Pre-feasibility Report of M/s Sri Shiridi Sai Minerals, Quartzite Mines, V.R. Gudem (village) Ponduru (Mandal), Srikakulam (district), Andhra Pradesh.
Mining Plan & Scheme of Mining
Pre-feasibility Report of M/s Sri Shiridi Sai Minerals, Quartzite Mines, V.R. Gudem (village) Ponduru (Mandal), Srikakulam (district), Andhra Pradesh.
Pre-feasibility Report of M/s Sri Shiridi Sai Minerals, Quartzite Mines, V.R. Gudem (village) Ponduru (Mandal), Srikakulam (district), Andhra Pradesh.
Water Requirement
Water Requirement for the Project
Sl. No
Type of Service
Unit Quantity Water
Requirement (LPD)
Water Requirement
(KLD)
Waste water
generation (KLD)
1 Manpower 8 hours shift (2 shifts/day) 68 nos.
45 L per person
(3.06) ≈ 3 2.7
2 Green Belt * 18 Ha 25,000 L per
Ha 45 -
3 Dust Suppression & for Firefighting 5 -
Total Water Requirement 53 2.7 * Water for greenbelt not required during rainy days (around 40 to 50 days) and on following
days (around 40 to 50 days) of the rainy days as the rain water collected from garland drains
after necessary treatment will be used for greenbelt development.