mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO...

8
4TP SWrucWural Analysis of HisWorical ConsWrucWions – Jerzy Jasieńko (ed) © 2012 DPNH ProcławH PolandH ISSN 0860-2395H ISBN 978-83-7125-216-7 mfib clrkaATflk fk Pa Mlabiifkd lc Brfiafkd aAMAdb arb Tl pbTTibMbkT diorgia diardina N I para Boldrini O I Max AKkK eendriks P I gan dK oots 4 ABpToACT qhis paper fçcuses çn different mçdelling apprçaches tç sçilJstructure interactiçn in the Pa finite element analysis çf settlementJinduced damage çn buildingsK pettlementJinduced damage çn histçrical structures can be a relevant cçnsequence çf excavatiçns in urban areasK kumerical analyses adçpted tç predict the pçtential damage need tç take intç accçunt the influence çf the sçilJstructure interactiçnI which includes the fçundatiçn respçnseK fn case çf pile fçundatiçnI the mçst detailed methçd cçnsists çf using sçlid elements fçr the piles and plane interfaces tç represent the sçilJpile interactiçnK Because çf the need tç match the pile and interface element faces with the sçil element facesI this apprçach implies a cçmplex mesh generatiçn prçcess; furthermçreI a great cçmputatiçnal expense is requiredI due tç the large number çf elementsK fn this paperI twç simplified mçdelling apprçaches are cçmparedK qhe first is based çn the use çf Pa embedded beam elements with interface slip; this allçws simplificatiçn çf the meshI withçut neglecting impçrtant aspects çf the sçilJpile behaviçurK bvery single pile is still mçdelled explicitlyK fn the secçnd apprçachI the piles are ±smeared” tç hçrizçntal interface elements with equivalent nçnJ linear behaviçur tç represent the sçilJstructure interactiçnK Bçth çf the methçds are applied tç the analysis çf a masçnry structure subject tç tunnelling in sçft sçilK A crack mçdel is adçpted fçr the buildingI and the tunnelling advanced is simulated thrçugh a stage analysisK oesults are cçmpared in terms çf structural damage and the feasibility çf the twç mçdelling strategies is evaluatedK ft is shçwn that the selected mçdelling apprçach affects the way the sçil settlements are transferred tç the structure and significantly influences the predicted damageK heywordsW aamage assessmentI kumerical analysisI coundation modelling N. fkTolarCTflk qhe rapid develçpment çf cçmputatiçnal mçdelling techniques and cçmputer facilities has made the use çf numerical simulatiçn fçr structural assessment mçre accessibleK Pa cinite blement jçdels are particularly suitable tç analyze the effect çf tunnellingJinduced settlement çn surface structuresK qhe cçupled analysis çf sçilI building and tunnel and the use çf nçnJlinear material mçdels allçw fçr the evaluatiçn çf the main factçrs gçverning the structural respçnseK An essential rçle is played by the interactiçn between the building and the tunnellingJinduced settlement trçughK A Pa fullyJcçupled cinite blement jçdel with interface elements representing the sçilJstructure interactiçn EcigK NcF was recently prçpçsed xNzK qhe interface element behaviçurI defined in terms çf a relatiçn between the nçrmal and shear stresses and the nçrmal and shear relative displacements acrçss the interfaceI can be relatively easily adapted tç the shallçw fçundatiçns respçnse EcigK NbFK fn this paperI the specific feasibility çf such interface tç mçdel pile fçundatiçn EcigK NaF is investigatedK mile fçundatiçns can be mçdelled in detail by means çf sçlid elements with plane interface cçnnected with the sçlid sçil elementsK qhe disadvantage çf this apprçach is the cçmplex and fine mesh generatiçn that is required tç match the nçdes çf the pile and the sçil elements EcigK OaFK qhis results in N jpcI aelft rniversity çf qechnçlçgyI gKgiardina]tudelftKnl O jpcI para BçldriniI papienza rniversity çf oçmeI saraKbçldrini]hçtmailKit P arI aelft rniversity çf qechnçlçgyI mKaKnKhendriks]tudelftKnl 4 mrçfI aelft rniversity çf qechnçlçgyI jKgKrçts]tudelftKnl

Transcript of mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO...

Page 1: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4TP=

SWrucWural Analysis of HisWorical ConsWrucWions – Jerzy Jasieńko (ed) © 2012 DPNH ProcławH PolandH ISSN 0860-2395H ISBN 978-83-7125-216-7

mfib clrkaATflk fk Pa Mlabiifkd lc Brfiafkd aAMAdb arb Tl pbTTibMbkT =diorgia=diardinaNI=para=BoldriniOI=Max=AKkK=eendriksPI=gan=dK=oots4== ABpToACT =qhis= paper= fçcuses= çn= different= mçdelling= apprçaches= tç= sçilJstructure= interactiçn= in= the= Pa= finite=element=analysis=çf=settlementJinduced=damage=çn=buildingsK=pettlementJinduced= damage= çn=histçrical=structures=can=be=a= relevant=cçnsequence= çf= excavatiçns= in=urban=areasK=kumerical=analyses=adçpted=tç=predict=the=pçtential=damage=need=tç=take=intç=accçunt=the=influence=çf=the=sçilJstructure=interactiçnI=which=includes=the=fçundatiçn=respçnseK==fn=case=çf=pile=fçundatiçnI=the=mçst=detailed=methçd=cçnsists=çf=using=sçlid=elements=fçr=the=piles=and=plane= interfaces= tç= represent= the= sçilJpile= interactiçnK= Because= çf= the= need= tç= match= the= pile= and=interface=element=faces=with=the=sçil=element=facesI=this=apprçach=implies=a=cçmplex=mesh=generatiçn=prçcess;=furthermçreI=a=great=cçmputatiçnal=expense=is=requiredI=due=tç=the=large=number=çf=elementsK=fn=this=paperI=twç=simplified=mçdelling=apprçaches=are=cçmparedK=qhe=first=is=based=çn=the=use=çf=Pa=embedded= beam= elements= with= interface= slip;= this= allçws= simplificatiçn= çf= the= meshI= withçut=neglecting=impçrtant=aspects=çf=the=sçilJpile=behaviçurK=bvery=single=pile=is=still=mçdelled=explicitlyK=fn=the= secçnd= apprçachI= the= piles= are= ±smeared”= tç= hçrizçntal= interface= elements= with= equivalent= nçnJlinear=behaviçur=tç=represent=the=sçilJstructure=interactiçnK=Bçth=çf=the=methçds=are=applied=tç=the=analysis=çf=a=masçnry=structure=subject=tç=tunnelling=in=sçft=sçilK=A=crack=mçdel=is=adçpted=fçr=the=buildingI=and=the=tunnelling=advanced=is=simulated=thrçugh=a=stage=analysisK=oesults=are=cçmpared=in=terms=çf=structural=damage=and=the=feasibility=çf=the=twç=mçdelling=strategies= is= evaluatedK= ft= is= shçwn= that= the= selected= mçdelling= apprçach= affects= the= way= the= sçil=settlements=are=transferred=tç=the=structure=and=significantly=influences=the=predicted=damageK==heywordsW= aamage=assessmentI=kumerical=analysisI=coundation=modelling===N. fkTolarCTflk =qhe=rapid=develçpment=çf=cçmputatiçnal=mçdelling=techniques=and=cçmputer= facilities=has= made=the=use=çf=numerical=simulatiçn=fçr=structural=assessment=mçre=accessibleK=Pa=cinite=blement=jçdels=are=particularly=suitable=tç=analyze=the=effect=çf= tunnellingJinduced=settlement=çn=surface=structuresK=qhe=cçupled=analysis=çf=sçilI=building=and=tunnel=and=the=use=çf=nçnJlinear=material=mçdels=allçw=fçr=the=evaluatiçn=çf= the=main= factçrs= gçverning= the= structural= respçnseK= An=essential= rçle= is= played=by= the=interactiçn= between= the= building= and= the= tunnellingJinduced= settlement= trçughK= A= Pa= fullyJcçupled=cinite=blement=jçdel=with=interface=elements=representing=the=sçilJstructure=interactiçn=EcigK=NcF=was=recently =prçpçsed =xNzK =qhe =interface =element =behaviçurI =defined =in =terms =çf =a =relatiçn =between =the =nçrmal=and=shear=stresses=and=the=nçrmal=and=shear=relative=displacements=acrçss=the=interfaceI=can=be=relatively= easily= adapted= tç= the= shallçw= fçundatiçns= respçnse= EcigK=NbFK= fn= this= paperI= the= specific=feasibility=çf=such=interface=tç=mçdel=pile=fçundatiçn=EcigK=NaF=is=investigatedK=mile=fçundatiçns=can=be=mçdelled=in=detail=by=means=çf=sçlid=elements=with=plane=interface=cçnnected=with= the= sçlid= sçil= elementsK= qhe= disadvantage= çf= this= apprçach= is= the= cçmplex= and= fine= mesh=generatiçn=that=is=required=tç=match=the=nçdes=çf=the=pile=and=the=sçil=elements=EcigK=OaFK=qhis=results=in=

================================================N=jpcI=aelft=rniversity=çf=qechnçlçgyI=gKgiardina]tudelftKnl=O=jpcI=para=BçldriniI=papienza=rniversity=çf=oçmeI=saraKbçldrini]hçtmailKit=P=arI=aelft=rniversity=çf=qechnçlçgyI=mKaKnKhendriks]tudelftKnl=4=mrçfI=aelft=rniversity=çf=qechnçlçgyI=jKgKrçts]tudelftKnl=

Page 2: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4T4=

a=time=cçnsuming=analysisI=bçth=in=terms=çf=preJprçcessing=and=calculatiçnK=qhe=use=çf=Pa=embedded=beam=elements=with=interface=slip=represents=a=valid=alternative=tç=this=apprçach=xOzI=because=the=piles=can=be=added=tç=an=existing=sçil=mesh=withçut=affecting=its=structure=EcigK=ObFK=qhe=present=study=aims=tç=a=further=simplificatiçnI=by=including=the=nçnJlinear=pile=fçundatiçn=respçnse=in=the=prçperties=çf=an=hçrizçntal=interface=EcigK=OcFK=qhe=specific=case=çf=an=histçrical=autch=building=çn=wççd=fçundatiçn=is=analyzedK= cirstI= lçad= displacement= curves= in= vertical= and= hçrizçntal= directiçns= fçr= a= single= pile= are=analytically=derivedK=qhenI= the=perfçrmance=çf=a= single=embedded=beam=and=an=equivalent= hçrizçntal=interface=is= evaluated=in= terms=çf=displacementsK=cinallyI= the=twç=different=apprçaches=are=applied=tç=a=Pa= analysis= çf= a= masçnry= building= subject= tç= tunnellingJinduced= settlementI= bçth= in= terms= çf=displacement=and=final=structural=damageK==

aF== bF== cF==

cig. N EaF=pile=fçundatiçnI=EbF=shallçw=fçundatiçns=and=EcF=hçrizçntal=interface=mçdel==

aF==== bF==== =cF=

cig. O=mile=fçundatiçn=mçdellingW=EaF=sçlid=elements=with=plane=interfacesI=EbF=embedded=beams=elements=with=interface=slip=and=EcF=hçrizçntal=interface=elements=

=cçne=resistance

NM=jmasurface

JR=m

JNM=m

aep

th

JNR=m

sçft=

sçil

bear

ing=

stra

tum

fill

=

=

M

OM

4M

SM

JMK4 JMKO M MKO MK4 MKSsertical=displacement=w =EmmF

ser

tical

=lçad

=mv=

Ekk

F

mv

w

M

O

4

S

U

NM

M R NM NR OM OR PMeçrizçntal=displacement=u =EmmF

eçr

izçn

tal=l

çad=

m h=Ek

kF

mh u

aF=================================================================bFcig. P pçil=stratigraphy=and=

cçne=penetratiçn=test=xPz=cig. 4 içad=displacement=curves=fçr=vertical=EaF=and=hçrizçntal=EbF=lçads=

Page 3: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4TR=

O. arTCe mfib clrkaATflk =fn= this= wçrk=a= masçnry=building=representative=çf=an=histçrical=autch=hçuse=çf= the=NTth=century= is=cçnsidered=EcigK=NaFK=A=wççden=pile=fçundatiçn= is=driven=in=the=first=sand=layer=tç=a=depth=çf=NM=m=EcigK=PFK=içad=displacement=curves=fçr=the=vertical=and=hçrizçntal=resistance=çf=a=single=pile=are=derived=using=analytical=methçds=cçmmçnly=accepted=in=practiceK=qhe=inherent=simplificatiçns=çf=these=methçds=dç=nçt= affect= the= scçpe= çf= this= studyW= bçth= embedded= beam= and= interface= element= apprçaches= will= be=evaluated=çn=the=basis=çf=the=references=curvesK==O.N. sertical loads qhe=ultimate=bearing=capacity=nu=çf=a=single=pile=is=generally=calculated=as=sum=çf=the=tçe=resistance=nt=and= the=shaft= resistance=nsK =nt= and= ns= are= derived= frçm= the=undrained=shear= strength= cu= çf =the =sçilI =using=the=tçtal=stress=methçd=x4zK=qhe=tçe=resistance=is=given=byW=== nt===Ap Nc cu===OPK4=kma= =ENF=

=there=Ap===MKOS=mO=is=the=pile=crçss=sectiçn=areaI=kc=is=the=bearing=capacity=factçrI=usually=taken=as=V=fçr=deep=fçundatiçnsI=and=cu=is=determined=using=the=cçne=penetratiçn=test=dataW==

= M NM kmas-

= =c vu

qc

k= =EOF=

=fn=bquatiçn=EOFI=qc=is=the=minimum=cçne=end=resistance=prçfile=value=EcigK=PFI=svM=is=the=tçtal=vertical=stress=and=k===OM=is=an=empirical=cçefficientK=qhe=shaft=resistance=isW= = ns===p a=i=a cu===RTKN=kk= =EPF==where=a===MKNUO=m=is=the=pile=diameterI=i===NM=m=is=the=pile=lengthI=a= is= the=empirical=adhesiçn=factçrI=equal= tç= N= fçr= the= calculated= value= çf= cu= x4zK =aue =tç =the =fact =that =the =shaft =and =tçe =resistance =dç =nçt =simultaneçusly=cçexistI=because=they=are=mçbilized=at=different=çrder=çf=displacement=magnitudeI=and=that=the= analyzed= pile= dçes= nçt= reach= the= cçnsistent= base= layerI= it= is= assumed= that= in= this= case= the= pileJlçad=bearing=capacity=depends=entirely=çn=the=shaft=resistanceK=qhe=lçad=displacement=curve=under=vertical=lçad=is=calculated=using=the=apprçximate=analytic=methçd=xRzK=qhe=displacement=çf=the=pile=shaft=is=given=byW==

=M

lnO

s m

s

n rwi d rp r

æ ö= ç ÷

è ø= =E4F=

=where= rM= is =the =pile =radiusI =ds= == NKVO= ×= NM4= kma= is= the= sçil= shear= mçdulusI= rm= == OKR= i= r= ENJnFI=n = 0.3 is the mçissçn’s=ratiç=çf=the=sçil=and=r===NK=cigK=4a=shçws=the=vertical=lçad=displacement=curveK=qhe=curve=gradient= represents=the=pile=stiffness=kvI=equal=tç=OKOV=×=NMR=kma=K=qhe=dçtted=line=represents=the=ultimate=bearing=capacity=nu===nsK=A=nçJtensiçn=criteriçn=is=assumedK=

=O.O. eorizontal loads qhe=characteristic=methçd=xSz= is=applied=tç=estimate= the= lateral=deflectiçns= in=single=fixedJhead=piles=under=lateral=lçadsK=qhe=characteristic=lçad=is=defined=asW==

= ( ) ( )ON RM

N

RRKTU kks

eæ ö

= =ç ÷è ø

mnp

cm c a b ob o

= =ERF=

=where=c===NI=b===NKR=×=NMT=kma=is=the=vçung’s=mçdulus=çf=the=pileI=oN===NI=sp===4.2 cuI=eRM===MKMM4I=m===MKSUP=and=n===JMKOO=fçr=clayK=qhe=displacement=u=fçr=different= levels=çf=lçad=mh=is=derived=using=the=equatiçnW==

=b

h

c

mu aa m

æ ö= ç ÷

è ø= =ESF=

=where=a===N4I=b===NKU4S=fçr=clay=xTzK=qhe=hçrizçntal=lçad=displacement=curve=is=shçwn=in=cigK=4bK=

Page 4: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4TS=

bmbedded==pile=element=

M

R

NM

NR

JMK4 JMKO M MKO MK4 MKSsertical=displacement=w =EmmF

phea

r=stre

ss= t

p=Ek

maF

tp

w

=

MMKR

NNKR

OOKR

P

M R NM NR OM OR PMeçrizçntal=displacement=u =EmmF

kçr

mal

=stre

ss=s

p=Ek

maF

P sp

=

mv

mh

==fnterface==element=

M

OM

4M

SM

JMK4 JMKO M MKO MK4 MKSsertical=displacement=w =EmmF

kçr

mal

=stre

ss= s

i=Ek

maF

wti

bF=

M

O

4

S

U

NM

M R NM NR OM OR PMeçrizçntal=displacement=u =EmmF

phea

r=stre

ss= t

i=Ek

maF

u

si

cF=

mv

mh

=dF=

==

aF

cig. R=EaF=blement=tçpçlçgyI=EbIcF=cçnstitutive=laws=and=EdF=finite=element=mçdel=çf=single=embedded=beam=and=interface=elementsK=

=P. pfkdib bibMbkT bsAirATflk =bmbedded=beam=elements=are=incçrpçrated=in=the=sçil=elements=EcigK=RaF=and=they=interact=with=the=sçil=thrçugh= nçrmal= and= shear= behaviçur= çf= an= interface= EcigK=RbI=RcFK= rsing= as= reference= the= lçadJdisplacement= curves=derived=fçr= a= single=pileI= the=perfçrmance=çf=a= Pa=embedded=beam=element= with=interface=is=evaluatedK=A=decçupled=analysis=is=perfçrmedW=the=finite=element=mçdel=çf=a=single=embedded=beam=under=vertical=lçad=is=used=tç=evaluate=the=equivalent=stiffness=çf=the=elementI=while=frçm=the=same=mçdel=subjected=tç=hçrizçntal=lçad=the=nçrmal=stiffness=is=çbtained=EcigK=RdFK=Alsç=the=behaviçur=çf=the=hçrizçntal= interface= elements= is= described= in= terms= çf= relatiçns= between= the= nçrmal= and= tangential=stresses=and=the=relative=vertical=and=hçrizçntal=displacements=acrçss=the=interface=EcigK=RbI=RcFK=aue=tç=the=element= tçpçlçgy= EcigK= RaFI= in= this= case=a= vertical= lçad= is= applied= tç= evaluate= the=nçrmal= interface=behaviçurI=while=the=hçrizçntal=lçad=is=used=tç=calibrate=the=shear=stress=transfer=EcigK=RdFK==

JNM

NM

PM

RM

TM

JMK4 JMKO M MKO MK4 MKS

sertical=displacement=w =EmmF

ser

tical

=lçad

=mv =

Ekk

F

mv

bs===RbHT

bs===RbHU

bs===RbHV

analytical=curve

aF=

MO4SU

NMNON4NS

M R NM NR OM OR PM

eçrizçntal=displacement=u =EmmF

eçr

izçn

tal=l

çad=

mh=Ek

kF

mh

bs===RbHT

bs===RbHU

bs===RbHV

analytical=curve

bF=

JNM

NM

PM

RM

TM

JMK4 JMKO M MKO MK4 MKSsertical=displacement=w =EmmF

ser

tical

=lçad

=mv =

Ekk

F

mv

cF=

MO4SU

NMNON4NS

M R NM NR OM OR PM

eçrizçntal=displacement=u =EmmF

eçr

izçn

tal=l

çad=

mh=Ek

kF

mh

dF=

cig. S=içad=displacement=curves=fçr=EaIbF=a=single=embedded=pile=and=EcIdF=a=single=interface=element===P.N. sertical loads cigK= Sa= shçws= the= lçad= displacement= curves= in= vertical= directiçn= fçr= the= single= embedded= beamI=assuming=fçr=the=shear=stiffness=ksIpile===kv=L=Ep=a=iF===RKPS=×=NM4=kkLmPK=qhe=analytically=derived=value=includes= the= sçil= stiffness= influenceI= while= in= the= cbj= the= sçil= is= explicitly= mçdelledK= qherefçreI=

Page 5: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4TT=

a=sensitivity=analysis= is= perfçrmed=tç= evaluate=the=effect= çf= sçil=stiffness= variatiçnK= oesults= shçw=that=fçr= high= interfaceLsçil= stiffness= ratiçs= the= interactiçn= can= be= entirely= represented= by= the= interface=cçnstitutive= lawK= qhe= same= cçnclusiçn= can= be= drawn= frçm= the= analysis= çf= the= vertical= lçadJdisplacement=curve=fçr=the=single=interface=element=with=unit=area=AinterfI=where=the=equivalent=nçrmal=stiffness=çf=the=element=is=calculated=as=knIinterf===kv=L=Ainterf===OKOV=×=NMR=kkLmP=EcigK=ScFK==P.O. eorizontal loads rsing=a=similar=apprçachI= the=equivalence=in=terms=çf=glçbal=stiffness=fçr=bçth=the=embedded=pile=and=the=interface=elements=can=be=derived=in=the=hçrizçntal=directiçn=EcigK=SbI=SdFK=fn=this=caseI=the=lçwest=value=çf=sçil=stiffness=assumed=in=the=sensitivity=analysis=is=high=ençugh=nçt=tç=affect=the=resultsK===

aF=

phase 0

phase 5

phase 10 bF= cF

cig. T=EaF=deçmetry=çf=the=Pa=finite=element=mçdel;=EbF=tunnel=advance=in=the=stage=analysis;=EcF=mçdel=with=embedded=pile=beam=elements=and=interface=elements=xUz=K=aimensiçns=are=in=mK=

=4. Pa Clrmiba Mlabi =

fn= this= sectiçn= the= twç= pile= fçundatiçn= mçdelling= apprçaches= are= applied= tç= a= fully= cçupled= finite=element=analysis=çf=a=tunnel=excavatiçn=in=sçft=sçilK=qhe=main=features=çf=the=adçpted=mçdel=areW=

– Pa=representatiçn=çf=buildingI=tunnel=and=sçil=EcigK=TaF;=– ptaged=simulatiçn=çf=the=tunnelling=prçcess=EcigK=TbF;=– rse=çf=smeared=cracking=mçdel=with=tensiçn=sçftening=tç=represent=the=masçnry=building=damage=

prçgressiçn;=– fnclusiçn=çf=nçnJlinear=interactiçn=between=the=sçil=and=the=structure=Eembedded=beam=çr=

hçrizçntal=interface=elementsI=as=shçwn=in=cigK=TcK=curther=details=abçut=the=mçdel=and=the=material=parameters=can=be=fçund=in=xNzK=cigK=U=shçws=the=cçmparisçn=between=the=glçbal=behaviçur=çf=the=mçdel=with=embedded=beams=and=the=mçdel= with= interface= elementsK= qhe= verified= equivalence= in= terms= çf= vertical= and= hçrizçntal= lçadJdisplacement=curves=at=the=structure=base=is=the=required=assumptiçn=fçr= the=further=evaluatiçn=çf=the=building=respçnse=tç=tunnellingK= Aim=çf= the=cçmparisçn=between=the=tunnelling=induced=defçrmatiçn=and=the=final=damage=çf= the=twç=mçdels= is=a=better= insight= intç=the=effect=çf=fçundatiçn=mçdellingK= fn=particularI=the=difference=in=term=çf=settlement=prçfile=transmitted=frçm=the=sçil=tç=the=structure=will=be=evaluatedK=By=assuming=the=relatively=high=value=çf=sçil=stiffness=required=tç=lçcalize=the=sçilJstructure=interactiçn=at=the=interface=level=EcigK=ScFI=the=grçup=effect=çf=pile=fçundatiçn=is=neglectedK===

sertical=lçads= eçrizçntal=lçads=

JN

NMMM

OMMM

PMMM

JN JMKR M MKR Nsertical=displacement=w =EmmF

ser

tical

=lçad

=mv=

Ekk

F

mv

bmbedded=pile=elementsfnterface=elements

aF=

M

ORM

RMM

TRM

NMMM

M OR RM TR NMM

eçrizçntal=displacement=u =EmmF

eçr

izçn

tal=l

çad=

mh=Ek

kF mh

bmbedded=pile=elementsfnterface=elements

bF=

cig. U=içad=displacement=curves=fçr=the=cçmpared=mçdels=in=EaF=vertical=and=EbF=hçrizçntal=directiçn=

Page 6: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4TU=

JTM

JRM

JPM

JNM

NM

PM

JNMM JRM M RM NMM

eçrizçntal=cççrdinate=EmF

ais

plac

emen

t=Em

mF

serticaleçrizçntal

aF=

J4M

JOM

M

M OM 4M SM UM NMM

eçrizçntal=cççrdinate=EmF

ais

plac

emen

t=Em

mF

mhase=Rmhase=Umhase=NMmhase=NOmhase=NR

bF=

cig. V=qunnelling=induced=greenfield=mçvements=at=surface=levelW=EaF=transverse=vertical=and=hçrizçntal=displacement;=EbF=develçpment=çf=lçngitudinal=settlement=with=the=tunnel=advance=

R. obpriTp Aka afpCrppflkp =cigK= Va= shçws= the= greenfield= hçrizçntal= and= vertical= displacements= çbtained= at= the= surface= level= as=cçnsequence= çf= the= tunnel= excavatiçnI= as= a= functiçn= çf= the= hçrizçntal= distance= tç= the= tunnel= axisK=cigK=Vb=illustrates= the=effect=çn=the=settlement=prçfile=çf= the=tunnel=advance=in= lçngitudinal=directiçn;=the=reference=sectiçn=is=in=the=sagging=zçne=at=–NPKS=m=frçm=the=tunnel=axisK=

=

aF == bF == cF==

cig. NM=jçdel=with=embedded=beam=elementsW=EaF=vertical=and=hçrizçntal=grçund=displacement=transferred==tç=the=building;=EbF=principal=strain=cçntçur=plçt=at=phases=NO=and=OM;=EcF=crack=pattern=at=phases=NO=and=OM=

=

==== = aF=================================================================bF=================================================================cF===

==cig. NN=jçdel=with=equivalent=interface=elementsW=EaF=vertical=and=hçrizçntal=grçund=displacement=transferred==

tç=the=building;=EbF=principal=strain=cçntçur=plçt=at=phases=NO=and=OM;=EcF=crack=pattern=at=phases=NO=and=OM=

=

=== == === == =aF=================================================================bF=================================================================cF===

===cig. NO=jçdel=with=smççth=interface=elementsW=aF=vertical=and=hçrizçntal=grçund=displacement=transferred==tç=the=building;=EbF=principal=strain=cçntçur=plçt=at=phases=NO=and=OM;=EcF=crack=pattern=at=phases=NO=and=OM=

=fn=cigK=NN=the=results=çf=the=cçupled=analysis=fçr=the=mçdel=with=the=hçrizçntal=interface=elements=are=presentedK=qhe=maximum=principal= strains= and= the= crack=pattern= çf= the= frçnt= façade= EcigK=NNbI=NNcF=highlight=the=damage=mechanism=develçping=during=and=after=the=tunnel=cçnstructiçnK=fn=the=assumed=sagging=zçneI= the=façade=is=subject= tç=a=dçwnwards=deflectiçn=with=develçpment=çf= tensile=strains=at=the=baseK=qhusI=the=cracks=start=at=the=lçwer=part=çf=the=structure=and=then=prçpagate=tç=the=upper=partK=

Page 7: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4TV=

A=certain=amçunt=çf=diffuse=damage=is=due=tç=the=interface=shear=stiffnessI=acting=as=hçrizçntal=restrain=EcigK= NNaFK= qhe= last= effect= is= gçverning= the= respçnse= when= the= pile= fçundatiçn= is= mçdelled= by=embedded= beam= elements= EcigK= NMFK= qhese= elements= transfer= tç= the= structure= a= settlement= prçfile=lçcated= at= deeper= levelI= where= the= magnitude= çf= bçth= vertical= and= hçrizçntal= displacements= in= the=transversal=directiçn=is=greaterK= fn=the=sagging=caseI=the=lateral=restrain=prçvides=a=cçmpressiçn=at=the=façade=base;=the=cçmpressive=strains=çverrule=the=tensile=strains=generated=by=the=building=deflectiçnI=significantly=reducing=the=extensiçn=çf= the=damageK=qhe= impact= çf= this= effect=becçmes=clearer= if= the=same=analysis= is= perfçrmed=çn=a= building= mçdel= with= interface= elements= characterized=by= negligible=shear=stiffness=Esmççth=interfaceI=cigK=NOFK=cigK= NPa= shçws= a= quantitative= cçmparisçn= between= the= three= analyzed= cases= in= terms= çf= maximum=crack=widthI= which= is= an= indicatçr= çf= the=glçbal=damageK=qhis= value= increases=significantly= frçm=the=maximum=level=çf=hçrizçntal=restrain=Eembedded=beamsF=tç=the=negligible=transfer=çf=hçrizçntal=strain=Esmççth=interfaceFK==qhe=results=çf=the=numerical=analysis=are=then=cçmpared=with=the=damage=assessment=accçrding=tç=the=iimiting=qensile=ptrain=jethçd=xVI=NMzI=a=simplified=analytical=prçcedure=cçmmçnly=used=in=practice=fçr=the=preliminary=damage=classificatiçnK=qhe=iqpj=methçd=cçnsists=in=a=Oa=decçupled=sçilJstructure=analysis=in=which=the=structure=is=mçdelled=as=a=linear=elastic=beamK=fnput=data=and=results=are=listed=in=qable=NK=qable=O=shçws=the=relatiçn=between=the=iqpj=çutput=and=the=expected=level=çf=damageK=cçr=the =analyzed =situatiçnI =the =iqpj =predicts =a =slight =damage =levelK =qhe =numerical =analysis =shçws =a =larger= range= çf= pçssible= resultsI= depending= çn= the= mçdelling= apprçach= and= the= interface= parameters=adçpted=tç=simulate=the=sçilJstructure=interactiçn=EcigK=NPbFK=cield=measurements=shçwed=thatI=in=case=çf=cçntinuçus=fççtingsI=the=hçrizçntal=strains=transmitted=tç=the=structure=are=significantly=lçwer= than=the=greenfield=çnes=xNNzK=Cçnsidering=the=strçng=effect=çf= fçundatiçn=mçdelling=çn= the=final=damage=assessmentI=further=field=and=experimental=investigatiçns=are=requiredI=especially=çn=pile=fçundatiçnI=tç=verify=the=damage=assessment=prçceduresK=

=

M

R

NM

NR

OM

OR

M R NM NR OMqunelling=phase

Crac

k=w

idth

=Emm

F

embedded=pilesrçugh=interfacessmççth=interfaces

==aF=

embedded=piles

rçugh=interface

smççth=interfaces

iqpj

M

R

NM

NR

OM

OR

Crac

k=w

idth

=Emm

F

VERY SLIGHT DAMAGE

SLIGHT DAMAGE

MODERATE DAMAGE

SEVERE DAMAGE

bF==

cig. NP=EaF=jaximum=crack=width=as=functiçn=çf=the=tunnel=advanceW=cçmparisçn=between=the=different=mçdelling=apprçaches;=EbF=damage=classificatiçnW=cçmparisçn=between=iqpj=and=numerical=results=

=S. ClkCirpflkp =fn=this= paperI= the=prçblem=çf=mçdelling=pile=fçundatiçn= in=Pa= finite=element= analysis= çf= tunnellingJinduced= damage= tç=building= is= addressedK= qwç= different= mçdelling= apprçaches= are= analysedW=use=çf=embedded=beam=elements=with=nçnJlinear= interfaces=and=use=çf=nçnJlinear= hçrizçntal= interfaces=with=equivalent=prçpertiesK= oesults= shçw=that= bçth= the=sçlutiçns=are=able=tç=represent= the=nçnJlinear= lçad=displacement=curves=at=the=surface=levelI=in=vertical=and=hçrizçntal=directiçnsK=qhe= twç= mçdels= are= then= applied= tç= a= Pa= stage= analysis= çf= a= tunnel= excavatiçn= in= sçft= sçil= under=a=masçnry=buildingK=A=tçtal=strain=rçtating=crack=mçdel= is=assumed=fçr= the=buildingI=and=the=effects=çf=tunnellingJinduced=settlements=are=cçmpared=in=terms=çf=prçgressive=structural=damageK=qhe=different=settlement=prçfile=transferred=frçm=the=sçil=tç=the=structure=by=the=embedded=beams=and=the=interface=elements=plays=a=fundamental=rçle=in=the=building=respçnseW=whereas=the=mçdels=give=similar=results=fçr=applied=test=lçads=at=the=pile=headsI=the=mçdels=significantly=give=different=results=fçr=the=actual=lçading=cçnditiçn=çf=distributed=sçils=settlementsK=oesults=shçw=that=the=actual=behaviçur=çf=the=fçundatiçn=is=essential=tç=calibrate=the=parameters=çf=bçth=apprçaches=fçr=numerical=mçdellingK=

Page 8: mfibclrkaflkfkPalabiifkd lcrfiafkdadbarblpbibbk · TS= bbedde= = =elemen= M R NM NR JMK4 JMKO M MKO MK4 MKS sertic=isplac= w=EF p=stres= p t =EmF tp w = M MKR N NKR O OKR P M R NM

4UM=

Table N=iqpj=input=data=and=results==

Table O=iqpj=damage=classificatiçn=eeight= NNKR= m=iength= NPKS= m=

aeflectiçn= MKMNO4= m=Bending=and=shear=

stiffness=ratiç=EbLdFN=OKS=EbLdFO=NN= =

jaximum=bending=strain=EbLdFN=

MKNN4= B=

jaximum=diagçnal=strain=EbLdFN=

MKMSR= B=

jaximum=bending=strain=EbLdFO=

MKMPS= =

jaximum=diagçnal=strain=EbLdFO=

MKMU4= B=

qçtal=tensile=strain=EbLdFN=

MKNN4= B=

qçtal=tensile=strain=EbLdFO=

MKMU4= B=

aamage=class= plight= ==

Category of damage

aamage class

Approximate crack width

EmmF

iimiting tensile

strain EBF

Aesthetic=damage=

kegligible= up=tç=MKN=mm= M=J=MKMR=sery=slight= up=tç=N=mm= MKMR=J=MKMTR=

plight= up=tç=R=mm= MKMTR=J=MKNR=

cunctiçnal=damage=

jçderate=R=tç=NR=mm=çr=a=

number=çf=cracks=[=P=mm=

MKNR=J=MKP=

pevere=NR=tç=OR=mmI=but=alsç=depends=çn=

number=çf=cracks=[=MKP=

ptructural=damage= sery=severe=

usually=[=OR=mmI=but=depends=çn=

number=çf=cracks=[=MKP=

=

==obcbobkCbp xNz diardina= dKI= eendriks= jKAKkKI= oçts= gKdK= EOMNMF= kumerical= analysis= çf= tunnelling= effects= çn=

masçnry=buildingsW=the=influence=çf=tunnel=lçcatiçn=çn=damage=assessmentK=Advanced=Materials=oesearch=NPPW=OUVJOV4K=

xOz bngin=eKhKI=Brinkgreve=oKBKgKI=Bçnnier=mKdKI=peptanika=bKdK=EOMMVF=jçdelling=piled=fçundatiçn=by= means= çf= embedded= pilesK= deotechnics=of=poft= poilsW=cocus=on= dround= fmprovementK= mrocK=2nd=fnternational=torkshopI=dlasgçwI=pcçtlandI=qaylçr=C=crancisI=NPNJNPSK=

xPz qçlI=AKcK=van=ENVVVF=fnteractiçn=between=existing=and=newly=added=pilesK=fn=serhçefI=iKdKtK=EedF=mroceedings= of= the= international= congress= on= rrban= heritage= and= building= maintenanceK=mublikatieburç=BçuwkundeI=aelftI=NMPJNNPK=

x4z qçmlinsçnI=jK=gK=ENVUMF=cçundatiçn=aesign=and=CçnstructiçnI=cçurth=bditiçnI=mitman=Advanced=mublishing=mrçgramK=

xRz oandçlph= jKcKI= trçthI= mK= ENVTUF= Analysis= çf= defçrmatiçn= çf= vertically= lçaded= pilesK= ApCb=gK=deotechK=bngngK=NM4=ENOFW=N4SRJN4UUK=

xSz auncanI =gK =jKI =bvansI =grKI =iK =qK =and =lçiI =mK =pK =hKI =iateral =içad =Analysis =çf =pingle =miles =and =arilled=phafts=ENVV4F=ApCb=gK=deotechK=bngngK=NOMESFW=NMNUJNMPPK=

xTz BrettmannI=qKI=auncanI=gK=jK=ENVVSFK=Cçmputer=applicatiçn=çf=Cij=lateral=lçad=analysis=tç=piles=and=drilled=shaftsK=gK=deotechK=bngKI=NOOESFI=4VSJ4VUK=

xUz Bçldrini=pK= EOMNNF=aamage=assessment=çf=buildings= including=explicit= sçilJstructure=interactiçnI=jaster=thesisI=papienza=rniversity=çf=oçmeK=

xVz Burland=gK=mK=ENVT4F=pettlement=of=buildings=and=associated=damageI=mentech=mressI=CambridgeK=xNMz Bçscardin= jK= aKI= Cçrding= bK= dK= ENVUVF= Building= respçnse= tç= excavatiçnJinduced= settlementI=

gournal=of=deotechnical=bngineering=NNRENFW=NJONK=xNNz jairI= oKg= EOMMPF= oesearch= çn= tunnellingJinduced= grçund= mçvements= and= their= effects= çn=

buildingsJlessçns=frçm=the=gubilee=iine=bxtensiçnK=fnW=qhe=Conference=on=oesponse=of=Buildings=to=bxcavationJfnduced=dround=MovementsI=PJOSK=

==