Mercury Monitoring Update for the Utility MACT Working Group
Barrett ParkerOAQPS03/04/03
![Page 2: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/2.jpg)
Overview
• Purpose• Background• Phase I• Phase II • Planned Phase III
![Page 3: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/3.jpg)
Purpose
• Explain– Where we are– How we got here– Where we intend to go
• EPA’s goal– Options for continuous mercury monitoring
• Maximum flexibility• Minimum cost
![Page 4: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/4.jpg)
Background Partners
• External– NIST– DOE– ETV– EPRI
![Page 5: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/5.jpg)
BackgroundMonitor Types
• One time– Manual reference test method (wet)
• Ontario Hydro is ASTM approved • Real time
– Wet CEMS• Automated version of reference method
– Dry CEMS• Proprietary catalysts and CVAAS or AFS
– Other CEMS • Carbon impregnated paper tape x ray fluorescence
• Time delayed– Carbon tube (EPRI)
![Page 6: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/6.jpg)
BackgroundGerman Experience
• Mercury CEMS on Incinerators – No requirement for coal-fired power plants
• Visited six incinerators– One co-fired lignite to produce electricity
• Sources are well-controlled – ESPs, scrubbers, carbon adsorption, and
SCR• 3rd party instrument certification
![Page 7: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/7.jpg)
BackgroundTechnical Concerns
• Stability, reliability, and availability of calibration standards
• Loss of sample in handling system
• Species conversion
![Page 8: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/8.jpg)
Background Concerns
• CEMS costs, complexity, performance
• CEMS application on US sources
• Fuel, equipment, control uniqueness
• Availability
![Page 9: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/9.jpg)
Background Work plan
• Phase I - summer 01– Test 2 German certified CEMS at minimally controlled
coal-fired power plant
• Phase II - fall 02– Test 7 CEMS and EPRI’s carbon tube at minimally
controlled coal-fired power plant
• Phase III - spring 03 to spring 04– Test most promising CEMS and EPRI’s carbon tube
at well controlled coal-fired power plant(s)
![Page 10: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/10.jpg)
Phase I Description
• Installed 2 German certified dry CEMS at a full scale, representative power plant– 140 MW PC with cold-side ESP firing bituminous– Plant type provides most challenge to CEMS
• Collected data over 5 months with 2 Relative Accuracy Test Audits (RATAs)– Total mercury using Ontario Hydro
• Included ORD’s wet CEMS
![Page 11: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/11.jpg)
Phase IInitial RATA
1 2 3 4 5 6 7 8 9 10 11Run Number
0
5
10
15
20
Ontario Hydro Dry CEMS #1
![Page 12: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/12.jpg)
Phase IFinal RATA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15Run Number
0
5
10
15
20
Ontario Hydro Wet CEMS Dry CEMS #2
![Page 13: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/13.jpg)
Phase IResults
• Collected evidence of stable, reliable calibration standards– Elemental and ionic
• Demonstrated no mercury loss in sample handling system
• Showed wet CEMS met draft RATA criteria
![Page 14: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/14.jpg)
Phase IIDescription
• Continued with 2 Phase I CEMS– Modified dry CEMS converter– Relocated wet CEMS to trailer
• Tested 4 new CEMS – 3 with differing dry conversion systems– 1 with plasma emission spectroscopy
• Included EPRI’s carbon tube sampler • Gathered reliability and operational data
![Page 15: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/15.jpg)
Phase IIMonitor Trailer
• Instruments (left to right)– Envimetrics, Mercury Instruments, Genesis, Opsis,
Durag, PS Analytical
![Page 16: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/16.jpg)
Phase IIEPRI’s Carbon Tube Sampler
![Page 17: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/17.jpg)
Phase II Results (ready spring 03)
• Reliability, cost, and operational dataover 3 months
• Analysis of – Differing approaches
• Plasma emission spectroscopy and X ray fluorescence
– Differing interference minimization• Larger volume systems and manual response
correction
![Page 18: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/18.jpg)
Phase IIInitial RATA (preliminary)
1 2 3 4 5 6 7 8 9 10 11 12Run Number
0
5
10
15
20
Ontario HydroWet CEMS
Dry CEMS #2Dry CEMS #3
EPRI
![Page 19: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/19.jpg)
Phase IIFinal RATA (preliminary)
1 2 3 4 5 6 7 8 9 10 11 12Run Number
0
5
10
15
20
Ontario HydroWet CEMSDry CEMS #2
Dry CEMS #3Dry CEMS #4Dry CEMS #5
X ray CEMSEPRI
![Page 20: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/20.jpg)
Planned Phase III
• Determine low level, co-pollutant impacts (by Jun 03)
• Manage NIST standards development (by Jan 06)
![Page 21: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/21.jpg)
Planned Phase III
• Evaluate CEMS at better controlled full scale power plant (by Aug 03)– Dry FGD with SCR and baghouse firing
subbituminous coal– Evaluate carbon tube sampler with EPRI
![Page 22: Mercury Monitoring Update for the Utility MACT Working Group](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816836550346895dddf21a/html5/thumbnails/22.jpg)
Planned Phase III
• Evaluate CEMS at full scale power plants (by Jan 04)– Wet scrubber firing bituminous coal or– Uncontrolled unit firing subbituminous coal