Transcript of Meeting 4 work in progress 2
![Page 1: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/1.jpg)
Personal Project – Taking Action
Meeting #4 – Work in progress
![Page 2: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/2.jpg)
Progress Report
Approach to learning
Expectation
Assessed as
Research
Has completed research to support the Personal Project goal and inform the specification
Unsatisfactory???
Self-Management
Has arranged, attended and been prepared for all required meetings
Satisfactory???
CommunicationHas clearly communicated progress with additional individual process journal entries
Good???
ReflectionHas responded to feedback in a positive manner and made required improvements
Excellent???
Overall progress is either unsatisfactory, satisfactory, good, excellent and based on collaboratively assessed requirements.
![Page 3: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/3.jpg)
Recorded in process journal entries including “How well am I keeping to my timeline?”
![Page 4: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/4.jpg)
including “I have got support from….”
Completed in process journal entries
Completed in process journal entries
(including “I had this problem so I….”
![Page 5: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/5.jpg)
Meet with supervisor 4 – Work in progress(Before the winter break)
Present evidence of your work in progress using a provided template
Process journal entries:• I have got support from….• How well am I keeping to my timeline?• I had this problem so I….
(note if these have not been completed a catch up meeting will take place straight after the winter break)
![Page 6: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/6.jpg)
Goal:OUTCOME/ PRODUCT:
![Page 7: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/7.jpg)
What have I done so far?
![Page 8: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/8.jpg)
What do I still have to do?
![Page 9: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/9.jpg)
Meet with supervisor 4 – Work in progress(Before the winter break)
Present evidence of your work in progress using a provided template
Process journal entries:• I have got support from….• How well am I keeping to my timeline?• I had this problem so I….
(note if these have not been completed a catch up meeting will take place straight after the winter break)
![Page 10: Meeting 4 work in progress 2](https://reader035.fdocuments.us/reader035/viewer/2022070601/5887658b1a28ab22358b47df/html5/thumbnails/10.jpg)
Present causes for concernANDRICI Iris HAMIAS OfekBADEA Leyla Alexandra JO MinkyuBAKIRCI Albert-Dino O'Hanlon CaolanBOSTAN Neli Ohlsen-Fueger SophiaBRICIU Radu Stefan Olsson LeifCACICOVSCHI Mircea Patrick CailighCAROLLO Jon-David PAUN GeorgiaDORON Elad POPA-RADU RaresDORON Eldan Schock MitchellELGAR Benjamin STAYKU IoanaGARCIA MENENDEZ Alejandro STEFANOIU Maria CristinaGUVEN Yigit Kaan TANASESCU TheodorHAMIAS Ofek TARARA David-IonutJO Minkyu VAN DE VEN Chaim Rui