METROPOLITAN TOPEKA PLANNING …...Project Location N METROPOLITAN TOPEKA PLANNING ORGANIZATION 620...
Transcript of METROPOLITAN TOPEKA PLANNING …...Project Location N METROPOLITAN TOPEKA PLANNING ORGANIZATION 620...
METROPOLITAN TOPEKA PLANNING ORGANIZATION 620 SE MADISON l TOPEKA KS www.topekamtpo.org l 785.368.3728
FOR ADMINISTRATIVE USE ONLY: TIP AMENDMENT # ___________ PROJECT ____ OF _____
Transportation Improvement Program T I P
A M E N D M E N T PROJECT DATA SHEET
EXPENSE SUMMARY
FY PHASE Federal State A.C. Conversion Total Cost 2019 PE 25,000 2019 CONST 37,000 148,000 9/2020 2019 CE 3,000 12,000 9/2020 TOTAL $65,000 160,000 225,000
PROJECT SUMMARY AND JUSTIFICATION:
New to TIP
TAC RECOMMENDATION & COMMENTS:
TAC Review Data:
TAC Comments:
PUBLIC COMMENTS:
Out for Comment: Legal Advertising: Comments Received:
TIP Amendment # TIP #: 1-19-04-3 KDOT#: KA-4942-01 Project Type: Bridge Repair
Requested by: KDOT
Project:
3- inch Asphalt Overlay. Waterproofing Membrane on bridge #046 located on I-470, 0.21 mi. NW of 10th St. in SN Co.
Fiscal Year(s): 2019
Total Project Cost: $225,000
PROJECT TYPES: Transportation Alternative Roadways & Bridges Transit/Paratransit
Project #KA-4942-01 Bridge #046
I 70
10th
6thUr
ish
Huntoon
I 470
4th
9th
12th
Vitt 11th
Birch
Arvon
ia
Wana
make
r
Pin Oak
Winding
priva
te
Maple
River Hill
Gail
Geral
d
Valley View
Comm
erce
OLD VINEYARD
Henderson
Corpo
rate V
iew
Red O
aks
Marge
Eagle Ridge
Murray Hill
BROADVIEW
Executive
Cabana
I 70
9th
12th
6th
Wana
make
r
Wind
ing
Project LocationN
METROPOLITAN TOPEKA PLANNING ORGANIZATION 620 SE MADISON l TOPEKA KS www.topekamtpo.org l 785.368.3728
FOR ADMINISTRATIVE USE ONLY: TIP AMENDMENT # ___________ PROJECT ____ OF _____
Transportation Improvement Program T I P
A M E N D M E N T PROJECT DATA SHEET
EXPENSE SUMMARY
FY PHASE Federal (NHPP) State Local TOTAL COST
2019 PE $35,000 2019 CONST $239,999 $59,999 2019 CE $16,000 $4,000 TOTAL $255,999 $63,999 $354,999
PROJECT SUMMARY AND JUSTIFICATION:
TAC RECOMMENDATION & COMMENTS:
TAC Review Data:
TAC Comments:
PUBLIC COMMENTS:
Out for Comment: Legal Advertising: Comments Received:
TIP Amendment # TIP #: 1-19-03-3 KDOT#: KA-4943-01 Project Type: Bridge Repair
Requested by: KDOT
Project: Path deck & replace expansion joints on bridge #161 located at E. junction I-70/US-75 in Shawnee Co.
Fiscal Year(s): 2019
Total Project Cost: $354,999
PROJECT TYPES: Transportation Alternative Roadways & Bridges Transit/Paratransit
Project #KA-4943-01 Bridge #161
6th
Gage
I 70
7th
Zoo
US 75
Danbury
Frazie
r
Gran
d
5th
8th
4th
Salin
e
Brentwood
Orlea
ns
Cres
t
private
9th
Yorks
hire
Watso
n
3rd
Ceda
r Cres
t
West Hills
Westc
heste
r
Rock Garden
Blaisd
ell
Camb
ridge
10th
Reinisch
White
hall
Wood
bury
West
Parkview
Meadow
Ande
rson
Conservatory
Porter
Morningside
Emland
Westlake
Rose Garden
Civita
nun
know
ndriveway
Munn Memorial
private drive
Frazier
Gage
9th
Frazie
r Watso
n 8th
7th
I 70
US 75
3rd
Salin
e
Westchester
Project LocationN
Funding Summary Table 2017 through 2020 Amendment #7 DraftMetropolitan Topeka Planning OrganizationMTPO Metropolitan Planning AreaKansas Department of Transportation, Shawnee County, City of Topeka, and the Topeka Metropolitan Transit Authority
Anticipated Funding
Year
Federal Total for Road, Bridge, Safety, and Enhancement Projects
State Total for Road, Bridge, Safety, and Enhancement Projects
Local Total for Road, Bridge, Safety, and Enhancement Projects
Federal Total for Urban Transit Projects
State Total for Urban Transit Projects
Local Total for Urban Transit Projects
Total of Anticipated Funding
Anticipated Minus Programmed
2017 $37,091,944 $19,776,599 $13,350,402 $2,699,400 $1,736,074 $7,084,096 $81,738,515 $02018 $5,144,726 $7,407,845 $12,091,160 $4,223,336 $11,984,674 $6,818,978 $47,670,719 $2,865,5442019 $3,088,108 $10,716,200 $7,480,000 $2,270,491 $730,000 $6,450,000 $30,734,799 $1,490,3342020 $6,000,000 $5,182,309 $10,890,000 $2,270,491 $730,000 $6,450,000 $31,522,800 $10,542,092Totals $51,324,778 $43,082,953 $43,811,562 $11,463,718 $15,180,748 $26,803,074 $191,666,833 $2,865,544
Funding Programmed in the TIP
Year
Federal Total for Road, Bridge, Safety, and Enhancement Projects
State Total for Road, Bridge, Safety, and Enhancement Projects
Local Total for Road, Bridge, Safety, and Enhancement Projects
Federal Total for Urban Transit Projects
State Total for Urban Transit Projects
Local Total for Urban Transit Projects
Total of Programmed Funding
2017 $37,091,944 $19,776,599 $13,350,402 $2,699,400 $1,736,074 $7,084,096 $81,738,5152018 $2,375,040 $7,407,845 $12,091,160 $4,127,478 $11,984,674 $6,818,978 $44,805,1752019 $3,088,108 $10,716,200 $6,356,257 $2,353,900 $730,000 $6,000,000 $29,244,4652020 $1,260,000 $2,682,309 $7,890,000 $2,368,399 $730,000 $6,050,000 $20,980,708Totals $43,815,092 $40,582,953 $39,687,819 $11,549,177 $15,180,748 $25,953,074 $176,768,863
Notes for Funding Programmed in the TIPThis table includes all of the forms of anticipated funding listed herein including local funds in excess of what is needed to match federal and state funding sources. Each proposed project for the TIP is placed into the TIP tables only after the project sponsor meets with the MTPO staff and identifies its funding sources.