(Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

25
Bio methane production in Växjö

Transcript of (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Page 1: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Bio methane production in Växjö

Page 2: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Content

• History

• Present situation

• Future

Page 3: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Bio-methane history

Old sewage

plant

1 digester / gas-

boiler

1994 - Sundet

2 digesters / gas-

boiler, gas-engine

2003 Agropti-gas

closed

Co-digestion of

biowaste, manure

and grass crop

2006 New reception

lines

Liquid organic waste

2007 New gas

upgrading and filling

station (SESAC-

project)

2008 New gas-engine2008 Decision source

separation in

households of

biowaste

Page 4: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Totalt mottogs 14 839 m3 externslam under 2007 vilket motsvarar ungefär 21,5% av totala slammängden som

pumpats in i rötkammaren (resten är Sundets interna slam)

Present situation

Feedstock for digestion 2011

Internal sludges sewage water treatment 65 000 ton

Sludge small sewage treatment plants 3 000 ton

Sludge septic tanks 11 000 ton

Sludge grease traps 900 ton

Food waste 300 ton

Page 5: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Food waste collection system, waste disposer –

tank store

...transport to sewage plant for co-digestion with sewage

sludge

The result – bio methane for vehicle

fuel and .el and heat production

Present situation

Food waste large scale kitchen

Page 6: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

The present system

Page 7: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Energy utilization from crude gas

6%

1%

84%

9%

Flare

Burner

Engines

Fuel-prod

Page 8: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Internal goal 60% el selfsuffiency

El selfsufficiency

0%10%20%30%40%50%60%70%

Janu

ary 2

008

Febru

ary

Mar

chA

pril

May

June

July

Aug

ust

Sep

tem

ber

Oct

ober

Nove

mbe

rD

ecem

ber

Page 9: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Sustainable waste handling

Future bio-methane production

Page 10: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Today household waste

to incineration plant in Ljungby for el and

heat production

Reloading at landfill area and transport

250 kg/inhabitant 18 % package products

48 % food waste

0,2 % env dangerous waste

Present situation

Page 11: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

National goals waste handling

• Waste to deposit shall decrease at least 50% from 1994 to 2005

• 2010 shall at least 50 % all waste from household be used for material

recovery included biological treatment.

• 2010 shall at least 35% of the foodwaste from households, restaurants and

institutional kitchens be treated by biological methods for recovery

• 2015 shall 60% of the content of phoforus in the sewer system be recycled

for agricultural purposes

General: The total amount of waste shall decrease

Page 12: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...
Page 13: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Collection system

· Paper bag system

· Separate 140 lit dust bin with

ventilation,

Page 14: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...
Page 15: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Pre treatment plant

Page 16: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Increased digestion capacity

Page 17: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

New Gas-Cleaning

Page 18: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

The CApureTM process tecn.

Page 19: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Biogas pipeline Sundet - Hammerdalsgatan

• 4 300 m

• Dy 125 mm

• Pressure <4 bar

Page 20: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Slow fuel filling for buses

Page 21: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Future bio methane production

• Existing crude gas production

Sundet 720 000 Nm3 vehicle

fuel

• Future crude gas production

with foodwaste 1 300 000 Nm3

vehicle fuel

Page 22: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

El (MWh) Värme (MWh) Fordonsbränsle(MWh)

Totalenergi (MWh)

Changed production

- 2 410 - 3 550 + 12 500 + 6 540

Changed consumphtion

+ 1 120 + 510 - 40 + 1 590

Changed energy balance

- 3 530 - 4060 + 12 540 + 4950

Ton CO2/år Ton CO2/år Ton CO2/år Summa ton CO2/år

Changed CO2

emission+ 113 Ingen - 3 360 - 3247

Effects - energy utilization and green house gases

Page 23: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

•Lower exhaust emissions from bio methane compared to diesel

•Renewable fuelled buses is a good argument to choice bus

•Less fuel prize fluctuation

•The city obtains the national environmental goals

•Better material recovery of other materials (experience from other municipalities)

•Recycling of nutrients

Other advantages with source separation of biological waste and bio methane fuel production for buses

Page 24: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Energy supply to Växjö 2010

13%

14%

1%

9%

2%

38%

10%

7%

1%

1%

1%

3%

Total 2711 GWhGasoline

Diesel

Aviation fuel

Oil

Peat

Wood fuels

Renewable imported electricity

Non-renewable importedelectricityLocal windpower

Local hydropower

Biogas

Solar energy

Ethanol

FAME

Heatpumps

Straw

LPG

Ecopar

Page 25: (Microsoft PowerPoint - Energikontor studiebes\366k 12-03-06 ...

Thanks !

Steve Karlsson

tekniska förvaltningen

[email protected]