Michael Murray
Development Manager – LondonHeritage Lottery Fund
![Page 2: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/2.jpg)
Collecting Cultures launched
£5 million available to MLA sector;
Grants between £50,000 - £500,000;
Application deadline 2 May
HLF has £402.5 million to spend in 2013/14, £375 m in 2014/15
The Black GardenerGarden Museum £60,000
![Page 3: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/3.jpg)
What can weaken museum projects?1. Under-estimating resources required to develop and
complete the project– Development phase too short to achieve ambitious fundraising
targets– Insufficient staff resources during development phase. Projects
under-estimate time required for project management and fundraising/project oversight – generally two separate roles.
– Insufficient contingency for historic building conservation, or insufficient survey work (e.g. Honeywood)
2. Planning for sustainability– How will you encourage people to come back after first visit/first
year?– On-going funding (e.g. commitments from local authority, ACE)– Governance issues– Business planning
![Page 4: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/4.jpg)
What can weaken museum projects?
3. Insufficient consultation– Planning permission– EH and amenity societies– Not embedded with wider community, voluntary sector (e.g.
volunteer recruitment, partnerships with non-heritage organisations)
![Page 5: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/5.jpg)
What can weaken museum projects?
4. Other issues– Impact of changes in staff on project development and
design (e.g. new curator with different ideas on interpretation)
– Lack of ambition related to new audiences development, capital or activity programmes
– Not considering the wider museum context (e.g. external landscaping)
– Unsatisfactory building design– Poor accessibility– Insufficient digital infrastructure and licences– Insufficient information on significance of the collection– Budgeting errors/value for money
![Page 6: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/6.jpg)
How do we assess applications?• Heritage importance
• Need or opportunity
• Why now / why lottery funding?
• What outcomes will the project achieve?
• Value for money
• Project well planned?
• Financially realistic?
• Sustainability
![Page 7: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/7.jpg)
How can the development team help?
Provide advice and support before you apply
Project enquiry form/ expression of interest forms available on our website
![Page 8: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/8.jpg)
Project enquiry stage – some common themes:• Uncertainty about HLF grant
process, confusion about timescales
• Focus on the ‘physical’ and people can be neglected
• Lack of overall strategy and why this project should happen now
• Speak to the sector, those who’ve been through a similar process
• Capacity of the organisation to deliver project, and sustainability in the long term, and being realistic
• Not reading HLF’s guidance!
![Page 9: Michael Murray Development Manager – London Heritage Lottery Fund.](https://reader030.fdocuments.us/reader030/viewer/2022032600/56649db35503460f94aa26e5/html5/thumbnails/9.jpg)
Contact UsLondon
Michael Murray020 7591 6183 [email protected]
Norma Pearson020 7591 6190 [email protected]
Helen Greer 020 7591 6174 [email protected]
Gillian Goode 020 7591 6265 [email protected]