Meter Board & EMDB FORM

5
SPECIFICATIONS FOR METER BOARD & EMDB Date: ........................... Project Name: ........................................................... ................................................................. ........ Address: ........................................................ ................................................................. ..................... 1. Meter Box: a) Quantity : 1 (One) b) Box Size : W 3’ x H 5’ x D 8” (For 10 three phase meter) c) Box Sheet : 18 Gauge (Accurate 0.048”) d) Door : Two Wings Wings Sizes: W 2’ x H 5’ W 1’ x H 5’ e) Base : 0.375” Heat Proof Fiber Sheet f) Paint : Hammer Paint g) Bus bar : Size L 6” x W 0.5” x T 0.125” for earthling. Made with pure Copper h) Meter Window : Size: 5” x 5" for each meter Made with Transparent Plastic sheet I) Panel Lock : 2. EMDB (Emergency Main Distribution Board): a) Quantity : 1 (One)

Transcript of Meter Board & EMDB FORM

Page 1: Meter Board & EMDB FORM

SPECIFICATIONS FOR METER BOARD & EMDB

Date: ...........................

Project Name: ....................................................................................................................................

Address: ..............................................................................................................................................

1. Meter Box:

a) Quantity : 1 (One)

b) Box Size : W 3’ x H 5’ x D 8” (For 10 three phase meter)

c) Box Sheet : 18 Gauge (Accurate 0.048”)

d) Door : Two Wings

Wings Sizes: W 2’ x H 5’

W 1’ x H 5’

e) Base : 0.375” Heat Proof Fiber Sheet

f) Paint : Hammer Paint

g) Bus bar : Size L 6” x W 0.5” x T 0.125” for earthling.

Made with pure Copper

h) Meter Window : Size: 5” x 5" for each meter

Made with Transparent Plastic sheet

I) Panel Lock :

2. EMDB (Emergency Main Distribution Board):

a) Quantity : 1 (One)

b) Box Size : W 2’ x H 3’ x D 6”

c) Box Sheet : 18 Gauge (Accurate 0.048”)

d) Bus bar : Total No. 4 (For three Phase & Neutral)

Size: L 12” x W 1” x T 0.1875”

Made with Pure Copper

e) Bus Bar Support : Bakelite

f) MCCB Base : Two Bases for 63A TP MCCB & 40A TP MCCB Must be operable from outside the box.

g) MCB Channel : For 16 Single Pole (SP) MCB

h) Panel Lock :

I) Indicating Lamps :

Page 2: Meter Board & EMDB FORM

Project Name: Genetic Luna LodgeAddress: Plot # 34/A, Road # 7, Sector # 3, Uttara, Dhaka.

Rate Quotation

1. Meter Box: : Tk. = 13,500.00 a) Quantity : 1 (One)b) Box Size : W 3’ x H 5’ x D 8” (For 10 three phase meter)c) Box Sheet : 18 Gauge (Accurate 0.048”)d) Door : Two Wings

Wings Sizes: W 2’ x H 5’W 1’ x H 5’

e) Base : 0.375” Heat Proof Fiber Sheetf) Paint : Hammer Paint g) Bus bar : Size L 6” x W 0.5” x T 0.125” for earthling.

Made with pure Copper h) Meter Window : Size: 5” x 5" for each meter

Made with Transparent Plastic sheet I) Panel Lock :

2. EMDB (Emergency Main Distribution Board): Tk. = 4,800.00a) Quantity : 1 (One) b) Box Size : W 2’ x H 3’ x D 6” c) Box Sheet : 18 Gauge (Accurate 0.048”)d) Bus bar : Total No. 4 (For three Phase & Neutral)

Size: L 12” x W 1” x T 0.1875”Made with Pure Copper

e) Bus Bar Support : Bakelite f) MCCB Base : Two Bases for 63A TP MCCB & 40A TP MCCB

Must be operable from outside the box.g) MCB Channel : For 16 Single Pole (SP) MCBh) Panel Lock :I) Indicating Lamps :

Tk. = 18,300.00

In word: Eighteen Thousand Three Hundred only.

Signature:

Page 3: Meter Board & EMDB FORM

To...................................................................................................................

Sub: Work order for supplying Meter Box & EMDB for the project “Genetic .......................”.

Dear Sir,

We are please to inform you that we are issuing you the work order for supplying Meter Box & Emergency Main Distribution Board as per specification and condition mentioned below.

1. Meter Box: Tk. ..............................a) Quantity : 1 (One)b) Box Size : W .....’ x H ......’ x D 8” (For ....... three phase meter)c) Box Sheet : 18 Gauge (Accurate 0.048”)d) Door : Two Wings

Wings Sizes: W 2’ x H 5’W 1’ x H 5’

e) Base : 0.375” Heat Proof Fiber Sheetf) Paint : Hammer Paint g) Bus bar : Size L ........” x W ......” x T..........” for earthling.

Made with pure Copper h) Meter Window : Size: .....” x ......" for each meter

Made with Transparent Plastic sheet I) Panel Lock :

2. EMDB (Emergency Main Distribution Board): Tk. ..............................a) Quantity : 1 (One) b) Box Size : W ......’ x H ....’ x D .....” c) Box Sheet : 18 Gauge (Accurate 0.048”)d) Bus bar : Total No. 4 (For three Phase & Neutral)

Size: L ......” x W ......” x T .............” Made with Pure Copper

e) Bus Bar Support : Bakelite f) MCCB Base : Two Bases for .......A TP MCCB & ........A TP MCCB

Must be operable from outside the box.g) MCB Channel : For .............................................. h) Panel Lock :I) Indicating Lamps :

Total Tk. = ..........................In word : . .................................................................Delivery date : Within 7 days, Otherwise work order may be cancelled. Delivery site: Genetic .......................................................................

Thanking you