Mid Day Meal Scheme

download Mid Day Meal Scheme

If you can't read please download the document

description

Mid Day Meal Scheme. MDM-PAB Meeting – MEGHALAYA on 11.04.2013. Ministry of HRD Government of India. Review of Implementation of MDMS in MEGHALAYA (Primary + Upper Primary) (1.4.2012 to 31.12.2012). Part-I. Ministry of HRD, Govt. of India. Performance of Primary during the year. - PowerPoint PPT Presentation

Transcript of Mid Day Meal Scheme

  • Mid Day Meal SchemeMDM-PAB Meeting MEGHALAYA on 11.04.2013Ministry of HRDGovernment of India

  • Review of Implementation of MDMS in MEGHALAYA (Primary + Upper Primary)(1.4.2012 to 31.12.2012)Part-IMinistry of HRD, Govt. of India

  • Performance of Primary during the year Ministry of HRD, Govt. of India*

    Chart1

    0.97

    0.98

    1

    0.79

    0.6

    0.59

    Sheet1

    Coverage against EnrollmetCoverage against PAB ApprovalWorking DayFG UtilisationCooking Cost UtilisationHono. to Cook-cum-helper

    97%98%100%79%60%59%

    0.923497267867%0.75915379880.5378056235

  • Performance of Upper Primary during the year Ministry of HRD, Govt. of India*

    Chart1

    0.94

    0.98

    0.98

    0.75

    0.6

    0.59

    Sheet1

    Coverage against EnrollmetCoverage against PAB ApprovalWorking DayFG UtilisationCooking Cost UtilisationHon. To CCH

    94%98%98%75%60%59%

    0.923497267868.37%70.31%

  • Coverage of Institutions (Primary) Ministry of HRD, Govt. of IndiaNo. of Institutions100%97%100%ASER 2012- MDM served in 29.7% schools on the day of visit

    Chart1

    74227422

    76137422

    76137613

    Total No. of Institutions

    Coverage

    Sheet1

    Total No. of InstitutionsCoverage2010-11

    2010-117422742201

    2011-12761374221910.9749113359

    2012-13761376130

    To resize chart data range, drag lower right corner of range.

    0.000.00-2.51

    97

  • Coverage of Institutions (Upper Primary) Ministry of HRD, Govt. of IndiaNo. of Institutions100%88%100%

    Chart1

    26522652

    29992652

    29992999

    Total No. of Institutions

    Coverage

    Sheet1

    Total No. of InstitutionsCoverage2010-11

    2010-112652265201

    2011-12299926523470.8842947649

    2012-13299929990

    To resize chart data range, drag lower right corner of range.

    0.000.00-11.57

    88

  • Coverage of Children (Primary ) No. of Children (in Lakhs)78%84% Ministry of HRD, Govt. of IndiaPercentage indicates coverage of children against the Total Enrollment97% As per ASER 2012 Report- 73.1% of the enrolled children present on the day of visit

    Chart1

    4.343.483.38

    4.33.913.63

    4.0443.93

    Enrollment

    PAB Approval

    Achievement

    Sheet1

    EnrollmentPAB ApprovalAchievement

    2010-114.343.483.38

    2011-124.303.913.63

    2012-134.044.003.93

    To resize chart data range, drag lower right corner of range.

    370566

  • Less Coverage of Children (Primary)

    DistrictEnrolmentAvailed MDM % of less coverage

    East Garo Hills484414333611

  • Coverage of Children (Upper Primary) No. of Children (in Lakhs)94%91%72% Ministry of HRD, Govt. of IndiaPercentage indicated coverage against Enrollment

    Chart1

    1.341.241.22

    1.691.221.21

    1.441.41.36

    Enrollment

    PAB Approval

    Achievement

    Sheet1

    EnrollmentPAB ApprovalAchievement

    2010-111.341.241.2298%

    2011-121.691.221.2199%

    2012-131.441.401.3697%

    To resize chart data range, drag lower right corner of range.

  • Less Coverage of Children(Upper Primary)Ministry of HRD, Govt. of India

    DistrictEnrolmentAvailed MDM % of less coverage

    East Garo Hills158701300718South Garo Hills11584997514

  • No. of Working Days MDM Served Primary Ministry of HRD, Govt. of IndiaNo. of Working DaysTotal Working Days approval for 2012-13: 200 Days

    Chart1

    200191

    200193

    200167

    PAB Approval

    Achievement

    Sheet1

    PAB ApprovalAchievement2010-11

    2010-1120019190.955

    2011-12200193

    2012-13200167

    To resize chart data range, drag lower right corner of range.

    0.000.00-4.50

  • No. of Working Days MDM Served : ( Upper Primary ) Ministry of HRD, Govt. of IndiaNo. of Working DaysTotal Working Days approval for 2012-13: 220 Days

    Chart1

    220216

    220215

    220178

    PAB Approval

    Achievement

    Sheet1

    PAB ApprovalAchievement2010-11

    2010-1122021640.9818181818

    2011-122202155

    2012-1322017842

    To resize chart data range, drag lower right corner of range.

    0.000.00-1.82

  • Approval Vs Achievement: No . of Meals (P + UP.)Ministry of HRD, Govt. of IndiaNo. of Meals (in crore)82% 90% 91%

    Chart1

    9.9137019.13

    10.5149.68

    119

    Approval

    Achievement

    Sheet1

    ApprovalAchievement2010-11

    2010-11109192%

    2011-12111092%

    2012-1311982%

  • Utilization of Food Grains(1.4.12 to 31.12.12)Ministry of HRD, Govt. of India78% % indicates the utilization against the allocation

    Chart1

    0OB

    12620Allocation

    9811.85Total Lifting

    9811.850

    9811.85Utilisation

    Sheet1

    OBAllocationTotal LiftingAvailability (Lifting + OB)Utilisation

    012620981298129812

    0

    To resize chart data range, drag lower right corner of range.

  • FOOD GRAINS : ALLOCATION VS UTILISATION Ministry of HRD, Govt. of IndiaQuantity in MTs97%95%78%

    Chart1

    11049.8510447.6815

    1185611469

    126209811.85

    Allocation

    Utilisation

    Sheet1

    AllocationUtilisation2010-11

    2010-11110501044860295%

    2011-12118561146997%

    2012-1312620981278%

    To resize chart data range, drag lower right corner of range.

    0.000.00-5.45

  • Payment of Cost of Food grains to FCIMinistry of HRD, Govt. of India 71%

    Chart1

    7.1304

    5.5437

    3.9571

    Sheet1

    AllocationBill raised by FCIPayment to FCI

    7.135.543.96

    To resize chart data range, drag lower right corner of range.

  • COOKING COST: ALLOCATION VS UTILISATION (Pry+U.Pry)Ministry of HRD, Govt. of IndiaRs in Crores60%102%93%

    Chart1

    29.710428.1807

    34.250434.8445

    3823.2397

    ALLOCATION

    UTILISATION

    Sheet1

    ALLOCATIONUTILISATION2010-11

    2010-1130282

    2011-123435

    2012-133823

    0.000.00-5.15

    34.2504

  • Engagement of Cook Cum Helpers (Pry+U.Pry)Ministry of HRD, Govt. of IndiaNo. of CCH93%63%91%

    Chart1

    1725410818

    1725415720

    1777616611

    Sanctioned

    Engaged

    Sheet1

    SanctionedEngaged2010-11

    2010-11172541081864360.6269850469

    2011-12172541572015340.9110930799

    2012-1317776166111165

    To resize chart data range, drag lower right corner of range.

    0.00-37.30-8.89

    91

  • Payment of Honorarium to Cooks-cum-Helpers

    Ministry of HRD, Govt. of India59%

    Chart1

    17.77

    10.54

    Sheet1

    AllocationPayment to CCH

    17.7710.54

    To resize chart data range, drag lower right corner of range.

    15300.579480.8

    62%

    13005.4845

  • MME : ALLOCATION vs UTILISATIONMinistry of HRD, Govt. of IndiaRs in Lakhs43%60%86%

    Chart1

    58.1634.64

    97.7383.64

    106.0145.82

    ALLOCATION

    UTILISATION

    Sheet1

    ALLOCATIONUTILISATION2010-11

    2010-1158.1634.6424

    2011-1297.7383.6414

    2012-13106.0145.8260

    0.000.00-40.44

    Sheet2

  • Transportation Assistance : Allocation vs UtilisationMinistry of HRD, Govt. of IndiaRs in Lakhs 55%

    Chart1

    11049.8510447.6815

    1185611469

    126209811.85

    Allocation

    Utilisation

    Sheet1

    AllocationUtilisation2010-11

    2010-11110501044860295%

    2011-12118561146997%

    2012-1312620981278%

    To resize chart data range, drag lower right corner of range.

    0.000.00-5.45

  • Construction of Kitchen cum StoresMinistry of HRD, Govt. of India*Total Units sanctioned : 9491 KS5391 units3172 units928 units

    Chart1

    0.570.18

    0.330.61

    0.10.2

    Physical

    Financial

    Sheet1

    PhysicalFinancial

    Constructed57%18%

    In progress33%61%

    Yet to start10%20%

    To resize chart data range, drag lower right corner of range.

    CIPYet

    949153913172928

    57%33%10%100%

    16021.432898.289842.363280.79

    18%61%20%100%

  • Procurement of Kitchen Devices under MDMMinistry of HRD, Govt. of India*Total Sanctioned : 10074 Kitchen DevicesProcured : 9634 Units and In Progress : 440 Units

    Chart1

    0.960.96

    0.040.04

    Physical

    Financial

    Sheet1

    PhysicalFinancial

    Procured96%96%0

    In Progress4%4%

    CIPYet

    100749634

    96%0%

    503.7481.7

    96%0%

  • Inspections Ministry of HRD, Govt. of IndiaNo. of Institutions7%

    Chart1

    10612745

    Total Schools

    Coverage

    Sheet1

    Total SchoolsCoverage2010-11

    Inspections1061274598670.0702035432

    To resize chart data range, drag lower right corner of range.

    2503

  • Coverage : School Health Programme Ministry of HRD, Govt. of India*DLHS 2002-04: 6% children are suffering from severe anaemia and 9,4% of the adolescent girls are suffering from anaemia

    ComponentNo. of Schools coveredNo. of Children covered

    Coverage under SHP3270(31%)175309(32%)Health Check up3270(31%)175309(32%)Iron & Folic Acid distribution3270(31%)108251(20%)Vitamin A distribution3067(29%)13333(2.4%)Deworming Tablets distribution3270(31%)84379(15%)Spectacle distribution00

  • Availability of Infrastructure Ministry of HRD, Govt. of IndiaASER Report 2012- Toilet facility is not available in 24.4% schools. But usable girls toilet available only in 19.3% of the visited*31%

    Chart1

    0.390.310.71

    0.530.1360.66

    As per State

    AS per ASER

    AS Per MDM MIS Data

    Sheet1

    ToiletsDrinking water

    As per State39%53%

    AS per ASER31%14%

    AS Per MDM MIS Data71%66%

    Sheet1

    As per State

    AS per ASER

    AS Per MDM MIS Data

  • Data Entry StatusMinistry of HRD, Govt. of India*State has completed 100% Annual Data Entry work Monthly Data Entry work has been completed only for 29% of the schools

  • SSMC MeetingsMinistry of HRD, Govt. of India*Two SSMC Meetings were held on 30.10.2012 and 18.03.2013

  • SCORE CARD- ALL COMPONENTSMinistry of HRD, Govt. of India

    Chart1

    10

    9.8

    9.8

    7.8

    7.1

    5

    6

    5.9

    4.3

    8.7

    10

    5.5

    3.2

    0.7

    10

    2.9

    5.3

    3.9

    4

    Sheet1

    Institutions10

    Children9.8

    Working Days9.8

    FG Utilsation7.8

    Payment to FCI7

    Fund Flow5.0

    Cooking Cost6

    Hon.CCH5.9

    MME4.3

    KS8.7

    KD10

    TA5.5

    School Health3.2

    Inspection0.7

    A.D Entry10

    M.D Entry2.9

    Drinking Water5.3720.875

    Toilet3.90.4133333333

    Sheet1

  • Issues

    Huge gap in enrolment of children in primary and upper primary stagesOnly 7% of the schools have been covered under inspections.Low coverage of children under School Health Programme.Poor Monthly data entry into MDM MIS web portal.Delay in release of funds from State to District level

    Ministry of HRD, Govt. of India

  • North-Eastern Hill University, ShillongDistricts covered: South Garo Hills

    In Rongara Block on the day of visit only one school had MDM programme. There is constant delay in the supply of food grains and the cooking cost by 2-3 months. In Baghmara Block, few schools have to purchase water to organize MDM every time.There is no school Health Card in any of the schools.Inconsistency is experience regarding supply of food grains and cooking cost

    Findings of Monitoring Institute Ministry of HRD, Govt. of India

  • Districts covered: East Khasi Hills & Ri Bhoi

    Non availability of cooking cost and food grains causing disruption in serving Mid Day Meals.Delay in release of funds to the grass root level due to lengthy administrative process.Delay in payment to cook cum helpers.Poor maintenance of MDM records in schools.Poor monitoring mechanism.Lack of community participation in the scheme.

    Findings of Central Team VisitMinistry of HRD, Govt. of India

  • Analysis of States Proposal for 2013-14Ministry of HRD, Govt. of India

  • Proposal for 2013-14 : Children (Primary)Ministry of HRD, Govt. of IndiaProposal for 2013-14* Availed MDM in Q-3Availed MDM in Q-2*Availed MDM in Q-1EnrolmentAvailed MDM (9 months)PAB Approval 12-13

    Chart1

    42011-123.933.93.93.782011-124.043.9

    PAB Approval 2012-13

    Avg. No. of children availed MDM

    Q-1

    Q-2

    Q-3

    Enrollment 2012-13 (I-V)

    Proposed for 2013-14

    Sheet1

    2011-12

    PAB Approval 2012-134.0

    Avg. No. of children availed MDM3.9

    Q-13.9

    Q-23.9

    Q-33.8

    Enrollment 2012-13 (I-V)4.0

    Proposed for 2013-143.9

  • Proposal for 2013-14 : Children (Upper Primary) Ministry of HRD, Govt. of IndiaProposal for 2013-14 Availed MDM in Q-3 Availed MDM in Q-2*Availed MDN in Q-1EnrolmentAvailed MDM (9 months) PAB Approval for 12-13

    Chart1

    1.41.361.361.391.341.441.36

    PAB Approval

    Avg. No. of children availed MDM

    Q-1

    Q-2

    Q-3

    Enrollment

    Proposed for 2013-14

    Sheet1

    2011-12

    PAB Approval1.40

    Avg. No. of children availed MDM1.36

    Q-11.36

    Q-21.39

    Q-31.34

    Enrollment1.44

    Proposed for 2013-141.36

  • Proposal for Cook-cum-helper engaged in MDM SchemeMinistry of HRD, Govt. of India*

    PAB Approval For 2012-13Engaged during 2012-13Proposal for(2013-14)1777616611Nil

  • Proposal for Construction of Kitchen-cum-StoreMinistry of HRD, Govt. of India**out of 224, 191 are newly opened schools which were are not eligible for construction of kitchen cum store.

    **out of 9491, Construction of 928 sanctioned kitchen- cum -stores has not yet started.

    Total Institutions(Govt +Govt aided +Local Bodies )Total Sanctioned till 2012-13 Construction through ConvergenceGapState ProposalRecommendation by Appraisal team106129491897224224*Nil**

  • Proposal for Procurement of Kitchen DevicesMinistry of HRD, Govt. of India**GoI has already sanctioned 700 units of kitchen devices for replacement on 11.05.2012. 1450 units of kitchen devices were sanctioned during 2006-07 and 1557 units were sanctioned during 2007-08. So total no. of units sanctioned during 2006-07 and 2007-08 is 3007. Therefore the balance amounts of 2307 units of kitchen devices have been recommended for replacement.

    Total InstitutionsTotal Sanctioned till 2012-13Procured through Convergence GapStates Proposal for new schoolsRecommendationby Appraisal teamNewReplacementNew Replacement1061210074053853814505382307*

  • Proposals and Recommendations Ministry of HRD, Govt. of India*

    S.NoComponentPAB Approval 2012-13Proposal for 2013-14Recommendation1Children (Pry)4000003935012Children (U Pry)1400001366333Working Days (Pry & Up.Pry)Pry- 200U.Pry- 220Pry- 200U.Pry- 2204Cook cum Helpers1777617776(No additional)5Kitchen cum Store006Kitchen Devices1988New-538Replacement-23077MME106.01Rs.108.78 lakhsWithin permissible limitNotional RequirementExisting RateRs.6313.48 LakhsProposed RateRs.7451.96 Lakhs

  • Thank YouMinistry of HRD, Govt. of India*

    ****************************************