Melton Town Centre Redevelopment Stage 2 …...The Melton Town Centre is being transformed to create...

2
The Melton Town Centre is being transformed to create an attractive, vibrant accessible and safe space for people. The proposed redevelopment will provide opportunities for engagement and activation of the public realm through the creation of spaces for both passive and social activities as well as organised events. The reinvigorated town centre will assist in attracting visitors and stimulation of local businesses. The City of Melton would like to acknowledge the contribution made by the Australian Government’s National Stronger Regions Fund and the Victorian Government’s, Interface Growth Fund towards the Melton Town Centre Redevelopment. Bruce Marshall Place Manager Economic Development & Advocacy P: 9747 7200 E: [email protected] Melton Town Centre Redevelopment May 2016 www.melton.vic.gov.au/meltontowncentreredevelopment Stage 2 Construction Fact Sheet Melton Town Centre Master Plan Artist Impression View 1 Artist Impression View 2 Artist Impression View 3 Former Melton Courthouse Informal Stage Shelter and Taxi Rank Upgraded Amphitheatre Sculpture Public Toilets IGA Truck Loading Zone Civic Lawn Consolidated Car Park Clock Tower Upgraded Laneway IGA Melton Learning and Library Hub Stage 2 Extent of Works Boundary Artist Impression View 1 Location Artist Impression View 2 Location Artist Impression View 3 Location Legend 1 1 1 2 2 3 3 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 12 12 13 13 11

Transcript of Melton Town Centre Redevelopment Stage 2 …...The Melton Town Centre is being transformed to create...

Page 1: Melton Town Centre Redevelopment Stage 2 …...The Melton Town Centre is being transformed to create an attractive, vibrant accessible and safe space for people. The proposed redevelopment

The Melton Town Centre is being transformed to create an attractive, vibrant accessible and safe space for people. The proposed redevelopment will provide opportunities for engagement and activation of the public realm through the creation of spaces for both passive and social activities as well as organised events.

The reinvigorated town centre will assist in attracting visitors and stimulation of local businesses.

The City of Melton would like to acknowledge the contribution made by the Australian Government’s National Stronger Regions Fund and the Victorian Government’s, Interface Growth Fund towards the Melton Town Centre Redevelopment.

Bruce MarshallPlace ManagerEconomic Development & AdvocacyP: 9747 7200E: [email protected]

Melton Town Centre RedevelopmentMay 2016

www.melton.vic.gov.au/meltontowncentreredevelopment

Stage 2 Construction Fact Sheet

Melton Town Centre Master Plan

Artist Impression View 1 Artist Impression View 2 Artist Impression View 3

Melton Town Centre Master PlanBelow is the Master Plan of the Melton Town Centre for Stages 2 and 3. Stage 1 is complete being the Taxi Shelter.

Former Melton Courthouse

Informal Stage

Shelter and Taxi Rank

Upgraded Amphitheatre

Sculpture

Public Toilets

IGA Truck Loading Zone

Civic Lawn

Consolidated Car Park

Clock Tower

Upgraded Laneway

IGA

Melton Learning and Library Hub

Stage 2 Extent of Works Boundary

Artist Impression View 1 Location

Artist Impression View 2 Location

Artist Impression View 3 Location

Legend

1

1

1

2

2

3

3

1

22

33

44

5

56

6

7

7

8

8

9

9

10

10

11

12

12

13

13

11

Page 2: Melton Town Centre Redevelopment Stage 2 …...The Melton Town Centre is being transformed to create an attractive, vibrant accessible and safe space for people. The proposed redevelopment

Melton Town Centre Redevelopment

Stage 2 Construction Fact Sheet

High Street

McKenzie Street

Bakery Square

Wallace Square

Henry Street

Unitt Street

Palm

erst

on S

treet

Ale

xand

ra S

treet

STAGE 2

Stage 2 Construction Boundary

Over the past 3 years Melton City council have undertaken 3 rounds of community engagement capturing feedback from the community and traders to incorporate into the development of a master plan.

Documentation plans were then prepared by specialised external consultants such as landscape architects, engineers, signage and lighting specialists to define details of elements, the cost and how to construct the works.

Stage 2 was then advertised for contractors to be shortlisted by demonstrating their relevant experience and ability. The contractors that passed this evaluation were then asked to submit prices to be assessed by a panel and then interviewed.

This process has now lead us to the commencement of construction which is anticipated from May 2016 and open for operation by December 2016.Stage 2 Extent of Construction Works

Pedestrian Access Plan During Stage 2 Construction

May 2016