INDEX TO EXECUTIVE COMMITTEE MEETING #11/14 Friday, January 16, 2015 MINUTES Minutes of Meeting #10/14, held on December 12, 2014 547 ONTARIO REGULATION 166/06, AS AMENDED ENBRIDGE GAS DISTRIBUTION INC. 548, 560 53 MEETING HOUSE ROAD 549 PAMELA ANGLE 549 2122498 ONTARIO LIMITED 550 CITY OF BRAMPTON 551 CITY OF MARKHAM 552, 558 REGIONAL MUNICIPALITY OF YORK 552-554, 560 39 ARTISAN TRAIL 553 2870 CONCESSION ROAD 5 553 115 BLACK CREEK BOULEVARD 554 35 BARTONVILLE AVENUE WEST 555 WOODBINE ENTERTAINMENT GROUP 555 91 RIVERVIEW DRIVE 555 101 FOREST HEIGHTS BOULEVARD 555 35 FISHLEIGH DRIVE 556 66 RUSSELL HILL ROAD 556 CITY OF VAUGHAN 556, 557 16096 THE GORE ROAD 557 167 DENNISON STREET 557 33 LYNWOOD CRESCENT 558 BELL CANADA 558 CITY OF PICKERING 559 TRANS-NORTHERN PIPELINE INC. 559 CITY OF TORONTO 559 ROGERS CABLE 560 SENECA COLLEGE OF APPLIED ARTS & TECHNOLOGY 561 1798 APPLEVIEW ROAD 561 176 MORNINGSIDE AVENUE 562 42 RIDGEVALLEY CRESCENT 562 177 VARSITY ROAD 562

Transcript of Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose...

Page 1: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

INDEX TO

EXECUTIVE COMMITTEE MEETING #11/14

Friday, January 16, 2015

MINUTESMinutes of Meeting #10/14, held on December 12, 2014 547

ONTARIO REGULATION 166/06, AS AMENDEDENBRIDGE GAS DISTRIBUTION INC. 548, 56053 MEETING HOUSE ROAD 549PAMELA ANGLE 5492122498 ONTARIO LIMITED 550CITY OF BRAMPTON 551CITY OF MARKHAM 552, 558REGIONAL MUNICIPALITY OF YORK 552-554, 56039 ARTISAN TRAIL 5532870 CONCESSION ROAD 5 553115 BLACK CREEK BOULEVARD 55435 BARTONVILLE AVENUE WEST 555WOODBINE ENTERTAINMENT GROUP 55591 RIVERVIEW DRIVE 555101 FOREST HEIGHTS BOULEVARD 55535 FISHLEIGH DRIVE 55666 RUSSELL HILL ROAD 556CITY OF VAUGHAN 556, 55716096 THE GORE ROAD 557167 DENNISON STREET 55733 LYNWOOD CRESCENT 558BELL CANADA 558CITY OF PICKERING 559TRANS-NORTHERN PIPELINE INC. 559CITY OF TORONTO 559ROGERS CABLE 560SENECA COLLEGE OF APPLIED ARTS & TECHNOLOGY 5611798 APPLEVIEW ROAD 561176 MORNINGSIDE AVENUE 56242 RIDGEVALLEY CRESCENT 562177 VARSITY ROAD 562

Page 2: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

ONTARIO REGULATION 166/06, AS AMENDED (Cont'd)76 HADRIAN DRIVE 562379 MARKLAND DRIVE 56327 BLUEHAVEN CRESCENT 563126 SPEARS STREET 5632 BRULE TERRACE 563120 EMMETT AVENUE 564192 NORTHWOOD DRIVE 56445 LYNNDALE AVENUE 564103 LOGAN AVENUE 56516 NOTLEY PLACE 565MOSAIK PINEWEST INC. 565449 PARADELLE DRIVE 56524 IVOR ROAD 566

Page 3: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

547

MEETING OF THE EXECUTIVE COMMITTEE #11/14January 16, 2015

The Executive Committee Meeting #11/14, was held by Teleconference, on Friday, January 16, 2015. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:32 a.m.

PRESENT VIA TELECONFERENCEMaria Augimeri Vice ChairBen Cachola MemberRonald Chopowick MemberGlenn De Baeremaeker MemberMichael Di Biase MemberJack Heath MemberColleen Jordan MemberMike Mattos MemberGerri Lynn O'Connor Chair

ABSENTJim Tovey Member

RES.#B131/14 - MINUTES

Moved by: Ronald ChopowickSeconded by: Michael Di Biase

THAT the Minutes of Meeting #10/14, held on December 12, 2014, be approved.CARRIED

_________________________________________

ONTARIO REGULATION 166/06, AS AMENDED

RES.#B132/14 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06, AS AMENDEDDevelopment, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, as amended, written permission from the Authority is required for:

a) straightening, changing, diverting or interfering in any way with the existing channel of ariver, creek, stream or watercourse, or for changing or interfering in any way with a wetland;

Page 4: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

548

b) development, if in the opinion of the authority, the control of flooding, erosion, dynamicbeaches or pollution or the conservation of land may be affected by the development.

A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.

Moved by: Ronald ChopowickSeconded by: Colleen Jordan

THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for the applications (EX10.1 - EX10.3 and EX10.6) which are listed below.

CARRIED

PERMIT APPLICATIONS EX10.1 - EX10.3 ARE MAJOR APPLICATIONS - REGULAR

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.1 ENBRIDGE GAS DISTRIBUTION INC.To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, and alter a watercourse located south of the end of Keele Street and Lavender Road, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the road allowance owned by City of Toronto. The purpose is to carry out works to temporarily cover and prevent further erosion and exposure of a 30" gas pipeline along Lavender Creek. Works will involve the placement of pea gravel filled metre bags along the length of the exposed gas pipeline. Through review of the information provided and identified in the Summary of Plans section, TRCA is of the opinion that the project and implementation as proposed will not cause serious harm to fish.

CFN: 52164 - Application #: 1002/14/TORReport Prepared by: Annette Maher, extension 5798For information contact: Annette Maher, extension 5798Date: December 12, 2014

Page 5: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

549

CITY OF VAUGHAN

EX10.2 53 MEETING HOUSE ROADTo construct, reconstruct, erect or place a building or structure on Lot 8, 12, Concession 7 Plan 546, (53 Meeting House Road), in the City of Vaughan, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 285.85 sq. m replacement residential dwelling, a 31.04 sq. m garage, 8.88 sq. m front porch and 15.59 sq. m rear deck associated with a municipal building permit.

CFN: 52483 - Application #: 1042/14/VAUGReport Prepared by: Anant Patel, extension 5618For information contact: Kevin Huang, extension 5307Date: January 6, 2015

TOWNSHIP OF KING

EX10.3 PAMELA ANGLETo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 2, Concession 12, (13945 Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by Pamela Angle. The purpose is to recognize the placement of fill and to allow site grading within a Regulated Area of the Humber River Watershed, in the Township of King. The placement of fill was completed without the benefit of TRCA approvals and as such an additional permit fee of 100% was applied to this application.

CFN: 50236 - Application #: 1048/13/KINGReport Prepared by: Jonathan Pounder, extension 5304For information contact: Jonathan Pounder, extension 5304Date: January 6, 2015

RES.#B133/14 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06, AS AMENDED - ERRATA APPLICATIONS

Moved by: Ronald ChopowickSeconded by: Colleen Jordan

THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for the application EX10.4 - 2122498 Ontario Limited, that had been scheduled on the agenda as an errata application, for which all the required information was received and finalized.

CARRIED

Page 6: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

550

PERMIT APPLICATION EX10.4 IS A MAJOR APPLICATION - ERRATA

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction

CITY OF BRAMPTON

EX10.4 2122498 ONTARIO LIMITEDTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Block G, Plan 636, (379 Orenda Road), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by 2122498 Ontario Limited. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a one-storey industrial addition associated with a municipal site plan application and building permit application.

CFN: 51804 - Application #: 0849/14/BRAMReport Prepared by: Tara Jahanarai, extension 5284For information contact: Quentin Hanchard, extension 5324Date: January 6, 2015

RES.#B134/14 - ONTARIO REGULATION 166/06, AS AMENDEDStandard Delegated Permits, Permission for Routine Infrastructure Works and Minor Works Letter of Approval

Moved by: Ronald ChopowickSeconded by: Colleen Jordan

THAT standard delegated permits, permission for routine infrastructure works, and minor works letter of approval granted by Toronto and Region Conservation Authority staff, in accordance with Ontario Regulation 166/06, as amended, which are listed below, be received.

CARRIED

EX10.5 STANDARD DELEGATED PERMITS

Standard Permits are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. Standard permits are subject to the authorization of designated staff appointed as Enforcement Officers, as per Authority Res.#A199/13. Standard permits are non-complex permissions consistent with TRCA approved policies and procedures and issued for a time period of two years or less.

Page 7: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

551

CITY OF BRAMPTON

CITY OF BRAMPTON - Humber River WatershedThe purpose is to remove sediments and install a new hickenbottom structure at the outlet of Farad pond, in the City of Brampton. The Redside Dace Fisheries timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry (MNRF). Through review of the information provided and identified in the Summary of Plans section, TRCA is of the opinion that the project and implementation as proposed will not cause serious harm to fish.

CFN: 51666 - Application #: 0797/14/BRAMReport Prepared by: Caroline Mugo, extension 5689For information contact: Caroline Mugo, extension 5689Date: December 09, 2014

CITY OF BRAMPTON - Humber River WatershedThe purpose is to remove sediments and install a new hickenbottom structure at the outlet of Baldwin pond, in the City of Brampton. The Redside Dace Fisheries timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry (MNRF). Through review of the information provided and identified in the Summary of Plans section, TRCA is of the opinion that the project and implementation as proposed will not cause serious harm to fish.

CFN: 51667 - Application #: 0798/14/BRAMReport Prepared by: Caroline Mugo, extension 5689For information contact: Caroline Mugo, extension 5689Date: December 10, 2014

CITY OF BRAMPTON - Humber River WatershedThe purpose is to remove sediments, deepen Carberry pond by an additional 1.0 m to a maximum 3.0 m, and install a new hickenbottom structure at the outlet of the pond in the City of Brampton. The Redside Dace Fisheries timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry (MNRF). Through review of the information provided and identified in the Summary of Plans section, TRCA is of the opinion that the project and implementation as proposed will not cause serious harm to fish.

CFN: 51048 - Application #: 0800/14/BRAMReport Prepared by: Caroline Mugo, extension 5689For information contact: Caroline Mugo, extension 5689Date: December 16, 2014

Page 8: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

552

CITY OF MARKHAM

CITY OF MARKHAM - Don River WatershedThe purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near Almond Avenue, in the City of Markham. The proposed works include replacing the existing headwall, cutting and removing 3.9 m of the outfall pipe, lining the outlet and the slope with vegetated rip rap and restoring the site with live stakes, shrubs and trees. The cold-water fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources and Forestry (MNRF).

CFN: 51588 - Application #: 0712/14/MARKReport Prepared by: Harsimrat Pruthi, extension 5744For information contact: Harsimrat Pruthi, extension 5744Date: December 16, 2014

CITY OF MARKHAM - Rouge River WatershedThe purpose is to undertake rehabilitation works at an outfall structure near Highway 7 and Main Street Unionville, in the City of Markham. The proposed works include chip and repair of the concrete headwall to its original dimensions, rehabilitation of the outlet pipe, and installation of a grate over the outlet. In water and near water works will be conducted during the Redside Dace fisheries timing window unless otherwise specified in writing by Ministry of Natural Resources and Forestry (MNRF).

CFN: 51591 - Application #: 0714/14/MARKReport Prepared by: Harsimrat Pruthi, extension 5744For information contact: Harsimrat Pruthi, extension 5744Date: December 4, 2014

REGIONAL MUNICIPALITY OF YORK - Rouge River WatershedThe purpose is to complete site restoration works on a maintenance shaft compound (Shaft 12) as part of the Southeast Collector (SeC) trunk sewer twinning, on the south side of 14th Avenue just west of the CPR crossing, in the City of Markham. The proposed restoration works were approved under Permit No: C-110462 on February 4, 2011 and reissued Permit No. C-130012R on January 9, 2013. The current permit will expire on January 8, 2015. All constructions works for shaft 12 except site restoration were completed under the existing permit. This permit application is for remaining site restoration works that have not been completed to date..

CFN: 51977 - Application #: 0945/14/MARKReport Prepared by: Manirul Islam, extension 5715For information contact: Manirul Islam, extension 5715Date: December 8, 2014

Page 9: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

553

39 ARTISAN TRAIL - Rouge River WatershedThe purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the restoration of an existing heritage dwelling and construction of a new two-storey addition, garage, patio, and landscaping associated with a municipal building permit.

CFN: 50892 - Application #: 0315/14/MARKReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Doris Cheng, extension 5306Date: December 3, 2014

CITY OF PICKERING

2870 CONCESSION ROAD 5 - Carruthers Creek WatershedThe purpose is to construct a new single family detached dwelling and septic system on the vacant residential lot at 2870 Concession Road 5 in the City of Pickering..

CFN: 51857 - Application #: 0857/14/PICKReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: December 19, 2014

REGIONAL MUNICIPALITY OF YORK - Frenchman's Bay WatershedThe purpose is to complete grading, access driveway to shaft compound and site restoration works of a maintenance shaft compound (Shaft 4) as part of the Southeast Collector (SeC) trunk sewer twinning, immediately northeast of the intersection of Fairport Road and Lynn Heights Drive, in the City of Pickering. The proposed works were approved under Permit No: C-110455 on February 4, 2011 and reissued Permit No. C-130017R on January 9, 2013. The current permit will expire on January 8, 2015. All constructions works for shaft 4 except final site grading, restoration and asphalt top coat on access driveway were completed under the existing permit. This permit application is for remaining works that have not been completed to date.

CFN: 51979 - Application #: 0941/14/PICKReport Prepared by: Manirul Islam, extension 5715For information contact: Manirul Islam, extension 5715Date: December 8, 2014

Page 10: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

554

REGIONAL MUNICIPALITY OF YORK - Petticoat Creek WatershedThe purpose is to complete final grading, site restoration and removal of a temporary structure built at construction shaft compound 6 and 7 as part of the Southeast Collector (SeC) trunk sewer twinning, immediately west of Altona Road, approximately 1 km north of Finch Avenue, in the City of Pickering. The proposed grading, restoration and removal of the temporary structure were approved under Permit No: C-110452 on February 4, 2011 and reissued Permit No. C-130013R on January 9, 2013. The current permit will expire on January 8, 2015. All construction works for shaft 6 and 7 except works related to final grading, site restoration and removal of the temporary structure were completed under the existing permit. This permit application is for remaining works that have not been completed to date.

CFN: 51978 - Application #: 0943/14/PICKReport Prepared by: Manirul Islam, extension 5715For information contact: Manirul Islam, extension 5715Date: December 8, 2014

REGIONAL MUNICIPALITY OF YORK - Duffins Creek WatershedThe purpose is to complete final grading and site restoration works of a construction shaft compound (Shaft 1) as part of the Southeast Collector (SeC) trunk sewer twinning, on the north side of Finch Avenue, east side of Valley Farm Road, in the City of Pickering. The proposed final grading and site restoration works were approved under Permit No: C-110457 on February 4, 2011 and reissued Permit No. C-130015R on January 9, 2013. The current permit will expire on January 8, 2015. All constructions works for shaft 1 except final grading and site restoration were completed under the existing permit. This permit application is for remaining grading and site restoration works that have not been completed to date..

CFN: 51980 - Application #: 0946/14/PICKReport Prepared by: Manirul Islam, extension 5715For information contact: Manirul Islam, extension 5715Date: December 8, 2014

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

115 BLACK CREEK BOULEVARD - Humber River WatershedThe purpose is to construct a replacement sunroom addition to the rear of the existing single family detached dwelling at 115 Black Creek Boulevard (Etobicoke York).

CFN: 52015 - Application #: 0937/14/TORReport Prepared by: Nicole Moxley, extension 5743For information contact: Steve Heuchert, extension 5311Date: December 8, 2014

Page 11: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

555

35 BARTONVILLE AVENUE WEST - Humber River WatershedThe purpose is to legalize the construction of a detached garage in the rear yard of the existing single family detached dwelling at 35 Bartonville Avenue West in the City of Toronto (Etobicoke York). The detached garage was constructed without the benefit of TRCA and/or municipal permit approval.

CFN: 49018 - Application #: 0226/13/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: December 11, 2014

WOODBINE ENTERTAINMENT GROUP - Humber River WatershedThe purpose is to carry out the excavation, de-watering, and removal of sediment necessary to clean and maintain the North Irrigation Pond associated with the Woodbine Racetrack at 555 Rexdale Boulevard in the City of Toronto (Etobicoke York).

CFN: 51924 - Application #: 0900/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: December 11, 2014

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

91 RIVERVIEW DRIVE - Don River WatershedThe purpose is to construct a two-storey front and rear addition with basement to the existing dwelling, new rear patio, shed, re-grading, retaining wall and associated landscaping at 91 Riverview Drive in Toronto (North York Community Council Area).

CFN: 51227 - Application #: 0526/14/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Mark Rapus, extension 5259Date: December 15, 2014

101 FOREST HEIGHTS BOULEVARD - Don River WatershedThe purpose is to construct a two storey replacement dwelling with walk-out basement and a raised rear deck at 101 Forest Heights Boulevard. Minor landscaping will be undertaken in the rear yard.

CFN: 50899 - Application #: 0319/14/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: November 28, 2014

Page 12: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

556

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

35 FISHLEIGH DRIVE - Waterfront WatershedThe purpose is to construct a replacement dwelling with rear basement walk-out and raised deck and associated front landscaping at 35 Fishleigh Drive.

CFN: 51024 - Application #: 0400/14/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Steve Heuchert, extension 5311Date: December 19, 2014

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

66 RUSSELL HILL ROAD - Don River WatershedThe purpose is to repair the existing dwelling foundation, replace the terrace and flagstone hardscaping, maintain the inground pool, reconstruct the retaining wall, and construct a new pool equipment shed to the rear of the single family detached dwelling at 66 Russell Hill Road in the City of Toronto (Toronto and East York).

CFN: 51155 - Application #: 0542/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: December 18, 2014

CITY OF VAUGHAN

CITY OF VAUGHAN - Don River WatershedThe purpose is to undertake rehabilitation of a pedestrian bridge crossing the Don River near Upland Golf and Ski Centre. The existing bridge will be removed and replaced with a new self weathering steel bridge on existing abutments. The works will also include upgrade to the approach pathways on either side of the bridge with light duty asphalt paving. The Ministry of Natural Resources and Forestry (MNRF) warmwater timing window will apply to the works unless otherwise specified in writing by MNRF.

CFN: 51660 - Application #: 0785/14/VAUGReport Prepared by: Harsha Gammanpila, extension 5629For information contact: Harsha Gammanpila, extension 5629Date: December 10, 2014

CITY OF VAUGHAN - Humber River WatershedThe purpose is to undertake rehabilitation of a pedestrian bridge crossing the Humber River near Pine Grove Road. The existing bridge will be removed and replaced with a new self weathering steel bridge on existing abutments. The works will also include upgrade to the approach pathways on either side of the bridge with light duty asphalt paving. The Ministry of Natural Resources and Forestry (MNRF) Redside Dace timing window will apply to the works unless otherwise specified in writing by MNRF.

Page 13: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

557

CFN: 51661 - Application #: 0786/14/VAUGReport Prepared by: Harsha Gammanpila, extension 5629For information contact: Harsha Gammanpila, extension 5629Date: December 1, 2014

CITY OF VAUGHAN - Don River WatershedThe purpose is to undertake rehabilitation of a pedestrian bridge crossing the Don River within Marita Payne Park, east of Glen Shields Avenue. The existing bridge will be removed and replaced with a new self weathering steel bridge on existing abutments. The works will also include upgrade to the approach pathways on either side of the bridge with light duty asphalt paving. The Ministry of Natural Resources and Forestry (MNRF) warmwater timing window will apply to the works unless otherwise specified in writing by MNRF.

CFN: 51665 - Application #: 0824/14/VAUGReport Prepared by: Harsha Gammanpila, extension 5629For information contact: Harsha Gammanpila, extension 5629Date: December 10, 2014

TOWN OF CALEDON

16096 THE GORE ROAD - Humber River WatershedThe purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 110.92 sq. m (1,194 sq. ft.) one storey addition to an existing residential dwelling associated with a municipal building permit and a municipal site plan (Town File #SPA 14-0058).

CFN: 52301 - Application #: 1018/14/CALReport Prepared by: Anant Patel, extension 5618For information contact: Leilani Lee-Yates, extension 5370Date: December 16, 2014

TOWNSHIP OF KING

167 DENNISON STREET - Humber River WatershedThe purpose is to construct an attached garage and addition to an existing dwelling within TRCA's Regulated Area of the Humber River Watershed at 167 Dennison Street in the Township of King.

CFN: 51943 - Application #: 0940/14/KINGReport Prepared by: Anant Patel, extension 5618For information contact: Kevin Huang, extension 5307Date: December 4, 2014

Page 14: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

558

33 LYNWOOD CRESCENT - Humber River WatershedThe purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 339.37 sq. m (3,653 sq. ft.) replacement two storey residential dwelling associated with a municipal building permit.

CFN: 51548 - Application #: 0651/14/KINGReport Prepared by: Anant Patel, extension 5618For information contact: Coreena Smith, extension 5269Date: December 10, 2014

PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS

Permission for Routine Infrastructure Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of routine infrastructure works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All routine infrastructure works are located within a Regulated Area, generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

CITY OF MARKHAM

BELL CANADATo undertake sewer, watermain or utility installation or maintenance within an existing roadway on Allstate Parkway, north of Highway 7, in the City of Markham, Rouge River Watershed as located on the property owned by the City of Markham. The purpose is to relocate Bell Canada's existing conduit by lowering within the right of way of Allstate Parkway, north of Highway 7 in City of Markham. The Ministry of Natural Resources and Forestry (MNRF) redside dace timing window will be applicable to this proposal unless otherwise specified in writing by MNRF.

CFN: 51142 - Application #: 0528/14/MARKReport Prepared by: Manirul Islam, extension 5715For information contact: Manirul Islam, extension 5715Date: January 6, 2015

CITY OF MARKHAMTo undertake drainage structure general maintenance on Tuclor Lane, near Billy Joel Crescent, in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake rehabilitation works at an outfall structure at Tuclor Lane, near Billy Joel Crescent, in the City of Markham. The proposed works include repair of the concrete headwall to its original dimensions and rehabilitation of the concrete outfall pipe. The warm-water fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources and Forestry (MNRF).

Page 15: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

559

CFN: 51590 - Application #: 0719/14/MARKReport Prepared by: Harsimrat Pruthi, extension 5744For information contact: Harsimrat Pruthi, extension 5744Date: December 3, 2014

CITY OF PICKERING

CITY OF PICKERINGTo undertake structure maintenance on Sideline 12, 0.6 km north of Concession 7 in the City of Pickering, Duffins Creek Watershed as located on the property owned by City of Pickering. The purpose is to replace the existing guide rails at Sideline 12 bridge, 0.6 km north of Concession 7, in the City of Pickering. The Redside Dace Fisheries timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry (MNRF). Through review of the information provided and identified in the Summary of Plans section, TRCA is of the opinion that the project and implementation as proposed will not cause serious harm to fish.

CFN: 51768 - Application #: 0806/14/PICKReport Prepared by: Caroline Mugo, extension 5689For information contact: Caroline Mugo, extension 5689Date: December 8, 2014

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

TRANS-NORTHERN PIPELINE INC.To undertake structure maintenance at Centennial Park, on the east and west sides of Centennial Park Boulevard, in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on property owned by the Hydro One. The purpose is to undertake an integrity dig to conduct pipeline inspection for internal pipe anomalies at Trans Northern Pipeline MP-348.8-2012 and MP-348-9-2014, located at the Centennial Park, east and west of Centennial Park Boulevard. There are no in-water or near water works within the scope of this project.

CFN: 52065 - Application #: 0974/14/TORReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: December 17, 2014

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

CITY OF TORONTOTo undertake structure maintenance on an existing pedestrian bridge located at the cul-de-sac of Pineway Boulevard and Goldenwood Road, over the German Mills Creek, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to rehabilitate an existing pedestrian bridge over the German Mills Creek connecting the cul-de-sacs of Goldenwood Road and Pineway Boulevard. There are no water works involved in this project.

Page 16: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

560

CFN: 51602 - Application #: 0740/14/TORReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: December 15, 2014

CITY OF VAUGHAN

REGIONAL MUNICIPALITY OF YORKTo undertake drainage structure general maintenance approximately 730m west of Bathurst Street on Rutherford Road, in the City of Vaughan, Don River Watershed as located on the property owned by the Regional Municipality of York. The purpose is to undertake urgent erosion repairs of a road embankment along Rutherford Road, 730m west of Bathurst Street..

CFN: 51067 - Application #: 0467/14/VAUGReport Prepared by: Scott Smith, extension 5758For information contact: Scott Smith, extension 5758Date: December 18, 2014

ROGERS CABLETo undertake utility relocation on Highway 7 from Millway Avenue to Creditstone Road, in the City of Vaughan, Humber River Watershed as located on the property owned by the Regional Municipality of York. The purpose is to relocate Rogers underground utility conduit and GLBs along the north edge of Highway 7 between Millway Avenue to Creditstone Road. The works are required as part of the VIVA Highway 7 widening project.

CFN: 51058 - Application #: 0448/14/VAUGReport Prepared by: Manirul Islam, extension 5715For information contact: Manirul Islam, extension 5715Date: January 6, 2015

TOWN OF CALEDON

ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer, watermain or utility watercourse crossing by trenchless technology along Mississauga Road, north of Mayfield Road, in the Town of Caledon, Etobicoke Creek Watershed as located on the property owned by the Town of Caledon, under Franchise Agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2" PE IP gas pipeline along the southwest side of Mississauga Road, under a tributary of the Etobicoke Creek. The Ministry of Natural Resources and Forestry (MNRF) warm water fisheries timing window will apply to this project unless otherwise specified in writing by the MNRF. Through review of the information provided and identified in the Summary of Plans section, TRCA is of the opinion that the project and implementation as proposed will not cause serious harm to fish.

Page 17: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

561

CFN: 51765 - Application #: 0804/14/CALReport Prepared by: Annette Maher, extension 5798For information contact: Annette Maher, extension 5798Date: December 19, 2014

TOWNSHIP OF KING

SENECA COLLEGE OF APPLIED ARTS & TECHNOLOGYTo undertake structure maintenance on Lot 11, Concession 3, (13990 Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by Seneca College of Applied Arts & Technology. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate repairs to an existing manhole structure at 13990 Dufferin Street, in the Township of King.

CFN: 52130 - Application #: 0988/14/KINGReport Prepared by: Jonathan Pounder, extension 5304For information contact: Jonathan Pounder, extension 5304Date: December 8, 2014

MINOR WORKS LETTER OF APPROVAL

Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of minor works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All minor works are located within a Regulated Area, outside of the floodplain and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

CITY OF PICKERING

1798 APPLEVIEW ROADTo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part 2 Lot 58, Plan 1051, (1798 Appleview Road), in the City of Pickering, Petticoat Creek Watershed.

CFN: 52127 - Application #: 0973/14/PICKReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: December 9, 2014

Page 18: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

562

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

176 MORNINGSIDE AVENUETo construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 121, Plan M356, (176 Morningside Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 52012 - Application #: 0932/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: December 3, 2014

42 RIDGEVALLEY CRESCENTTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 19, Plan 3515, (42 Ridgevalley Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 51793 - Application #: 0843/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: December 16, 2014

177 VARSITY ROADTo construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Block N, Plan 1260, (177 Varsity Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 52145 - Application #: 1006/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: December 12, 2014

76 HADRIAN DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 49, Plan 5189, (76 Hadrian Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

Page 19: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

563

CFN: 52308 - Application #: 1028/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: January 6, 2015

379 MARKLAND DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 105, Plan, (379 Markland Drive), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.

CFN: 52428 - Application #: 1029/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: January 6, 2015

27 BLUEHAVEN CRESCENTTo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 182, Plan M-119, (27 Bluehaven Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 52054 - Application #: 0965/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: December 18, 2014

126 SPEARS STREETTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Lot 2, Plan 1461, (126 Spears Street), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 52096 - Application #: 0989/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: December 3, 2014

2 BRULE TERRACETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan M-538, (2 Brule Terrace), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

Page 20: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

564

CFN: 52143 - Application #: 1004/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: December 9, 2014

120 EMMETT AVENUETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 2, Concession 5 WYS, (120 Emmett Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 52302 - Application #: 1019/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: December 16, 2014

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

192 NORTHWOOD DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 2, Plan 4940, (192 Northwood Drive), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 51185 - Application #: 0485/14/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: December 18, 2014

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

45 LYNNDALE AVENUETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft), construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 41, 42, Plan 3227, (45 Lynndale Avenue), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed.

CFN: 52056 - Application #: 0967/14/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Steve Heuchert, extension 5311Date: December 15, 2014

Page 21: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

565

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

103 LOGAN AVENUETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 79, Plan 423, (103 Logan Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.

CFN: 52090 - Application #: 0979/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: December 3, 2014

16 NOTLEY PLACETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (16 Notley Place), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.

CFN: 51932 - Application #: 0927/14/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: December 3, 2014

CITY OF VAUGHAN

MOSAIK PINEWEST INC.To undertake a municipal or utility project on Lot 23, 24, Concession 6 Block 40, 47, Plan, (Pine Valley Drive and Teston Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Mosaik Pinewest Inc..

CFN: 52135 - Application #: 0999/14/VAUGReport Prepared by: Anant Patel, extension 5618For information contact: Anant Patel, extension 5618Date: December 17, 2014

TOWN OF RICHMOND HILL

449 PARADELLE DRIVETo install a swimming pool and construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 79, Plan 65M3727, (449 Paradelle Drive), in the Town of Richmond Hill, Humber River Watershed.

CFN: 52486 - Application #: 1043/14/RHReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Doris Cheng, extension 5306Date: January 6, 2015

Page 22: Meeting - Executive Committee · CITY OF MARKHAM CITY OF MARKHAM - Don River Watershed The purpose is to undertake rehabilitation works at an outfall structure at Pinevale Road, near

566

PERMIT APPLICATIONS EX10.6 - MAJOR APPLICATIONS - REGULAR

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.6 24 IVOR ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, Plan 2343, (24 Ivor Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to restore a pre-existing slope landform that was modified without the benefit of a TRCA Permit and carry out additional rear yard landscaping at 24 Ivor Road in the City of Toronto (North York Community Council Area).

CFN: 52589 - Application #: 0005/15/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: January 13, 2015

_________________________________________

TERMINATION

ON MOTION, the meeting terminated at 9:36 a.m., on Friday, January 16, 2015.

Gerri Lynn O'ConnorChair