Microsoft Outlook - Memo Style - SAHRIS | SAHRA · 1 3 . A ppe ndix A S lope ( h t p: /sar .o gz i...
Transcript of Microsoft Outlook - Memo Style - SAHRIS | SAHRA · 1 3 . A ppe ndix A S lope ( h t p: /sar .o gz i...
1
Marais, Wanda
From: Microsoft Outlook
<MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@srk.onmicrosoft.com>
Sent: 06 December 2016 08:33 AM
Subject: Relayed: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure,
Chatty
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
2
Marais, Wanda
From: Microsoft Outlook
<MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@srk.onmicrosoft.com>
Sent: 06 December 2016 08:33 AM
Subject: Relayed: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure,
Chatty
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
3
Marais, Wanda
From: Microsoft Outlook
<MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@srk.onmicrosoft.com>
Sent: 06 December 2016 08:33 AM
Subject: Relayed: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure,
Chatty
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
4
Marais, Wanda
From: Microsoft Outlook
<MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@srk.onmicrosoft.com>
To: [email protected]; [email protected]
Sent: 06 December 2016 08:33 AM
Subject: Relayed: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure,
Chatty
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] Subject: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
5
Marais, Wanda
From: Microsoft Outlook
<MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@srk.onmicrosoft.com>
To: [email protected]; [email protected];
[email protected]; [email protected]
Sent: 06 December 2016 08:33 AM
Subject: Relayed: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure,
Chatty
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] [email protected] Subject: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
6
Marais, Wanda
From: Microsoft Outlook
<MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@srk.onmicrosoft.com>
To: [email protected]; [email protected]
Sent: 06 December 2016 08:33 AM
Subject: Relayed: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure,
Chatty
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] Subject: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
1
Marais, Wanda
From: Marais, Wanda
Sent: 06 December 2016 08:32 AM
Subject: NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
Attachments: 492071_Chatty Stormwater_Post-Application DBAR_Executive Summary_
20161017.pdf
Importance: High
TrackingTracking: Recipient Delivery
Gardiner, Rob Delivered: 2016/12/06 08:33 AM
Nel, Karissa Delivered: 2016/12/06 08:33 AM
Strydom, Luc Delivered: 2016/12/06 08:33 AM
Dear Authorities, Stakeholders and Interested & Affected Parties,
NOTICE OF COMMENT PERIOD: Proposed Bulk Stormwater Infrastructure, Chatty
Please find attached the Executive Summary of the Post-Application Draft Basic Assessment Report (DBAR) for the
proposed Bulk Stormwater Infrastructure, Chatty, Port Elizabeth, Eastern Cape Province.
The Post-Application DBAR is not a final report and is open for public and stakeholder review and comment for a
period of 30 days (6 December 2016 – 26 January 2017). Any comments received will thereafter be integrated into
the Final Basic Assessment Report (FBAR) which will be submitted to the Department of Economic Development,
Environmental Affairs & Tourism (DEDEAT) for their decision.
Comments on the Post-Application DBAR will assist to ensure that all potential environmental impacts related to the
listed activities have been assessed. The public is therefore urged to submit comments, as these could ultimately
influence the recommendations of the Final Basic Assessment Report and the decisions taken by DEDEAT.
A printed copy of the complete Post-Application DBAR is available for public review at the Algoa Park Public Library.
The report will also be made available as an electronic copy to IAPs upon request.
Should you wish to comment on this report, please submit such comment, in writing, by 17h00 on 26 January
2017 to:
Wanda Marais
SRK Consulting
2
Postal address: P O Box 21842, Port Elizabeth, 6000
Fax: (041) 509 4850
E-mail: [email protected]
Kind Regards,
Wanda Marais B Proc
Public Participation Practitioner
SRK Consulting (South Africa) (Pty) Ltd
Ground Floor, Bay Suites, 1a Humewood Rd, Humerail, Port Elizabeth, 6001
P O Box 21842, Port Elizabeth, 6000
Tel: +27-(0)41-509-4809; Fax: +27-(0)41-509-4850
Email: [email protected]
www.srk.co.za
This transmission is intended for the sole use of the addressee, and may contain information that by its privileged and confidential nature is exempt from disclosure under applicable law. You are hereby notified that any dissemination, distribution or duplication of this transmission by someone other than the intended recipient or its designated agent is strictly prohibited. If you have received this transmission in error, please notify the sender immediately by replying to this transmission, or by collect call to the above phone number.
Chatty Bulk Stormwater BA73 reads
AdditionalDocuments
Heritage Cases Chatty Bulk Stormwater BA has been updated.
Heritage Cases
ApplicationDate: Tuesday, May 17, 2016 10:37CaseID: 9560Applicants: Nelson Mandela Bay MunicipalityConsultants/Experts: Wanda Marais
Heritage Reports: Chatty Bulk Stormwater Heritage ScrrenerChatty Bulk Stormwater Archaeological LoE
ProposalDescription: Basic Assessment Process for the Proposed Chatty Bulk Stormwater, Port Elizabeth
OtherReferences: Dept CaseReference DueDate FinalDecision
DEDEAT ECm1/C/LN1&3/M/502016 26/01/2017
ReferenceList:
CaseHeader LocationInfo Admin
MyDashboard Explore Create Calendar Maps Help
Chat (10)
1. Background Information Document (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_BID_20160428.pdf)2. PostApplication DBAR Executive Summary (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_Chatty%20Stormwater_PostApplication%20DBAR_Executive%20Summary_20161017_0.pdf)
3. PostApplication DBAR (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_Chatty%20Stormwater_PostApplication%20DBAR_20161124_0.pdf)4. Appendix A Locality Map (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_001_Locality_Map_14Apr2016_0.pdf)
5. Appendix A Catchment Map (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_004_Catchment_Map_29Apr2016_0.png)6. Appendix A_ PPP Properties (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_005_PPP_Properties_05Oct2016_0.pdf)
7. Appendix A Zoning Map (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_006_Zoning_Map_14Apr2016_0.png)8. Appendix A_Existing services(http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_007_Existing_Services_10Oct2016_0.png)
9. Appendix A Environmental Sensitivity (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_008_Environmental_Sensitivity_10Oct2016_0.png)10. Appendix A Vegetation (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_009_Vegetation_10Oct2016_0.png)
11. Appendix A Hydrology (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_010_Hydrology_10Oct2016_0.png)12. Appendix A Geology (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_011_Geology_10Oct2016_0.png)
13. Appendix A Slope (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_012_Slope_10Oct2016_0.png)14. Appendix B Photo Map (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_013_Photo_Map_14Oct2016_0.pdf)
15. Appendix B Photos (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_Appendix%20B_Photos_0.pdf)16. Appendix C Typical example of culvert (http://sahra.org.za/sahris/sites/default/files/additionaldocs/103110F02_0.pdf)
17. Appendix C Detention Pond Layout (http://sahra.org.za/sahris/sites/default/files/additionaldocs/103110P01_Pond%20layout_0.pdf)
18. Appendix C Detention Pond inlet (http://sahra.org.za/sahris/sites/default/files/additionaldocs/103110P03_Pond%20inlet_0.pdf)19. Appendix C Detention Pond detail reinforcement (http://sahra.org.za/sahris/sites/default/files/additionaldocs/103110P
04_Pond%20detail%20reinforcement_0.pdf)20. Appendix C Detention pond positions (http://sahra.org.za/sahris/sites/default/files/additionaldocs/RETENTION%20POND%20POSITIONS%20COMPARED_0.pdf)
21. Appendix C Gabion Flood protection 1 (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Chatty%20Flood%20ProtectionGEN001_0.pdf)22. Appendix C Gabion Flood protection 2 (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Chatty%20Flood%20ProtectionGEN002_0.pdf)
23. Appendix C Gabion Flood protection 3 (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Chatty%20Flood%20ProtectionGEN003_0.pdf)24. Appendix C Gabion Flood protection 4 (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Chatty%20Flood%20ProtectionGEN
004_0.pdf)25. Appendix C Gabion Flood protection master drawing (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Master%20DrawingGabion%20Protection_0.pdf)
26. Appendix D Aquatic Impact Assessment(http://sahra.org.za/sahris/sites/default/files/additionaldocs/FINAL%20Chatty%20Stormwater_Aquatic_20161007_0.pdf)
27. Appendix E1 ppp summary (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E1%20%20point%20summary_0.pdf)28. Appendix E2 BID (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E2%20%20BID%20rev1_0.pdf)
29. Appendix E2 onsite poster (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E2%20%20poster_0.pdf)30. Appendix E2 Newspaper tearsheet (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E2%20
%20The%20Herald_tearsheet_0.pdf)31. Appendix E3 BID delivery receipts (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E3%20%20BID%20delivery%20receipts_0.pdf)
32. Appendix E4 PreApplication DBAR delivery reciepts (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E4_PreApp%20DBAR%20delivery%20receipts_0.pdf)
33. Appendix E5 IAP Register (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E5%20%20List%20of%20IAPs_0.pdf)34. Appendix E6 IAP correspondence on BID (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E6%20
%20IAP%20correspondence%20on%20BID_0.pdf)35. Appendix E7 IAP correspondence on PreApplication DBAR (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E7%20
%20IAP%20correspondence%20on%20PreApp%20DBAR_0.pdf)36. Appendix E8 Comments & Responses Table (http://sahra.org.za/sahris/sites/default/files/additionaldocs/Appendix%20E8%20
%20comments%20%26%20responses%20table_0.pdf)37. Appendix F Draft EMPr (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_Draft%20EMPr_20161018_0.pdf)
38. Appendix G Stormwater design report
(http://sahra.org.za/sahris/sites/default/files/additionaldocs/001b_Chatty%20Bulk%20Stormwater%20Implementation_Revised%20Design%20Report_Signed_0.pdf)39. Appendix H Impact Rating Procedure
(http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_APPENDIX%20H_Impact%20Rating%20Procedure_20161014_0.pdf)40. Appendix H Impact Rating Sheet (http://sahra.org.za/sahris/sites/default/files/additionaldocs/492071_DBAR%20Impact%20Rating%20Sheet_20161007_0.pdf)
41. Appendix I EAP declaration (http://sahra.org.za/sahris/sites/default/files/additionaldocs/20161014_490271_EAP%20declaration.pdf)42. Appendix I K Nel CV (http://sahra.org.za/sahris/sites/default/files/additionaldocs/SRK%20ZA_PE_NelK_Resume_May2016_4.pdf)
43. Appendix J DEDEAT Application form
(http://sahra.org.za/sahris/sites/default/files/additionaldocs/20161122_492071_Chatty%20Stormwater_DEDEAT%20Application%20Form%20%28as%20submitted%29.pdf)44. Appendix J DEDEAT Acknowledgement of receipt (http://sahra.org.za/sahris/sites/default/files/additionaldocs/20161130_492071_f%20DEDEAT_AoR_0.pdf)
Back to Top
South African Heritage ResourcesAgency (SAHRA)Head Office111 Harrington StreetCAPE TOWN8001
PO Box 4637 Cape Town, 8000Tel 021 462 4502/Fax 021 462 4509Email [email protected] www.sahra.org.za(http://www.sahra.org.za)
______________________________________An agency of the Department of Arts & Culture
Powered by Drupal(http://drupal.org/)
Site best viewed using GoogleChromeDisclaimer
(http://www.sahra.org.za/about/disclaimer) (http://creativecommons.org/licenses/bysa/2.5/za/)
Chat (10)