    Method Study defined

    According to British Standards Institution .

    Method study is a systematic recording and

    critical examination of existing and proposed

    ways of doing work, as a means of developing

    and applying easier and more effective

    methods and reducing costs.

  • 7/29/2019 method study work study.pptx

    3/14

    Method study along with Work Measurement is termed as

    Work Study

    Method Study aims to determine

    the most effective method of performing a job

    the most logical layout of manufacturing facilities

    the smooth flow of men and material throughout the organisation

    and the right placement of inspection stages

    to enable processing of a job through the smallest possible

    time and at least possible cost

  • 7/29/2019 method study work study.pptx

    4/14

    Method study is concerned with how things aredone and is aimed quite simply at finding betterways of doing things.

    Method study can be improved by five ways:

    Eliminate unnecessary tasks

    Simplify the process

    combine tasks

    Rearrange tasks

    Reduce the number of operations

  • 7/29/2019 method study work study.pptx

    5/14

    SELECT the work to be studied and define its boundaries.

    RECORD the relevant facts about the job by direct observation and collect suchadditional data as may be needed from appropriate sources.

    EXAMINE the way the job is being performed and challenge its purpose,place, sequence, person and method of performance.

    DEVELOP the most practical, economic and effective method.

    EVALUATE different alternatives to developing a new improved method, andcompare the cost-effectiveness of the selected new method with the currentmethod of performance.

    DEFINE the new method in a clear manner and present it to those concerned,management, supervisors and workers.

    INSTALL the new method as standard practice and train the persons involvedin applying it.

    MAINTAIN the new method & introduce control procedures to prevent adrawback to the previous method of work.

    Basic procedure for Method Study

  • 7/29/2019 method study work study.pptx

    6/14

    Advantages of method study

    Work simplification

    Improved working method ( cheaper method)

    Better product quality Improved equipment design

    Better working conditions

    Better material handling Improved work flow

  • 7/29/2019 method study work study.pptx

    7/14

    Work Measurement

    Work measurement is the application of techniques designed toestablish the time for a qualified worker to carry out specified jobs at adefined level of performance.

    total time to manufacture a product is increased by:

    adding undesirable features to product,

    bad operation of the processes, and

    ineffective time added because of worker and management.

    All this leads to decreased productivity.

  • 7/29/2019 method study work study.pptx

    8/14

    Work measurement (WM) is concerned with investigating, reducing

    and eliminating ineffective time, whatever may be the cause.

    WM is the means of measuring the time taken in the performance of an

    operation or series of operations in such a way that the ineffective timeis shown up and can be separated out.

    In practice, proving existence of the ineffective time is the most

    difficult task.

    After existence is proved, nature and extent is easy to see!

  • 7/29/2019 method study work study.pptx

    9/14

    WM is also used to set standard times to carry out the work, so that

    any ineffective time is not included later.

    Any addition the standard time would show up as excess time and thus

    can be brought to attention.

    Since, standard times are set for all the activities through WM, it has

    earned bad reputation amongst workers.

    Major reason for that has been the initial focus of the WM methods,

    which essentially targeted only the worker controllable ineffective

    times. Management controllable ineffective times were ignored traditionally.

  • 7/29/2019 method study work study.pptx

    10/14

    Process

    1.Selecting the job.

    2. Recording the specifications.

    3. Breaking operation into elements.

    4. Examining each element.

    5. Measuring using stop watch.

    6. Assessing the rating factor.

    7. Calculating the basic time.

    BT = Observed Time * operators time/ standard time8. Determining the allowances.

    9. Compiling the standard time allowed time

  • 7/29/2019 method study work study.pptx

    11/14

    Advantages

    serves as a basis for methods analysis bycomparing the efficiency of alternative workmethods.

    enables preparation of realistic work schedulesthrough accurate assessment human work inrelation to plant capacity for production andmaintenance planning.

    helpful in balancing the work of different workers

    provides an objective basis for wage incentiveplans by setting standards of machine utilisationand labour performance.

  • 7/29/2019 method study work study.pptx

    12/14

    Work study

    The application of systematic analysis to the work ofmen and machines so as to improve methods and toestablish proper time values for that work.

    Objectives are to make the most effective use of plantand human effort and to establish a reasonable workload for those employed.

    Investigates every aspect of existing or proposed workin order to find the best way of performing tasks.

    Involves setting standard and solving problems relatedto bottlenecks, low morale, large amounts of defectivework and low productivity

  • 7/29/2019 method study work study.pptx

    13/14

    Benefits of work study

    Increased productivity and operational efficiency

    Reduced manufacturing costs

    Improved work place layout

    Better manpower planning and capacity planning

    Fair wages to employees

    Better working conditions to employees

    Improved work flow

    Reduced material handling costs