Metro Construction
-
Upload
mayur-soni -
Category
Engineering
-
view
133 -
download
4
Transcript of Metro Construction
![Page 1: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/1.jpg)
JAIPUR METRO
1
![Page 2: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/2.jpg)
2
![Page 3: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/3.jpg)
JAIPUR METRO PHASE - I
Corridor- I
Corridor-II
Sitapura to Ambabadi(North – South)
Route Length (km.)
Elevated 18.004
UnderGround 5.095
Total 23.099
Number of Stations
Elevated 15
UnderGround 5
Total 20
Completion Cost (Rs. In crores)
Without Taxes & Escalation
3481
With Taxes & Escalation
4624
Ridership (PHPDT)
2014 11300
2021 18200
2031 27000
Mansarovar to BadiChaupar (East -
West)
9.439
2.628
12.067
8
3
11
2194
2907
10000
20200
34100
Total
21.03
7.88
28.91
21
8
29
5675
7531
21300
38400
61100
As per Revised DPRPHPDT- Peak Hour Peak Direction Trips3
![Page 4: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/4.jpg)
INTRODUCTION
PHASE I
North-South(15.5 kilometers)
East-West (13.5 kilometers)
Totaling nearly 30 Kilometers, will be laid across the city atan estimated cost of Rs 8,000 crores.,
The East-West corridor will be from Ramganj to Mansarover,.
A nine-km elevated track connecting Chandpole toMansarover be the first to be completed
The North-South corridor will connect Sanganer to Panipech
4
![Page 5: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/5.jpg)
NEED OF METRO SYSTEMPopulation growth rate of Jaipur is double the
average growth rate of other cities.
Significant reduction in environmental pollution.
Development of Delhi-Mumbai Industrial Corridor,
SEZ, International hub for Gem & Jewellery &
increasing tourist inflow will put additional burden
on transportation need.
5
![Page 6: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/6.jpg)
ADVANTAGE OF METRO SYSTEM
Metro systems are superior to other modes because
they provide higher carrying capacity, faster,
smoother and safer travel, occupy less space, are
non-polluting and energy-efficient.
Causes no air pollution in the city.
Causes lesser noise level.
Reduces journey time by anything between 50%
and 75% depending on road conditions.6
![Page 7: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/7.jpg)
READY MIX CONCRETEReady-mix concrete is a type of concrete is manufactured in
a factory or batching plant.
TRANSIT MIXTURE
The cylindrical portion is continuously rotating.
The rotation speed of cylindrical portion is 0-14 rpm.
7
![Page 8: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/8.jpg)
TRANSIT MIXTURE 8
![Page 9: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/9.jpg)
GRADE OF CONCRETE IN CONSTRUCTION
Piles - M 35
Pile cap - M 35
Piers – M 50
All precast element for station- M 45
Crash Barrier - M-35
Cantilever piers arm- M 55
9
![Page 10: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/10.jpg)
BOOM PLACER
10
![Page 11: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/11.jpg)
CONSTRUCTION STEPSPile Foundation
Pile Cap
Pier/Column
Pier Arm or Cross Arm
Track Level
11
![Page 12: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/12.jpg)
CONSTRUCTION
12
![Page 13: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/13.jpg)
PILE FOUNDATION STEPSETTING OUT
DRIVING OF TEMPORARY CASING
BORING
REINFORCEMENT CAGE LOWERING
FLUSHING OPERATION
CONCRETING
13
![Page 14: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/14.jpg)
PILE FOUNDATION
14
![Page 15: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/15.jpg)
PILLING MACHINE
15
![Page 16: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/16.jpg)
PILE CAPA pile cap is a thick Concrete mat that rests on concrete
or timber piles that have been driven into soft or unstable ground to provide a suitable stable foundation.
16
![Page 17: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/17.jpg)
PIERGrade of Concrete M- 50
The Diameter of Pier is 2000 mm from Ground level to Concourse level and from Concourse level it is 1600 mm.
17
![Page 18: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/18.jpg)
PIER
18
![Page 19: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/19.jpg)
CRASH BARRIER
It is constructed around the pier to avoid the direct impact on the pier in case of accident. The thickness of crash barrier is225mm and consist 25mm cover. The height of crash barrier is 165mm.The grade of concrete use in crash barrier construction is M-35.
19
![Page 20: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/20.jpg)
DRAINAGE
The drainage pipe is used for drain the rain water fromtrack level.
The diameter of drainage pipe is 200mm.
For the drain of water a drain hole is also construct inthe crash barrier.
20
![Page 21: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/21.jpg)
21
![Page 22: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/22.jpg)
CANTILEVER PIER ARMA pier is consist 2 pier arms at Concourse level.
M -55 grade concrete is used.
The size of one arm is 10230 mm from center of the pier.
The depth of pier arm at near to the pier is 2250 mm and at end point is 1650 mm.
22
![Page 23: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/23.jpg)
CANTILEVER PIER ARM
23
10230 mm
1650 mm
![Page 24: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/24.jpg)
PRECAST GIRDERThey are precast at casting yard or on site.
The girders are placed on the corbel.
The sizes of girders are 350 mm X 1200 mm.
Grade of concrete is M-50.
24
![Page 25: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/25.jpg)
PRECAST GIRDER
25
![Page 26: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/26.jpg)
PRECAST SLABThe dimensions of precast slab are 165 mm X 1000 mm.
The concrete grade is M-35.
The slabs and girders are jointed each other by arc weldedconnection.
26
![Page 27: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/27.jpg)
LAUNCHING OF PRECAST GIRDER
HYDRA DEMAG HC-400” is used to launching orErect the Precast Slabs and Precast Girders onPier Arms.
Firstly Hydra must be stand on hydraulic jack.
The capacity of this crane is about 150KN.
The Capacity of Hydra is Depend on its Boom Length.
27
![Page 28: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/28.jpg)
HYDRA DEMAG HC-400
28
![Page 29: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/29.jpg)
PROBLEM AT SITE
Allowing free flow of vehicular traffic on the already congested along with chosen alignment.
Paucity availability of Land.
Existence of charted and uncharted utilities.
Problems to pedestrian.
Problems to existing residents.
Environmental Impact including noise and vibration etc. 29
![Page 30: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/30.jpg)
SAFETYSafety is very important thing for any kind of
construction.
The safety is for workers as well as for public also.
The safety belts, helmets and Safety shoe is used,without these things, the entry to the site isprohibited.
30
![Page 31: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/31.jpg)
SAFETY HELMETS & SHOES
31
DMRC
ENGINEERELECTRICIAN
SAFETY LABOUR
SHOES BELTS
![Page 32: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/32.jpg)
CONCLUSION
Such types of construction actually is very difficult.reduce the traffic volume, travelling time .
Summer Training is a golden opportunity for learning and self development and really experiencing the real scenario of the company environment. It helped me to increase my technical skills. It is also helped me to be with latest and new technologies.
32
![Page 33: Metro Construction](https://reader031.fdocuments.us/reader031/viewer/2022020101/55a69dc21a28abda7d8b47fd/html5/thumbnails/33.jpg)
Jaipur
Metro
33