Milan Srskic, CCM, FHFI

15
Milan Srskic, CCM, FHFI Acting Chief, Project Management Service Office of Construction and Facilities Management

description

Milan Srskic, CCM, FHFI Acting Chief, Project Management Service Office of Construction and Facilities Management. Mission. Planning, design, construction and lease management for major projects (over $10M) Develop design & construction standards for VA - PowerPoint PPT Presentation

Transcript of Milan Srskic, CCM, FHFI

Page 1: Milan Srskic, CCM, FHFI

Milan Srskic, CCM, FHFI

Acting Chief, Project Management Service

Office of Construction and Facilities Management

Page 2: Milan Srskic, CCM, FHFI

Mission• Planning, design, construction and lease

management for major projects (over $10M)

• Develop design & construction standards for VA

• Historic preservation, NEPA compliance, etc.

• High quality, cost effective facilities

Page 3: Milan Srskic, CCM, FHFI

Vision/Goals

• Business leadership, expertise, advice for facilities projects; CFM is VA’s in-house CM “firm”

• Focus resources to support VA asset management

• Promote continuous improvement

Page 4: Milan Srskic, CCM, FHFI

Human Capital Strategies• A major transformation and improvement, moving to

an enterprise-wide, rather than fragmented model for facility management

• Moving more functions to field offices, including contracting, planning, tech support

• All project management to be done in field offices; Program Management (PM) in Central Office.

Page 5: Milan Srskic, CCM, FHFI

Opportunities & Challenges• VA using Agency CM firms since FY2006• Constructability reviews, market surveys,

estimates, value engineering, phasing, construction administration; local market knowledge essential

• Individual CM firms for very large projects. Six IDIQ CM contracts.

• Exploring other options for CM/PM use

Page 6: Milan Srskic, CCM, FHFI

Project Delivery Methods

• Evaluated during planning process and acquisition strategy development

• Design-Bid-Build most utilized method, and likely to remain so.

• Best Value (FAR 15) selection – no sealed bid utilized

Page 7: Milan Srskic, CCM, FHFI

Design-Build• Usually for less complex projects, but have done an

operating room renovation by DB. • One- and two-step processes used• Currently re-evaluating to improve DB• Constraints on use of DB – lack of full funding, NEPA and

historic compliance requirements , site acquisition issues, etc.

Page 8: Milan Srskic, CCM, FHFI

Integrated Design/Construct

• FAR 16.403.2, fixed price incentive (successive targets) contracts

• Constraints– Complying with competition requirements– Meeting socio-economic goals– Availability of trained VA staff

• Contractor selection at end of schematic

Page 9: Milan Srskic, CCM, FHFI

FY 2011 Budget

• $1B for major construction, including:– New Orleans medical facility, $310M– Denver facility, $450.7M– Palo Alto polytrauma/ambulatory, $30M– Alameda Point, outpatient clinic and

columbarium, $17.3M

Page 10: Milan Srskic, CCM, FHFI

FY 2011 Budget

• Major construction (cont’d)– Omaha replacement facility, $56M design– L.A. National Cemetery, $27.6M– Indiantown Gap, PA cemetery, $23.5M– Tacoma, WA, cemetery $25.8M

Page 11: Milan Srskic, CCM, FHFI

Future Funding & ARRA

• No major construction projects in ARRA

• CFM not affected by reporting requirements.

• Anticipate future funding at around $1B per year.

Page 12: Milan Srskic, CCM, FHFI

BIM• VA wants to use and reap benefits – required on all major

projects since FY2009• VA required Industry Foundation Classes (IFC) compliant

parametric BIM• “Major” construction = >$10M• New VA BIM Guide online soon at:

http://www.cfm.va.gov/TIL

Page 13: Milan Srskic, CCM, FHFI

Commissioning• Federal mandates apply for sustainability and energy

reduction• VA requires compliance with VA Directive 0055 (April 2010)

available at:http://www.cfm.va.gov/til/sustain.asp

• LEED Silver or two Green Globes• VA uses independent commissioning agent

Page 14: Milan Srskic, CCM, FHFI

Electronic PM & Tech

• No current unified electronic project management system

• Various systems now in use

• VA exploring enterprise-wide solutions as part of the transformation initiative

Page 15: Milan Srskic, CCM, FHFI

Doing Business with VA

• A/E Opportunities are listed at http://www.cfm.va.gov/contract/forecastAE.asp

• Construction opportunities are listed at http://www.cfm.va.gov/contract/forecastCC.asp

• Current contracts on FedBizOps.