Meeting Summary Notes - dart.orgdart.org/.../AFGMeetings/NorthDallasAFGSummary.pdfMeeting Summary...

33
1 Meeting Summary Notes Project: DART Cotton Belt Subject: North Dallas Area Focus Group Meeting Date: Monday, September 11, 2017 at 7:00 PM Location: Campbell Green Recreation Center, 16600 Parkhill Drive, Dallas, TX 75248 Attendees: DART Tim Mckay, EVP of Regional Development Steve Salin, VP of Rail Planning John Rhone, VP of Capital Design and Construction Mike Miles, VP of Government Relations Chad Edwards, AVP of Capital Planning John Hoppie, Cotton Belt Project Manager Rosa Rosteet, Community Affairs Lawrence Meshack, Community Affairs General Planning Consultant (GPC6) Mark Martin, Sr. Projec Manager Tom Shelton, Project Engineer Amanda Stahlnecker, Sr. Railroad Engineer Kris Lloyd, Environmental Planner Dianne Tordillo, Public Information Specialist Stefanie Tapke, Public Information Coordinator Dallas Area Rapid Transit (DART) conducted its second North Dallas Area Focus Group (AFG) meeting on Monday, Sept. 11, 2017. The purpose of the meeting was to provide updates on various topics based on the last meetings about the Cotton Belt Corridor Regional Rail project and discuss next steps for for the project. Attachments Presentation Sign-in sheets Email invitation Handout Flip Chart Notes Welcome & Introduction Lawrence Meshack, DART Community Engagement, welcomed attendees and introduced John Hoppie, Cotton Belt Project Manager. Agenda AFG Concerns: AFG seeks binding resolution or codification that freight will be adandoned permanently in North Dallas AFG requests elimination of some or all North Dallas stations AFG requests that DART consider alternate vehicles such as hydrogen cell which may be quieter

Transcript of Meeting Summary Notes - dart.orgdart.org/.../AFGMeetings/NorthDallasAFGSummary.pdfMeeting Summary...

1

Meeting Summary Notes Project: DARTCottonBelt

Subject: NorthDallasAreaFocusGroupMeeting

Date: Monday,September11,2017at7:00PM

Location: CampbellGreenRecreationCenter,16600ParkhillDrive,Dallas,TX75248

Attendees: DARTTimMckay,EVPofRegionalDevelopmentSteveSalin,VPofRailPlanningJohnRhone,VPofCapitalDesignandConstructionMikeMiles,VPofGovernmentRelationsChadEdwards,AVPofCapitalPlanningJohnHoppie,CottonBeltProjectManagerRosaRosteet,CommunityAffairsLawrenceMeshack,CommunityAffairs

GeneralPlanningConsultant(GPC6)MarkMartin,Sr.ProjecManagerTomShelton,ProjectEngineerAmandaStahlnecker,Sr.RailroadEngineerKrisLloyd,EnvironmentalPlannerDianneTordillo,PublicInformationSpecialistStefanieTapke,PublicInformationCoordinator

DallasAreaRapidTransit(DART)conducteditssecondNorthDallasAreaFocusGroup(AFG)meetingonMonday,Sept.11,2017.ThepurposeofthemeetingwastoprovideupdatesonvarioustopicsbasedonthelastmeetingsabouttheCottonBeltCorridorRegionalRailprojectanddiscussnextstepsforfortheproject.

Attachments

• Presentation• Sign-insheets• Emailinvitation• Handout• FlipChartNotes

Welcome&Introduction

LawrenceMeshack,DARTCommunityEngagement,welcomedattendeesandintroducedJohnHoppie,CottonBeltProjectManager.

Agenda

AFGConcerns:

• AFGseeksbindingresolutionorcodificationthatfreightwillbeadandonedpermanentlyinNorthDallas

• AFGrequestseliminationofsomeorallNorthDallasstations• AFGrequeststhatDARTconsideralternatevehiclessuchashydrogencellwhichmaybequieter

2

DesignUpdate:

• Engineeringo Willbeginbuildingsingle-track,thenexpandtodouble-trackeventuallyo Single-anddouble-trackareascannotbedeterminedyetsincetheoperationsmodelis

stillbeingdevelopedo Typicalsectionswereviewed

• Stationso Names

§ NorthlakeStationisnowCypressWatersStation§ RennerVillagestationisnowCoitStation§ UTDStationisnowUTDallasStation

o Locationandlength§ 350-footplatformtoaccommodateavehiclesimilartoTEXRail’sFLIRT§ Platformsapproximately24inchestall,similartovehiclesusedinFortWorth§ Sideandcenterplatformconceptswillbeused§ Conceptualarchitecturalrendering§ Stationplanviews

o Stationswithinfocusgrouparea§ KnollTrail§ PrestonRoad§ CoitStation§ UTDallas§ DARTisclearingupto12stationsenvironmentallyalongthecorridorbutmany

ofthemwillbedeferred§ NorthDallasistheonlyareawhereresidencesareonbothsidesofthecorridor

EnvironmentalUpdate:

• Documentationofexistingconditionsalongthecorridor:o Landuseo Parksandrecreationo Vegetationandwaterresourceso Historicresources

• NoiseMitigation:o A noise monitoring program has been initiated to characterize the existing noise

conditionsatrepresentativenoise-sensitivereceptorsalongtheCottonBeltCorridor§ Noise monitors were installed at 27 locations to collect 24-hour noise

measurementsalongthecorridor§ Noisemonitors were installed at 11 locations to collect short-term, one-hour

noisemeasurementsalongthecorridoro Finalnoiseanalysis cannotmove forwardunlessengineeringandoperationsmodeling

arecomplete;nextphasesinclude:§ Assesment§ Identificationimpacts(perFederalTransitAdministrationcriteria)§ Recommendmitigation§ Quietzonerecommendationsforresidentialareasalongthecorridor

3

TrafficUpdate:• Trafficanalysisnotcomplete• MitigationrequiredatHillcrestRoadandCoitRoad

RidershipUpdate:

• Comparisonofindividualstationridershiponopeningdayversusprojectedridershipin2040• Theprojectionsarebetteratpredictingoveralllineridershipthanindividualstationridership

CommunityIntegration:

• Community integration features such as fences, walls, trails and landscaping will beincorporatedintotheprojectsubsequenttoidentificationofimpactsandrequiredmitigation

• DARTwillwork incooperationwiththeNorthCentralTexasCouncilofGovernmentsand localjurisdictionsforimplementationofcommunityintegrationfeaturesincluding:

o Soundwalls:§ Noiseimpactanalysiswilldeterminewherewallsarerequired§ DART will work in cooperation with local jurisdictions for consideration of

additionalwallso Trails:

§ Currentlyhaveplaceholdersfortrailswheresomeimplementedwithrailline§ DARTwillworkincooperationwithNCTCOG

UpcomingCommunityOpenHouses:

• Monday,September18,2017,6:30p.m.DeWittPerryMiddleSchoolCafeteria1709EastBeltLineRoad,Carrollton,TX75006

• Wednesday,September20,2017,6:30p.m.RichardsonCivicCenter411WestArapahoRoad,Richardson,TX75080

• Monday,September25,2017,7:00p.m.ParkhillJuniorHighSchoolCafeteriA6500ShadyBankDrive,Dallas,TX75248

QuestionandAnswerSessionThefollowingquestionandanswerstatementsarefromtheopenforumpartoftheareafocusgroupmeetingheldMonday,Sept.11,2017.

MattNeville-HighlandSpringsRetirementCommunityWhatistheheightoftheproposedwall?

JohnHoppieThatwouldbebasedonthegradenexttoitandwherethewallis.Thewallheightisyettobeconfirmed.

DavidDick-PrestonwoodTrailsCanyouidentifywherethestationwouldbealongKnollTrailDrive?

4

JohnHoppie(ReferencesthemapoftheKnollTrailStation).ThisisKnollTrailDriverunningnorthandsouthhere.TheDallasNorthTollwayisjustoffofthepagehere,andthentheCottonBeltcrossesjustnorthofArapahoRoad.

TomWood-PrestonGreenHomeownersAssociationWhereisFairhillSchool?

JohnHoppie(ReferencesthemapofPrestonRoadStation,pointingtothelocationofFairhillSchoolonthemap).

RabbiAryehRodin-CongregationOhevShalomWhatdoesmitigationmean?

JohnHoppieMitigationmeanstotaketheimpactandlessenitbacktowhereitisnoworreduceitevenfurther.

SandyGreyson–DallasCityCouncilCanIseethetrafficnumbersforHillcrestRoadversusCoitRoadandPlanoParkway?

JohnHoppieYouwillbeabletoseethemallassoonastheyareready.Weareintheprocessofcompletingthemnow.

SandyGreyson,CityofDallasYoumusthavesomeideaofwhattheyarebecauseitlookslikeyouareproposinggradeseparationsonstreetsthatarenotasbusyasHillcrest.

JohnHoppieEverygradeseparationthatwearesuggestingisfromwhatwehadin2010.Wewillhavethenewnumbersveryshortly.Thereportisbeingdonebyourconsultant.

SallyWolfishIsthereanyplantoslowthetraindownwhereitcrossesDavenportRoad?Aschoolisacrosstherailroadtracks.

JohnHoppieWewouldputinsafecrossingsthatwouldkeeppeopleoutoftherailcorridor.

SallyWolfishRightnow,thereisaspeedlimitwherethereisafreightline.Oncethepassengerrailisinstalled,willthatspeedlimitstillapply?

JohnHoppieWewillhavetodetermineexactlywhatthespeedlimitwasbeforeandwhatthepreviousspeedlimitwasfor.

5

SallyWolfishIthink35milesanhour.

JohnHoppieIbelievethespeedlimitwasmadeupundertrackconditions.

TimMcKayLetmeseeifIcanansweryourquestion.Freightisalotdifferentfromcommuterrail,fromthestandpointofhowmuchmassandenergyittakestorun.Itmaytakeamileorhalfamilebeforeafreightrailstops.IthinkwhatJohnistryingtosayisthataswegothroughthecorridor,welookatalotofthings.Welookatneighborhoods,crossings,sightlines,visibilityandanotherwholesetofcriteria.Idon’tknowthatitwillbethesamespeedbutwewillsetthatspeedtohelpusachievesafetyatcrossingsandintersections.

Whenwe’recomingintoastation,thespeedsalwaysgodown.Whenwe’releavingastation,speedsarelow.Welookatalltheconditionsacrossthecorridorandtrytomatchthemup.Whatwedon’twanttohaveisaspeedprofilethatgoeshighandlow,thenhighandlow,etc.Weusuallytryandlevelitoutandwillbegenerallyconservative.Wemaydesignitforhigherspeedsforsafety.Wetypicallymatchthespeedswithenvironmentalneeds.

Idon’tknowwhatspeedthefreighttrainsweredoingwhentheyweretravelingthroughneighborhoods.Alotofthemhavetodowiththeconditionoftraffic.SoifatrackisinwhattheycallaClass1condition,that’slikea10-mileyardtrack.Ifit’sClass2,itgoesupto25miles.TypicallywewoulddesignourcommuterrailstobeClass4.Thatmeanswecouldgoupto79milesperhour.Thethingis,youlookatthelocationsofthestationsandobviouslythespeedwillgoanywherenear79milesperhoureventhoughthat’swherewewouldbeabletodesignittoward.Itisjustasafetyfactor.

Wetendtobeoverlysafewiththedesignandwetendtobeoverlysafewiththespeed.Wearenotthereyetbecausewehavenotfinishedallthephysicaltracks,crossingsandgrades.Weareprobablyonlyatfivepercentwhenitcomestopullingallofthatstufftogether.Weneedabitoftime.

Oncewegetthere,wewillsitdownwithyouallandwewillgiveyousectionbysectionofwhatweanticipatetoproposeforthiscommunity.Wearenotthereyet,butyeswewilltakesafetyintoconsideration.Doesthathelp?

SallyWolfishYes.

BobMoore–PrestonGreenHomeownersAssociationAsfaraschildrencrossingtherail,whatkindofsafetymeasureswillbetaken?

JohnHoppieWewillhavepedestriangates,signalsatthecrossingwithflashinglightsthatwillbeactivitatedwhenatrainiscoming.

6

WaltMarston–HillcrestManorHomeownersAssociationDoyouhaveanexampleofthatalreadyinplace?

JohnHoppieWehavealightrailsystemthat’salreadyinplacewithgatesandsignalsrightnow.TheCottonBeltrailwillprobablyhaveamoreheightenedsecuritythanlightrailbecauseofthequietzonesandextrarequirementsfromtheFederalRailroadAdministration(FRA).

DaneCofer–CongregationOhevShalomArethesethesametypethattheyusefortheDentonCountyTransportationAuthority(DCTA)?

TimMcKayProbablynot.Insomelocationsmaybe.Quietzonesrequireyoutohavequadgates,whicharegatesthatcomedowninallfourquadrants.Itrequiresyoutohavearaisedmedium.Andthenthere’scommunicationtrainsignalsthataresentbackandforthinacontinuousmanner.Thereareeightcriteriayouhavetomeetforaquietzone.Allthosecriteriawillbemet.Partofitisvisibility,speed,timingofthegates,closeproximitytoabunchofcrossings.Theremaybeanareawhereyouwouldhavetwocrossingsthatareclosetogetherandessentiallythegateswillactivitatewithinafewsecondsfromeachotheronlybecausethey’rethatclose.Aswegothroughthat,typicallyonthesidewalks,youwouldhavethegatespositionedtowheretheycouldcomedownonthesidewalksandcanhaveaphysicalbarrieronthesidewalks.Thisissothatyouwouldnottohaveasituationwheretherewouldbeagatefortrafficandnotonthesidewalk.Doesthatmakesenseandhelpansweryourquestion?

DaneCofer–CongregationOhevShalomYesitdoes.Ijustwantedtoknowwhetherthereareexistingexamples.

TimMcKayThereareseveralalongtheTrinityRailwayExpress(TRE).ThereareafewuptherealongDentonCounty.Wecangetyousomeexamplesofwhatsomeofthosemightbe.Justunderstandthatsomeofthoseexamplesmaynotbethecriteriathatyouareconcernedwithhere.Justbecauseitisaquadgate,itdoesnotnecessarilymeanthatitisbyaschoolorjustbecauseitisaquadgateithastodowithnoise.Itdoesnotmeanthatthereareotherprotectivebarrieratthecrossing.Thosethingsallhavetobeuniquelyapplied.

SandyGreysonWhopaysforthegatesandimprovementsyourneedtogetaquietzone?

JohnHoppieDARTwillbepayingforthat.Wewouldhavetodoanapplicationwiththecity,butitisnotcityfunded.

TimMcKayItisDARTfunded.Wewillpackageeverythingupandworkwithjurisdictionalauthoritiesandcities.Thecityactuallyhastosubmitforthequietzone.

7

SandyGreysonThat’sfine.Ijustwanttomakesurewearenotgoingtopayforit.

JohnHoppieItwillbepartofourfundformitigation.

BobMooreJohn,atwhatpointwillridershipbreakeven?Whatwillyourridershipnumbersbebeforeyoubreakeven?

JohnHoppieWedon’tbreakeven.Transportationdoesn’tpayitselfoff.Doyoumeanwhatisthetrade-offbetweenonestationfromanotherstation?

BobMooreYes.

JohnHoppieRidershipbecomespartofthecontributinginformationanditwilltieinwithotherstationsthathavelowridership,pooraccess,noparking,etc.Wedohavelightrailstationsthathavelowridership,andprojectedlowridership.Itreallydependsonsite-specificconditionsandinformation.

JoshCohen–AttendeeWhatadditionalinformationwillyouhavefortheopenhouses?

JohnHoppieTherewillbenonewinformationattheopenhouses.Itwillnotbemorethanwhatwehavetoday.Weareopeningituptotheentirecorridor,notjustthisareafocusgroup

DennisDeShazer–PrestonwoodHomeownersAssociationAtthelastmeeting,thisissueofdoubletrackingwasleftopenforinputfromthecommunity.IknowDART’spositiononthatisifwedoitnow,wedonothavetodoitlater.ButI’mnotsurewhattheconsensusisnow.Thewayyou’representingtonightmakesitlooklikedouble-trackisforsure.

JohnHoppieDouble-trackingisstillopenfordiscussionrightnow.

SallyWolfishOntheissueoftrails,willtherebetrailsinpeople’sbackyards?ThetopicoftrailsalongtheCottonBeltseemsliketherewillbebothatrainandatrailinmybackyard.Thatisalotofpublicaccessthere.

JohnHoppieItisawidecorridor.Weareplanningfora100footwidecorridor.Therewillberoomfortwotracks,atrailandanaccessroadwithinourcorridor.Ifyoudon’twantatrail,speakupandwewouldbegladtolistentothat.

8

DavidDickWhatsideofthesoundwallwouldthetrailbe?

JohnHoppieItwouldbeontheoutsideofthetrain.

TimMcKayHere’sthething.Itdependsonhowthezoneisprofiledinthatarea.Ifyousaythatifthesoundwallwasofftotheside,thenthereshouldbesomethingthatseparatesthehikeandbiketrail.Wecannothavepeoplejustcrossingwherever.Ifthat’sthecase,wewillgetfolksouttherewhatwillgoandjumpsometracks.Wehavenotdeterminedexactlywherethetrailswillgorightnow.Weareinthesoundmodelingprocess.WeareworkingwithCraigJanssen(CraigEstatesHomeownersAssociation)whoactuallylivesalongthatcorridor.Hetookhisownduplicatereadings.Hisbaselineresultsareessentiallythesameasours.Bothgroupsareworkingthroughsomecalculations.Ifyou’reinterestedyoucansitdownandtalkwithhimandhewouldbeabletogiveyouabetterpicture.Thisisnotbasedonanymodel.Thisisjustapossibleconfiguration.Itmaymeanthatthosewallswillbeclosetothetracksinordertomitigatethenoisethatcomefromtherail.Or,theymaybefartheraway.Wearejustnotthereyet.

DavidDickThebiketrailwillnotbeinsidethesoundwallwillit?

TimMcKayItdepends.Somewallsareforsoundandsomeareforvisualreasons.Itcouldbeinsidedependingonthesoundmodel.Theywouldstillhavetobeseparatedfromthetrack.

DavidDickSotherecouldbeawirefencethatisinsideofthewall,andanotherfencebetweenthetrailandtherailtrack?Ifthefenceisoutsideofthemitigationwallthenthereshouldbeanadditionalwirefencetothesideofthebiketrailinordertopreventanyofthebikeriderstogooffthetrail.

TimMcKayWhenyoulookattheslidethatshowstheright-of-way,itismeanttoshowyouhowmuchspacewewillhavealongthecorridor,buttheconfigurationonhowitisallactuallysetuphasnotbeendeterminedyet.Soitisgoodthatyouaresharingthiswithusnow.

DavidDickIamabikeriderandIusethetrails.ItistheonlythingaboutthisprojectthatIaminterestedin.

DennisDeShazerWhatisthetimeperiodofwhenyouwillbeabletolayoutthepotentialconfigurationofthings?

TimMcKayMysuspectisthatit’sprobablygoingtobeabout60daysfromnowtopullallthattogether.SoIwouldsayNovemberorDecembertimeperiod.Weareactuallygoingtostartlayingthoseoutforyou.Keepinmindthatwearelookingatadesign-buildprojectdelivery.What’simportantisthatwegetthingsfixed

9

asmuchaswecan.Asdesignisfinished,wearestillgoingtohavedialogue.Wewillprobablyonlygoupto10percentdesignbeforeweputitoutfordesign-buildsolicitation.Wewanttotrytofixasmuchaswecan,butsomethosethingsmaystillhavetomoveasweworktowardthefinaldesignprocess.

Pleaseunderstandthatwhilewearegoingtostartlayingthingsouttoyou,wemightstillsaywedonotknowalltheanswersasofyet.Doesthatmakesense?

DennisDeShazerThankyou.Yes,thatdoeshelp.Itisjusttheonlywaywewillknowwhereeverythingis.Wewillactuallyknowhowfarwalls,creeksandrailare.Itallgetsrealatthatpoint.

JackDaniels–HighlandSpringsHomeownersAssociationAreyoustillconsideringUTDallasandCoitRoadstations?

JohnHoppieYes,botharestillunderconsideration.

DebTarantino–HighlandsofMcKamyHomeownersAssociationInour2.6-milenorthDallascorridor,doyouknowforsurethereisroomforeverythingthatyouaretalkingabout?

JohnHoppieThereisroomforallofit.Thereisnofreightrailinyourarea,buttherearemoreopportunitiesfortrailinNorthDallasthanotherareas.Plusthereissignificantareasofright-of-wayinthisareaaswell.

TimMcKayTheanswertoyourquestionisthatwehaven’tpinneddownallofwhatwillbeincludedintheright-of-wayyet.Weneedanother60daysuntilwecanputallthelocationsinperspective.

AryehRodinIbelieveyousaidtherearetwopotentialstationsthatdonothaveparkingaccessibilityordrop-offlocationstothestation.Wouldn’tthatknockthosetwoplacesout?Whywouldwehavestationsifwecan’thaveaccessibilitytoit?

JohnHoppieNotnecessarily.Theyhavehandicapaccessinbothlocations.Theyhavepedestrianaccessandpromotesneighborhoodwalking.

AryehRodinAreyoutalkingaboutpeoplewithinwalkingdistance?Seethat’sverylimited.Tomakeastationonlyforpeopletowalkthereisprobablynotagoodidea.

MattBach–NorthDallasNeighborhoodAllianceNowthatwearesomewhatfamiliarwiththeplans,IwilltellyouthatneighborsandhomeownersI’vetalkedto,andmyselftoacertainextent,arestillshakingtheirheadsthattheCottonBeltprojectisnot

10

goingthroughLBJExpressway.HowwouldyouexplaintoaneighborwhythisisnotgoingdownLBJ?AllofthesemitigationswouldgoawayifyouusedLBJ.Whyarewenotlookingatthis?

JohnHoppieLBJisanadditionalcorridor,butnotapreventativecorridor.IfyoulookatthetraveldemandfortheCottonBeltcorridor,itisseparatefromtheLBJcorridor.

MattBachLBJclearlyhas10timesthedemandthattheCottonBeltcorridor.

JohnHoppieItisalsopossiblethatLBJis10timesmoreexpensive.

SallyWolfishIjustwanttopointouttheobviousonthePrestonRoadstation.Ifonethingabouttherailistopromotegettingpeopletotheairport,thenpeoplearenotgoingtowalkupwiththeirluggagetogotoPrestonRoadstationandgetonatrain.Thereisnotadensityinhousingthereforpeopletowalk.IliveontheothersideofthecreekfromthatandIjustdon’tunderstandwhyanymoneywillbeexpendedInthatstation.

JohnHoppieIamhappytodiscussthat.Itendtoagreewithmostofwhatyousaid,exceptforthatthenumberoneusedcorridoriscommutertraffic,asopposedtoairporttraffic.YestherearelimitationstothePrestonRoadstation.Iacknowledgeit.We’veheardyousayit.Ourboardwillknowyouropinionaboutthis.

BobMooreItisjustconcerning.Itisnexttoaschool.Thereisnoparking.Wehaveresidentialcloseby.Quitefrankly,thattrafficcircuitisverydangerous.Ifyoucantakeitoutnow,youcancertainlydoso.

JohnHoppieIhearwhatyou’resaying.Itrytomakeanefforttoeliminatethestation,butwestillhavetokeepitduetotheresolutionthatwaspassed.However,itisnotlikelytobeadvanced.

SteveSalinLet’stalkaboutthisalittlebit.ThereisaCityofDallasresolutionthatsaysthereshouldbethreestationsinNorthDallas.AllwearetryingtodoiscarryforwardthewishesanddesiresoftheDallasCityCouncilfrom2006.WehavealsoreceivedalotoffeedbackfromfolksjustlikethisgroupthatsaysespeciallythestationatPrestonRoaddoesnotmakesense.Weareworkingtoeliminateit,butwehavetogothroughaprocesstobeabletomakethecasebacktotheDallasCityCouncilthateventhoughwehavearesolutionthatsayswehavetobuildastationhere,thepublicissayingthatitisnotreallyagoodidea.IfweaskpeoplerightnowforashowofhandswhowouldliketoeliminatethePrestonRoadstation,I’dseeanawfullotofhandsgoup.Staffwouldbesayingthesamething.Pleaseworkwithusaswegothroughthisprocessandfinishupthedesign.Thenwewouldhavetogothroughtheenvironmentalprocess.Afterthat,wewouldthenbeabletogobacktocitycouncil.

11

DennisDeShazerWasn’tthistheresolutionthattooktherailunderground?

SteveSalinThat’sthedifficultythatIamdealingwith.I’vegotpartsofaresolutionthatsayonething,butthat’salsohowwegettothevehicle,whichhastheTier4environmentallyfriendlydesign.It’snotthatIampickingandchoosingbutIamtryingtohelpmakeupforyourcasesforsomeofthethingsthatyouhavesaidthatyoudonowanttosee.Wehavealreadygonethroughtheissuethatthetrenchaspectisjustnotgoingtohappen.Whatwearegoingthroughisaprocesstodemonstratethatmanyofthethingsthatwentintovariousresolutions,whetherit’sfromtheDARTBoardorthecitycouncil,haskindofgottenustothispoint.WearetryingtofindthebestfitoftheprojectinNorthDallasthatminimizesimpacts.Ihaveheardthattheremaybesomedesiretoeliminatehikeandbiketrails.Yet,theCityofDallasalsopassedaresolutionwherewearesuppsedtoaccomodattheNorthCentralTexasCouncilofGovernments(NCTCOG)regionalplanforthetrailintheCottonBeltcorridor.Thisisjustadiscrepancythatwehavetoworkthrough.Therearethingsrelativetothestations,gradeseparations,thewallsandothermitigations.Aswegothroughourdesignandenvironmentalprocess,youwillfindthattherewillhavetobealittlegiveandtakewithalloftheresolutionsandhowtheprojectcomesintofruition.Aswesaid,thereisstillabout60daysworthofworktogetupthroughtheendofNovemberwherewewillstarttobeabletoshowveryspecificdetailsabouthowfastthetrainwouldoperateandwherethestationswillbe.

AryehRodinHowmanystationsdiditspecificallysayintheresolution?

SteveSalinItsaidthreestations:westofCoitRoad,PrestonRoadandKnollTrail.

JohnHoppieTheyfollowedupwitharesolutionlastyearthatsaidallstationsinDallaswouldbewithinthreemiles.

SteveSalinSomeofthosethingsweredonerightbeforewedidthedesignwork.Itmayhavebeenabitpremature.Wearetryingtoworkthroughthedetails.ItisagoodideatohavestationsinNorthDallas,butnotnecessarilyatthethreestationsthatweareplanningon.

AryehRodinWillthatmeanyoustillmighthavetwootherlocations?

SteveSalinWemightsaythatthestationatKnollTrailmightmakethemostsense,butevenifweputthestationatKnollTrail,itisstillawfullyclosetothestationinAddison.Evenifitisinacommercializedareathatwouldhavemorewalking,butstillallowedforbustransfersandthatsortofthing,that’sabetterstationthantheonelocatedatPrestonRoadfortheexactsamereasonsthathavebeennamed.

12

ThomasRoshelle–AttendeeWhatisthemaximumfrequencyofvehiclesperhourandperdayforsingletrackversusdoubletrack?Whatisthetopspeedforsingleversusdoubletrack?

JohnHoppieWearedoingthemodelingnow,butthefrequencyofthetrainwillvarywhetherwewillhaveonetrackversustwotracks.Enoughdoubletrackareaswithinthecorridorwillachieve20minuteheadwaysorfrequencyineachdirection.Weareprojectingtoopenthesystemat30minuteheadways.Wearegoingtohavesomesingletrackandsomedoubletracksections.Itwillmaintainthesamespeeds.

ThomasRoshelleWhyistheresomuchemphasisinmatchingthevehicletotheoneinFortWorth?

JohnHoppieWesharetwostationswiththem.Wehavetomatchvehicleheightexactlyoratsomevariation.Wearealsolookingathowsomeofthetrainswillenterthestationsgoingintotheairportsothatourtraincanstopattheirstations.

ThomasRoshelleHavetherebeenanydiscussionsonhavingtheexistingDARTvehiclesstoppingattheairportandthenthatpersonwouldthentransferontotheFortWorthvehicle?Wouldthatopenupmoreopportunity?

TimMcKayWearegoingthroughthatexerciserightnow.ThereisprobablyfiveorsixrailvehiclemanufacturersthatmeetthecriteriahereintheUnitedStates.Thereisreallynobodythatmanufacturersthemhereunlesstheyshipthepartsandthenareassembledhere.However,theyaregettingcloser.AllofthedistancebetweentracksmeetgeneralstandardsforpassengerrailhereinTexas.Forplatformclearance,wehavetolookatthewidthofthevehicletomakesurewedon’thavebiggaps.Thisisgenerallynotconsideredasstructural,butmoresocosmetic.

ItisnotjustlimitedtocopyingwhateverFortWorthhas.IwilltellyouthesamethingthatIhavetoldthem.Forcircumstancesthatarereallytheirbusiness,notmine,theyarepayingwaymoreforthatvehiclethantheyshouldbe.Idon’tthinkitwouldbeagoodideaforusoranybodyelsetowalkintoasolesourcelikethat.Ijustdon’tthinkyou’regoingtogetcompetition.

Inabout30days,IwillbeinAtlantameetingwiththegroupofmanufacturers.Wehavea60percentspecificationforthevehiclethatwillbedonenextweek.Wearegoingtoputitoutforanindustryreview.Iwillgoandtalktoallofthemanufacturersthathaveexpressedinteresttomakesurethatwetrulygetthebestvehicle.

Theinterestindoingthisisthatwewillactuallyhavethenoiseprofilesforallofthis.Thiswillhaveanimpactonwhichvehicletochoosefromthestandpointofmitigation.Allofthisiskindofinterralated.Weareinthatpartwhereweareprovidinginputandsiftoutthebestthingsfortheplan,thatworkforallofus.Wecanthenmaketherecommendation,eithertotheDARTBoardorDallasCityCouncil,andsaythisistheattributesofourprojectthatseemtoworkverywell.

CookiePeadonIthinkoneofthefrustrationsthateverybodyherefeelsisthatrailisgoingtobebuiltinourbackyards.

13

Wealsodonotseeanyviableusablestationforourbenefit.WeseetheproposedPrestonRoadstationthathasnoparking,whicheliminatesalotofusage.Thepointis,IdonotthinkweareagainsthavingarailinNorthDallas,oratleasthavesomeservice,butithastoserveasausablebenefit.

IalmostcameoutofmychairwhensomeonesaidwedidnotwantanytrainsinNorthDallas.Ifweweregoingtohavetoputupwiththetrains,itwouldbenicetousethetrains.Wearenotseeingitasarealisticoptionatthispoint.Maybeit’stimeforaself-drivingcar.

TimMcKayFairenough.WehavebeenfocusedintheNorthDallaslocations.SteveandIwerejusttalking.Wewillputalittleextrabrainpowertoseeifwecancomeupwithalternateideas.Ifthatissomethingthatyou’reinterestedin,wewouldbemorethanhappytotakealook.Itmayverywellbeatracklesscorridor.

FrankPolma–HomeownerDoyouhavesomesortofcontractwithAdventureLanding?Presumptively,ifyouputastationthere,Iwouldlikethat.IwoulduseUbertogetthere.Doyouhavesomesortofeminentdomain?JohnHoppieAtthispoint,wearenotallowedtohaveanydiscussionaboutthat.Thepropertystillhastogothroughtheenvironmentalprocess.Thereareafewexceptionssuchasifthepropertyownerisgoingthroughhardshipbecauseoftheprojevt.Weidentifywhatthepropertyisandbegindialoguewiththeproperty.Wedonothaveeminentdomainpowersourselves.WegothroughtheCityofDallaswhenthatisneeded.WaltMarstonHowwillthecommunityopenhousesbeadvertised?LawrenceMeshackItwillbeonthecommunicatedthroughnormalmeasuressuchastheDARTwebsite,wordofmouth,emailnotificationsandthemedia.WaltMarstonItwillnotbemailedout?LawrenceMeshackNosir.Thereisanelectronicmechanismforsomefolksbutnotconventionalmailing.Isn’tthatrightRosa?RosaRosteetThat’scorrect.Wearenotgoingtomailany.Letusknowifyouwantustomailittoaparticularneighborhood.Wewillalsopostthemonsocialmediaandemailblasts.Wedoalotofsocialnetworkinganddigitalformsofcommunication,includinginSpanish.WaltMarstonOnethingthatIthinkpeoplearegoingtowanttoknowiswhereweareintheprojectandwhatwehavelearnedsofar.Peoplearegoingtowanttoknowwhatisnext,andwhatkindoftimelinetoexpect.Isthatgoingtobepresented?

14

JohnHoppie(Referencesslidewithprojectscheduleinformation)SusanThompson–CampbellGreenNeighborhoodAssociationWillthetrainstartrunningin2022?JohnHoppieYes,endof2022.TimMcKayLetmeclarifysothatyoudonotleavewithamisimpression.Inordertodorevenueservicein2022,wewillneedtodotesttrainsandwewillbesafetycertified.Youwillstarttoseeactivityprobablyinlate2021orearly2022.Therewillbevehiclesouttherethatwewillbetesting,tryingtomakesureallofthesystemsarelinedupandworkingtogetherpriortoservice.SusanThompsonHowmanyvehicleswillberunningwhentheservicebegins?TimMcKayTherearesomevehiclemanufacturersthatsayweoperatewithasfewaseightvehicles.Becauseyouhavetohavemaintenanceonsome,mysuspectatthispointintimeiseightto12inordertorunserviceatcontinuousheadways.Thinkaboutthisfromasingleanddoubletrackstandpoint.Oneofthebenefitsofdoubletrackingmeansthattheycanactuallydomaintenanceduringthedaybecausewecanusetheothertrack.Youcanthinkaboutthatinregardstohowitcanhaveanimpactinyourcommunity.Ifwehavejustasingletrackthroughtherewhenwehavetodomaintenance,thatmeanswewouldneedtoclosetherailatnight.Therearesomebenfitstodoubletracking.Itdoesnotalwaysmeanwearegoingtopushmoretrain.Itmayalsomeanthatweareabletoperformsomemaintenanceactivitiesduringthedaybecausewecanessentiallyshifttracksandrunonasingletrack.Sotherearesomeoperationalflexibilitytothinkaboutthereaswell.ScottGorenc–AttendeeYouwillneedtodomaintenanceatnightright?TimMcKayTherearesomethingsonsingletrackthatwehavetodoatnight.ThisisadiscussionthatIwanttohaveatthenextfocusgroupmeeting.Wewillhavemoreinformationonthemodeling.Insomeareaswhereyouonlyhaveasingletrack,itisoftentimesunavoidable.FrankPolmaWhatkindsofthingsneedtobedoneatnight?Areyougoingtoaddressgrinding?TimMcKayGrindingisoneofthethingsthatwehavetodo.Wearegoingtogetaprofileoftherailandaprofileofthewheel.Periodically,we’regoingtohavetogrindthatrailinordertokeepthatinterfaceasminimalaspossible.Ideally,thewheelcontactstherail,kindofanellipticallookingdown.Thatistheonly

15

interfacewiththerail.Thatgetswiderbecausethetrackisonaprofileanditbringsmorenoise.Grindingisanexcruciatingthingforsomeofyou.Thereisalwaysneverarighttimetodoit.Anothertaskistrackdressing.Whentheyneedtoadjustthetrack,youmaywanttocheckthatthetrackisinagoodalignmentvertically,aswellashorizontally.Thiswillreducethenoiseandmakeforbetterrides.Thesearethepredominantthings,andofcourseregularmaintenance.FrankPolmaJusthearingallofyourpoints,Ithinkitisagoodideatododoubetrack.TimMcKayThinkaboutitforaminute.Idon’twanttomakeanydecisionsforyou.Iwanttogiveyouenoughinformation.SusanThompsonIsdoubletrackingmorecosteffective?TimMcKayAbsolutely.Notonlywillitbecosteffectivebutitisalsolessdisruptionforyourcommunity.Rightnow,becausetherearenoconcretedecisions,wearegoingtodesigncompletelysothatwhateverweputintoplace,wewillnotneedtore-alignanything.Intheeventthatyoumightthinkthroughthis,wehopeyoufinditabrightideafromalessdisrpuptionstandpoint.DebTarantinoInoneoftheNCTCOGmeetngs,IheardsomebodysaythattheylovetheideaofpeopletravellingfromFortWothtoPlano.Ifwedothatonthesametrack,oneperseat,aretherethesamenoiseabatementsforourneighborhood?JohnHoppieWeareusingtheFLIRTvehiclethatTexRailisputtinginaspartofournoiseanalysis.TimMcKayThathastodowithallthevehiclenumbersandthenoiseprofiles.Thesmartthingforustodoisusetheexistingtrainouttheretousesomethingmoreconservativethanthemitigation.That’sthereasonwhyweareinterestedinwhichtrainmakesthemostnoise.Wehavetoknowalltheprofilesofthetrainsthatenterthecorridor.DebTarantinoAretheTexRailvehiclesgoingtohavethesamestandardastheonethebeingusedalongourcorridor?TimMcKayTheanswerisyes.Moreimportantly,wewantedtoplanourmitigationforanythingandeverythingthat’soutthere.DebTarantinoAreallthesetrainsgoingtohavesecuritycameras?Peoplemaybetravelingearlyinthemorningorreallylateatnight.

16

TimMcKayYestheywill.JohnHoppieCouncilwomanGreyson,doyouhaveanythingtoadd?SandyGreysonIjustwantedtotouchonacoupleofpoints.Firstofall,Ibelievethattherearevirtuallynochancesthatthereisgoingtobeanythingotherthanwhatyousaw.TheNCTCOGhasagroupcalledtheRegionalTransportationCommission(RTC)thatmakespolicyontheentirenorthcentralTexasregion.I’vebeenontheirpolicyboardfor15yearsandtheyhavesaidforyearsthattheywantthetrainstobethesameoneverycommuterrailline.TheywantthecommuterrailstobeexactlylikeTexRailoralmostexactlylikeit.Theywantthesametraintobeabletogothrougheverycommuterraillineinourwholeregion.TheywanttodomorecommuterraillinesthanjusttheCottonBelt,forexample,theywanttodoanorth-southrail.Oneofthemainreasonswhytheywantthesamevehicleisbecausetheywanttoattractthevehiclemanufacturertocometoourarea.Ibelievetheirgoalistomakealltherailcarsthesame.Theremaybetinylittledifferences.Timsaysheisgoingtotalktoabunchofmanufacturersm,butbasicallywhatDARTshowedyouiswhatyouaregoingtoget.Idon’tthinkwearegoingtohaveawholelotofabilitytochangewhatthatvehiclelookslike.Ialsowantedtomentiontoyouthatthe2006CityofDallasresolutioncalledforlightrailontheCottonBeltcorridor.Therearejustawholelotofthingsthathavechangedinthe11yearssincethatcameoutoftheDallasCityCouncil.Atthesametimethatresolutionwasbeingtalkedabout,therewasalsoadiscussionatcityhallaboutDARTupdatingitssystemplan,whicharetheplansforwhattobuildinthefuture,whentobuilditandwhichraillineswillbedonefirst.TheDallasCityCouncilsubmittedalistof10projectsthattheywantedtoseedoneinDallas.Theseincludedraillinesinthesouthernandnorthernpartsofthecity.Theyprioritizedthem.Theywantedsomeraillinesinthesouthernpartofthecitytobedonefirst.ThereisonlysomuchmoneysotherewasadiscussionhadaboutLBJFreeway.IagreewithMattearlierthatitmakesabsolutelynosensetodotheCottonBeltwhenyoucandoalineatLBJ.TheCottonBeltmighthelpthesuburbsbutitdoesn’tdoanythingforDallas.AnLBJlinewouldbeawonderfulbenefittotohelpusredevelopthatcorridor.ItmaybeacostlysolutioncomparedtotheCottonBelt.OurtwoNorthDallasrepresentativespickedtheCottonBelttobenumberthreeonthelistofprojectsoutof10,whereasLBJfellateithernineor10onthelist.ThoserepresentativesbasicallytoldDARTthattheybetterdotheCottonBeltbeforeeventhinkingaboutdoinganLBJline.Lookingbackatit,IhavetotellyouthatIamveryunhappywiththedecisions.Thisiswhywearewherewearetoday.IalsowantedtoaskDARTaboutthefundingsources.(Sandyreferencestheexhibitslistingfundinginformation)Youseesomethingtherefor$100millionfromtheFederalTransitAdministration.That’smoneycomingtoDARTfromthisRTCgroup.MichaelMorris,thedirectorofRTC,haspromisedthatRTCwillget$100millioninthosekindsoffundingifDARTagreestodoinnovativefinancing.WhereisDARTonthat?

17

Iwilltellyouguysthatinnovativefinancingislikeapublic-privatepartnership.Ifyoubringinaprivategroup,thatgivesyousaysoinhowthatlineisdesigned,developedandoperated.Hewhohasthemoneywillmaketherules.TimMcKayAsyoucanimagine,inthemiddleofasolicitation,wearetryingtogetteamslinedup.WhenwehadameetingrecentlywiththeRTC,wehadateamwhoshowedupwithoutaproposal,whichwasveryconcerningtous.WesatdownwithMichaelMorrisandexplainedtohimourfinancing.IwasnotpartoftheconversationbutwhatIwastoldwasthathehasacceptedourfinancingpackageasbeinginnovativeenough.ThereisapparentlyanagendaitemcomingupthisThursdayattheRTCwhereitisexpectedthathewillsaythat.Initiallyhewaspushingforapublic-privatepartnership.SandyGreysonRight,hesaidhewouldnotgiveyouthe$100million,andthat’sgoingtoleadtomynextquestion,whichapparentlyismovednowsothat’sagoodthing.IfMichaelMorrisdidnotgiveyouthe$100million,howareyougoingtofinanceit?TimMcKayIwillstayawayfromthatone,unlessThursdayturnsouthowwedonotwantittoturnout.SandyGreysonSohehasagreednowthatDART’sfundingandfinancingisinnovativeenough.That’sreallyagoodthing.WeshouldbehappythatDARTdidthat.Thatmeansthat’snoprivateparticipation.AsmuchasDARTmakesmesoangrymostofthetime,inthisparticularinstance,IfinditagoodthingthattheywenttoMichaelandtheysaidnopublic-privatepartnership.ThelastthingIwanttotalktoyouaboutwastheformatforthemeetingtwoweeksfromnowonSept.25.WhenIwalkedintothatmeetinglastMay,Ihadabout30angrypeoplerunuptomethatdidnotapproveoftheformat.Theysaidtheyarenotgettinganythingoutofthis.Theyweregettingconflictinganswers,andtheyfeltitwasnotwhattheyneededinordertogettheinformationtheywanted.IthinkCookiewouldagree.Shegotalotofinputafterthemeetingfrompeoplewhosaidtheopenhouseformatwasnotforus.IwrotealettertoGaryThomas,DARTPresidentandExecutiveDirector,askinghimtochangetheformatfromanopenhousetoapresentationwithaquestionsandanswerssessionlikethismeetingtonight.Ifounditveryuseful.Ithinkwhat’sgoingtohappenatthisopenhouseformatistheattendanceisgoingtobepoor.Peopletoldmelasttimethattheyarenotcomingbacktoanythinglikeitagainbecauseitwasnotusefultothem.IaskedGarytochangetheformattoapresentationwithQ&A.DARThasanadvertisementinthenewspaperandhavethingseverywherethatsaysitisanopenhouse.IhopetheyrespondfavorablybecauseIreallyfeelitisnotveryusefultohaveanopenhouse.Wewillseewhathesays.Whenwehaveananswer,IwilldiscussitwithCookieandshewillhelpdisseminatetheinformationontheCottonBeltConcernedCitizensCoalitioninformationpage.IjustwanttoletyouallknowthatbecauseIsurelydon’twanttogetpeoplecomingtoameetingandleavingasangryastheywerelasttime.DanelleErickson-Atendee

18

Sandy,whydoyouthinkDARTchosetodoanopenhouseformatanyway?SandyGreysonDARTbelievesopenhousesareagoodwaytogettheinformationout.DebTarantinoItwasapoorwaytogettheinformationout.MaybeinAddison,theyjustwanttoseetheprettypicturesofwhatmightbe.However,thisthingisinmybackyardandIwanttoknowwhatisgoingon.No,Idon’tjustwanttoseetheprettypicturesthatmayormaynotevencomeintofruition.Forourneighborhood,Ihadsomanypeoplecallingmeangry.SandyGreysonThethingthatdisappointedmewasthatImentionedittoGaryafterthelastmeetingandsodidhisboardmemberwhowasthere.Sodidalotofpeople.Heisstillschedulinganopenhouse,whichItoldhiminthelettermaybefinewiththeothercommunities.Theymightlikethat,butwedon’tlikethat.IwillletyouknowonceIgetaresponsefromhimandhopefullyitistherightresponse.BobMooreWhatdoyouthinkaretheoddsofgettingridofsomeofthesestations?SandyGreysonIthinktheoddsareprettygood.Atsomepoint,IamgoingtotheDallasCityCounciltovoteonaresolutionaboutstations,mitigationanddifferentthings.Youseehowmuchresolutionsworkwhentheychangethingsupfrom2006.However,Ithinkatthispointintheirdesignandplanning,DARTwillpayattentiontotheresolutionfromtheDallasCityCouncilandwewillhavetofigureoutwhichstationswethinkwewant.IfDARTapproachesthecityandasksforeminentdomainforAdventureLandng,Iamgoingtosayno100times.Remember,theycannotdoitwithoutourapproval.TherewillprobablybeaKnollTraillstation.Therearelike1,000apartmentsnearKnollTrailifyoutalkabouttransitorienteddevelopments.IthinkevenDARTagreesthatthePrestonRoadstationmakesnosensewhatsoever.WecancontinuediscussionsabouttheCoitRoadstation.Italsodoesn’tmakesenseforcommuterraillinestobethatclosetogether.Wehavelikefivestationsin4miles.LawrenceMeshackThankyouMs.Greyson.Wehopetoseeeachofyouintwoweeks.Althoughwehavetobeoutofthebuildinginafewminutes,wewillbearoundforanyquestionsyoumighthave.Thankyouforcomingout.

1

• AFG Concerns• Design Update

– Alignment/Cross-section/Stations• Environmental Update

– Documentation of Existing Conditions• Traffic Update• Ridership• Community Integration• Community Open Houses

Agenda

2

• AFG is seeking further assurance through binding resolution or codification that freight will be abandoned permanently in North Dallas

• AFG has requested elimination of some or all of North Dallas Stations

• AFG requests that DART consider alternate vehicles such as hydrogen cell which may be quieter.

AFG Concerns

3

AFG is seeking further assurance through binding resolution or codification that freight will be abandoned permanently in North Dallas• DART has actively sought and achieved the

abandonment of freight in North Dallas through Surface Transportation Board action (January 27, 2010)

• DART has no plans to reintroduce freight into the corridor

• Current design focuses on community integration of passenger rail only. Freight is not part of the environmental documentation in North Dallas

AFG Concerns

4

AFG has requested elimination of some or all of North Dallas Stations• There is both opposition and support for the North

Dallas stations• All stations are being cleared environmentally• DART Board has requested to participate in the

station location process• City of Dallas Council Resolution #161692; October

11, 2016

AFG Concerns

5

City of Dallas Resolution

City of Dallas Council Resolution #161692, October 11, 2016

Section 1. That the City Council has identified its highest immediate priorities for improved transit services, and urges the DART Board to include these projects for priority implementation in their 2017 20-Year Financial Plan in this order:

2. Expedited implementation of expanded bus services targeted toward the transportation needs of low income and transit-dependent riders. The City Council requests that DART develop, adopt and implement a Level of Service policy consistent with transit industry best practices including but not limited to the following service area metrics:

e. Transit rail stations should be within 3 miles of all service areas within theCity of Dallas to support multi-modal transportation options;

0

Cotton Belt CorridorArea Focus Group (AFG)North DallasSeptember 11, 2017

John Hoppie, Capital Planning

7

City of Dallas Resolution

8

AFG requests that DART consider alternate vehicles such as hydrogen cell which may be quieter.• Hydrogen cell vehicle are being tested in Germany but

have not been qualified for use in the USA.• Proposed vehicle is state-of-the art for Regional Rail

available in USA• Vehicle procurement will not exclude qualified

alternative vehicle*

AFG Concerns

* FRA Compliant* Buy America Compliant* TEXRail Compatible* Comparable Operating Costs* Fuel availability* EPA Tier IV Emission Standards* DART Size Requirements 9

Regional Rail Vehicle• Regional Rail Vehicle• Environmentally and Community Friendly

– Tier 4 EPA Emissions Standards– Noise similar to LRT

• Meets FRA Standards• Compatible with TEX Rail (FLIRT)• Self-propelled

1011

Design Update: Engineering

Revised Drawings: (Double Track Scenario)• Horizontal alignment• Vertical alignment• Typical sections

6

City of Dallas Resolution

13

Typical Sections: Initial Build

14

Typical North Dallas Cross-section

15

Design Update: Stations

Revised Station Location and Length (350-foot)• Side Platform Concept• Center Platform Concept• Conceptual Architectural Rendering• Station Plan Views

16

Design Update: Stations

267

318

17

Design Update: Stations

267

318

12

Typical Sections: Double Track

19

Proposed North Dallas Stations

20

Knoll Trail Station

21

Preston Road Station

22

Coit Station

23

Existing Grade Crossings

18

Design Update: Stations

25

Proposed Traffic Mitigation

*Mitigation could include: Signal synchronization, intersection improvements, or adding capacity

26

aA1

TEXRail Grade SeparationExisting Grade SeparationProposed Grade Separation

cA B C D E F

G

ba

1

2 3

4 5

KJ 6

H I

Key Existing Grade Separation

A SH 121

B IH 635

C PBGT

D IH35E/Frontage

E Green Line LRT

F NDT

G Preston Road

H Synergy Park

I Renner Road

J PGBT

K Red/Orange Line LRT

Key TEXRail Grade Separation

a S.B. Frontage International/Ramps

b North Airfield Drive

c SH 114

Key Proposed Grade Separation

1 S. Belt Line Road

2 BNSF/Madill Sub

3 Midway Road

4 Coit Road

5 US 75

6 Plano Parkway

Preliminary Grade Separation Analysis

a

bc

A

C

D

F

G

K

J

H

B

E

I

1

2

3

4

5

6

27

Environmental Update

Documentation of Existing Conditions• Land Use• Parks and Recreation• Vegetation and Waters Resources• Historic Resources

2829

24

Traffic Analysis (DRAFT)STREET CROSSING

LOCATION (North Dallas AFG) CITY DRAFT GRADE CROSSING ANALYSIS

MITIGATIONREQUIRED

Davenport E-W Dallas No mitigation required No

Campbell Dallas No mitigation required No

Davenport Road N-S Dallas No mitigation required No

Hillcrest Dallas Potential for some mitigation. Yes*

McCallum Dallas No mitigation required No

Meandering Dallas No mitigation required No

Dickerson Dallas No mitigation required No

COIT Dallas Analysis reconfirms need for grade separation of CoitRoad Yes

*Mitigation could include: Signal synchronization, intersection improvements, or adding capacity

31

32

A noise monitoring program has been initiated to characterize the existing noise conditions at representative noise-sensitive receptors along the Cotton Belt Corridor.• Noise Monitors* were installed at

27 locations to collect long-term (24- hour) noise measurements along the corridor.

• Noise Monitors* were installed at 11 locations to measure short-term noise (1 hour).

*Noise Monitors were NTi Audio model XL2 that conform to American National Standards Institute (ANSI) Standard S1.4 for Type 1 (Precision) sound level meters

Noise Methodology

33

34

• Assessment• Identification of Impacts (Per FTA Criteria)• Recommend Mitigation • Generally Quiet Zones will be recommend along

the most of the corridor

Noise - Next Phase

36

Community IntegrationCommunity Integration features such fences, walls, trails, landscaping, etc. will be incorporated into the project subsequent to identification of impacts and required mitigation.• DART will work in cooperation with NCTCOG and local

jurisdictions for implementation community integration features.

30

35

STATION NAME

DAILY RIDERSHIP

Opening Day 2040DFWIA AB Terminal Station 1,200 1,200North DFW Station 800 1,300Cypress Waters Station 200 900Downtown Carrollton Station 1,000 2,000Addison Station 1,000 1,700Knoll Trail Station 500 600Preston Rd Station 300 500Coit Rd Station 600 700UT Dallas Station 700 900CityLine/Bush Station 1,000 1,40012th Street Station 200 300Shiloh Station 400 700

Total 7,900 12,200

Cotton Belt Ridership

38

Trails

Trails:• DART will work in cooperation with NCTCOG and

local jurisdictions for implementation of trails along corridor

39

Cotton Belt Regional Trail (NCTCOG)

40

Open HousesMonday, September 18, 2017, 6:30 p.m.DeWitt Perry Middle School Cafeteria1709 East Belt Line Road, Carrollton, TX 75006(Parking and entrance off Warner Street)

Wednesday, September 20, 2017, 6:30 p.m.Richardson Civic Center411 West Arapaho Road, Richardson, TX 75080

Monday, September 25, 2017, 7:00 p.m.Parkhill Junior High School Cafeteria16500 Shady Bank Drive, Dallas, TX 75248

4142

42

37

Noise

• Noise impact analysis will determine where sound walls are required.

• DART will work in cooperation with local jurisdictions for consideration of additional walls

• Quiet Zones will be recommend at residential areas along corridor

Subject: Invita'onfor2ndNorthDallasAFGMee'ngDate: Tuesday,August22,2017at4:25:50PMCentralDaylightTimeFrom: StefanieTapkeTo: [email protected],[email protected],[email protected],

[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected],[email protected]

CC: RosaRosteet

PleasejoinusasamemberoftheDART

NorthDallasAreaFocusGroup(AFG)CoUonBeltRegionalRailProject

2ndMee'ng

NorthDallasAFGMonday,September11,7-9PM

CampbellGreenRecrea'onCenter16600ParkHillDrive

Dallas,TX

DARThasscheduledanAreaFocusGroup(AFG)mee'ngasplanningcon'nuesfortheCoUonBeltCorridor.

PleasejoinusonMonday,September11at7PMtohearupdates,askques'onsandexpresscommentsdirectlytoprojectrepresenta'ves.

RSVPtoStefanieTapke

[email protected]

TolearnmoreabouttheCoUonBeltCorridor,visitwww.DART.org/CoUonBelt

Notice of DART Community Open Houses

Cotton Belt Regional Rail Corridor ProjectYou are invited to attend a community open house to review the progress of the Cotton Belt Regional Rail Corridor Project. DART, in cooperation with the Federal Transit Administration (FTA), the Federal Railroad Administration (FRA), and the Federal Aviation Administration (FAA), is preparing an Environmental Impact Statement (EIS) to assess the impacts and benefits of passenger rail service on the 26-mile long Cotton Belt Corridor from DFW International Airport to Plano. Open house displays will include: • Updated alignment drawings and station layout;• Results of Traffic/Grade Separation Analysis; and • Identification of existing conditions along the corridor including, parks, cultural

resources, land uses, etc. This series of open house meetings will focus on existing conditions along the corridor and information learned in the data collection phase of the project. Future public meetings will focus on corridor impacts and mitigation.

Dates & Locations

Monday, September 18, 2017, 6:30 p.m.DeWitt Perry Middle School Cafeteria

1709 East Belt Line Road, Carrollton, TX 75006 (Parking and entrance off Warner Street)

Wednesday, September 20, 2017, 6:30 p.m.Richardson Civic Center

411 West Arapaho Road, Richardson, TX 75080

Monday, September 25, 2017, 7:00 p.m.Parkhill Junior High School Cafeteria

16500 Shady Bank Drive, Dallas, TX 75248

For More InformationPlease visit DART.org/cottonbelt or contact DART Community Engagement at 214-749-2522.

Flip Chart NotesNorth Dallas

Area Focus Group MeetingMonday, Sept. 11, 2017