Method Statement for Indoor Auto Blasting
-
Upload
muhammedemraan -
Category
Documents
-
view
216 -
download
0
description
Transcript of Method Statement for Indoor Auto Blasting
-
As for the emails from the outside, the sender should be checked. Such emails may contain spyware or malicious codes in the
link or the attached file.
Classification: Saudi Aramco Company General Use
Dear Alvin - FYI
This email has been classified as Saudi Aramco: Company General Use on Thursday, April 23, 2015 10:18:47 AM by Sagour, Hassan S.
From: Sagour, Hassan S
Sent: Thursday, April 23, 2015 10:18 AM
To: Omary, Ibrahim A (PID)
Subject: RE: CRM
Classification: Saudi Aramco Company General Use
Dear Ibrahim,
Based on our discussion and further technical discussions with the contractor, the attached method
statement cannot be accepted as is. You will find my comments in the form of sticky notes on the
attached document.
Basically, the contractor needs to address the following:
0 Abrasive material used, shall be approved by Saudi Aramco. Not all sources of steel shots/grits are
acceptable.
0 In their system, they need to control the salt contamination of abrasives to meet the requirements
of SAES-H-001
0 Upon completion of blasting, substrates shall be tested for salt contamination to avoid osmotic
blistering
-
Once their system is rectified, they should update the changes on the method statement and re-submit
for approval.
Best Regards,
Hassan
This email has been classified as Saudi Aramco: Company General Use on Thursday, April 23, 2015 10:18:05 AM by Sagour, Hassan S.
From: Omary, Ibrahim A (PID)
Sent: Wednesday, April 22, 2015 7:29 AM
To: Sagour, Hassan S
Subject: RE: CRM
Classification: Saudi Aramco Company General Use
Thanks & I appreciated your usual support .
This email has been classified as Saudi Aramco: Company General Use on Wednesday, April 22, 2015 7:29:01 AM by Omary, Ibrahim A (PID).
From: Sagour, Hassan S
Sent: Wednesday, April 22, 2015 7:23 AM
To: Omary, Ibrahim A (PID)
Subject: RE: CRM
Classification: Saudi Aramco Company General Use
Good morning Ibrahim,
-
Please note that I had a conference call from the technical engineer from Samsung, and he promised to
send me a few photos illustrating the system they are using. I am waiting for their feedback so I can
properly review this procedure.
Best Regards,
Hassan
This email has been classified as Saudi Aramco: Company General Use on Wednesday, April 22, 2015 7:23:09 AM by Sagour, Hassan S.
From: Omary, Ibrahim A (PID)
Sent: Tuesday, April 21, 2015 10:06 AM
To: Sagour, Hassan S
Subject: RE: CRM
Classification: Saudi Aramco Company General Use
Dear Hassan ,
SAMSUNG representative will contact you to answer all questions about the Auto Blasting System .
Thanks ,
This email has been classified as Saudi Aramco: Company General Use on Tuesday, April 21, 2015 10:05:48 AM by Omary, Ibrahim A (PID).
From: Sagour, Hassan S
Sent: Monday, April 20, 2015 10:55 AM
To: Omary, Ibrahim A (PID)
Subject: CRM
-
Classification: Saudi Aramco Company General Use
Salam Ibrahim
Please call me at your convenience at 880-9581
Thanks Hassan Alagour / CSD
This email has been classified as Saudi Aramco: Company General Use on Monday, April 20, 2015 10:55:21 AM by Sagour, Hassan S.
The contents of this email, including all related responses, files and attachments transmitted
with it (collectively referred to as this Email), are intended solely for the use of the
individual/entity to whom/which they are addressed, and may contain confidential and/or
legally privileged information. This Email may not be disclosed or forwarded to anyone else
without authorization from the originator of this Email. If you have received this Email in
error, please notify the sender immediately and delete all copies from your system. Please
note that the views or opinions presented in this Email are those of the author and may not
necessarily represent those of Saudi Aramco. The recipient should check this Email and any
attachments for the presence of any viruses. Saudi Aramco accepts no liability for any
damage caused by any virus/error transmitted by this Email.
-
AdministratorSticky NoteAbrasive material shall be approved by Saudi Aramco, as below:
5000441776 10015645 Manufacturer WINOA FRANCE (Wheelabrator-Allevard) 5001318596 10027128 Manufacturer Pometon
-
AdministratorSticky NoteWhat about dust contamination. In abrasive material, the sulfate content shall be less than 50 PPM, the chloride shall be less than 50 PPM, and calcium carbonate shall be 0.1 0% maximum by weight.
AdministratorSticky Notewhat about salt contamination? It shall not exceed 40 mg/m