Milsat 2004 · 2021. 1. 20. · Milsat 2004 UNCLASSIFIED//FOUO. UNCLASSIFIED//FOUO as of 2 Mar 04...
Transcript of Milsat 2004 · 2021. 1. 20. · Milsat 2004 UNCLASSIFIED//FOUO. UNCLASSIFIED//FOUO as of 2 Mar 04...
UNCLASSIFIED//FOUO
TCO Charter Signed off 1 2 Feb0 3
Transformational Communications Architecture (TCA)Transformational Communications Architecture (TCA)
MilsatMilsat 20042004
UNCLASSIFIED//FOUO
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
Terrestrial Infrastructure Segment(Backbone & User Networks)
TCA Baseline Overview 2011-2015Space
Segment
RF Users
G/H, Pred,U2, …User Terminal
Segment
DoD TSAT
RF Links
Optical Links
Terrestrial Links
Circuits
IP (Packets)
LEGEND
APS
DoDgroundstation
systems
groundstation
systems
Relay
IC: HSN, …
DoD: GIG-BE: DSN
CONUS/OCONUS, …
NASA: NASA-Net, …
Network Management: Integrated Network Management: operations (OMCs), networks
(NOCs), satellites (SOCs), launch & anomaly (CCS-C)
Deployed Networks: WIN-T, ForceNet, …
MILSATCOM (Systems of record) • AEHF• Wideband (WGS) • Narrowband (MUOS)• Commercial
Terminal Systems: FAB-T, NIST,
Army OF/WIN-T, JTRS, L/C, …
Optical Users
Deployed Networks: WIN-T, ForceNet, …
NASA & Narrow-band Users
Space
Backbone
TDRSS-C
groundstation
systems
ORCA
Space
Backbone
OpticalUsers
FeasiblePlanned
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
TCA Attributes• Independent and Interoperable Systems across IC, DoD, NASA
• Net Centric Operations Enabled by IP and Guaranteed Service
• Dynamic Allocation of Net Resources; Highly Available Infrastructure
• Black Core Source Encrypted
• End-to-End Security Architecture
• More user Transparent, Highly Automated Network Management and IA
• Processed (X, Ka, EHF), Protected, Survivable, and Endurable Comms (EHF)
• COTM enabling higher capacity and smaller, more flexible terminals
• Synchronized terminal development, fewer types & smaller terminals
• Enable more Perceptive, Persistent, Global, and Robust ISR
• 24/7 contact availability with all space and airborne assets (MA S-band)
• Integrated Mission Planning Capability
TCA will be updated and reviewed periodically (every 2 years to sync up with PPBS processes) to accommodate
changing requirements and technologiesUNCLASSIFIED//FOUO
UNCLASSIFIED//FOUO
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
TCA Supports Multiple Military Service Visions
Army Future Force
AF Air Expeditionary Force
Army Future Force
Navy SeaPower 21
MMA
CruiseMissile
UAV / UCAV
CarrierStrike Group
ExpeditionaryStrike Group
Strike SurfaceAction Group
S EAWOLF
21
Sub Ops
Forward DeployedNaval Force
MAGTFJTF
Gateway /TELEPORTNCTAMS /
TELEPORT
B/C Inject
CommercialTC Satellites
Space Based Radar – MTI
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
TCA Supports National & Civil Space Visions
Capability Based – Full Threat SpectrumMultiple Options
Network-Centric OperationsIntegrated Capabilities
Continuous Technology RefreshmentUnified, Flexible, and Adaptable C2
Defenses
BombersSLBM
C2, Intel &
Planning
ICBM
Non-Nuclear and Nuclear
Strike Capabilities
Infrastructure
Strategic Systems
IC Missions
NASA Missions
Remote Sensing Data Backhaul
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
TCA Performance
FY06 FY11 FY16
b a se
0.0
5.0
10.0
15.0
20.0
25.0
30.0
FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16
B a
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
FY0 6 FY0 7 FY0 8 FY0 9 FY10 FY11 FY12 FY13 FY14 FY15 FY16
Ba0 . 0
0 . 1
0 . 2
0 . 3
0 . 4FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16
Baselin
0
5
10
15
20
25
Lasercom AISR Accesses
2015 Requirement 24 Gbps
2015 Requirement 320 Mbps
2015 Requirement 770 Mbps
2015 Requirement (16 Accesses)
Protected Capacity (Gbps)
Strategic Capacity (Gbps)
COTM Capacity (Gbps)
AEHFTCA
AEHFTSAT
AEHFTSAT
AEHFTSAT
FY0 6 FY0 7 FY0 8 FY0 9 FY10 FY11 FY12 FY13 FY14 FY15 FY16
Baseline0 . 0
5 . 0
10 . 0
15 . 0
2 0 . 0
2 5 . 0
3 0 . 0
3 5 . 0
4 0 . 0
4 5 . 0
5 0 . 0
WGS 1-3TCA
Ka-band AISR Accesses
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
Transformational Communications Architecture –An Opportunity for Change
MI LSATCOM NRO CommNASAComm
Protected comm for thousands of small terminals
High data rates to few large terminals
Medium data rates to few large terminals
Fixed Sites
Fixed Sites
>$5B/yearCommunication
Investment
Path Without TCA• Enhanced capabilities within stovepipes! Very limited Interoperability with segregated svcs! Sensor to Shooter Latency! Non-synchronized Terminal Developments! Limited ability to support emerging Information Dissemination Management (IDM) vision
Path With TCA• Enables Network Centric Operations• Standards Based Interoperability and Integrated Services• Increased communications connectivity and capacity• Robust, adaptable, dynamic and flexible network services• Integrated Operations Centers• Accommodates Multi Security Levels• Enables new information exploitation models, i.e. fusion
TCO Master ScheduleFY2004 FY2007FY2006FY2005FY2003 FY2010FY2009FY2008 FY2013FY2012FY2011 FY2014
Q1 Q2 Q3 Q4 H1 H2
Sp
ac
e
NISNTe
rre
str
ial
KDP-B
ATPPDR CDR KDP-C
TSAT
National Relay System
TDRSS Replacement
Study (TDB)
TDRSS Full CapabilityTDRSS Degraded Capability
TDRSS
TC
A
Cap
ab
ilit
y
GIG
GIG-BEGIG 2.0GIG
HSN Capacity
Upgrades
#2
30 Gbs
#3
40 Gbs #4
>40 Gbs
APSF1 F2
TeleportTeleport Gen-1
Teleport Gen-2
Teleport Gen-3
AEHF-1 AEHF-2 AEHF-3
AEHF
WGS-1WGS WGS-2 WGS-3 WGS-4 WGS-5
MUOS
Early Fielding Examples• IP Stds & Protocols• High Rel. IP Router• Early HAIPE Encrypter• E2E Test Bed Work• Early COTM Terminals• Teleport Modifications
Architecture Refresh
GBS
Ground
AISRPltfrms
Small Trans
COTM MIST Terms Embedded with IP/DBRA
Term
inals
ATP
SpaceTransformation
Window
AEHFFOC
(AEHF1,2,3 + TSAT-1)
MUOSFOC
(Jul 13)
APSIOC
APSFOC
GroundTransformation
WindowGIG-BE/HSN/NISN
MUOSIOC
(Jul 09) WGSFOC
Broadcast Services from WGS and Integrated as a TSAT Service for TSAT Terminals
Program upgrades for XDR / AEHF Migrate To MIST Program, IP Capable
Ku Capability Upgrade to Ka Add Optical Capability
SEP Terminals Migrate to MIST with TCA waveform, IP & DBRA
Airborne Deploy initial FAB-T for Strategic Aircraft. Upgrade for TCA waveform, IP & DBRAUHF and LDR Migration
F1 F3 F4F2∀SRR F1 F3 F4F2IPR1 SDR IPR2
MUOS -1 MUOS -2 MUOS -5MUOS -3 MUOS -4Mar 04
KDP-B KDP-CApr 06 Apr 09 Apr 10 Apr 11 Apr 13
UNCLASSIFIED//FOUOas of 18 Feb 04
UNCLASSIFIED//FOUO
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
Backups
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
PurposeUNCLASSIFIED//FOUO
RADM Fisher
• TCA Overiew and Attributes
• SBR, AISR, and COTM in TCA
• TCA Risk Management- Consolidated Satellite Program- Consolidated Ground Infrastructure
Address SBR and TCA Architecture Relationshipsfrom JROCM 237-03
UNCLASSIFIED//FOUO
UNCLASSIFIED/FOUO
TCO Working to Synchronize Terminals
Terminal Program Catagorization (Wideband and Protected Based on 2009 Launch)
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
WGS Capable
Current Terminals That Will Be Phased Out
New TC Capable(TSAT and/or WGS)
Mod/Spiral to TC
Global Hawk (existing)Predator (existing)U2 (existing)DSCS TerminalsLegacy Ground CPSMART-TGEMS (baseline)MMP (baseline)M3P (baseline)SCAMP Blk ITrojan Spirit (Comm)NESPWSC-8NMT (baseline)
GMFGBS Tx/RxGMT (baseline)LMSTDCGS (TFT/TMET)KaSTARSPhoenixGR/CSTrojan SpiritWSC-6
FAB-TGMT (upgrade)MMP (upgrade)M3P (upgrade)GEMS (upgrade)NMT (upgrade)
New EnterpriseMISTER/MP UAVACSITPBAMSALCT
• Terminal Programs Have Considered the Best Programmatic Path For Migration with the following options:(1) Current Terminal that will be Phased Out(2) Current Terminals that will be supported in TC (WGS)(3) Modified or Spiral Upgrade Terminals(4) New Terminal Programs
UNCLASSIFIED/FOUO
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
TCA Risk Management
TCA RiskManagement
Coupled Effects
TechnicalRisk
ScheduleRisk
CostRisk
PerformanceRisk
Security Risk
IA Crypto Devices
Lasercom Xlinks
80” COTM NullingAntenna
Dynamic BandwidthManagement
XDR
MA Lasercom
User Req. Date2011 TSAT – AEHF FOC
Meet Tech MaturationSchedule
DoD/IC/NASA ProcessSynchronization
CAIV Trades
Technology MaturationPerformance Levels
Modeling & Simulation
Interoperation Features(Space, Airborne, Terminals,
Ground/Networks)
Stability of DoD/ICNASA Budgets
Critical ComponentDevelopments
Work Force Stability
Test & Evaluation
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
TCA Key Capability Insertions
Network StandardsAnd InterfacesHigh Rate Terrestrial Networks
and Ground Infrastructure
Baseline: X Gbps (TRL-4-5)
TRL 6 Date: FY06
Backup: Use 10 Gbps class
Baseline: 6-8 Accesses (TRL-2-3)
TRL 6 Date: FY07
Backup: Use SA LC
Dynamic BW
Baseline: 12 dB margin reused (TRL 4-5)
TRL 6 Date: FY06
Backup: Fixed margins/ data rates
Network StandardsAnd Interfaces
Baseline: XDR + (TRL 4-5)
TRL 6 Date: FY06
Backup: AEHF XDR Rates
COTM 1’ TrackingAntenna
Information Assurance(Cover all Segments)
Baseline: 100 Mbps for Ground (TRL 3-4)
8 Mbps for Space (TRL 4)
TRL 6 Date: FY06
Backup: Use lower rate HAIPE and aggregate
COTM NullingAntenna
Baseline: 80” Nuller (TRL 4-5)
TRL 6 Date: FY05
Backup: 50” AEHF Nuller
KeyTCM ComponentsOther Components
Multi-accessLasercom
LasercomCrosslinks
Airborne LCTerminals
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
TCA Decision Path
Phase C
04 05 06 07 08 09 1003FY1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
11
TSAT-DSAB
KDP-B
20Jan04
TSAT-DSAB
KDP- C
05Aug08
Phase BSDR
PDR
Dec06
CDR
Apr08IPR1
Nov04
MRB
06Jan04
IPR2
Jan06
Gain/Keep Congrssional
Support for TCA
Components (esp. Terminals)
FY05 and Beyond
AEHF-4 and
TSAT-1
Decision
Arrange Long-Term
Budget Synchronization
Process
JROC
SWarFSWarFApr04
Jul03
ATP TSAT
Jan 04
6
TRL-6?
1 2 3 4 5
Resolve TCO
Governance
Approve MOA
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
SpaceJPO
Army
Air Force
Navy
Marine Corps
JTRS
NASA
NRO/ IT/ DTS
Teleports
GIG-BE
NISN
HSN
NASA
NRO
DISA
Services
Attributes
• Creates New Authorities
• Possible Incr. Effectiveness
• Increased Risk & Cost
• Mixing of Money
• High Interdependency/
Close Coupling
• High Complexity
• Dissimilar Policies
• Priority Mgmt Challenge
Chief Sys Engr
TCO
TerrestrialJPO
NetworkOps/Mgmt
Authorities
Programs/PMs
PEOs
SAEs
DoD IC NASA
USecAFD/DCI(SAE)
Administrator
Satellites
Terminals
Networks
Satellites
Terminals
Networks
Terminals
Networks
Ma
na
ge
me
nt
Bu
dg
et
Ma
na
ge
me
nt
Ma
na
ge
me
nt
Bu
dg
et
Bu
dg
et
C3I/CIO
Funding
USDI??
MonitorReport Influence
D/DCI(CMS)USDI
NASA/M3
TCO
PA&E, J8CMS
CSAFCSA
CNOCMC
USecAFUSD (AT&L)
IC/CMSAA/NASA
BudgetSynch.
Attributes
Use Existing Authorities
No Replication of Functions
Coordinated Budgets
Flex./ Effective/ Loose Coupling
Less Risk and CostUNCLASSIFIED//FOUO
UNCLASSIFIED//FOUO
Acquisition Funding
Managed Separately
By DoD, IC, NASA
Communications
Functional Area
Integration
Office
Work withOther FAIOs
Space ControlSpace Access
ISRPrec Nav Timing
CIO Executive Board
DoD, IC, NASA
GIG Architecture
Integration Panel
GIG+ Systems
Engineering Council
Technology Monitor
IA Monitor
Protection Monitor
TerminalJPO
TCA Governance OptionsTCA Governance OptionsIntegrated/ Consolidated Model
(like MDA)Independent/ Interoperable Model
Acquisition Funding
DoD/ NFIP/ NASA
APS
TSAT
AEHF
WGS
MUOS
ORCA
TDRSS-C
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04UNCLASSIFIED//FOUO
De facto and Recommended TCA Governance ProcessDe facto and Recommended TCA Governance Process
Acquisition Approval
Processes, e.g., NAB/DSAB
& PPBS
TCA Baseline GRA
The TCO must work within the Existing Approval Authorities
IC, DoD & NASA CIO Joint Executive Board
SWarF/JROC/MRB/NASA
SLTTCO Develop GRA
Yes
Yes
No
No
UNCLASSIFIED//FOUO
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
Organizational CONOP
Develop Strategies/
Action Plans
Programming Integration
Facilitate Creation of Strategic Direction
Vision, Strategy, Priorities
Future Integrated
Operational and Architectural
Concepts
Planning
System-of-Systems Engr
Acquisition Integration
SupportDecision-Making
Assessments
Management Support
Functional Integration
UNCLASSIFIED//FOUO
as of 2 Mar 04 UNCLASSIFIED//FOUO
4 Mar 04
National Security Space Office
Director/Deputy Director2 /SES/SIS
Assessments/Evaluations Div
Communications (TC)
ISR (later)
Space Control (later)
Deputy for PlansFO/SES/SIS
Deputy for Architecture& Engineering
FO/SES/SIS
Architecture Div
Engineering Div
Studies and Analysis Div
Planning Integration Div
Program Integration Div
Future Concepts Div
Deputy for FunctionalIntegration FO/SES/SIS
Strategic Comm Div