MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links...

17
MIDS JTRS Status CAPT Dave Prater, USN Program Manager MIDS Program Office (619) 607-7546 (cell) [email protected] IDLS 2007 18 October 2007 Distribution Statement A: Approved for public release; distribution is unlimited (11 OCT 2005) DISCLAIMER This briefing may contain references to projected U.S. Government plans and potential capabilities. Mention of them in no way guarantees that the U.S. Government will follow these plans or that any of the associated system capabilities, if developed, will be available or releasable to foreign governments.

Transcript of MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links...

Page 1: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

MIDS JTRS Status

CAPT Dave Prater, USNProgram Manager

MIDS Program Office(619) 607-7546 (cell)

[email protected]

IDLS 200718 October 2007

Distribution Statement A: Approved for public release; distribution is unlimited (11 OCT 2005)

DISCLAIMER

This briefing may contain references to projected U.S. Government plans and potential capabilities. Mention of them in no way guarantees that the U.S. Government will follow these plans or that any of the associated system capabilities, if developed, will be

available or releasable to foreign governments.

Page 2: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

1

MIDS Program Office

MIDS IPO DPMCAPT Cridlig

Program ManagerCAPT Prater

DeputyProgram Manager

Carol Kim

MIDS-LVTDivision Director

CDR Cassol

Acquisition (-1)Dave Felker

CM/DM (-2)Gerhard Geis

Engineering (-3)LTCOL Marinoni

Logistics (-4)COL Zamorano

3rd Party Sales (-5)Simon Smith

MIDS JTRSDivision Director

CDR Nurse

Link-16 Waveform

Core Terminal w/Link-16

TTNT Build

MIDS International Program Office

FMSDivision Director

Greg Ropp

Case ManagerBeverly Bowen

Case ManagerVickie Webb

Case ManagerSteve Kolbert

MIDS JTRS MIDS FMS

Page 3: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

2

JPEO JTRS Organization

JPEO JTRS

Network Enterprise

Domain

Special Radios

Airborne, Maritime and Fixed Site

Domain

Ground Domain

Waveforms

Network Enterprise Services

GMR

HMS

AMF

MIDS Program

Office

MIDS – Multifunctional Information Distribution SystemHMS – Handheld/Manpack/Small Form FitGMR – Ground Mobile RadioAMF – Airborne, Maritime, Fixed SiteJEM – JTRS Enhanced MBITR

JEM

Page 4: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

3

MIDS Program

Program of RecordMIDS

ACAT 1D

MIDS PMOU

VariantsLVT(1)LVT(2)LVT(3)MOSEtc.

ASR July 2004MIDS JTRS ECP

US EffortMS C 2008

ADM Mar 2006“MIDS Develop TTNT

as Initial JAN-TE”

ADM Sept 2001“Migrate to JTRS”

Page 5: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

4

Link-16 Continuum

&JTRS Link-16

Waveform

MIDS JTRS

IP Airborne Networking

MIDS-LVT

MIDS-LVT Enhancements

JSF

AMF

JTIDS

JTIDS Enhancements

LINK-16

Link-16 Enhancements

Page 6: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

5

Migration Objectives

P3I

MIDS-LVT• Link-16, J-Voice, and TACAN utilizing

dedicated modules

• Highly successful cross domain radio– Aircraft, Ships, Ground

• Proven affordability via continuous competition

– Stimulated competition– Driving the unit price down

• Cornerstone of tactical networking interoperability

– Joint and coalition

MIDS JTRS• 4 Channel JTRS compliant radio

– 1 Channel for Link-16/TACAN & J-Voice– 3 Programmable Channels

• Runs other JTRS Waveforms

• “Plug-and-Play” with MIDS-LVT

• “Hooks” to host additional airborne networking capability

• Reprogrammable Crypto

• Link-16 Enhanced Throughput and Frequency Remap

Page 7: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

6

Requirements Documents• Single MIDS Operational Requirements Document

– Foundation

• Software Communications Architecture version 2.2– Compliance

• JTRS ORD version 3.2/3.2.1– Incremental compliance as required by platform

• Tactical Data Links Transformation Capabilities Development Document– Strategic enhancement– Focuses terminal on high-end data networking– Enabled via strength of vendor base

Page 8: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

7

MIDS JTRS FAQT Terminal

Page 9: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

8

MIDSTerminal

MIDS Form Fit Replacement to Minimize Platform Integration Impact

MIDS-LVT to MIDS JTRS

MIDS On ShipAN/URC-141(C)

Radio Set

MIDS

MIDS

MIDS-LVT(2) with self- contained power & cooling

•Air Defense

•New Construction

Page 10: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

9

MIDS JTRS Pwr Supply

MIDS JTRS R/T

F/A-18E Hornet Fitted with a MIDS JTRS Terminal

MIDS JTRS (R/T and PS)64.9 lbs~ 1000 cu. in.

F/A-18E Fit Check 8 NOV 2006 - NAS PAX River

Page 11: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

10

MIDS JTRS Acquisition Strategy from 2004 ASR

Phase 2A/2BCore Terminal

(Funded)Development

JTRS Certified Terminal Link-16 w/ECP(1) Porting

TTNT “Hooks”Production Transition

SINCGARS Porting (Lab)IntegrationF/A-18E/F

Critical DependenciesSINCGARS WF

Phase 2C/2DTTNT JPCP

(Funded)Development

TTNT PortingTTNT Transceiver

TTNT Ext PAIntegration

Interim Obj. GatewayCritical Dependencies

TTNT WF

Phase 2E/2FEMF JPCP(Unfunded)Development

Waveform PortingRemove LVT legacy

interconnects & TACAN 4 Universal Transceivers

IntegrationTBD

Critical DependenciesWaveforms

Link-16 200W PA

Link

-16

JTR

S W

F

JTR

S W

F

JTR

S W

F

1 2 3 4

Link-16 200W PA

Link

-16

TTN

T W

F

JTR

S W

F1 2 3

TTN

T Ex

t PA

Kit-ableModification

Standalone Radio

JTR

S W

F

JTR

S W

F

JTR

S W

F

JTR

S W

F

1 2 3 4

Standalone Radio

Ext

PA

* JPCP = JTRS Platform Capability Package

Page 12: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

11

ContractingMIDS IPO

ViaSat DLS

IPT Design for Common Product Baseline

TDP

ViaSat DLS

10 Terminals FAQT

10 Terminals FAQT

Competitive Production

Competitive Production

contract contractsubcontracts subcontracts

subcontracts subcontracts

*DLS = LLC of BAE Systems & Rockwell Collins

Interchangeable LRUs & SRUs

Jointly DevelopedFunctional BaselineAllocated BaselineProduct Baseline

First Article ApprovalPass Contractor FAQTPass Government FAQTIA CertificationEMC Features CertificationAir Worthiness CertificationSCA Certification

Page 13: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

12

L-16

Mod

em/X

cvr

2-20

00 M

odem

/Xcv

r

4 C

h I/O

RPS

Chassis/Harness

DLS

ViaSat

CO

MSE

CPr

oces

sor

2-20

00 M

odem

/Xcv

r

2-20

00 M

odem

/Xcv

r

SW

Link

-16/

TAC

AN

RFA

TAC

AN

Proc

esso

r

IPS

Basic Design

Page 14: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

13

MIDS JTRS Waveform Growth• MIDS JTRS Spec Waveform Hosting Capabilities

Link-16 TACANSINCGARS ESIP HAVE QUICK II UHF DAMA SATCOM 188-181,182,183 and 184 EPLRS/SADL Wideband Networking Waveform HF ISB with ALE HF SSB with ALE AJ Link 11A STANAG 5066 STANAG 4529 VHF FM HF ATC Data Link VHF ATC w/8.33 kHz Ch (AM, 118-137 MHz) VHF ATC w/25 kHz Ch (AM, 108-156 MHz) VHF/UHF-FM Land Mobile Radio VHF ATC w/VHF Digital Data Link (NEXCOM) UHF AM/FM/PSK Link 4A Link 11B SATURN

• Core carries 3 unused 2X2 transceivers

Link-16 200W PA

Link

-16

JTR

S W

F

JTR

S W

F

JTR

S W

F

1 2 3 4

Page 15: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

14

Link-16 200W PA

Link

-16

JTR

S W

F

JTR

S W

F

JTR

S W

F1 2 3 4

Link-16 200W PA

Link

-16

TTN

T

JTR

S W

F

1 2 3

Ext

PA

CDR TRR PVT PTTF/A-18 DT

Certs

LRIP

Phase 2B Core4-Channel

F/A-18IOC

PDR CDR TRR PVTCerts

PTTPlatform DT

Link-16v1 Link-16v2 Link-16v3

Phase 2C/2CxKit-able Mod to Core to include TTNT

NEDTTNT AWARD

DARPATTNT

TTNT Waveform

Core Terminal

TTNT

SRR SDR

MIDS JTRS ScheduleJan/06 Jan/07 Jan/08 Jan/09 Jan/10 Jan/11Jul/06 Jul/07 Jul/08 Jul/09 Jul/10

-2B Award: 23 Dec 04-PDR: Jul 05-Link-16 ECP(1) Award: 27 Sep 05

MS C

-2C Award: Mar 06-DARPA TTNT: Nov 05-2Cx: Feb 07-2D: Tech Eval/Negotiations

FRPDecision

FieldingDecision

IOGIOC

WF delivery

PDR CDR TRR FQTSRR

Page 16: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

15

Core Terminal Status• Core Terminal Development

– Delivered first EDM to F/A-18 (Boeing, St Louis) on 1 May 07– FAQT Test Readiness Review (TRR) conducted 31 July 2007– FAQT initiated (ATP, EMI, ECS, Environmental tests in progress) – 20 of 24 FAQT EDM terminals assembled as of 16 Aug 2007

• MIDS JTRS Certification– Received CDR closure concurrence letter

• Acquisition Documentation– MIDS JTRS Capability Production Document (CPD) through JCIDS stage 2 – MIDS JTRS Information Support Plan (ISP) in JCPAT-E Stage 2 Review– PPP, SEP, TEMP, MER, & PESHE in Core Review– Technology Readiness Assessment (TRA) in process

• Critical Technology Elements (CTEs) approved by OSD/CERDEC• Production Transition initiated

– Awarded production transition NRE and terminals • Facilitize MIDS vendors to eight terminals/month capacity• 28 Production transition terminals (PTTs)

• Link-16– V3 delivered Apr ’07– SFQT A (Bypass; Mode 4): 13 Apr 07 – SFQT B (Full Crypto; Mode 1): 15 Oct 07

Page 17: MIDS JTRS Presentation - idlsoc.com · as Initial JAN-TE ” ADM Sept 2001 ... Tactical Data Links Transformation Capabilities Development Document ... MIDS JTRS Spec Waveform Hosting

16

MIDS JTRS Way Ahead• First Article Qualification Testing

– FAQT (Aug 07 - Dec 07)

• Terminal Delivery– Deliver remaining integration terminals USN & USAF customers

• SSC-SD System Integration Facility (SIF)• NAWC China Lake Airborne Weapons Lab (AWL)

– Deliver Air Worthiness Terminals (AWT) for F/A-18 DT (Oct 07)– Deliver FAQT’d terminals (Jan 08) to F/A-18 and USAF

• Second waveform– TTNT ready to award