METROPOLITAN PARK PHASES 6 / 7 / 8
SITE PLAN REVIEW COMMITTEE23 SEPTEMBER 2019
/ 2SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
SPRC #1 FOLLOW-UP ITEMS:• Refinement of Materials• Crown expression• Building 6 Massing• Accessibility• Meeting Center
FOR SPRC #3:• Retail Merchandising• Sustainability
/ 3METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
500 feet
REAGANNATIONAL AIRPORT
POTOMACRIVER
LONG BRIDGEPARK
PENTAGON
INTERSTATE 395
PENTAGONCENTER
FASHION CENTER
MALL
U.S
. RO
UT
E 1
VIRGINIAHIGHLANDS
PARKCRYSTAL CITY585,000 SF / Stage I
PEN PLACE2.1 Million SF / Stage III
METROPOLITAN PARK2.1 Million SF / Stage II
10 MIN.
5 MIN.
15 MIN.
CONTEXT / PATH OF GROWTH
WALK
WALK
WALK
PHASE 6 / 7 / 8
/ 4METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
CONTEXT / METROPOLITAN PARK
/ 5METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / METS 6 MATERIALS
Colored Glass Fins
Metal Panel 1 - Light Grey
Terracotta - Dark Charcoal
Metal Panel 2 - Medium Gray
Metal Fin- Copper
Vision and Spandrel Glass
/ 6METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / METS 78 MATERIALS
Terracotta 1 - Dark Charcoal
Vision and Spandrel Glass
Metal Panel 1 - Light Grey
Metal Screen - Copper
Metal Fins
Metal Fin - Copper
/ 7METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / BUILDING CROWN
/ 8SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
SPRC #1 FOLLOW UP / BUILDING CROWN
7/8 6
/ 9METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / BUILDING CROWN
/ 10METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / BUILDING CROWN
METROPOLITAN PARK PHASES 6, 7, & 8
2
3
Area Plan 3. Virginia Highlands Park
1. Eads and Army Navy Drive 2. Eads & 18 Street
1Mets 7/8
Mets 7/8Mets 6
Mets 6
The Grammercy
/ 11METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / METS 6 STREET FACADE
Mets 6 from 15th and Eads Mets 6 from 12th and Eads
/ 12METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / ACCESSIBILITY
Project Specific:
• Accessible routes from Pentagon City Metro Station, Metroway Station, and adjacent bus stops.
• All sidewalks on site slope less than 2%.
• Power door operators at all building lobbies and garage elevator lobbies.
• Accessible way-finding signage throughout
KEYAccessible RouteOffice EntranceRetail Entrance
When creating products, services, and workspaces Amazon thinks about customers of all abilities. and was recently recognized by the American Founda-tion for the Blind for their work in this area.
/ 13METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / MEETING CENTER
/ 14METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
SPRC #1 FOLLOW UP / MEETING CENTER
Image courtesy of the Downtown Seattle AssociationImage courtesy of the Downtown Seattle Association
OPEN SPACE
/ 32SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
/ 33METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
N64'
SOUTH FERN STREET
SOUTH FAIR STREET
METROPOLITAN PARK
EAST ELM STREET
SOUTH ELM STREET SOUTH ELM STREET
SOUTH EADS STREET
15T
H S
TR
EE
T S
OU
TH
13T
H S
TR
EE
T S
OU
TH
12T
H S
TR
EE
T S
OU
TH
14T
H S
TR
EE
T
EXISTING RESIDENTIAL EXISTING RESIDENTIAL
EX
ISTIN
G R
ESID
EN
TIA
LE
XISTIN
G R
ESID
EN
TIAL
EX
ISTIN
G R
ESID
EN
TIA
L
National Landing, Met 678 | 09 MAY 2019DESIGN UPDATESite Plan
MET 7/8
4
32
218
8
14
3
183
33
13
22
22
PH
18
11
11
PH
MET 6
4
THE GRAMERCY(EXISTING RESIDENTIAL)
THE MILLENNIUM(EXISTING RESIDENTIAL)
THE ACADIA(EXISTING RESIDENTIAL)
THE BARTLETT(EXISTING RESIDENTIAL)
OPEN SPACE / SITE PLAN
PARK EXTENSION(24,400 SF / 0.56 ACRES)
13T
H S
TR
EE
T S
OU
TH
RETAIL
Pentagon City Mall
Crystal City
MARKET STREET(34,000 SF)
PLAZA(14,700 SF)
PLAZA(6,400 SF)
LINEAR PARK (8,600 SF)LINEAR PARK (10,200 SF)
PARK(13,500 SF / 0.31 ACRES)
CENTRAL GREEN(57,900 SF / 1.33 ACRES)
LINEAR PARK (5,000 SF)
PARK(12,600 SF / 0.29 ACRES)
NEW PUBLIC OPEN SPACE
NEW STREETSPACE
EXISTING PUBLIC OPEN SPACE
CAFE SEATINGZONE
CAFE SEATING(14,600 SF) POST 4.1 PARK
MASTERPLAN
/ 34METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
OPEN SPACE / APPROACH
Mets 678 Design Update | 8 February 2019OPEN SPACE DESIGNSTUDIO39
Plaza: Precedent Imagery
FESTIVE EVENINGS SUNNY SEATING GARAGE ACCESS
URBAN RESPITE
MOVIE LAWN
PASSIVE USE LAWN
FOOD TRUCK PARKING
CREATIVE SEATING
SHADY SEATING
GAMES + RECREATION
ENGAGING LANDFORMS
10
/ 35METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
OPEN SPACE / APPROACH
Mets 678 Design Update | 13 March 2019OPEN SPACE DESIGNSTUDIO39
Park Lawn & Landforms
VALUE (Reduced Quality)
BASELINE (High Quality)
PREMIUM (Upgraded Quality)
9
/ 36SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
OPEN SPACE / EADS STREET LINEAR PARK
4Metropolitan Park Phase 6, 7, & 8 Client Presentation #11 |9 September 2019
Met 6 Eads Street Design
SCALE 1” = 30’-0”
0 15’ 30’ 60’
4
bIKE RACKSLIGht PoLES
LIttER RECEPtACLES ICoNIC bENCh
ShADE umbRELLAS DoGRELIEFbouLDERS
REtAIL
5Metropolitan Park Phase 6, 7, & 8 Client Presentation #11 |9 September 2019
Met 7/8 Eads Street Design
SCALE 1” = 30’-0”
0 15’ 30’ 60’
5
DoGRELIEFbouLDERS
bIKE RACKS LIGht PoLESLIttER RECEPtACLES
ICoNIC bENCh
ShADE umbRELLAS
REtAIL
5Metropolitan Park Phase 6, 7, & 8 Client Presentation #11 |9 September 2019
Met 7/8 Eads Street Design
SCALE 1” = 30’-0”
0 15’ 30’ 60’
5
DoGRELIEFbouLDERS
bIKE RACKS LIGht PoLESLIttER RECEPtACLES
ICoNIC bENCh
ShADE umbRELLAS
REtAIL
/ 37SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
OPEN SPACE / EADS STREET LINEAR PARK
Building 6
Building 7/8
6Metropolitan Park Phase 6, 7, & 8 Client Presentation #11 |9 September 2019
Streetscape Precedent Images6
/ 38SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
OPEN SPACE / EADS STREET LINEAR PARK
/ 39SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
OPEN SPACE / EADS STREET LINEAR PARK
6Metropolitan Park Phase 6, 7, & 8 Client Presentation #11 |9 September 2019
Streetscape Precedent Images6
DESIGN / EADS STREET LINEAR PARK
/ 40METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
/ 41SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
TRANSPORTATION
/ 42METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
TRANSPORTATION / SURROUNDING CONTEXT
o Very Walkable - Walkscore of 84o Approximately 7 minute walk from Pentagon
City Metrorail Stationo Approximately 9 minute walk from Crystal
City Metrorail Stationo Approximately 10 minute walk from VRE o Served by 18 bus routes including Metrowayo Well-connected pedestrian and bicycle
network• Improved bicycle and pedestrian facilities
surrounding the site• Highly accessible to/from Pentagon City and
Crystal City Metro Stations
TRANSIT / OVERVIEW
METROPOLITAN PARK PHASES 6 / 7 / 8 Transportation Commission / 05 September 2019 / 20
• Very Walkable - Walkscore of 84
• Approximately 7 minute walk from Pentagon City Metrorail Station
• Approximately 9 minute walk from Crystal City Metrorail Station
• Approximately 10 minute walk from VRE Station
• Served by 18 bus routes including Metroway
• Well-connected pedestrian and bicycle network with improved facilities around the site.
/ 43METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
TRANSPORTATION / MMTA STUDYANALYSIS / MMTA
METROPOLITAN PARK PHASES 6 / 7 / 8 Transportation Commission / 05 September 2019 / 29
o Scoped with the County• 31 intersections studied• Incorporation of internal roadway network• Assumes Route 1-to-Grade and other approved
development nearby
o Mitigations identified by capacity analysis:• 2021 Analysis – Signal timing adjustments to four (4)
intersections• 2027 Analysis – Signal timing adjustments to four (4)
intersections, and signal phasing or cycle length adjustments to four (4) additional intersections
o Additional mitigation measures include:• Enhanced site design elements• TDM Plan
AM and PM Mode Split:
• Scoped with the County & VDOT
• 31 intersections studied
• Assumes Route 1-to-Grade and other approved development in vicinity
• Coordinating with County Staff on appropriate mitigations
Mode Split
/ 44METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
TRANSPORTATION / PROPOSED SIGNALS
• Includes the design and installation of three (3) traffic signals, with signalized pedestrian crossings:
• 13th Street S & S Eads Street• 15th Street S & S Elm Street• 14th Street S & S Eads Street
• Includes phasing and geometric changes to (1) intersection
• 15th Street S & S Eads Street.
/ 45METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
GARAGEENTR.
TRANSPORTATION / VEHICLE & LOADING ACCESS
LOADING DOCK
GARAGEENTRANCE
LOADINGDOCK
• Parking and loading access from 13th Street S and S Elm Street
• Approximately 1,885 office parking spaces (1 per 1,109 GSF)
• Approximately 65 retail parking spaces (1 per 800 GSF)
• 3 Loading Berths proposed for Building 6 (2 Required)
• 4 Loading Berths proposed for Building 7/8 (3 Required)
KEYVehicle RouteTruck RouteLoading DockOffice EntranceRetail Entrance
/ 46METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
TRANSPORTATION / PROPOSED CURBSIDE MANAGEMENT
• TNC (Uber/Lyft) pick-up/drop-off areas on S Eads Street and E Elm Street
• Daycare drop-off along E Elm Street
• On-street parking on S Eads Street and 15th Street S, and E Elm Street
• Far-side bus stops proposed on S Eads Street at 13th Street S and 15th Street S
STR
EE
T PA
RK
ING
STREET PARKING
STR
EE
T PA
RK
ING
STR
EE
T PA
RK
ING
RID
ESH
AR
EST
RE
ET
PAR
KIN
GR
IDE
SHA
RE
BU
SB
US
DA
YCA
RE
DR
OP
OFF
BLD
G. D
RO
P O
FF
BUSKEY
On-Street ParkingPick-up/Drop-OffBus StopOffice EntranceRetail Entrance
/ 47METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
TRANSPORTATION / PEDESTRIAN ACCESS
• Sidewalk and streetscape improvements surrounding site including:
• Extension of 14th Street S and E Elm Streets• Installation of sidewalks and street trees on
13th Street S and S Elm Street• Widened sidewalks and installation of street
trees on 15th Street S and S Eads Street
• 14th Street S and E Elm Street proposed with flush curbs.
• Building lobbies and daycare located along park frontage
• Retail entrances primarily located along S Eads Street and 15th Streets
KEYPedestrian RouteFlush Curb StreetOffice LobbyRetailOffice EntranceRetail Entrance
/ 48METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
TRANSPORTATION / BIKE ACCESS
• Southbound Eads Bikelane upgraded to a protected lane (currently buffered).
• Dedicated bike lane maintained on 15th Street
• Dedicated ground-floor entrances to long-term bicycle parking
• 500 long-term bicycle parking spaces proposed (346 required)
• 120 short-term bicycle parking spaces proposed (120 required)
• 58 showers proposed (46 required)
• 750 lockers proposed (700 required)
BIKEROOM
BIKEROOM
KEYProtected BikelaneDedicated BikelaneBike RouteBike RackOffice EntranceRetail Entrance
/ 49METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019
TRANSPORTATION / EADS STREET BIKEWAY
MET 7/8 MET 6 MET 4/5(The Bartlett)
Eads Street Protected Bikeway
Current / Buffered bike lane with flexi posts. Proposed / Protected Bikeway with curb.
N
EADS STREET
/ 50SPRC Meeting #2 / 23 September 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
TRANSPORTATION / 15TH AND EADS
15th and Eads / Protected Intersection
N
Protected Intersection / Chicago, IL
MET 7/8
S Eads Street15
th S
tree
t S
DESIGN / VIEW NORTH FROM THE PLAZA
/ 51METROPOLITAN PARK PHASES 6 / 7 / 8 SPRC Meeting #2 / 23 September 2019