8/12/2019 MEVA prezentare
1/28
ReferencesCivil Engineering
-
8/12/2019 MEVA prezentare
2/28
DIN 18218
B E
T O
N E R S T
A R
R U
N G
C
O
N C
R E
T E
S E T T I N G
S O
L I
D I
F I
C A T
I
O N
2
Leading the way in concrete standardsMEVA has been instrumental in redening the
European DIN 18218 Standard for concretepressure to take account of new concretemixtures such as self-compacting and owableconcrete. A new procedure to determine howconcrete pressure will develop during each pouris based on MEVA know-how and will be part ofthe new standard.
Replacing the knead-bag test:Measuring device SolidCheck
calculates concrete setting timeWhen has the concrete set? When can theformwork be stripped? These questions,up to now, had to be answered literallyby rule of thumb using a knead-bag andpushing a thumb into the concrete. Thisuncertain technique is now redundant,replaced by a computer-aided ultrasonicmeasuring technology that ascertains theexact setting time as required for instanceby the German standard DIN 18218. Thisallows the site to safely and fully utilisethe formworks load capacity.
MEVA Formwork Systems is once again enhanc-ing its portfolio of expertise and know-how
by offering this technology to the contractorcommunity. In addition calculation tools forfresh concrete pressure are available online. Goto www.meva-international.com to downloadthem.
Benet also from the mobile app.
-
8/12/2019 MEVA prezentare
3/28
MEVA MEVA
3
Civil Engineering: Contents
More than justFormworkKnow-how for your building successFrom the beginning, it has been MEVAsphilosophy to offer added value in the formof know-how and expertise beyond supply-ing high-quality formwork. This far-reachingpromise has been redeemed impressively formany years.
Leaders in the eldCommittee and industry standards work has ahigh priority because it is essential to furtherexpertise in concrete works. This is where qual-ity and safety standards are dened and imple-mented. The German quality control association(GSV) nominated MEVA to chair the technologycommittee; MEVA ist part of the inuential,internationally active American ConcreteInstitute and its formwork committee and werea member of the ASCC (American Society ofConcrete Contractors) to name only a few.
MEVA is acclaimed as an innovative leader in the formwork industry, underlined by severalawards, distinctions and commendations for quality and service.
MEVAMEVA: More than just formwork .................................................................................................... 2Solutions in Civil Engineering .......................................................................................................... 4Technology in Civil Engineering ....................................................................................................... 6Quality Concrete Finish ................................................................................................................... 8MEVA International / Addresses and contacts ................................................................................ 26
REFERENCES
Power PlantsMoorburg power plant, Hamburg, Germany ................................................................................. 10Hydropower plant Linthal 2015, Switzerland ................................................................................. 11
WaterworksLauenburg watergate, Germany .................................................................................................... 12Deurganckdok, Antwerpen, Belgium ............................................................................................. 13Dam and Tunnel, St. Petersburg, Russia ......................................................................................... 14Klingenberg Dam, Germany .......................................................................................................... 15
TransportBjorvika/Sorenga Tunnel, Oslo, Norway ......................................................................................... 16Canal crossing, Minden, Germany ................................................................................................. 17
TGV rail link, Mulhouse, France ..................................................................................................... 18Henndorf tunnel, Austria .............................................................................................................. 19
InfrastructureDultenaugraben bridge, Rheinfeldn, Germany ............................................................................... 20M6 motorway bridge, Budapest, Hungary ..................................................................................... 21Al Saadiyat Island, Abu Dhabi, United Arab Emirates ..................................................................... 22National enrichment facility, Eunice, New Mexico, USA ................................................................. 23Tunnel for connecting canal, Senftenberg, Germany ..................................................................... 24Bradford College, Great Britain ..................................................................................................... 25
-
8/12/2019 MEVA prezentare
4/28
4
Cost Efciency, Safety, QualityCivil engineering construction:A welcome challengeBeing special makes them special. Their size or
span, their height or volume: Large industrialfacilities, bridges, tunnels, reservoirs, waterworksor power plants are a challenge to the formworkengineer. Without their inventiveness and theendeavour to make possible what seemed impossi-ble, many a structure would not have been pouredor differently so. As in other cases too, it is the
search for the technically feasible, economi-cally viable and practically sensible solutionthat makes the difference
Based on MEVAs comprehensiveproduct range for civil engineeringconstruction, the best solution foryour project will be found. We are atyour side to develop clever answersand support you in all formworkchallenges.
Engineering
Work ow planning
Formwork design
-
8/12/2019 MEVA prezentare
5/28
MEVA MEVAMEVAUnternehmensprol & berblick
5
Solutions in Civil Engineering
Contractor Benet through ExpertiseKnow-how and services
Engineering services Formwork design and application
Support in structural planning Special and customised designs Calculation of fresh concrete pressure and
pour rates Support in optimising work ow and pour
cycles
On-site support Assembly service and support
Supervision and training of forming teams
Support in supervising work ow Project engineers on site Support during critical concrete pours
Project management
Customised designs
Logistics
On-site support
-
8/12/2019 MEVA prezentare
6/28
1
2 3
4
6
-
8/12/2019 MEVA prezentare
7/28
MEVA
5 6
7
7
Technology in Civil Engineering
Leadingthe Way
High performance formworkMEVAs product and technology portfolio has adominant position in civil engineering construc-tion. The worlds largest panelised wall form-work system Mammut 350 with the highestconcrete load capacity of 100 kN/m standsfor high-end construction performance. TheSTB 450 is the only support frame whose exten-sions come on top and require no dismantling. Itallows pours up to and beyond 12 m and beingonly 4.50 m deep at the base ts on a truck, nospecial haulage needed. The 100 % wood-free,all-plastic facing handles hundreds of toughpours and high demands on concrete nish. Ortake the shoring tower Space with which hun-dreds of very high columns have been formedat exceptional speed. Or the working scaffoldKLK 230, trusted for its robustness, safety andcomfortable work on the 2.30 m wide platform.And the shoring system MEP guarantees maxi-mum worker safety thanks to its easy assemblyand optimum exibility at different heights andvarying loads.
Mammut 350: heavy-duty wall formwork Shoring tower Space Shoring System MEP Special formwork carriages Special forms Climbing Scaffold KLK 230 Support Frame STB: single-sided forming
over 12 m
1
32
4567
-
8/12/2019 MEVA prezentare
8/28
1
2
3
2
1
1 2
3
21
8
Warranty again
st rotting
Warranty again
st warping
Warranty on
exural rigidity
Warranty against
discoloration
Warranty on U
V resistance
7 Year unlimi
ted usage
The patented all-plastic facing sheet is made of polypropylene (1 and 3), reinforced by an aluminiumfoil (2). The facing is resistant to UV rays, shrinking, swelling, rotting, building chemicals or fungaldecay. It remains stable in any climate or temperature.
The All-Plastic Facing forUnlimited Cycles
The all-plastic facing puts an end toplywood waste in formworkThe introduction of the worlds rst 100%wood-free facing started a new age in form-work. Replacing worn-out plywood sheets isnow a thing of the past. No more waste. Getyour job done without interruptions. No moreunnecessary freight costs, no down-times andno hassles in work ow. No more chemical coat-ings that make disposal dangerous and expen-sive. Less waste means fewer C02 emissions.Besides offering better quality, the all-plasticinnovation saves time and money.
Your advantages No swelling and shrinking Nailable like plywood No re-facing no hidden costs Easy and quick to clean Repairable using the same material Better concrete nish
-
8/12/2019 MEVA prezentare
9/28
MEVA MEVAMEVA
9
Quality Concrete Finish
A superior concrete nish, architectural standards for high demands, constant results from the rst pour to the last, stability in very high, fast pours:The all-plastic facing alkus has achieved a prominent position in engineering construction. Easy cleaning with a high pressure washer or rotation cleanercontributes to a high-quality pour result even in tough on-site conditions.
-
8/12/2019 MEVA prezentare
10/28
10
Moorburg Power Plant, Hamburg, Germany
Complete formworksolution with planningand logistics plus workow support.
ProjectGermanys largest coal power plant projectMoorburg in Hamburg.
MEVA SystemsWall formwork Mammut 350Shoring tower MEP
ContractorWayss & Freytag Ingenieurbau AG
-
8/12/2019 MEVA prezentare
11/28
Mammut 350, STB 450, MEP
A
x p o
A
x p o
11
Hydropower Plant Linthal 2015, Switzerland
Power Plants
ProjectSwitzerlands largest hydropower plant withunderground pumped-storage power plantincluding inlet and outlet gallery in the Alps.
MEVA SystemsWall formwork Mammut 350Support frame STB 450Climbing scaffold KLK 230Working scaffold KAB 190
ConsortiumMarti AGKraftwerk Linth-Limmern AGAxpo AG
Formwork engineeringMEVA Schalungs-Systeme, Seon
Cramped alpine siteconditions, logistics,exceptional concretepressure, work ow.
-
8/12/2019 MEVA prezentare
12/28
12
Lauenburg Watergate, Germany
ProjectConstruction of a new reinforced concretewatergate to replace the old facilities in Lauen-burg on the Elbe-Luebeck canal. Work duringnormal watergate operation.
MEVA Systems Wall formwork Mammut All-plastic facing alkus Support frame STB 450
Consortium Hochtief Construction AG Moelders Baugesellschaft mbH Bauer Spezialtiefbau GmbH
Formwork engineeringMEVA Schalungs-Systeme, Haiterbach
Flowable concrete,10 m high single-sidedpours with very highconcrete pressure.
-
8/12/2019 MEVA prezentare
13/28
Mammut, STB 450
13
Deurganckdok, Antwerp, Belgium
Waterworks
ProjectConstruction of a new 1,360 m quay wall,29.70 m high for the Deurganckdok (tidal dock)in Antwerps container harbour, with no tiesand no joints, applying a unique pilgrim stepmethod.
Foundation base 24 m wide, 6 m high 23.70 m high, 1,360 m long quay wall 17.15 m hohe ankerlose Wand
MEVA Solution Wall formwork Mammut with its load capac-
ity of 97 kN/m and all-plastic facing alkus Special construction: mobile gantry crane
Consortium Cordeel & Aertssen MBG CFG van Laere Dredging International
Formwork engineeringMEVA Schalungs-Systeme, Haiterbach, Germany
Gantry crane reducedlabour costs by 75 %from 0.8 h/m to0.2 h/m.
-
8/12/2019 MEVA prezentare
14/28
RussiaGulf of Finland
Dam
Kronstadt(Island of Kotlin)
St. Petersburg
14
Dam and Tunnel, St. Petersburg, Russia
Formwork planningand logistics, highconcrete pressure,work ow.
Project25.4 km ood dam in the Gulf of Finland out-side St. Petersburg. Construction of 2 locks anda 1.2 km tunnel to the locks. 52,500 sq.metreswith reinforced concrete. Walls up to 1.30 mhigh and 7.55 m thick.
MEVA SystemWall formwork Mammut
Formwork engineeringZAO MosMeva, St. Petersburg
-
8/12/2019 MEVA prezentare
15/28
MEVAMammut, STB 450, alkus
15
Klingenberg Dam, Germany
Waterworks
Special formingframes and climbingsolution using the pro-truding wall anchorsas climbing support.
ProjectComplete renovation of the dam for thedrinking water reservoir Klingenberg nearDresden. Special climbing solution allowingup to 4 jobs to be done simultaneously.
MEVA Systems Special formwork frames Climbing scaffold KLK 230 All-plastic facing alkus Support frame STB 450
ContractorEd. Zueblin AG
Formwork engineeringMEVA Schalungs-Systeme, Haiterbach
-
8/12/2019 MEVA prezentare
16/28
16
Bjorvika/Sorenga, Oslo, Norway
ProjectThe largest trafc infrastructure project in
Norways history. In a tunnel under Oslos citycenter and harbour, the new European road E18will connect the western and eastern part of theOslo bay and thus alleviate the trafc conges-tion on Oslos roads.
MEVA Systems Special formwork design with support frame
STB 450 extended to 7.50 m Wall formwork Mammut 350 Wall formwork StarTec
Formwork engineering
Teknikk AS, Vyenenga
Complete formworktunnel engineering,single-sided solutionsin cramped conditions.
-
8/12/2019 MEVA prezentare
17/28
STB 450, Mammut 350, StarTec
17
Canal Crossing, Minden, Germany
Transport
Intricate formworkplanning with ex-ible use of panels forwalls, slabs, haunches.
ProjectConstruction of a road and railway tunnelunder the Mittellandkanal canal as a rectangularreinforced concrete frame, 15 m wide and 39 mlong.
MEVA Systems Wall formwork Mammut Wall formwork StarTec Girder formwork MevaFlex Shoring tower MEP
ContractorsArge H. F. Wiebe GmbH Co & KG, Achim, andHeinrich Hecker GmbH & Co KG, Bremen
-
8/12/2019 MEVA prezentare
18/28
-
8/12/2019 MEVA prezentare
19/28
Mammut 350, EcoAs, KAB, STB 450
19
Henndorf Tunnel, Austria
Transport
Quick, effective con-crete works: standardpanels combined withspecial forms.
ProjectConstruction of the new Henndorf tunnelincluding ventilation shaft, near Salzburg.
MEVA SolutionSpecial formwork design with support frameSTB 450 and shoring tower MEP
Contractors Wayss & Freytag Ingenieurbau AG Held und Francke Baugesellschaft mbH
Formwork engineeringMEVA Schalungs-Systeme, Pfaffstaetten
-
8/12/2019 MEVA prezentare
20/28
20
Dultenaugraben Bridge, Rheinfelden, Germany
ProjectConstruction of a parallel bridge over theDultenaugraben valley along the motorwayA 98 in south-western Germany
MEVA Systems Climbing platform KLK 230 Wall formwork Mammut Mammut frames with special facing
ContractorPorr Deutschland GmbH
Formwork engineeringMEVA Schalungs-Systeme, Munich
Column head
Footprint
Cross-section
Tapering columnsformed with standardformwork panels plusadaptable inlays acost-effective solution.
-
8/12/2019 MEVA prezentare
21/28
Mammut 3540, KLK 230, Circo
21
M6 Motorway Bridge, Budapest, Hungary
Infrastructure
ProjectNew construction of a bridge for theM6 motorway around Budapest.
MEVA Systems Climbing platform KLK 230 Circular column formwork Circo
ContractorP.A.M. Invest Kft.
Formwork engineeringMEVA Zsalurendszerek, Budapest
Cost-effective form-ing solution, quick,safe climbing, superiorconcrete nish.
-
8/12/2019 MEVA prezentare
22/28
22
Al Saayidat Island, Abu Dhabi, United Arab Emirates
ProjectInfrastructure project on Saadiyat island, 500 moffshore from Abu Dhabi, with water treatmentplants, pumping stations, biological treatmentfacilities etc.
MEVA Systems 3,500 m wall formwork Mammut 350 for
walls up to 9 m high and 80 cm thick
6.60 m high columns poured using thecolumn formwork CaroFalt
ContractorsKhara National LLCCiviltech General Contracting Co. LLCFourth Dimension General Contracting
Formwork engineeringMEVA KHK, Dubai
Changing geometries,great heights, highconcrete pressure,special forms.
-
8/12/2019 MEVA prezentare
23/28
Mammut 350, KLK
23
Infrastructure
National Enrichment Facility, Eunice, New Mexico, USA
ProjectUranium enrichment facility in Eunice,New Mexico
MEVA Systems 12,000 m wall formwork Imperial
(US version of Mammut 350) 4,000 m wall formwork MevaLite
(US twin to the AluFix system) More than 700 climbing scaffolds KLK 230
with slide carriage
Project managementWashington Group
ContractorRust Contractors
Formwork engineeringMEVA Formwork Systems, Springeld, OH
Planning and logis-tics for 16,000 m offormwork and 700 KLKclimbing scaffolds.
-
8/12/2019 MEVA prezentare
24/28
Tunnel for Connecting Canal, Senftenberg, Germany
ProjectTunnel for a canal that connects Lake Senften-berg to Lake Geierswalder in the Lausitz region,eastern Germany.
MEVA Systems Wall formwork 350 with all-plastic facing
alkus Push-pull props SRL Slab forming carriage table with MEP H20 beams Mobile table forms
ContractorEd. Zueblin AG, Dresden
Tapering walls, archi-tectural nish: stand-ard formwork withspecial inlays.
-
8/12/2019 MEVA prezentare
25/28
MEVAMammut 350, MEP
25
Infrastructure
Bradford College, Great Britain
Cramped inner-cityconstruction site, workow, logistics, safeclimbing.
ProjectBuilding site on the campus of Bradford College
MEVA Systems Wall formwork Mammut 350 with all-plastic
facing alkus Climbing platform KLK 230
ContractorGRKC LLP, Bradford
Formwork engineeringMEVA Formwork Systems, Tamworth
-
8/12/2019 MEVA prezentare
26/28
-
8/12/2019 MEVA prezentare
27/28
MEVA
MEVA Asia PacicSingapore, SGP - Singapore
VIBAPetrovce, SLO - Slovenija
MEVA KHKDubai, UAE - United Arab Emirates
MEVA Formwork SystemsSpringeld, OhioUSA - United States of America
UAB MuramedaKaunas, LT - Lietuva
Waiko Engineering WorksPerak, MAL - Malaysia
TeknikkOslo, N - Norge
MEVA BekistingssystemenGouda, NL - Nederland
CorpinsaCuidad de Panam, PA - Panam
PPU PalisanderBialystok, PL - Polska
MEVA Sisteme de cofrajeBucuresti, RO - Romania
ZAO MosMevaMoskva, Sankt-Peterburg, RUS - Rossija
MEVA
MEVA Schalungs-Systeme, Haiterbach, Deutschland
MEVA Formwork Systems, Springeld, Ohio, USA
27
International
-
8/12/2019 MEVA prezentare
28/28
Headquarters (Germany) International Sales & ServiceLogistic Centers
000 3/13 M, Printed in Germany
MEVA Schalungs-Systeme GmbHIndustriestrasse 5D-72221 HaiterbachTel. +49 7456 692-01Fax +49 7456 692-66
A-Pfaffsttten, Tel. 02252 20900-0D-Berlin, Tel. 03375 9030 0D-Haiterbach, Tel. 07456 692-01D-Hannover, Tel. 0511 94993 0GB-Tamworth, Tel. 01827 60217
H-Budapest, Tel. 01 2722222RO-Bucuresti, Tel. 021 2066460RUS-Moskva, Tel. 495 7813737USA-Springeld, Tel. 937 3280022
A-Pfaffsttten, Tel. 02252 20900-0AUS-Adelaide 08 82634377B-Kruibeke, Tel. 03 250 11 11CH Seon, Tel. 062 7697100CDN-Toronto, Tel. 416 5766397
CO-Bogot, Tel. 01 5204236F Sarreguemines, Tel. 0387 959938GB Tamworth, Tel. 01827 60217H Budapest, Tel. 01 2722222HR-Bestovje, Tel 013 323 666IND-Mumbai, Tel. 022 27563430LT-Kaunas, Tel. 0684 82795MAL-Perak, Tel. 12 5209337N-Oslo, Tel. 067 154200NL Gouda, Tel. 0182 570770PA-Panama City 507 2372222PL-Bialystok, Tel. 085 6768159RO Bucuresti, Tel. 0 21 2066460RUS Moskva, Tel. 495 7813737RUS Sankt-Peterburg, Tel. 812 6802890SGP-Singapore, Tel. 67354459SLO-Petrovce, Tel. 03 7131500UAE Dubai, Tel. 04 3411180USA Springeld, Tel. 937 3280022