Meeting with the members of the organisation “Green-Project” Riga, 22nd of August, 2012
description
Transcript of Meeting with the members of the organisation “Green-Project” Riga, 22nd of August, 2012
22.08.2012 1
Meeting with the members of the organisation “Green-Project” Riga, 22nd of August, 2012
Renewable energy sources use in the Riga city
Dr.sc.ing. Maija Rubīna, Director of Riga Energy AgencyJuris Golunovs, Head of Energy Efficiency Information Centre of Riga Energy Agency
22.08.2012 2
Riga City Sustainable Energy Action Plan 2010-2020 (SEAP)
• Riga signed the Covenant of Mayors in the year 2008 and assumed an obligation
20-20-20 at 2020
• SEAP was approved by the Riga City Council in 2010
• The first progress report of SEAP was worked up in 2011. There was pointed out that CO₂ emissions decreased by 49% compare to 1990.
22.08.2012 3
Introduction of RES types use in Riga:
• hydroenergy – Riga HES (Daugava cascade) connected to the power supply system of Riga
• biogas
• solid biomass
• subsurface ground heat
• solar energy
• electric cars
22.08.2012 4
B I O G AS
Biogas cogeneration (CHP) plants:
◙ Sewage water treatment plant “Daugavgrīva” (LtD “Rigens”) – 2,1 MWel.; 2,6 MWth;
◙ LtD “Getliņi EKO” solid communal waste treatment plant – 5,3 MWel.; 6,8 MWth.
Heat to be used in the greenhouses farm.
22.08.2012 5
Solid biomass – wood chips
JSC “Rīgas siltums” - main operator of centralized district heat supply in Riga
The target – increase the share of solid biomass up to the 20% in the heat supplier fuel balance before the year 2015
22.08.2012 6
SUBSURFACE GROUND HEAT
Riga municipality installed space heating based on the ground heat pumps in the two kindergartens, thereby closed the two coal-fired boiler houses:
Kindergarten “Kastanītis” – 10 thermal probes in vertical boreholes with depth – 120m;
Two stage heat pump with the total capacity 57,5 kW
22.08.2012 7
SUBSURFACE GROUND HEAT (2)
Kindergarten No 108 in the neighbourhood Mežaparks - 12 thermal probes with depth – 80m;
Two heat pumps (2 x 29 kW)
22.08.2012 8
SOLAR ENERGY
0
50
100
150
200
250
Jan
Feb Mar Apr
Maij
sJū
n Jūl
Aug Sep OktDec
Berlīne
Helsinki
Stokholma
Kopenhāgena
Rīga
Global monthly solar radiation on horizontal surface in Nordic cities of Europe (kWh/m²):
Most important solar PV plant in Riga was installed by the hazardous waste treatment company “Zaļā Latvija” LtD - with the annual production capacity 156.000 kWh
22.08.2012 9
ELECTRIC CARS IN RIGA
First registered electric cars (8) in Latvia are in Riga, incl.:
- Riga municipality – 5 pcs;
- JSC “Latvenergo” – 2 pcs
- electric cars sales dealer – 1 pcs
There was registered in Riga also the car with both electrical and gasoline engines, which is the famous in the world OSCAR - first electric car – the participant of Dakar international rally competition
22.08.2012 10
ELEKTRIC CARS IN RIGA (2)
22.08.2012 11
Kontaktinformācija:
www.rea.riga.lv
tel. +37126403004
tel. +37128356246
Thank you for attention!