Method Statement for Butt Fusion Welding 13Apr14
69
-
Upload
ansarisaeed -
Category
Documents
-
view
641 -
download
118
description
Detail of HDPE Wielding. This covers only Butt Fusion. it includes manpower required, the type of machine used, a very detailed process of butt fusion including precaution that need to be taken. It also contain technical manual of the machine itself.