

project

implementatio

n

Communique

Reports

30 30 30 30 30 150 CNC

Host periodic NCIP

country cluster

programmes

Harmonised

Country

positions

Improved

project

implementatio

n

Reports on NCIP 12 12 12 12 12 60 CNC

Monitor, Evaluate and

report on coordination

M & E reports Improved

implementatio

n process

No. of M & E

reports

10 10 10 10 10 50 CNC

Page 65: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

52

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

and implementation

process of the projects

Key result area 11: Coordination of Regional Development Authorities

Strategic Objective 11: To improve coordination and oversight of RDA’s

Coordination of

Regional

Development

Authorities

Finalize review of bills

and policy

RDAs Act and

Policy

Improved

Governance

and

operations of

RDAs

RDA Act and

Policy in place

5 5 - - - 10 PS,DRD

Establish Project

Monitoring Units

(PMU) and Project

Steering Committees

(PSC)

PMU and PSC

committees

established

Effective

project

implementatio

n

Reports and

Minutes of

meetings

2 2 2 2 2 10 PS,DRD

Undertake quarterly

Monitoring and

Evaluation of RDA

projects and

programmes

M & E reports Effective

implementatio

n of projects

and

programmes

No of M & E

reports

6 6 6 6 6 30 PS,DRD

Page 66: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

53

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Key result area 12: Sustainability of the Regional Development Authorities

Strategic Objective 12: To enhance sustainability of Regional Development Authorities

Sustainability of

the Regional

Development

Authorities

Develop a resource

mobilization strategy

for RDA’s

Resource

mobilization

Strategy

Adequate

resources for

implementatio

n of projects

and

programmes

Amount of

resources

mobilized

2 2 2 2 2 10 PS,DRD

Develop and

implement a

stakeholders

engagement plan on

projects implemented

by RDAs

Stakeholder

engagement

plan

Wide

inclusivity

and

ownership

Reports of

Stakeholder

engagement

1 1 1 1 1 5 PS

Conserve RDAs water

catchment areas

Water

catchment

areas

conserved

Project

sustainability

Number of water

catchment areas

conserved

- 2 2 2 2 8 PS,DRD

Strengthen

collaboration,

partnerships and

Networks

MoUs,

agreements

and Multi

agency

committees

Successful

implementatio

n of projects

and

programmes

Number of MoUs

and agreements

signed

Minutes of

Committee

meetings

2 2 2 2 2 10 PS,DRD

Expand acreage under

irrigation

Increased

area under

irrigation

Enhanced

food security

Number of

acreage under

irrigation

4 4 4 4 4 20 PS,DRD

Page 67: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

54

Strategy Activity Output Outcome

Performance

indicator

Target Period Budget (Kshs.

Millions)

Total

Budget

(Kshs.

Millions)

Responsibility

2018

2019

2020

2021

2022

Establish and

operationalise a

climate change unit

Climate

Change Unit

Established

and

operationalise

d

Climate

change issues

addressed

and linkages

established

No. of climate

change

mitigations/adap

tation measures

undertaken

3 5 5 5 5 23 PS,DRD

Sub Totals 1,76

9.62

1,81

7.62

1,77

7.12

1,79

2.12

1,76

3.12

8,919.60

Page 68: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

55

CHAPTER FOUR: IMPLEMENTATION AND COORDINATION

FRAMEWORK

4.1 Introduction

Strategic planning is a management tool that is motivated by the desire in

organizations to increase efficiency and effectiveness in their way of doing

business, amid limited resources available to them. The plan also embraces

performance management, teamwork and learning organizations; as the new way

of doing business. Having identified several activities for implementation; this

section deals with the implementation matrix, resource allocation and

mobilization.

4.2 Strategy Implementation Matrix

The strategies that have been proposed will be implemented in order to achieve

the Strategic objectives of the Department. In this regard, Table 3 details key

result areas, strategic objectives, strategies and accompanying activities to

deliver the strategic objective.

4.3 Resources Allocation and Mobilization

In order to implement this Strategic Plan, resources mobilisation and budgeting

for the plan period will be carried out by the Ministry to determine the estimated

amount of resources required each year. The Ministry will then put in place

strategies to mobilize resources aimed at meeting the likely resource gaps. Apart

from allocation by the Exchequer, the Ministry will explore other sources of

revenue to finance programmes including Public Private Partnership.

4.4 Implementation Matrix

The strategic objectives of the Ministry will be realised through the strategies that

have been proposed. In this regard, a Strategy Implementation Matrix with details

of activities, responsibility, time frames, required resources, expected outputs,

and performance indicators has been developed as shown in Table 3, within

Chapter Three.

4.5 Organizational Structure and Chart

For effective implementation of this Strategic Plan, the Ministry has adopted an

Organizational Structure that seeks to enhance delegation, effective management

and facilitates information flow. The structure has also taken into account

lessons learnt in the implementation of the previous Strategic Plan and the

Mandate of the Organization as stipulated in the Executive Order No. 1 of June,

2018 (Revised). Appendix I is the current organizational chart and structure of

the Ministry.

Page 69: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

56

CHAPTER FIVE: MONITORING, EVALUATION AND REPORTING

5.1 Introduction

The strategic plan will be operationalized into the Ministry’s day-to-day activities

through Performance Contracts and Annual Work Plans. In this regard, the plan

has taken major steps to logically sequence activities that will be undertaken in

order to achieve the strategic objectives, within the specified period. To assess

progress towards the achievement of the Ministry’s objectives, the Central

Planning and Project Monitoring Unit (CPPMU) will use an effective Monitoring

and Evaluation (M&E) system developed in line with the National Integrated

Monitoring and Evaluation System (NIMES). The annual reports from the Ministry

shall form part of the annual progress reports of the MTP compiled by the

Directorate of Monitoring and Evaluation, the National Treasury and Planning.

The M&E system will provide a framework for regular assessment of the

implementation of the Strategic Plan. Monitoring and Evaluation will be

undertaken by CPPMU in collaboration with all Directorates and Units.

5.2 Responsibility and Accountability

The overall responsibility of implementing the Strategic Plan will rest with the

Principal Secretary. It is expected however that a result-based monitoring and evaluation framework/mechanism will be developed to provide feedback on

effectiveness of its implementation. The feedback will also indicate the level of achievement of the Ministry performance contract targets.

The accountability practices in the Ministry will be guided by the constitutional

provision on Leadership and Integrity. This will ensure that members of staff are

held accountable to the public for decisions and actions taken by the Ministry in

executing its mandate. In addition, the Ministry shall:

i. Operationalize an anti-corruption policy;

ii. Undertake annual corruption risk assessments;

iii. Develop and implement corruption prevention plans; and

iv. Annually review internal corruption controls.

5.3 Risk Analysis and Critical Assumptions

The successful implementation of the Strategic Plan is based on certain prevailing

conditions and assumptions; hence lack of the same could derail the Ministry

from the charted course. Key to the effective implementation of the Strategic Plan

is sustaining the discipline to execute identified strategies while remaining

focused on the mission.

It is important to identify and mitigate against risks that would hinder plan

implementation or reduce its positive effect. The potential risk factors and events

which would threaten attainment of the Ministry planned objectives have been

identified according to the performance scorecard pillar and through the scanning

Page 70: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

57

of the environment to enable preparation of mitigation plans. Table 4 outlines the

various possible risks and their concomitant mitigation measures.

Table 3: Strategic Plan Implementation Risks Assessment and Mitigation

Risk Issue Current Situation

or Vulnerability

Proposed Strategic Actions

Performance

Management

System

weak linkages in

performance

management system

Strengthen linkages between

strategic plan, performance

contract, Departmental and

individual work plan and

Performance Appraisal System

(PAS)

Implementation

and monitoring of

the strategic plan

Poor

implementation and

monitoring of the

strategic plan

Appoint and build the capacity of

the Strategic Plan Implementation

and Review Committee

Administrative

bureaucracy

Delays in the

implementation of

planned activities

Development and Implementation

of the Service delivery charter

Development

partners

conditionalities

Unfavourable

conditionalities of

development

partners

Delays in release of

funds of the planned

activities

Establish a Resource Mobilization

Committee

Negotiate for favourable conditions.

Resource

constraints

Inadequate

resources for the

planned activities

Enhance budget preparation

process within the Ministry

Develop sustainability plans for the

RDAs that are over dependence on

exchequer

Austerity measures Unforeseeable

austerity measures

Review work plans and budgets

accordingly

Succession

management

Low staffing levels

Natural Attrition

Aging workforce

Prepare and implement a

comprehensive Human Resource

plan

Donor dependence Reliance on

Development

Lobby for Government of Kenya

Funds on Development vote

Page 71: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

58

Risk Issue Current Situation

or Vulnerability

Proposed Strategic Actions

partners for

development funds

Develop programmes that can be

funded by Government of Kenya

under development vote

Promote Public Private

Partnerships

Insecurity Unsecured access to

the Ministry.

Introduce a secure system for

access and CCTV monitors

Procurement

services

Delays in response

to users’ requests

Align requests to budgetary

provisions Engage Treasury to facilitate

procurement process through IFMIS and additional funding as per procurement plan

Build capacity of staff on the

procurement system Acquire store house

Develop a stores management system

HIV/AIDS Inadequate budgetary allocation

to ACU

Review and implement workplace policy on HIV and AIDS

Increase budgetary allocation to

ACU

Alcohol, Drugs, and Substance Abuse

Lack of budgetary allocations

Review and implement the workplace policy on Alcohol, Drugs, and Substance Abuse

Provide budgetary allocation

Corruption Weak internal control mechanisms

Develop a risk mitigation plan; Sensitise and raise awareness of

staff on corruption risk areas

Work environment Non-conducive work environment

Provide essential office supplies; additional parking and office space

Regular service and maintenance of equipment

Page 72: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

59

5.4 Monitoring and Evaluation

5.4.1 Monitoring

Monitoring provides the back-up necessary to ensure that objectives are achieved

and gaps are addressed. Monitoring is a check on whether results produced by

the implemented activity were those forecasted as outputs and whether they were

achieved according to stated performance measurement including timelines. A

Strategic Plan Implementation and Review Committee will be appointed and

tasked to keep track of progress on planned activities, prompting action in case

of delays or gaps on the strategic plan. The Committee will report annually and

advise the Ministry on remedial measures to ensure the strategy remains on

course.

5.4.2 Evaluation

The Strategic Plan will be evaluated during and after implementation to ensure

that it is feasible and produces the intended results. The evaluation will be carried

out using the relevance, efficiency, effectiveness, sustainability and impact

criteria. The relevance criterion seeks to ensure that the Plan is consistent with

the policy priority of the Ministry at all times. The efficiency criterion assesses the

extent to which resources are used optimally, while effectiveness criterion

assesses the extent to which the desired outputs are being achieved.

Sustainability ensures that the Ministry has the capacity to continue with the

implementation of the strategies, while the impact assessment confirms whether

the Strategic Plan is causing any positive intended changes in areas of

cooperation. The Ministry shall observe the following evaluation mechanisms:

1) Annual Ministry’s Performance Evaluation and Reporting.

2) Annual Ministry’s Work-Plan Implementation Review and Reporting.

3) Mid-term impact assessment to inform subsequent plan review and

revision.

4) Final plan evaluation report.

Page 73: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

60

Appendix I: ORGANIZATION STRUCTURE FOR THE MINISTRY OF EAST AFRICAN COMMUNITY AND

REGIONAL DEVELOPMENT

Cabinet Secretary

Principal Secretary, State Department for Regional & Northern

Corridor Development

Secretary, Regional Development Coordinator/Secretary, Northern

Corridor Development

Infrastructure

& Energy

Directorate

Northern

Corridor

Projects

Liaison

Directorate

Regional

Planning & Dev.

Directorate

Technical

Services Directorate

Principal Secretary, State Department for East African

Community

Chief Administrative

Secretary

Director

Administration

Director

HRM&D

Regional Political

Integration

Directorate

Secretary, Regional Integration

Regional

Economic

Integration

Directorate

Regional Social

Integration

Directorate

Regional

Productive &

Services

Directorate

Liaison Integration

Directorate

Director

Administration

Director HRM&D

Page 74: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

61

Appendix II: Staffing Levels

STATE DEPARTMENT FOR EAST AFRICAN COMMUNITY

S/No Designation Job

Group

Authorized

Establishment

In-post Variance

CABINET SECRETARY’S OFFICE

1. Cabinet Secretary 4 1 1 0

2. Chief Assistant Office Administrator N 0 1 1

3. Assistant Office Administrator II J 0 1 1

4. Senior Driver H 0 1 1

5. Driver I G 0 1 1

6. Cleaning Supervisor IIA F 0 1 1

7. Support Staff Supervisor E 0 1 1

8. Sub Total 1 7 6

CHIEF ADMINISTRATIVE SECRETARY’S OFFICE

1. Chief Administrative Secretary U 1 1 0

2. Principal Assistant Office Administrator N 0 1 1

3. Chief Assistant Office Administrator M 0 1 1

4. Senior Driver G 0 1 1

5. Driver II E 0 1 1

6. Cleaning Supervisor I G 0 1 1

7. Sub Total 1 6 5

PRINCIPAL SECRETARY'S OFFICE

1. Principal Secretary U 1 1 0

2. AD Office Administrative Services P 1 1 0

3. Chief Assistant Office Administrator M 1 0 -1

4. Office Administrative Assistant J 0 1 1

5. Chief Driver H 1 1 0

6. Senior Driver G 1 1 0

7. Cleaning Supervisor I G 1 1 0

8. Cleaning Supervisor IIA F 1 1 0

Sub- Total 7 7 0

INTEGRATION OFFICE

Integration Secretary T 1 0 -1

REGIONAL LIASON INTEGRATION DIRECTORATE

1. Director, Regional Integration S 1 0 -1

2. Deputy Director, Regional Integration R 3 0 -3

3. Senior AD, Regional Integration Q 2 0 -2

4. Ass Dir, Regional Integration P 2 0 -2

5. Chief/Principal Regional Integration Officer M/N 5 0 -5

6. Senior Regional Integration Officer L 1 0 -1

7. Regional Integration Officer I K 2 0 -2

8. Regional Integration Officer II J 2 0 -2

Sub Total 19 0 -19

REGIONAL ECONOMIC INTEGRATION DIRECTORATE

1. Director, Regional Integration S 1 1 0

2. Deputy Director, Regional Integration R 2 1 -1

3. Senior AD, Regional Integration Q 4 2 -2

4. Ass Dir, Regional Integration P 4 1 -3

5. Principal Regional Integration Officer N 4 0 -4

Page 75: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

62

6. Chief Regional Integration Officer M 4 0 -4

7. Senior Regional Integration Officer L 2 0 -2

8. Regional Integration Officer I K 2 1 -1

9. Regional Integration Officer II J 2 0 -2

Sub Total 25 6 -19

REGIONAL PRODUCTIVE AND SERVICES INTEGRATION DIRECTORATE

1. Director, Regional Integration S 1 1 0

2. Deputy Director, Regional Integration R 3 1 -2

3. Senior AD, Regional Integration Q 4 3 -1

4. Ass Dir, Regional Integration P 8 3 -5

5. Principal Regional Integration Officer N 4 0 -4

6. Chief Regional Integration Officer M 4 0 -4

7. Senior Regional Integration Officer L 1 0 -1

8. Regional Integration Officer I K 1 0 -1

9. Regional Integration Officer II J 2 0 -2

Sub Total 28 8 -20

REGIONAL POLITICAL INTEGRATION DIRECTORATE

1. Director, Regional Integration S 1 0 -1

2. Deputy Director, Regional Integration R 2 0 -2

3. Senior AD, Regional Integration Q 3 2 -1

4. Ass Dir, Regional Integration P 4 2 -2

5. Principal Regional Integration Officer N 3 0 -3

6. Chief Regional Integration Officer M 2 0 -2

7. Senior Regional Integration Officer L 2 0 -2

8. Regional Integration Officer I K 2 0 -2

9. Regional Integration Officer II J 2 0 -2

Sub Total 21 4 -17

REGIONAL SOCIAL INTEGRATION DIRECTORATE

1. Director, Regional Integration S 1 1 0

2. Deputy Director, Regional Integration R 3 0 -3

3. Senior AD, Regional Integration Q 3 3 0

4. Ass Dir, Regional Integration P 6 1 -5

5. Principal Regional Integration Officer N 4 1 -3

6. Chief Regional Integration Officer M 4 0 -4

7. Senior Regional Integration Officer L 4 0 -4

8. Regional Integration Officer II J 2 0 -2

Sub Total 27 6 -21

LEGAL

1. Senior Principal State Counsel Q 1 0 -1

2. Principal State Counsel P 0 1 1

3. State Counsel 1 M 0 1 1

Sub Total 1 2 1

ADMINISTRATION

1. Director of Administration S 1 0 -1

2. Deputy Secretary Q 1 2 0

3. Under Secretary P 2 1 0

4. Senior Asst. Secretary N 1 0 -1

5. Asst. Secretary I/II/III J/K/L 1 0 -1

Sub Total

6 3 -3

Page 76: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

63

SECRETARIAL SERVICES

1. AD Office Administrative Services P 1 0 -1

2. Principal Assistant Office Administrator N 4 2 -2

3. Chief Assistant Office Administrator M 6 5 -1

4. Senior Assistant Office Administrator L 2 12 10

5. Assistant Office Administrator I K 4 10 6

6. Assistant Office Administrator II J 4 1 -3

7. Assistant Office Administrator III H 3 0 -3

8. Office Administrative Assistant I J 2 3 2

9. Office Administrative Assistant II H 2 0 -2

10. Office Administrative Assistant III G 3 1 -2

Sub Total 31 34 3

CLERICAL OFFICERS

1. Chief Clerical Officer J 2 2 0

2. Senior Clerical Officer H 3 6 3

3. Clerical Officer I G 4 3 -1

4. Clerical Officer II F 3 0 -3

Sub Total 12 11 -1

DRIVERS

1. Principal Drivers J 1 1 0

2. Chief Driver H 3 1 -2

3. Senior Driver G 3 4 1

4. Drivers I/II E/F 3 6 3

5. Drivers III D 4 0 -4

Sub Total 14 12 -2

SECURITY

1. Security Officer J 1 1 0

2. Security Warden G 1 0 -1

3. Security Warden I/II F/E 3 0 -3

Sub Total 5 1 -4

LIBRARIANS

1. Principal Librarian N 1 1 0

2. Chief Librarian M 1 1 0

3. Librarian I K 1 0 -1

4. Library Assistant II H 1 0 -1

Sub Total 4 2 -2

RECEPTIONISTS

1. Receptionist II G 1 1 0

2. Receptionist III E/F 1 0 -1

Sub Total 2 1 -1

SUPPORT STAFF

1. Cleaning Supervisor I G 5 6 1

2. Cleaning Supervisor IIB / IIA E/F 7 5 -2

3. Senior Support Staff B/C/D 2 0 -2

Sub Total 14 11 -3

TELEPHONE SERVICES

1. Chief Telephone Supervisor M 1 0 -1

2. Senior Telephone Supervisor L 1 0 -1

Page 77: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

64

3. Telephone Supervisor I K 1 1 0

4. Telephone Supervisor II J 1 0 -1

5. Senior Telephone Operator H 1 3 2

6. Telephone Operator II F 1 0 -1

7. Telephone Operator I G 1 0 -1

Sub Total 7 4 -3

HUMAN RESOURCE MANAGEMENT AND DEVELOPMENT

1. Director HRM&D S 1 1 0

2. Senior Assistant Director HRM&D Q 1 0 -1

3. Assistant Director HRM&D P 1 0 -1

4. Principal HRM/D Officer N 2 0 -2

5. Chief HRM/D Officer M 2 1 -1

6. Human Resource Management Officer I K 1 3 2

7. Human Resource Management Officer II J 1 1 0

8. Human Resource Management Assistant I K 1 2 1

9. Human Resource Management Assistant III H 1 0 -1

Sub Total 11 8 -3

RECORDS MANAGEMENT

1. Assistant Director/Records Management P 1 0 -1

2. Principal Records Management Officer N 1 0 -1

3. Chief Records Management Officer M 2 1 -1

4. Senior Records Management Officer L 2 0 -2

5. Records Management Officer I K 1 1 0

6. Records Management Officer II J 1 1 0

7. Records Management Officer III H 1 0 -1

Sub Total 9 3 -6

FINANCE

1. Chief Finance Officer R 0 1 1

2. Deputy Chief Finance Officer Q 1 0 -1

3. Senior / Principal Finance Officer M/N 1 0 -1

4. Finance Officer I K 0 2 2

5. Finance Officer II J 0 3 3

Sub Total 2 6 4

ACCOUNTANTS

1. Senior Asst. Accountant General Q 1 1 0

2. Asst. Accountant General P 0 1 1

3. Principal Accountant N 1 1 0

4. Chief Accountant M 1 0 -1

5. Senior Accountant L 2 2 0

6. Accountant I K 2 2 0

7. Accountant II/I J 3 2 -1

Sub Total 10 9 -1

SUPPLY CHAIN MANAGEMENT

1. SAD, Supply Chain Management Officer Q 1 0 -1

2. Chief Supply Chain Management Officer M 1 0 -1

3. Senior Supply Chain Management

Assistant/Officer

L 1 0 -1

Page 78: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

65

4. Supply Chain Management Officer I K 1 1 0

5. Supply Chain Management Officer II J 1 3 2

6. Supply Chain Management Assistant IV/III G/H 2 4 2

Sub Total 7 8 1

CENTRAL PROJECT PLANNING AND MONITORING UNIT

1. Chief Economist R 1 0 -1

2. Deputy Chief Economist Q 0 1 1

3. Principal Economist P 0 1 1

4. Senior Economist II/I M/N 1 1 0

5. Economist I L 1 0 -1

6. Economist II K 1 0 -1

Sub Total 4 3 -1

PUBLIC COMMUNICATIONS

1. Assistant Director, Public Communication P 1 0 -1

2. Principal Information Communication Officer N 0 1 1

3. Chief Information Communication Officer M 1 1 0

4. Technical Officer / Cameraman/Photographer III H 1 0 -1

Sub Total 3 2 -1

INFORMATION COMMUNICATION TECHNOLOGY

1. Senior Assistant Director ICT Q 1 1 0

2. Assistant Director ICT P 1 0 -1

3. Chief /Principal ICT Officer M/N 1 0 -1

4. Senior ICT Officer L 0 2 2

5. Information Communication Technology Officer I K 1 1 0

6. Information Communication Technology Officer III H 1 1 0

Sub Total 5 5 0

GRAND TOTAL 274 169 -105

STATE DEPARTMENT FOR REGIONAL AND NORTHERN CORRIDOR

DEVELOPMENT

S/No Designation Job

Group

Proposed

Establishment

In-Post Variance

PRINCIPAL SECRETARY'S OFFICE

1. Principal Secretary U 1 0 -1

2. Assistant Director, Office

Administrative Services

P 1 0 -1

3. Senior Office Administrator L 1 0 -1

4. Drivers D/E/F/G/

H

2 0 -2

5. Support staff D/E/F/G 2 0 -2

Sub Total 7 0 -7

NORTHERN CORRIDOR DEVELOPMENT

1. Coordinator, Northern Corridor U 1 1 0

2. Coordinator/Secretary, Northern

Corridor

T 1 0 -1

3. Director S 2 0 -2

4. Deputy Director R 2 0 -2

5. Senior Assistant Director Q 2 0 -2

Page 79: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

66

6. Assistant Director P 4 0 -4

7. Principal Officer, Northern Corridor N 2 0 -2

8. Chief Officer, Northern Corridor M 2 0 -2

9. Senior Officer, Northern Corridor L 2 0 -2

10. Officer II/I, Northern Corridor J/K 2 0 -2

11. Principal Office Administrator N 1 0 -1

12. Senior Office Administrator M 2 0 -2

13. Office Administrative Assistant HJK 2 1 -1

14. Driver III/II/I/Snr./Chief D/E/F/G/

H

2 1 -1

15. Support staff D/E/F/G 3 1 -2

Sub Total 29 4 -25

REGIONAL DEVELOPMENT

1. Secretary, Regional Development T 1 0 -1

2. Director, Regional Development S 2 0 -2

3. Deputy Director, Regional

Development

R 4 1 -3

4. Senior Assistant Director, Regional

Development

Q 6 0 -6

5. Assistant Director, Regional

Development

P 6 1 -5

6. Chief /Principal Regional

Development Officer

M/N 6 1 -5

7. Regional Development Officer

II/I/Senior

J/K/L 10 0 -10

8. Principal Office Administrator N 1 0 -1

9. Chief Office Administrator M 2 0 -2

10. Assistant Office Administrator

Assistant III/II

H/J/K 2 0 -2

11. Support staff D/E/F/G 5 0 -5

Sub Total 45 3 -42

ADMINISTRATION

1. Director of Administration S 1 0 -1

2. Deputy Secretary Q 1 0 -1

3. Under Secretary P 1 0 -1

4. Senior Assistant Secretary N 1 0 -1

5. Assistant Secretary II/I L/M 1 0 -1

6. Assistant Secretary Cadet/III J/K 1 0 -1

7. Office Administrative Assistant M 1 0 -1

8. Office Administrative Assistant L 1 0 -1

9. Support staff D/E/F/G 2 0 -2

10. Drivers III/II/I/Snr./Chief D/E/F/G/

H

10 0 -10

Sub Total 22 0 -20

HUMAN RESOURCE MANAGEMENT AND DEVELOPMENT

1. Director HRM/D S 1 0 -1

2. SAD HRM/D Q 1 0 -1

3. Principal HRM/D Officer N 1 0 -1

4. Chief HRM/D Officer M 1 0 -1

5. Chief HRM/D Assistant M 1 0 -1

Page 80: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

67

6. Senior HRM/D Officer L 1 0 -1

7. Human Management &

Development Officers

J/K 1 0 -1

8. Human Management &

Development Assistant

H/J 1 0 -1

9. Chief Office Administrative

Assistant

M 1 0 -1

10. Senior Office Administrative Officer K/L 1 0 -1

11. Clerical Officer II/I/Snr/

Chief/Principal

F/G/H/J/

K

3 1 -2

12. Support staff D/E/F/G/ 2 0 -2

Sub Total 15 1 -14

ACCOUNTS UNIT

1. Deputy Accountant General R 1 0 -1

2. Assistant Accountant General/Senior

Assistant Accountant General

P 1 0 -1

3. Chief Accountant M 1 0 -1

4. Senior Accountant L 2 0 -2

5. Accountant I&II J/K 4 0 -4

6. Senior Office Administrative

Assistant

L 1 0 -1

7. Support staff D/E/F/G/ 1 0 -1

Sub Total 11 0 -11

SUPPLY CHAIN MANAGEMENT

1. Senior Assistant Director, Supplies

Chain management

Q 1 0 -1

2. Principal Supplies Chain

Management officer

N 1 0 -1

3. Chief Supplies Chain Management

officer

M 1 0 -1

4. Senior Supplies Chain Management

officer

L 2 0 -2

5. Supplies Chain Management officer

II/1

J/K 2 0 -2

6. Supplies Chain Management

Assistant II/I/Snr

G/H/J/K 2 0 -2

7. Office Administrative Assistant K 1 1 0

8. Support staff D/E/F/G 1 1 0

Sub Total 11 2 -9

CENTRAL PLANNING UNIT

1. Chief Economist/Statistician R 1 0 -1

2. Principal Economist/ Statistician P 1 0 -1

3. Senior Economist/ Statistician II M 1 0 -1

4. Economist /Statistician II/I K/L 1 0 -1

5. Senior Office Administrative Officer L 1 0 -1

6. Support staff D/E/F/G 1 0 -1

Sub Total 6 0 -6

FINANCE

1. Chief Finance Officer R 1 0 -1

Page 81: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

68

2. Senior Principal Finance officer P 1 0 -1

3. Principal Finance officer N 0 1 1

4. Senior Finance Officer M 1 0 -1

5. Finance Officer I L 1 0 -1

6. Finance III/II J/K 2 2 0

7. Senior Office Administrative Officer L 1 0 -1

8. Support Staff D/E/F/G 1 0 -1

Sub Total 8 3 -5

INFORMATION COMMUNICATION TECHNOLOGY (ICT)

1. Assistant Director ICT P 1 0 -1

2. Chief ICT Officer M 1 0 -1

3. Senior ICT Officer L 1 0 -1

4. ICT Officer II/I J/K 2 0 -2

5. ICT Officer III H 1 0 -1

Sub Total 6 0 -6

PUBLIC COMMUNICATION

1. Assistant Director Public

Communication

P 1 0 -1

2. Chief Public Communications

Officer

M 1 0 -1

3. Technical Officer (Camera Man/

Photographer) III/II/I

H/J/k 1 0 -1

Sub Total 3 0 -3

RECORDS MANAGEMENT UNIT

1. Principal Records Management

Officer

N 1 0 -1

2. Senior Records Management Officer L 1 0 -1

3. Records Management Officer III/II/I H/J/K 1 0 -1

4. Clerical Officer II/I/Snr/ Chief F/G/H/J 2 0 -2

5. Support Staff D/E/F/G 1 0 -1

Sub Total 6 0 -6

TELEPHONE SERVICES

1. Telephone Supervisor II J 1 0 -1

2. Telephone Operator II/I/Snr F/G/H 2 0 -2

Sub Total 3 0 -3

LIBRARY

1. Chief Librarian M 1 0 -1

2. Librarian/Snr K/L 1 0 -1

Sub Total 2 0 -2

STATE COUNSEL

1. Principal State Counsel / Senior

State Counsel

P 1 0 -1

2. State Counsel L/M 1 0 -1

Sub Total 2 0 -2

INTERNAL AUDIT

1. Chief Internal Auditor M 1 0 -1

2. Internal Audit II/I J/K 2 0 -2

Sub Total 3 0 -3

RECEPTIONISTS

1. Receptionist Assistant I H 1 0 -1

Page 82: MINISTRY OF EAST AFRICAN COMMUNITY AND REGIONAL … · in tandem with the Medium-Term Expenditure Framework (MTEF) budgetary cycle and will also take into consideration the resources

69

2. Receptionist Assistant II/II G 1 0 -1

Sub Total 2 0 -2

SECURITY OFFICER

1. Security Officer III/II H/J 2 0 -2

Sub Total 2 0 -2

GRAND TOTAL 175 13 162