11
Regional Transportation Authority 1 06/27/22 Parking Management Guidance System Metra Parking Management Guidance System (PMGS) ITS PCB T3 Webinar October 21, 2008

description

Metra Parking Management Guidance System (PMGS). ITS PCB T3 Webinar October 21, 2008. RTA Background. Heavy and commuter rail Urban and suburban bus 6 counties, 3,700 square miles, and 260+ municipalities Second largest transit system in the U.S. 2 million trips per weekday. - PowerPoint PPT Presentation

Transcript of Metra Parking Management Guidance System (PMGS)

Page 1: Metra Parking Management Guidance System (PMGS)

Regional TransportationAuthority

104/21/23 Parking Management Guidance System

Metra Parking Management Guidance System (PMGS)

ITS PCB T3 WebinarOctober 21, 2008

Page 2: Metra Parking Management Guidance System (PMGS)

204/21/23 Parking Management Guidance System

RTA Background

• Heavy and commuter rail

• Urban and suburban bus

• 6 counties, 3,700 square miles, and 260+ municipalities

• Second largest transit system in the U.S.

• 2 million trips per weekday

Page 3: Metra Parking Management Guidance System (PMGS)

304/21/23 Parking Management Guidance System

PMGS Description• Part of the RTA’s

Transit ITS Plan

• System Objectives• Provide real-time

space availability in commuter rail station parking facilities

• Allow customers to make critical and timely decisions on their commuting options

Page 4: Metra Parking Management Guidance System (PMGS)

404/21/23 Parking Management Guidance System

PMGS Goals

• More effective use of existing transit infrastructure• Increased transit ridership• Greater parking efficiency

• Increased customer satisfaction• Information availability• Reduced parking lot circulation times

• Improve corridor operations• Reduced congestion• Incident management tool

• Air quality improvements

Page 5: Metra Parking Management Guidance System (PMGS)

504/21/23 Parking Management Guidance System

Participating Entities

• United States Department of Transportation (USDOT)

• Metra Commuter Rail

• City of Mokena

• Village of Tinley Park

• Cook and Will Counties

• Illinois Department of Transportation

Page 6: Metra Parking Management Guidance System (PMGS)

604/21/23 Parking Management Guidance System

PMGS HistorySite Selection

System Design

Installation

KEY

LMR 400/600 COAXIALCABLE

SPREAD SPECTRUMRADIOSS RADIO

WIRELESS LINK

YAGI

4-2/C

SHI

ELDE

D

ENTRANCE80-S5

LOOPS

LOOPS

LOOPS

LOOPS

4-2/C

SHI

ELDE

D

4-2/C SHIELDED

4-2/C SHIELDED

LOOPS4-2/C

SHIELDED

LOOPS

4-2/C

SHI

ELDE

D

ENTRANCE80-S6

ENTRANCE80-S2

ENTRANCE80-S3

ENTRANCE80-S4

900 MHZ SSCONTACTCLOSURE

RADIO

12 CONTACTCLOSURE

ENTRANCE80-S1

YAGI

LOOPS8-2/C

SHI

ELDE

D

ENTRANCE80-N1

8 CONTACT CLOSURE

DATACONTROLLER

12 CONTACTCLOSURE

8 CONTACTCLOSURE

LOOPS4-2/C

SHIELDED

LOOPS

6-2/C

SHIE

LDED

ENTRANCEHC-1

ENTRANCEHC-2

DATACONTROLLER

16 CONTACTCLOSURE

YAGI ANTENNA

TINLEY PARK/80TH AVE LOT HICKORY CREEK LOT

900 MHZSS RADIO

RS-232

900 MHZSS RADIO

RS-232

2-CHANNELLOOP

DETECTOR

6

2-CHANNELLOOP

DETECTOR

6

2-CHANNELLOOP

DETECTOR

4

YAGI

2-CHANNELLOOP

DETECTOR

8

YAGI

25-PAIR CABLE

TWISTED PAIR CABLE

REQUIRED CABINET/EQUIPMENT LOCATION

LOOPS6-2/C SHIELDED

TO RELAYTOWER

TO/FROMRELAYTOWER

JBJ

RCB

RCB

NO. DATE REVISED APR.

BASE DATE:

DRAWN CHECKED

PM

RRLLINE MILEPOST

SHEET NO.

PLAN TITLE

CADD FILE NO.

PE NO.

TECHNICAL SERVICES

STATION LOT NO.

PRIMARY CONSULTANT

OF

ARCHITECTSENGINEERSPLANNERS

111 N. CANAL STSUITE 1250CHICAGO, IL 60606(312) 930-9119

DATA COLLECTION SYSTEMBLOCK DIAGRAM

900 MHZSS RADIO

REPEATER

900 MHZ SSCONTACTCLOSURE

RADIO

TO DMS#6(SEE DMS COMMUNICATIONS

BLOCK DIAGRAM)

REQUIRED CABLING/CIRCUIT

80TH AVENUE LOTREPEATER RADIO CABINET

RF COMBINER

SEE NEXT SHEET FOR DETAILS

RF COMBINERRS-232

900 MHZSS RADIO

REPEATER

900 MHZSS RADIO

REPEATER

YAGI

YAGI

RS-232

YAGI

YAGI

YAGI

YAGI

900 MHZSS RADIO

EQUIPMENT DETAILED ONNEXT SHEET

3 58

10/31/03

ENTRANCEHC-3

6REQUIRED DEVICE, QUANTITYAS SHOWN

10 MBPS EHTERNETE10

CABLING DETAILED ON NEXTSHEET

Operation

Page 7: Metra Parking Management Guidance System (PMGS)

704/21/23 Parking Management Guidance System

Site Selection: PMGS Demo Corridor

• Peak Parking Occupancy

• Total # of Unrestricted Spaces

• Proximity to Expressways

• Inter-Station Groups

Page 8: Metra Parking Management Guidance System (PMGS)

804/21/23 Parking Management Guidance System

Page 9: Metra Parking Management Guidance System (PMGS)

904/21/23 Parking Management Guidance System

Design: System Configuration80TH AVE

PARKING LOTHICKORY CREEK

PARKING LOT

VEHICLEDETECTORS

VEHICLEDETECTORS

FIELDPROCESSOR

Page 10: Metra Parking Management Guidance System (PMGS)

1004/21/23 Parking Management Guidance System

Technical Lessons Learned

• Strong institutional partnerships

• Define site selection criteria• PMGS treatment is

not for every corridor

• Define sign location criteria

• Lane delineation• Communication

Page 11: Metra Parking Management Guidance System (PMGS)

1104/21/23 Parking Management Guidance System

Contact Information

Gerwin J. Tumbali

Phone: 312-913-3251

E-Mail: [email protected]