Michigan Department of Education School Improvement Plan SIP February 2011.
-
Upload
sonya-plumlee -
Category
Documents
-
view
216 -
download
1
Transcript of Michigan Department of Education School Improvement Plan SIP February 2011.
Michigan Department of Education
School Improvement PlanSIP
February 2011
Purpose
• School Improvement Plan Overview• School Improvement Processes and Online
Reporting • What is new for the SIP due September 1, 2011 ?
School Improvement Plan Overview– The School Improvement Plan (SIP) is a planning tool
designed to address student achievement and system needs identified through the school's comprehensive needs assessment.
– The SIP provides a method for schools to address the school improvement planning requirements of Public Act 25 of the Revised School Code and the Elementary and Secondary Education Act (ESEA) as applicable, including appropriate Title I requirements.
© 2010 AdvancED
School Improvement Plan Overview
– This template also meets requirements for AdvancED Michigan/NCA Accreditation.
– The SIP is required to be submitted online by all schools September 1st of each year.
© 2010 AdvancED
5
NCLB & PA 25
Title IOEII
MI SAAS External
School Improvement
Process
Coherent Plan for Improvement
Common Vision Guide our Work
Technical Assistance
Grant Criteria
Professional Learning Language• Tools • Assistance
Continuous Improvement
One Common Voice – One Plan
IDEA
6
Michigan Continuous Improvementand Reporting Cycles
• Getting Ready• Collect Data • Build Profile
Analyze Data Set Goals
• Set Measurable Objectives• Research Best Practice
• Develop Action Plans
• Implement Plan• Monitor Plan• Evaluate Plan
Goals Management
School Improvement Plan SIP
Gather
Study
Plan
Do
School Process Profile
School Data Profile/AnalysisSDP/A
DoImplement Plan
Monitor PlanEvaluate Plan
PlanDevelop Action Plan
StudentAchievement
GatherGetting Ready
Collect District DataBuild District Profile
StudyAnalyze Data
Set Goals Set Measurable Objectives
Research Best Practice
Michigan Continuous School Improvement
School Process Rubrics
School Data Profile/Analysis
School Data Profile/Analysis
Goals Management
School Improvement Plan
School Improvement Plan
8
Continuous School Improvement
Processes Products
Internal Review conducts internal review of current capacity in meeting accreditation standards
Self-Assessment (SA)Executive Institutional
Summary (EIS)
External Review hosts external review conducted by professional peers
Quality Assurance Review Report (QAR)
Continuous Improvement
continues to monitor, document, and evaluate improvement efforts
Accreditation Progress Report (APR)
Stage Processes Products
Gather • Assemble school improvement team• Establish a collaborative vision• Design a planning process• Collect school data • Engage stakeholders in an internal review • Build school profile
• **School Process Rubrics
• School Data Profile/ Analysis (SDP/A)
Study • Analyze Data• Set Goals • Set Measurable Objectives • Research Best Practice
• SDP/A• Goals Management
Plan • Develop action plan for strategies and activities
• Define methods for monitoring and evaluation
• School Improvement Plan
• Goals Management
Do Implement strategiesMonitor, document, and evaluate improvement efforts
• School Improvement Plan
• Goals Management
Michigan Continuous School ImprovementOnline Reporting Tools
GATHER• Getting Ready – Collect School Data – Build School Profile
School Data Profile/Analysis (SDP/A)
School Process Profile/Analysis One of the following:
a. MDE: School Process Rubrics 90 (SPR 90) b. MDE: School Process Rubrics 40 (SPR 40)
c. AdvancED NCA: Assist Self Assessment (ASSIST SA) d. AdvancED NCA: Self Assessment (SA)
STUDY• Analyze Data – Set Goals –Set Measurable Objectives – Research Best Practice
School Data Profile/Analysis (SDP/A) Summary Report/Goals Management
PLAN• Develop Action Plan
School Improvement Plan (SIP)
DO• Implement Plan – Monitor Plan – Evaluate Plan
School Improvement Plan (SIP)
• Title I specific requirements included within the SIP itself – automatically identified for each school.
• Additional Assurances included within one dynamic template.
• Functionality is enhanced:
– Drop Down report selection
– Archival options
© 2011 AdvancED
What is New and Improved in 2011?
School Improvement Plan (SIP)
• SIP Report Criteria
– All Michigan schools must complete the SIP. – The content of the SIP will change slightly based
on the individual school types (i.e. Non Title, Title I, and Single Building Districts).
– Due to the report’s ability to dynamically change content, six variations of the report are electronically generated.
© 2010 AdvancED
School Improvement Plan (SIP)
The six variations of the SIP report include:
1.SIP2.SIP - Schoolwide3.SIP – Schoolwide – Single Building District4.SIP – Single Building District5.SIP - Targeted6.SIP – Targeted – Single Building District
© 2010 AdvancED
School Improvement Plan (SIP)
Report Criteria All SIP reports include the following main sections:
1. Instructions 2. Introduction3. Institution Information4. Vision, Mission and Beliefs5. Goals6. Additional Requirements7. Assurances8. Stakeholders9. Statement of Non-Discrimination10.Supporting Documentation
© 2010 AdvancED
School Improvement Plan (SIP)
• Report Criteria The content for sections 1, 6, and 7 will vary according to the
designated reports:
1. Instructions2. Introduction3. Institution Information4. Vision, Mission and Beliefs5. Goals6. Additional Requirements7. Assurances8. Stakeholders9. Statement of Non-Discrimination10.Supporting Documentation
© 2010 AdvancED
School Improvement Plan (SIP)
• Report Criteria- The content within Sections 2 - 5 and 8 – 10 are
common for all the reports. - The questions within these sections will be the same
for every variation of the report.
© 2010 AdvancED
School Improvement Plan (SIP)
• Report Criteria – The questions within Sections 1 & 6 will change
based on whether a school is Non Title, Title I Targeted Assistance or Title I Schoolwide.
– The assurances within Section 7 will vary if a school is a Single Building District. Single Building Districts are required to provide responses for both school and district specific assurances.
© 2010 AdvancED
School Improvement Plan
© 2010 AdvancED
Example of Additional Requirements Section for Non Title I Institution
School Improvement Plan
© 2010 AdvancED
Example of Additional Requirements Section for Non Title I Institution
School Improvement Plan Title 1 Schoolwide
© 2010 AdvancED
Example of Additional Requirements Section for Title I – Schoolwide Institution
School Improvement Plan Title 1 Schoolwide
© 2010 AdvancED
Example of Additional Requirements Section for Title I – Schoolwide Institution
School Improvement PlanTitle 1 - Targeted Assistance
© 2010 AdvancED
Example of Additional Requirements Section for Title I – Targeted Assistance Institution
School Improvement Plan Title 1 - Targeted Assistance
© 2010 AdvancED
Example of Additional Requirements Section for Title I – Targeted Assistance Institution
School Improvement Plan
© 2010 AdvancED
Example of Assurances Section for Title I – Targeted Assistance Institution that is also a Single Building District
School Improvement Plan Title 1 - Targeted Assistance
© 2010 AdvancED
Example of Assurances Section for Institutions that are not Single Building Districts
School Improvement Plan
© 2010 AdvancED
Example of Supporting Documentation Section
© 2010 AdvancED
SIP Report Identification
• The report name will appear as a hyperlink. • The link will display deadline for the online report.
Functionality Improvement # 1
See example next slide…
© 2010 AdvancED
Functionality Improvement # 1
© 2010 AdvancED
SIP Drop Down Action Links
Drop down links will include the following: • Tasks – enter, continue, review• PDF Archives • Manage Archives
See example next slide…
Functionality Improvement # 2
© 2010 AdvancED
Functionality Improvement # 2
© 2010 AdvancED
PDF Archive • PDF Archive available in Manage Archives• Each archive generated will allow the user to enter
notes pertaining to archived document. • The date the archive was created, by whom, report
status and notes will display. • Document will be downloadable. • In addition, reports will be archived automatically
after submission and acceptance of reports.
See example on next slide …
Functionality Improvement # 3NEW!
© 2010 AdvancED
Functionality Improvement # 3
TRAINING RESOURCES
COMMUNICATIONS
Additional Online Resources and Tools
• MI CSI Steps and Stages • Video Series for Goals Management • SIP - Recorded Webinar - Coming soon! • SIP - Live Webinar - Coming soon! • LEAPC/DIP Training and Updates• SDP/A - Coming soon!
Questions & Answers
© 2010 AdvancED