Metal and Nonmetal Fatal Accident Review CY - 2009
description
Transcript of Metal and Nonmetal Fatal Accident Review CY - 2009
Metal and NonmetalMetal and NonmetalFatal Accident ReviewFatal Accident Review
CY - 2009CY - 2009
Contractor Employees, 6
Mine Employees, 10
MNM Fatalities
Crushed Stone, 12%
Other*, 57%
Sand & Gravel, 31%
MNM Fatalities by Commodity
* Alumina, Cement, Clay, Gold, Lead/Zinc, Salt, Dimension Stone, Lime, Copper
Machinery, 25%
Fall of Roof, 6%
Electrical, 6%Falling
Material, 19%
Powered Haulage, 31%
Fall of Person, 13%
MNM Fatalities by Classification
1-5 Employees,
25%
6-10 Employees,
25%11-20
Employees, 6%
21-50 Employees,
6%
51-100 Employees,
6%
100+ Employees,
32%
MNM Fatalities by Mine Size
MNM Fatalities by Occupation
Delivery Person, 6%
Supervisor, 13%
Machinery/Plant
Operator, 6%
Repairman/Technician,
30%
Mobile Equipment Operator,
25%
Laborer/Utility, 20%
Other, 13%Production,
31%
Maintenance, 56%
MNM Fatalities by Activity
MNM Fatalities by Total ExperienceMNM Fatalities by Total Experience
30+ Years, 19%
0-1 Year, 19%
11-15 Years, 19%
2-5 Years, 25%
6-10 Years, 6%
16-30 Years, 12%
MNM Fatalities by Job ExperienceMNM Fatalities by Job Experience
2-5 Years, 25%
0-1 Years, 44%
10-15 Years, 6%
16-30 Years, 25%
51-60, 56%
25-40, 25%
41-50, 13%
60+, 6%
MNM Fatalities by Age
MNM Fatalities by Day of WeekMNM Fatalities by Day of Week
Friday , 6%
Thursday, 25%
Tuesday, 32%
Sunday, 6%Saturday,
31%
6-8 a.m, 6%8-10 a.m., 25%
12-3 p.m., 38%
3-4 p.m., 25%
9-10 p.m., 6%
MNM Fatalities by Hour of Day
Root CausesRoot Causes
No Risk Assessment ConductedNo Risk Assessment Conducted
Inadequate Policies, Procedures, ControlsInadequate Policies, Procedures, Controls
Did not use Personal Protective EquipmentDid not use Personal Protective Equipment
Lack of Pre-operation ChecksLack of Pre-operation Checks
Equipment not MaintainedEquipment not Maintained
Failure to Conduct ExaminationsFailure to Conduct Examinations
Training InadequateTraining Inadequate
55
47
30
42
26 27
35
26
33
23
16
0
10
20
30
40
50
60
70
MNM Fatalities – 1999-2009
ElectricalElectrical
YearYear ‘05 ‘05 ‘06 ‘06 ‘07 ‘07 ’08 ’08 ’09 ’09
FatalitiesFatalities 2 2 5 5 1 1 22 1 1
MCC fires / explosionsMCC fires / explosions
DeenergizeDeenergize
Lockout/TagoutLockout/Tagout
Power line clearancePower line clearance
Monitor ContractorsMonitor Contractors
Fall of Material Fall of Material
YearYear ‘05 ‘05 ‘06 ‘06 ‘07 ‘07 ‘08 ‘08 ’09 ’09 FatalitiesFatalities 33 6 6 2 2 3 3 3 3
Block equipment against motionBlock equipment against motionCover or secure openingsCover or secure openingsBarricade area below work Barricade area below work Avoid suspended loadsAvoid suspended loads
Fall of Roof or BackFall of Roof or Back
YearYear ‘05 ‘06 ‘05 ‘06 ‘07 ‘07 ‘08 ‘08 ’09 ’09
FatalitiesFatalities 0 0 0 0 3 3 3 3 1 1
Examine and test for loose groundExamine and test for loose ground
Design, install, and maintain a support Design, install, and maintain a support system to control the ground in places system to control the ground in places where persons work or travel in performing where persons work or travel in performing their assigned taskstheir assigned tasks
Slip / Fall of PersonSlip / Fall of Person
YearYear ‘05 ‘05 ‘06 ‘06 ‘07 ‘07 ‘08 ‘08 ’09 ’09
FatalitiesFatalities 33 3 3 6 6 4 4 2 2
Many serious fall injuriesMany serious fall injuries
Eliminate Hazards and use PPEEliminate Hazards and use PPE– Inadequate walkwaysInadequate walkways
and scaffoldsand scaffolds– Fall protection not usedFall protection not used
– Persons not anchoredPersons not anchored – Holes not covered or protectedHoles not covered or protected
Human ElementHuman Element
Safe Work Practices Safe Work Practices notnot Established or Followed– Established or Followed–
Hazards not eliminated Hazards not eliminated Fall protection not attachedFall protection not attachedSeat belt not wornSeat belt not wornNo barricades while working belowNo barricades while working belowWorking near an open hole Working near an open hole Circumvented a guardCircumvented a guard
SLAM Risks