Mitsubishi Air Blown IGCC in Japan
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
Outline of Outline of MHI AirMHI Air--blown IGCC Systemblown IGCC System
Stack
Pulverizer
Hopper
CoolingWater
Compressor
AirSlagHopper
Coal
Gas Turbine
Air
Generator Transformer
Heat RecoverySteam GeneratorGasifier
HeatExchanger
RecycledChar
Steam Turbine
Gas Treatment
ASUAirN2
O2
Gasification / Gas Clean-up IslandProduce clean syngas from coal effectively
Power Block Effective power generation by using GTCC
Key is Engineering Ability to Integrate Total System Configuration Effectively
Compact ASU for N2 product : Byproduct O2 is effectively utilized as gasifying agent
High Efficiency Gasifier
High EfficiencyGas Turbine
22
CoolingWater
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
� Air-blown Lower auxiliary power(Large Capacity ASU units are not necessary)
� Dry coal feed Lower heat loss than slurry feed
Features of MHI AirFeatures of MHI Air--Blown IGCCBlown IGCC
�� AirAir--Blown IGCCBlown IGCC is MHIis MHI’’s original technology and supplied s original technology and supplied only by MHIonly by MHI..�� MHI AirMHI Air--Blown IGCC achieves Blown IGCC achieves the world highest efficiencythe world highest efficiency..
USCConventional
O2-BlownIGCC
(Dry Feed)
MHIAir-Blown IGCC
AuxiliaryPower
NetPlan
t Effi
cien
cy Gross
+5%(abs.)
O2-BlownIGCC
(Slurry Feed)
+3%(abs.)48%
45%
43%42%
AssumptionAssumption Same gas turbine appliedSame gas turbine applied
33
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
1980 1990 2000 20101985 1995 20051
10
100
1,000
5
50
500
5,000Fu
el C
apac
ity (t
on/d
ay)
2t/d PDU (CRIEPI)
200t/d Pilot Plant(Nakoso)
Pilot Test Plant(MHI Nagasaki)
20202015
10,000
2025
Mitsubishi IGCC/GasificationMitsubishi IGCC/GasificationTechnology DevelopmentTechnology Development
250MW / 1,700t/d250MW / 1,700t/dDemo. Plant CCPDemo. Plant CCP
500MW or MoreCommercial Plant
PDU : Process Development UnitCRIEPI : Central Research Institute of Electric Power Industry
Successful operation Successful operation -- National Project in Japan National Project in Japan --
Ensures Quality & PerformanceEnsures Quality & Performance
44
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
�Project is going on Schedule.�Operation started Sep. 2007
� 100% Load� 2,000hrs. Continuous Operation finished
� Coal Change / Load Swing / Efficiency Improvement, etc.
� 5,000hrs. Durability Test finishedSubsidy from METI ended
Gas Clean-Up
Gasifier
HRSG
GT / ST
Single Point Responsibility(EPC Turn-Key Contract)
METI
Clean Coal PowerR&D Co., Ltd.
30% SubsidyHokkaido EPCo.Tohoku EPCo.Tokyo EPCo.Chubu EPCo.Hokuriku EPCo.Kansai EPCo.Chugoku EPCo.Shikoku EPCo.Kyushu EPCo.J-PowerCRIEPI
70%Contribution
Researchers
Ministry of Economy, Trade and Industry
MHI
Joint Project AgreementJoint Project Agreement
NagasakiTakasago
Tokyo
Yokohama
NakosoNagasaki
Takasago
Tokyo
Yokohama
NagasakiTakasago
Tokyo
Yokohama
NakosoNakoso
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Engineering Construction Operation
250MW IGCC Demonstration Plant250MW IGCC Demonstration Plant-- Current Status Current Status --
55
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
Gasifier ITV
100% Load(Gross Output: 250MW)
• Full Load (250MW) : March, 2008• 2,000hrs. Continuous Operation : Sep., 2009• 5,000hrs . Durability Test : June, 2010
Unburnt carbon in slag: < 0.1wt%
250MW IGCC Demonstration Plant
Achieved Successful Operation!
66
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
� All of the demonstration targets have been achieved.� Future plan focuses on the further improvement of
operational flexibility.
Targets Achievements Future Plan
Performance
Output 250MW 250MWEfficiency (Gross/Net, LHV) >48% / > 42% 48.9% / 42.9%
Carbon Conversion > 99.9% > 99.9%
EmissionSOxNOxDust
< 8 ppm< 5 ppm
< 4 mg/m3N
1.0 ppm3.4 ppm
< 0.1 mg/m3N
OperationalFlexibility
Coal KindsBituminousSub-bituminous
ChinesePRBIndonesianColombian
Expanding
Start-up Time < 18 hr 15 hrMinimum Load 50% Less than 50%Ramping Rate 3% / min 3 % / min
ReliabilityLong-termContinuous Operation 2,000 hr 2,238 hr
Long-TermReliability Run 5,000 hr 5,013 hr
250MW IGCC Demonstration Plant250MW IGCC Demonstration Plant-- Targets & Accomplishments Targets & Accomplishments --
77
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
• The earthquake (@M9) and tsunami attacked the Demo. Plant on Mar. 11, 2011. • All facilities flooded 2 m above the ground level and piping, etc. damaged,
but the plant shut down quite in safe,the plant shut down quite in safe,with neither dangerous situation like syngas leakage nor explosionneither dangerous situation like syngas leakage nor explosion.
• No fatal damage due to the earthquakethe earthquake--resistant design of main equipmentsresistant design of main equipments.• After 4.5 months restoration, the plant came back, and since July 28
it has been continuously operatingfor 1,500 hrs. right now at full load.
Present Status of 250MW IGCC Present Status of 250MW IGCC Demonstration Project (Nakoso)Demonstration Project (Nakoso)
Copyright Clean Coal Power R&D Co., Ltd
IGCCTsunami FloodingTsunami Flooding
Demo. Plant in Operation after RestorationDemo. Plant in Operation after Restoration(September)(September)
88
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
0
50
100
150
200
250
300
2011/3/10 2011/3/15 2011/3/20 2011/3/25 2011/3/30
Power�Output�(MW)
250MW IGCC Demonstration Plant - Restoration of Damage by Earthquake -
March 11
Earthquake& Tsunami Plant Restart
July 27
Photo: Clean Coal Power R&D Co., Ltd
March 11 April 8 April 8
Present
99
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
Mitsubishi Air Blown IGCCfor Chinese Market
and Chinese IGCC FS with China Power Investment Corporation
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
NEDOFS FeeMHI / MCDesign
Condition
SummaryResult
FS Report
NEDO: New Energy and Industrial Technology Development Organization
1111Chinese IGCC Project for CPIChinese IGCC Project for CPI-- NEDO FS Scheme NEDO FS Scheme --
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
2011/ Aug. Sep. Oct. Nov. Dec. 2012/Jan. Feb. Mar.
Kick-offMTG
H&MB Design Estimation & Review
SiteSurvey
Reportingto CPI
Report for NEDO
Expiration of the term of the contract with NEDO
Chinese IGCC Project for CPIChinese IGCC Project for CPI-- FS Overall ScheduleFS Overall Schedule --
�July 14, 2011 Preliminary Kick-off MTG with NCPE & DEC�August 10, 2011 Kick-off MTG with CPI, NCPE & DEC�Nov. 1, 2011 Interim MTG with NCPE & DEC
Ongoing Design and Estimation with NCPE & DEC
1212
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
1313
CO2Sequestration
Gasifier &Syngas Cooler
Coal Bunker & Coal Grinding
Coal Transportation
Slag Transportation
Water Treatment, Sewage Treatment
Gas Clean-up
Byproduct Transportation
Gas Turbine
HRSG & SCR
Condenser
Cooling Tower
Switch Yard
Start-up fuel
Gasification AirBooster
Study Scope Interface 2-grade
city sewage
Discharge
Generator
StackASU
Other
NCPE
DECMHI / DEC
CO2 Compressor
Steam Turbine
Slag Handling
Coal Handling
Byproduct Treatment
To be confirmed during FS
Chinese IGCC Project for CPIChinese IGCC Project for CPI-- OverviewOverview --
�Owner(China Power Investment Corp.)
�Site Undisclosed
�Fuel(Bituminous Coal)
�Plant Configuration
500 MW Class x 2 trains (Air-blown Gasifier, M701F Gas Turbine, 1 on 1 Single Shaft)
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
Chinese IGCC Project for CPIChinese IGCC Project for CPI-- Conceptual 3D model with ScopeConceptual 3D model with Scope --
Turbine Building Gasifier
Supplied by MHI
Supplied by NCPESupplied by DEC
In collaboration with DEC and NCPE, Chinese companies supply most part of plant.
1414
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
Note:Note: Ambient condition; Ambient condition; temp.11.4degtemp.11.4deg--C, pressure 1.0152 C, pressure 1.0152 barabara, RH 61%., RH 61%.
Item SpecificationCoal Bituminous CoalOutput Gross Approx. 540 MW
Net Approx. 480 MWGasifier Oxidizer Air
Coal Feed DryAcid Gas Clean-up Wet MDEAGas Turbine M701FGross Efficiency(LHV)
Approx. 52 %w/o CO2 Capture
Net Efficiency(LHV)
Approx. 47 %w/o CO2 Capture
Air Emissionfrom HRSG Stack(15%O2, dry)
SOx < 7.4 mg/Nm3
NOx < 50 mg/Nm3
Dust < 1.6 mg/Nm3
540MW
MW
250MW
140140
330330
38
40
42
44
46
48
701DA G/T
50
Net
Effi
cien
cy (L
HV
%)
Demo. Plant701F G/T
400
500
600
300
200
Gro
ss O
utpu
t
Chinese IGCC
Expected Performance ofExpected Performance ofChinese IGCC Project for CPIChinese IGCC Project for CPI
1515
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
Preliminary Plant Layout of Preliminary Plant Layout of Chinese IGCC Project for CPIChinese IGCC Project for CPI
Ongoing Optimization of Plant Layout
Power Block
ASU
Gas Clean-up
Gasifier
Cooling Tower
Substation
Waste Water Treatment
Warehourse /Administration Building
Flare
Required Area : Approx. 470 m x 470 m
Chemical Dosing System, etc.
1616
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
ConclusionConclusion1.1. Mitsubishi Air Blown IGCCMitsubishi Air Blown IGCC
1) Ready for commercial application 1) Ready for commercial application 2) World Highest Efficiency 2) World Highest Efficiency
Decrease CODecrease CO22 / Efficient use of coal resource/ Efficient use of coal resource2.2. Cooperation with Chinese PartnersCooperation with Chinese Partners
(NCPE & DEC)(NCPE & DEC)Competitive IGCC in ChinaCompetitive IGCC in China
3.3. Successful cooperation in ChinaSuccessful cooperation in ChinaContribute to competitive IGCC worldwideContribute to competitive IGCC worldwide
1717
Commercial scale IGCC in China Commercial scale IGCC in China = Key for= Key for IGCC development worldwideIGCC development worldwide
© 2011 MITSUBISHI HEAVY INDUSTRIES, LTD. All rights reserved.
“Mitsubishi’s Contribution for Energy and Environment Solutions”
““MitsubishiMitsubishi’’s Contribution for s Contribution for Energy and Environment SolutionsEnergy and Environment Solutions””
Thank you!!Thank you!!Thank you!!