Transcript of Metode Blasting
-
EXPLOSIVE MATERIAL; consist of DANFODayagel / DinamitDetonatorConnecting WireLinerSAFETY PLAN FOR BLASTINGa. Personil- Blasting Master=Must be had a certificate from Mining Department- Driller=Must be had a specialy and experience for this work- Worker=All worker must using a safety equipment as a helm, boot, masker etc.- Insurance=To be covered for all worker and employee, Construction All Risk and Third Party Liability
-
b. Sign BoardSign board for blasting as a:-AWAS BAHAN PELEDAK-HATI-HATI, AREA PELEDAKAN-UTAMAKAN KESELAMATAN-GUNAKAN ALAT PELINDUNG DIRI-ETCShould be placed at the right positionc. Explosive Material StoreMust be constructed as a drawing attachedMust be constructed on the safe areadistance from public roaddistance from public housingShould be a 200 meter minimum
-
Must be guarded by policeman and guard manIncoming and outgoing explosive material should be controlled as a procedureHauling to the blasting area should be used a special vehicle (like a pick up) as a drawing attached
d. Blasting AreaBlasting Radius meterBefore execution of blasting must be checked :No body in the blasting areaNo equipment in the blasting areaSirine must be sound before and after execution of blastingBlasting should be done in a day
-
METHOD OF WORKBLASTING WORK
-
ROCK EXCAVATIONDrillingCDRX = Distance of hole, depend on geological condition
-
ROCK EXCAVATION
-
ROCK EXCAVATIONInstallation of Explosive MaterialBlastingMachineConnectingWireBlasting
-
ROCK EXCAVATIONLoading and Hauling