Page 1: Mesteacan - National Road 1C 2011 - Geobrugg · Engineering IPTANA S.A. - Bucharest Contractor FCC Construcţii Romania S.A. Other participating companies MAVO Transilvania S.R.L

Slope Protection

MESTEACAN - NATIONAL ROAD1C, RO

Page 2: Mesteacan - National Road 1C 2011 - Geobrugg · Engineering IPTANA S.A. - Bucharest Contractor FCC Construcţii Romania S.A. Other participating companies MAVO Transilvania S.R.L

MESTEACAN - NATIONAL ROAD 1CSlope Protection

Project Mesteacan - National Road 1CStreet National Road 1CZip code 437374Place MesteacanCountry/Region Romania

Year of installation 2011

Customer C.N.A.I.R. - BucharestEngineering IPTANA S.A. - BucharestContractor FCC Construcţii Romania S.A.Other participating companies MAVO Transilvania S.R.L - Cluj Napoca

Initial situation The national road DN1C connects the cities of Dej and Baia Mare. Total length ofthe road is 86,49 km and due to an increase in traffic, had to be rehabilitated. Onseveral sectors the road was enlarged to 3 lanes. In some areas slopestabilization measures were necessary due to topography and geology.

Description The designing office asked Geobrugg to provide an alternative solution toretaining walls, a solution which also could be revegetated. TECCO ® SYSTEM³ waschosen and dimensioned to stabilize a total of 2600 m² of newly cut slopes.

Protected object RoadSystems TECCO® G65/3

Corrosion protection GEOBRUGG SUPERCOATING ®

Geology Clay

Stabilized area 2600 m²

Maximum slope height 12 mSlope inclination 50 ° - 87 °

Greening YesErosion control mat YesExposition North-East

Slope Protection | Mesteacan - National Road 1C, RO /

Page 3: Mesteacan - National Road 1C 2011 - Geobrugg · Engineering IPTANA S.A. - Bucharest Contractor FCC Construcţii Romania S.A. Other participating companies MAVO Transilvania S.R.L

Perfectly integrated slope stabilizationwith TECCO® SYSTEM³ (steepest part,directly next to the road)

The situation before the road wasrenovated - the demolition of theretaining wall and a change of the slopegeometry change were necessary in orderto widen the road

The slope after geometry changing earthworks and thus prepared for theinstallation of the nails

Slope Protection | Mesteacan - National Road 1C, RO /

Page 4: Mesteacan - National Road 1C 2011 - Geobrugg · Engineering IPTANA S.A. - Bucharest Contractor FCC Construcţii Romania S.A. Other participating companies MAVO Transilvania S.R.L

Self drilling nails during top-downinstallation with the drill rig on thetemporary berm

High tensile TECCO® G65/3 mesh andTECMAT® anti-erosion mat installationwith a crane

TECCO® SYSETM³ before tensioning thesystem spike plates P33/40

Slope Protection | Mesteacan - National Road 1C, RO /

Page 5: Mesteacan - National Road 1C 2011 - Geobrugg · Engineering IPTANA S.A. - Bucharest Contractor FCC Construcţii Romania S.A. Other participating companies MAVO Transilvania S.R.L

Final installation overview - visible slopestabilization with TECCO® SYSTEM³ withits steepest part directly next to the road

For questions please contact our Geobrugg specialist at your side

Kamal Khodja, MSc.Project Specialist Eastern CanadaPhone +1 514 862 4636

[email protected]

[email protected] | www.geobrugg.comA company of the BRUGG Group | Certified to ISO 9001

Slope Protection | Mesteacan - National Road 1C, RO /