PB_00013 MicroNet TMR 5009 FT Geothermal Plant Steam Turbine Upgrade CS7551 APPLICATION PROJECT OVERVIEW Governor Control Systems, Inc. (GCS) applied a modular approach to upgrading the original Woodward MicroNet TMR Control Systems on critical steam turbines in a Central American geothermal plant. FIGURE 1.0 Geothermal Power Plant TURBINES CONTROL TECHNOLOGIES The updated MicroNet TMR’s 2-out- of-3 voting architecture and diagnostic coverage create a reliable system to meet current IEC61508 SIL-3 compliance standards. Existing CPU’s were a 1990 vintage - New CPU’s are current and have Ethernet capability. Existing Kernel PSU’s were also 1990 vintage and needed to be replaced. Existing two line display was obsolete. Woodward GAP Software was upgraded to GAP3, customer can now monitor the functions. This upgrade was considered for the following reasons: Software modifications were required to integrate additional products. The Woodward MicroNet TMR 5009 FT is the best governing control system module available. It is easy to learn, reliable, locally supported and offers superior performance, as compared to the existing control system. The existing 040CPU was replaced with a state of the art M5200CPU to provide Ethernet capability. The existing GAP software was updated to GAP3 and adapted to the new CPU. The MicroNet kernel PSU was replaced with the latest version compatible with the M5200 CPU. The existing MicroNet two-line display was replaced with a 17” HMI Operator Panel that consists of a touchscreen Operator Control Panel, with Woodward Control Assistant. A dedicated tuning App was written to allow tunables in the MicroNet TMR 5009 FT to be viewed and configured. Plant operators were pleased to learn that control components offering a new, modern interface were readily available. An important customer requirement was for the commissioning to be completed in five (5) days. After the first upgrade system was successfully installed and operated, plant management awarded GCS upgrade projects for the additional steam turbines. 32 MW Steam Turbines Woodward MicroNet TMR® 5009 FT (triple modular redundant) Digital Control Platform Motorola MPC5200 processor, 128 MB DDR RAM, 64 MB of flash memory, a Real Time clock, and various communication peripherals. These peripherals include (2) general use Ethernet Ports, (2) Real Time Network Ports, (1) Serial Port, (1) one Service Port, and (2) CAN Ports. This Module includes an FPGA to provide VMEbus master/slave capability as well as other functions necessary for redundant systems. Updated Woodward kernel PSU Modules. Woodward M5200 CPU A touchscreen Operator Control Panel with Woodward Control Assistant software allows tunables in the MicroNet TMR 5009 FT to be viewed and configured. Woodward service tools (i.e. Monitor Gap, etc.) 17” HMI Touch Screen Operator Panel GAP3 version with logic changes as per customer’s request and needs. GAP Software Site required quick turnaround. GCS was able to commission the upgrade in only one day, minimizing plant downtime.

Transcript of MicroNet TMR 5009 FT Geothermal Plant Steam Turbine ... Studies/CS7551 - MicroNet TMR 5009.pdfThe...

Page 1: MicroNet TMR 5009 FT Geothermal Plant Steam Turbine ... Studies/CS7551 - MicroNet TMR 5009.pdfThe Woodward MicroNet TMR 5009 FT is the best governing control system module available.

PB_00013

MicroNet TMR 5009 FT Geothermal Plant Steam Turbine Upgrade CS7551

APPLICATION PROJECT OVERVIEW

PRIME MOVERS

CONTROL TECHNOLOGIES

APPLICATION PROJECT OVERVIEW

Governor Control Systems, Inc. (GCS) applied a modular approach to upgrading the original Woodward MicroNet TMR Control Systems on critical steam turbines in a Central American geothermal plant.

FIGURE 1.0

Geothermal Power Plant

TURBINES

CONTROL TECHNOLOGIES

The updated MicroNet TMR’s 2-out-of-3 voting architecture and diagnostic coverage create a reliable system to meet current IEC61508 SIL-3 compliance standards.

• Existing CPU’s were a 1990 vintage - New CPU’s are current and have Ethernet capability.• Existing Kernel PSU’s were also 1990 vintage and needed to be replaced.• Existing two line display was obsolete.• Woodward GAP Software was upgraded to GAP3, customer can now monitor the functions.

This upgrade was considered for the following reasons:

• Software modifications were required to integrate additional products.

The Woodward MicroNet TMR 5009 FT is the best governing control system module available. It is easy to learn, reliable, locally supported and offers superior performance, as compared to the existing control system. The existing 040CPU was replaced with a state of the art M5200CPU to provide Ethernet capability.

The existing GAP software was updated to GAP3 and adapted to the new CPU. The MicroNet kernel PSU was replaced with the latest version compatible with the M5200 CPU. The existing MicroNet two-line display was replaced with a 17” HMI Operator Panel that consists of a touchscreen Operator Control Panel, with Woodward Control Assistant. A dedicated tuning App was written to allow tunables in the MicroNet TMR 5009 FT to be viewed and configured.

Plant operators were pleased to learn that control components offering a new, modern interface were readily available. An important customer requirement was for the commissioning to be completed in five (5) days. After the first upgrade system was successfully installed and operated, plant management awarded GCS upgrade projects for the additional steam turbines.

32 MW Steam Turbines

Woodward MicroNet TMR® 5009 FT (triple modular redundant) Digital Control Platform

Motorola MPC5200 processor, 128 MB DDR RAM, 64 MB of flash memory, a Real Time clock, and various communication peripherals. These peripherals include (2) general use Ethernet Ports, (2) Real Time Network Ports, (1) Serial Port, (1) one Service Port, and (2) CAN Ports. This Module includes an FPGA to provide VMEbus master/slave capability as well as other functions necessary for redundant systems. Updated Woodward kernel PSU Modules.

Woodward M5200 CPU

A touchscreen Operator Control Panel with Woodward Control Assistant software allows tunables in the MicroNet TMR 5009 FT to be viewed and configured. Woodward service tools (i.e. Monitor Gap, etc.)

17” HMI Touch Screen Operator Panel

GAP3 version with logic changes as per customer’s request and needs.

GAP Software

• Site required quick turnaround. GCS was able to commission the upgrade in only one day,minimizing plant downtime.

Page 2: MicroNet TMR 5009 FT Geothermal Plant Steam Turbine ... Studies/CS7551 - MicroNet TMR 5009.pdfThe Woodward MicroNet TMR 5009 FT is the best governing control system module available.

Southeast / Bahamas 3101 SW 3rd AvenueFort Lauderdale, FL 33315Phone: 954-462-7404Toll Free: 877-659-6328Fax: 954-761-8768

Mid-Atlantic 3120 Arizona Avenue Norfolk, VA 23513 Phone: 757-852-5808 Toll Free: 877-659-6328 Fax: 757-852-5809

Gulf Coast 2022 Tamvest Court Mandeville, LA 70448 Phone: 985-626-8707 Toll Free: 888-427-4853 Fax: 985-626-8732

Pacific Northwest 1720 75th Street SW Everett, WA 98203 Phone: 425-513-9390 Fax: 425-513-9391

GCS offers comprehensive control system support, from engine and turbine systems integration to turnkey project management for a broad range of marine, power generation and industrial projects. GCS is a member of the MSHS Group. Learn more at www.govconsys.com or email us at [email protected]

P R O J E C T O V E R V I E W : MicroNet TMR (5009) Geothermal Plant Steam Turbine Upgrade PB_00013

FIGURE 1.1 - BEFORE MICRONET TMR FIGURE 1.2 - AFTER MICRONET 5009 FT

FIGURE 1.3 - BEFORE VIEW: 2 LINE DISPLAY FIGURE 1.4 - AFTER HMI SCREEN: FULL COLOR GRAPHIC DISPLAY