Menchie’s
Brianna Broadwater, Brendon Wilsey, Jared Laird, and Margarette Bou
![Page 2: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/2.jpg)
Brief History• First store in Valley Village, Los Angeles, California in May 2007
• Started franchising in 2008
• Mission Statement “we make you smile”
• Delivers mission through employing the 3-P principle: People, Place, and Product
• 518 locations around the world
![Page 3: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/3.jpg)
Current Operations StrategyThree Phase System
Up to two channels
Self-Service:
Phase 1: Customers take cup, choose flavors
Phase 2: Customers add fruits or candy
Phase 3: Customers pay
Phase 1
Phas
e 2
Phase 3
![Page 4: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/4.jpg)
Customer (Group)
Time In Time Out Wait Time (seconds)
# of Phases # of Server # of Fro-Yo Service Time (minutes)
1 5:06 PM 5:11 PM 0 3 1 5 5
2 5:20 PM 5:26 PM 0 3 1 2 6
3 5:25 PM 5:28 PM 0 3 1 1 3
4 5:26 PM 5:30 PM 0 3 1 1 4
5 5:27 PM 5:31 PM 10 3 1 1 4
6 5:31 PM 5:34 PM 0 3 1 2 3
7 5:32 PM 5:37 PM 0 3 1 2 5
8 5:34 PM 5:36 PM 0 3 1 1 2
9 5:37 PM 5:39 PM 0 3 1 1 2
10 5:37 PM 5:42 PM 0 3 1 1 5
28 6:21 PM 6:26 PM 0 3 1 1 5
29 6:22 PM 6:28 PM 0 3 1 1 6
30 6:24 PM 6:29 PM 0 3 1 1 5
AVERAGE 7.33333 1.566667 4.8
![Page 5: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/5.jpg)
Advantages and Disadvantages of Current PracticeADVANTAGES
• Simple and Efficient• Employee labor• Cost structure (Weight)
• Self-Service, customer customization• Whatever combination they want.• However much they want.
• System able to Handle Traffic• Average wait in line during peak
hours: 7.3 seconds.
DISADVANTAGES• Customers make decision in
system• Customers spend on average 4.8m
in system
• Clustering and subsequent bottlenecking• Majority of time spent choosing
flavors• random clustering
• No clear exposure to Menchies’ other products• Menchie’s other products not visible
or in the system. (Cakes)
![Page 6: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/6.jpg)
To help alleviate bottleneck:
1.Make signs clearer
2.Add “New Flavor” sign to call attention
Insert other products into system:
3.Cake sign above the flavors
Possible Improvement of Current Practice
![Page 7: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/7.jpg)
Current Practices for Quality Management Control
Strawberries
• Ordered in 2-3 cases
• High demand
• 1 case= 4 packages, 32 oz
• 1 package makes 2 batches
• Avg. demand = 3 batches/day
Bananas
• Ordered in single cases
• Low demand
• SS = as low as 2 bananas
• LT = 1 day
• perishable
![Page 8: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/8.jpg)
Quality Management ControlStrawberries Bananas
# cases an order 3 1
number of packages a case 4 (32 oz) 6 (1/2 lb)
# batches per package 2 1
# batches used per day 1-5 depending on demand 1-2 depending on demand
Costs 6.43 per package .59 a lb
25.72 per case 3.54 a case
3.22 per batch .30 a batch
Last Order date 2/20/2016
max inventory 4 cases 2 cases
Lead Time 1 day 1 day
last time? fridge 1-3d cut 5-7d whole 5-7 in fridge
counter 1 day cut , 1-3 day whole 5 hours sliced
freezer 6-8m whole 3-4m cut 2-5 months in freezer
![Page 9: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/9.jpg)
Quality Management Control
![Page 10: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/10.jpg)
Advantages and Disadvantages for Quality Management ControlADVANTAGES
• keeping up with demand
• small lead time• reduces risk of a stockout
• small safety stock• reduces risk of a stockout
DISADVANTAGES
• perishable
• bad fruit = wasted expense
![Page 11: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/11.jpg)
Possible Improvements of Current Practices for Fruit Quality1. Ordering less fruit for delivery, increasing the number of deliveries
• High level quality for Menchie’s patrons• Set a new delivery schedule
2. Move bananas storage from from fridge to freezer• Cut back cost of wasted bananas
• $47*518 locations = $24,346 savings a year from Bananas• Reducing food waste footprint
![Page 12: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/12.jpg)
Overall, Menchie’s is very efficient• Simple System
Operations System:• Can be more efficient• Save time & Maximize Merchandising
Quality Management Control:• Save money on Fruits• $47*518 locations = $24,346 savings a year from Bananas
Summary
![Page 13: Menchie's Operations Management](https://reader031.fdocuments.us/reader031/viewer/2022030216/588854f41a28ab951c8b69ff/html5/thumbnails/13.jpg)
Questions?