Master PlanMaster PlanMarch March 20092009
Fast Track Fast Track Projects Projects
( Next ( Next 6 6 months)months)
Gas Power plantsGas Power plants20092009--20122012
Thermal Power Thermal Power Plant Plant 20122012--20152015
medium term long termShort term
Investment ProjectsInvestment Projects
To bridge the gap between demand and Production .
A master plan was issued in 2006 and updated in march 2009 .
![Page 2: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/2.jpg)
![Page 3: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/3.jpg)
Energy Production Plants in IraqEnergy Production Plants in Iraq
►►Thermal .Thermal .
►►Gas.Gas.
►►Hydro.Hydro.
►►Diesel.Diesel.
![Page 4: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/4.jpg)
Percentage Participation of power plant for Percentage Participation of power plant for the years the years 19901990-- 20002000--20082008
200820001990
%Installed
capacity
%Installed
capacity
%Installed
capacity
Plant type
41.55015625015735415Thermal
49549620180081760Gas
9.52513182430192347Hydro
13024
MW
9245
MW
9522
MW
Total
![Page 5: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/5.jpg)
Actual Energy production for the years Actual Energy production for the years 19901990--20082008
![Page 6: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/6.jpg)
Power Plant Participation in Energy Power Plant Participation in Energy Production For Production For 2008 2008
41.50%
9.50%
49%
hydro
gas
Termal
![Page 7: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/7.jpg)
Status of load consumptionStatus of load consumption
33%
12%10%
45% BAGHDAD
BASRAH
MOUSEL
OTHER GOV
![Page 8: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/8.jpg)
Industrial14%
Governmental16%
Commercial 8%
Agricultural4%
Households58%
Summary of load DistributionSummary of load Distribution by by SectorsSectors
![Page 9: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/9.jpg)
On Going Power Projects
North Baghdad:45 MW (Diesel)
Samawa: 40 MW (Diesel)
Musaiyeb :100 MW (Gas)
Erbil :200 MW (Gas)
Chamchamal :100 MW (Gas)
Hilla :20 MW (Gas)
Najaf :2x125 MW (Gas)
Samarra :125 MW (Diesel)
Baghdad :300 MW (Diesel)
Baghdad south :100 MW (Gas)
Chamchamal :200 MW (Gas)
Nasriya :40 MW
2009
Yusfiya :600 MW (Thermal)
Dibis :300 MW (Gas)
,2010
Samarra :180 MW (Diesel)
Hadiytha:230 MW (Diesel)
Haidariya:150 MW (Gas)
Bazurgan:80MW (Gas)
,2011
Haidariya:150 MW (Gas)
2008,
![Page 10: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/10.jpg)
Expected Power Addition from the Ongoing Expected Power Addition from the Ongoing ProjectsProjects
16501550
1500
3350
0
500
1000
1500
2000
2500
3000
3500
MW
2009 2010 2011 2012 Total
![Page 11: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/11.jpg)
New Gas Projects
Bazurgan:2x40 MW:
Nasiriya:1x40 MW
Taji:4x40 MWا
Shat Al-Basrah:6x125MW:
Rumaila:5x265MW
Dora(2):4x125 MW
Kirkuk:1x260 MW
Dewaniya:4x125 MW
Kerbala2x125 MW
Hilla:2x125 MW
Mansuriya:2x125 MWا
Naynawa:6x125 MW
Baiji:6x160 MW
Al-Khairat:6x125 MW
Akkas:2x160 MW Al-Sadr:2x160 MW
Najaf:4x125 MW
Dora(3):6x125 MWا
Dibis:2x160 MW
Samawa:4x125 MW
Nasiriya:4x125 MW
Quds:2x125 MWا
Omara2x125 MW:
Wasit:2x125 MW
Al-Anbar:4x125 MW
Chamchamal3x125 MW:
![Page 12: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/12.jpg)
0
2000
4000
6000
8000
10000
12000
14000
2009 2010 2011 2012 Total
1257012570
10701070
5335533561656165
Expected Capacity Additions from the New Gas Power
Projects by MoE
MW
![Page 13: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/13.jpg)
Total Expected Capacity Additions
(Ongoing + Planned by MoE) 2009- 2012
1810
7555
5485
1070
15920
0
2000
4000
6000
8000
10000
12000
14000
16000
MW
2009 2010 2011 2012 Total
![Page 14: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/14.jpg)
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000MW
18 B. US$
( 4.5 B. US$ / Year )
2008 2009 2010 2011 2012
![Page 15: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/15.jpg)
Al-shemal : 1400 MW
Wasit : 1320 MW
Salah Al-Deen : 1200 MWAnbar: 1200 MW
Khairat : 1200 MW
Shat Albasrah : 1200 MW
Nasriya Expansion : 400 MW
Hartha Expansion : 600 MW
Planned Thermal Projects
2012-2015
![Page 16: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/16.jpg)
موازنة القدرة بين الطلب واBنتاجموازنة القدرة بين الطلب واBنتاج
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
2009 2010 2011 2012
MW
الطلب اBنتاج
![Page 17: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/17.jpg)
MoE and MoO are
continuously
coordinating short
and medium term
plans
Types of fuel used for generation in Iraq:
Fuel OilFuel Oil
Natural GasNatural Gas
Gas OilGas Oil
Crude OilCrude Oil
![Page 18: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/18.jpg)
Technical ChallengesTechnical Challenges
SPARE PARTS AVAILABILITY
AGING OF ELECTRICAL SYSTEM
FUEL SUPPLY (Mismatch of Demand & Supply)
CAPACITY BUILDING
![Page 19: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/19.jpg)
NonNon--Technical Technical ChallengesChallenges
SECURITY
MILITARY OPERATIONS AND SABOTAGE
FINANCIAL RESOURCES
TARIFF AND BILL COLLECTION
![Page 20: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/20.jpg)
Investment in Electrical Investment in Electrical Sector in IraqSector in Iraq
![Page 21: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/21.jpg)
►►Expected Huge amount of Investment Expected Huge amount of Investment in all sectors in Iraq in the near future.in all sectors in Iraq in the near future.
►►MoE invites and encourages MoE invites and encourages companies to come and invest in Iraq.companies to come and invest in Iraq.
►►MoE has put an ambitious investment MoE has put an ambitious investment plan .plan .
![Page 22: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/22.jpg)
Ministry of ElectricityMinistry of Electricity
Investment plan
Estimated
Cost
M/USD
Fuel Total
MWMW
No
.unit
TypeStationGovernor
ate
250
250
400
Fuel oil /
natural gas
Crud oil / fuel
oil
250
250
600
125
125
300
2
2
2
Gas
Steam
Al-Garraf
Nasiria
(Extension)
Thi-Qar
400Fuel oil 6003002steamAl-khyratKarbela
400Fuel oil 6003002steamAl-ShemalNenavia
400Crud oil / fuel
oil
6003002steamAl-AnbarAl- Anbar
400Fuel oil 6003002steamShat al-
Basra
Al-Basra
![Page 23: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335 ...](https://reader034.fdocuments.us/reader034/viewer/2022051123/585c9a571a28abed218ed1aa/html5/thumbnails/23.jpg)
AL-Gharaf:4x125
MW
Al-Anbar: 2x300
MW
Shat al-
Basrah:2x300MW
Salah Al-Dean : 2x300
MW
Nasriya : 2x300 MW
Khairat : 2x300
MW
Al-shemal : 2x350
MW
IPP ProjectsIPP Projects