Insident Report
Pgina 1
Customer: NTDC Lahore Date: 27.02.2011
Substation: Ravi Grid Reported by: Urs Sommer
GIS Type: B212-4
Country: Pakistan
According the information from NTDC personal, Friday night 25.02.2011 was an incident and the
cb D06-Q0 tripped. During Saturday 26.02.2011 NTDC personal was metering the SF6 purity and
the result was 94.1%. NTDC personal replaced the gas with new one (purity 98.1%).
Customer called to inform me that there was another incident and I was on site at 20:30h. The
situation was that the rupture disk of cb D06-Q0 phase A was busted. Additional I found the BB I
isolating switch D01-Q1 not in definitive OFF position. With the test pin I could confirm this
irregularity of isolating switch. Fact is that additional to the cb D06-Q0 the added bus bar isolating
switch D06-Q1 (both phase A only) is demaged as well.
NTDC needs urgent the necessary information from ALSTOM GRID which are the next steps.
A B C
Circuit breaker =D06-Q0 1992/2135359
-
01 02 03
BB-Isolating switch =D06-Q1 1992/2135359
-
104 105 106
Rupture disc view from bottom
-
8/2/2019 Method Statement Rectification Bay 06
5/14
Insident Report
Pgina 2
Inside of cb
BB Isolator switch position indicators BB I Isolator switch Q1 with test pin (to check
definitive position of hv-device
Show glass is black with indication of high
heat event
-
8/2/2019 Method Statement Rectification Bay 06
6/14
Insident Report
Pgina 3
On site are available spare parts please see follow pictures:
General Information:
ALSTOM GRID has not start with the work according Tender No. E598/251_Vers3 before happened
these two incidents.
During my stay on Saturday night were present fellow persons:
Eng. Muhammad Aghter, Manager NTDC Lahore Eng. Shafiqur- Rehman Deputy Manager NTDC Ravi Grid Lahore Eng. Mirza Muhammad Akram Deputy Manager (Grids)
I`m according with this report:
Mr. Qamar Iqbal Bhatti Chief Eng. NTDC Lahore Date:
-
8/2/2019 Method Statement Rectification Bay 06
7/14
-
8/2/2019 Method Statement Rectification Bay 06
8/14
-
8/2/2019 Method Statement Rectification Bay 06
9/14
-
8/2/2019 Method Statement Rectification Bay 06
10/14
-
8/2/2019 Method Statement Rectification Bay 06
11/14
-
8/2/2019 Method Statement Rectification Bay 06
12/14
NEUWERT CHF. GERUNDET 1'934.10AMOUNT CHF. ROUND
GEWICHT BRUTTO KG.
LETZTE KONTROLLE
LAST CHECK
COUNTRY OF ORIGIN
STRUNGSSET-SF6 MIT VOLLMASKE
SERVICESET-SF6 WITH FULL FASE MASK
CH
GEWICHT NETTO KG. 18.0
GROSS WEIGHT KG.
NET WEIGHT KG.
URSPRUNGSLAND
ARTIKEL NR. ARTICLE NO.
GEBINDE NR. CASE NO.
FAB NR. FAC NO.
DIMENSION DIMENSION
Q471.8600.3
Q471.8600.3
-
60x40x40cm
23.0
04.03.2011
TYP TYPE -
Ausgabe: 05.01.2006
INVENTARLISTE / INVENTORY Dokument Nr.: Q471.8600.3
Abteilung: GIS MONTAGEN
STRUNGSSET-SF6 MIT VOLLMASKE
BENENNUNGITEM
ARTIKEL NR. DIMENSIONSTK.CHF.PCS.
FACHNRDRAWERARTICLE NO. DIMENSION
STAPELBEHLTER MIT DECKEL 600x400x430mmBOX WITH COVER 600x400x430mm 55.001 -60.6440.400.971K 1
NATRIUMCARBONAT CALC.TECH. (1 EIMER=5KG.)NATRIUMCARBONAT (1 BOX = 5KG.)
60.241 D=26x25cm81946-155 1.01
ATEMSCHUTZMASKE, 3M 9915 FFP1, BOX 20DUST RESPIRATOR , 3M 9915 FFP1, BOX 20
102.401 FFP114638 1.02
VOLLMASKE SPIROMATIC FPC-N OHNE FILTERFULL FASE MASK FPC-N , WITHOUT FILTER
536.002 285x190x150mm334190076 1.03
KOMBIFILTER IS 230 B2-P3COMBINED FILTER IS 230 B2-P3
68.002 -96818 1.04
STAUBSAUGER HEPA ABLUFTFILTERGEHUSE 32mmCOVER FOR VACUUMCLEANER FILTER HEPA
103.001 -11731003 1.05
STAUBSAUGER HEPA-FILTERELEMENTSPEZ. FILTER FOR VACUUMCLEANER
233.001 0.006-0.009mm/100%21738000 1.06
STAUBSAUGER PAPIERSCKE 18LVACUUMCLEANER BAGS 18L 17.001 18L816200 1.07
STAUBSAUGER PINSELBRSTE 70, 32mmVACUUMCLEANER BRUSH 70
29.751 D=70mm11276901 1.08
ABDECKBAND 25TAPE 25
5.891 25mm316.212.322 1.09
SCOTCHTUCHSCOTCH
5.313 -61.143.845-01 1.10
PLASTIKSACK 55L, 1 ROLLE ZU 20 STK.BAGS 55L
5.193 55 LITER59.776-01 1.11
REINIGUNGSTCHERTOWELS
21.00100 -59.801-01 1.12
TRICHTERFUNNEL
9.601 -08.3542.6 1.13
Q471.8600.3 Seite 1 von 3
ALSTOM Grid AGCarl-Sprecher-Strasse 3 - Service - CH-5036 Oberentfelden - Switzerland - Tel: +41(0)62 737 33 33 - www.alstom.com
Druckdatum / Printing: 04.03.2011
-
8/2/2019 Method Statement Rectification Bay 06
13/14
BENENNUNGITEM
ARTIKEL NR. DIMENSIONSTK.CHF.PCS.
FACHNRDRAWERARTICLE NO. DIMENSION
HANDSEIFE SOLOPOL, TUBE 250mlSOAP
6.802 D=50x200mm2520391400 1.14
PH-INDIKATORPAPIERROLLE, pH 1-10PH-INDICATOR-PAPERS, pH 1-10
9.001 D=52x14mm109526 1.15
WARNBAND "ACHTUNG NICHT EINSCHALTEN"WARNING LABEL
11.351 -603300020 1.16
ABSPERRBAND ROT/WEISSTAPE
28.801 80mm59.040-14 1.17
ARBEITSUNTERWEISUNG SF6 ENTSORGENMANUAL SF6 1.001 -Q83.121 1.18
VORSCHRIFT FR WARTUNG MIT ZERSETZTEM SF6OPERATING INSTRUCTIONS HANDLING USED SF6
0.011 -47.020.035 1.19
STAPELBEHLTER MIT DECKEL 600x400x430mmBOX WITH COVER 600x400x430mm
55.001 -60.6440.400.971K 2
OVERAL OHNE KAPUTZE GR.52-56OVERALL PROTECTION (DISPOSABLE)
232.6320 (1900)59.070-19 2.01
ARBEITSKITTEL 52-56DUST COAT (DISPOSABLE)
168.9320 GR.52-5647.184.709-01 2.02
BERZIEHSCHUHE 52-56SHOE PROTECTION (DISPOSABLE)
55.3920 (1946)59.070-18 2.03
SCHUTZKAPPEHEAD PROTECTION (DISPOSABLE)
36.0020 (1940)59.070-17 2.04
BAUMWOLLHANDSCHUH 10GLOVES 10 36.5640 GR.1059.070-07 2.05
GUMMIHANDSCHUH 10RUBBER GLOVES 10
9.4240 GR.1059.070-10 2.06
GUMMIHANDSCHUH 10 "MAPA ULTRANITRIL 493"RUBBER GLOVES 10 "MAPA ULTRANITRIL 493"
31.855 GR.1059.070-13 2.07
Q471.8600.3 Seite 2 von 3
ALSTOM Grid AGCarl-Sprecher-Strasse 3 - Service - CH-5036 Oberentfelden - Switzerland - Tel: +41(0)62 737 33 33 - www.alstom.com
Druckdatum / Printing: 04.03.2011
-
8/2/2019 Method Statement Rectification Bay 06
14/14
BENENNUNGITEM
ARTIKEL NR. DIMENSIONSTK.CHF.PCS.
FACHNRDRAWERARTICLE NO. DIMENSION
Sinnbildliche Darstellung:
Symbol, Allegory:
(Der gelieferte Artikel kann mit dem Bild nicht 100% bereinstimmen)
(Maybe mismatching)
Bemerkungen, Hinweise, PM Nr. Comment, Remark, Item No.
No: 08.3542.6 No: 109526 No: 11276901 No: 11731003
No: 14638 No: 21738000 No: 2520391400 No: 316.212.322
No: 334190076 No: 47.020.035 No: 47.184.709-01 No: 59.040-14
No: 59.070-07 No: 59.070-10 No: 59.070-13 No: 59.070-17
No: 59.070-18 No: 59.070-19 No: 59.776-01 No: 59.801-01
No: 60.6440.400.971K No: 603300020 No: 61.143.845-01 No: 816200
No: 81946-155 No: 96818 No: Q83.121
Q471.8600.3 Seite 3 von 3
ALSTOM Grid AGCarl-Sprecher-Strasse 3 - Service - CH-5036 Oberentfelden - Switzerland - Tel: +41(0)62 737 33 33 - www.alstom.com
Druckdatum / Printing: 04.03.2011