![Page 1: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/1.jpg)
1
WELCOME
Wednesday, December 6, 2017
6-8 p.m.
Copper Trails Elementary School
![Page 2: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/2.jpg)
2
RESTROOM LOCATION(s)
EMERGENCY EXITS
![Page 3: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/3.jpg)
3
• Introduction of Study Team
• Meeting Purpose
• ADOT Right-of-Way Acquisition Process
• Loop 303 Timeline
• Corridor & Alternative Evaluations
• The Build Alternatives
• The No Build Alternative
• Study Next Steps
AGENDA
![Page 4: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/4.jpg)
4
ADOT Right-of-Way Acquisition Process
![Page 5: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/5.jpg)
5
Loop 303 TIMELINE
![Page 6: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/6.jpg)
6
CORRIDOR EVALUATION 2006
![Page 7: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/7.jpg)
7
ALTERNATIVES DESCRIPTION
ALTERNATIVE 2C
![Page 8: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/8.jpg)
8
ALTERNATIVES DESCRIPTION
ALTERNATIVE 3
![Page 9: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/9.jpg)
9
ALTERNATIVES DESCRIPTION
ALTERNATIVE 5
![Page 10: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/10.jpg)
10
WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition
carried forward if the proposed action (major transportation facility) were not built
• The No Build Alternative will provide the Loop 303 study team with a basis against which social, environmental, and economic impacts can be measured
• The No Build Alternative will be studied in the Loop 303 Environmental Assessment (EA) and compared with the Build Alternative
• The No Build Alternative assumes the construction of all other funded transportation projects occurs in the study area (e.g., City, County and MAG projects) would be built
![Page 11: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/11.jpg)
11
NEXT STEPS
![Page 12: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/12.jpg)
12
Question Card Review
and
Answer Session
![Page 13: Meeting Presentation | Loop 303 from Interstate 10 to ... · 10 WHAT IS THE NO BUILD ALTERNATIVE • The No Build Alternative in an environmental study is the baseline condition carried](https://reader034.fdocuments.us/reader034/viewer/2022050204/5f57cbc90af6416d6915bce7/html5/thumbnails/13.jpg)
13
YOUR INPUT IS IMPORTANT
Please send us your comments using one of the methods below:
Email: [email protected]
Phone: 855.712.8530
Mail: c/o ADOT Communications
1655 W Jackson Street, MD #126F
Phoenix, AZ 85007
Please send in your comments no later than January 5, 2018