PACKET GUIDE - TUESDAY, APRIL 10, 2018
Transportation Policy Committee
AGENDA
1. Consideration: Approval of the March 13, 2018 minutes Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
2. Consideration: Amendment to the New Orleans Transportation Improvement
Program, Highway & Transit Elements Jeffrey Roesel.…………………………………………………………..…………………………………………………………………………...4-6
3. Consideration: Amendment to the St. Tammany Transportation Improvement
Program, Highway & Transit Elements Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...7
4. Consideration: Amendment to the Tangipahoa Transportation Improvement
Program, Highway & Transit Elements Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...8
5. Update: Unified Planning Work Program For FY-19 Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
6. Consideration: New Orleans Transportation Improvement Program: FFY19- FFY22 (Review Draft) Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
7. Consideration: St. Tammany Transportation Improvement Program: FFY19- FFY22 (Review Draft) Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
8. Consideration: Tangipahoa Transportation Improvement Program: FFY19- FFY22 (Review Draft) Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
9. Consideration: Public Comment Period Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
10. Consideration: Other Matters Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
Page 2 of 27
Packet Guide - Tuesday, April 10, 2018
Regional Planning Commission
AGENDA
1. Consideration: Approval of the March 13, 2018 minutes Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
2. Consideration: Committee Reports:
(a) Budget and Personnel Committee
(b) Other Committee Reports Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
3. Consideration: Financial Report
(a) Balance Sheet of Local Activities
(b) Monthly Budget Report Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...9
4. Consideration: Amendment to the New Orleans Transportation Improvement
Program, Highway & Transit Elements
5. Consideration: Amendment to the St. Tammany Transportation Improvement
Program, Highway & Transit Elements
6. Consideration: Amendment to the Tangipahoa Transportation Improvement
Program, Highway & Transit Elements
7. Consideration: New Orleans Transportation Improvement Program: FFY19- FFY22 (Review Draft)
8. Consideration: St. Tammany Transportation Improvement Program: FFY19- FFY22 (Review Draft)
9. Consideration: Tangipahoa Transportation Improvement Program: FFY19- FFY22 (Review Draft)
10. Presentation: Carr, Riggs & Ingram LLC
By: Philip Rebowe, Partner Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
11. Consideration: Request for Local Resolutions to promote Air Quality Awareness Week 2018
(April 30-May 4) Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
12. Consideration: Travel Request Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...10
13. Consideration: Contract Extensions Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...10
14. Consideration: Consultant Billings Jeffrey Roesel.…………………………………………………………..………………………………………………………………………….….11
15. Consideration: Public Comment Period Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
16. Consideration: Other Matters Jeffrey Roesel.…………………………………………………………..……………………………………………………………………………...
Page 3 of 27
Am
en
dm
en
t Co
nsid
ere
d a
t the
Me
etin
g o
f Ap
ril 10
, 20
18
Tran
spo
rtatio
n Im
pro
vem
en
t Pro
gra
m –N
ew
Orle
an
s Urb
an
ized
Are
a
Hig
hw
ay E
lem
en
t – Fina
ncia
lly Co
nstra
ine
d
Pro
ject N
o.
Pro
ject D
escrip
tion
P
arish
P
roje
ct
Sp
on
sor
Pro
po
sed
Imp
rove
me
nt
Prio
rity*
Wo
rk
Ph
ase
Est.
Co
st
Co
st +
Co
ntin
ge
ncy
Fed
era
l Sh
are
Fu
nd
So
urce
Fisca
l
Yea
r S
tatu
s
Vin
tage D
rive
Multi-U
se P
ath
Je
fferso
n
City
of
Kenner/
Parish
Constru
ct Multi
Use
Path
2,5
C
$1,5
15,0
00
$1,6
66,5
00
$1,3
33,2
00
STP>
200K
21
New
Lin
e
Item
H.0
11845
St. Jo
hn E
B M
iss. Riv
er T
rail P
H. 4
St. Jo
hn
Parish
Share
d U
se P
ath
2,5
C
$3,3
03,0
14
$3,3
03,0
14
$2,6
42,4
11
$660.6
K=
STPFLEX
$280K=
DEM
O
$2.3
6M
=STP>
200K
18
Revise
d C
ost
and L
ettin
g
*1=safety; 2=
livable comm
unities; 3=state of good repair; 4=
economic com
petitiveness; 5=environm
ental sustainability ,
Page 4 of 27
Pro
jectP
arishTo
tal Co
stSe
ction
53
07
Sectio
n 5
33
7
(Ra
il)
Sectio
n 5
33
7
(HO
V)
Sectio
n 5
33
9
Oth
er (Se
e
Co
mm
ents)
Total Fed
eral
Loca
l Match
Co
mm
ents
Hu
man
Services Transit V
ehicles
Regio
n9
74
.17
79
.37
79
.31
94
.8
Sectio
n 5
31
0; P
end
ing D
OTD
Aw
ard
Co
mp
rehen
sive Op
eration
s An
alysisR
egion
72
5.0
23
0.0
35
0.0
58
0.0
14
5.0
RP
C P
roject w
/RTA
match
;
35
0K
in Sectio
n 5
30
3
Total R
egio
n FY
-18
1,6
99
.12
30
.00
.00
.00
.01
,12
9.3
1,3
59
.33
39
.8
Total R
egio
n1
,69
9.1
23
0.0
0.0
0.0
0.0
1,1
29
.31
,35
9.3
33
9.8
Preven
tative Main
tenan
ceJefferso
n1
,36
2.1
93
3.7
15
5.9
1,0
89
.72
72
.4
Op
erating A
ssistance - Fixe
d R
ou
teJefferso
n3
,08
6.0
1,5
43
.01
,54
3.0
1,5
43
.0
Cap
ital Pro
ject Man
agem
ent - 3
rd P
artyJefferso
n8
2.5
66
.06
6.0
16
.5
Plan
nin
gJefferso
n3
21
.32
57
.02
57
.06
4.3
Secu
rity Equ
ipm
ent
Jefferson
42
.83
4.2
34
.28
.6Safety an
d Se
curity
Paratran
sit Veh
iclesJefferso
n7
5.0
60
.06
0.0
15
.0
Fixed-R
ou
te Veh
iclesJefferso
n8
68
.83
20
.03
75
.06
95
.01
73
.8
AD
P H
ardw
areJefferso
n5
0.0
40
.04
0.0
10
.0
AD
P So
ftware
Jefferson
50
.04
0.0
40
.01
0.0
Reh
ab an
d R
eno
vate FacilitiesJefferso
n1
50
.01
20
.01
20
.03
0.0
Total Jefferso
n FY
-18
6,0
88
.33
,41
3.9
0.0
15
5.9
37
5.0
0.0
3,9
44
.92
,14
3.5
Total Jefferso
n6
,08
8.3
3,4
13
.90
.01
55
.93
75
.00
.03
,94
4.9
2,1
43
.5
Preven
tative Main
tenan
ce (Bu
s)O
rleans (R
TA)
11
,09
7.5
8,8
78
.08
,87
8.0
2,2
19
.5
Vid
eo Su
rveillance
Orlean
s (RTA
)1
15
.09
2.0
92
.02
3.0
Safety and
Secu
rity
St. Ch
arles Street C
ar Pain
t and
Rep
airO
rleans (R
TA)
29
1.8
23
3.4
23
3.4
58
.4
Streetcar Skid
Pressu
re Wash
ersO
rleans (R
TA)
25
.02
0.0
20
.05
.0
Axle an
d G
ear Reb
uild
Orlean
s (RTA
)4
5.5
36
.43
6.4
9.1
Switch
Ton
gue R
eplacem
ent
Orlean
s (RTA
)3
50
.02
80
.02
80
.07
0.0
Po
rtable Track H
and
Tamp
ersO
rleans (R
TA)
12
.81
0.2
10
.22
.6
Preven
tative Main
tenan
ce (HO
V B
us)
Orlean
s (RTA
)1
94
.91
55
.91
55
.93
9.0
Preven
tative Main
tenan
ce (Rail)
Orlean
s (RTA
)4
,23
2.1
3,3
85
.73
,38
5.7
84
6.4
Rail Sh
op
Too
ls and
Equ
ipm
ent
Orlean
s (RTA
)3
5.0
28
.02
8.0
7.0
20
18
New
Orlean
s Transp
ortatio
n Im
pro
vemen
t Pro
gram - Tran
sit Elem
ent
Page 5 of 27
Paratran
sit Min
i Bu
sesO
rleans (R
TA)
65
0.0
52
0.0
52
0.0
13
0.0
Paratran
sit Min
i Van
sO
rleans (R
TA)
30
0.0
24
0.0
24
0.0
60
.0
Miscellan
eou
s Equ
ipm
ent
Orlean
s (RTA
)1
00
.78
0.6
80
.62
0.1
Ferry M
ainten
ance
Orlean
s (RTA
)5
37
.54
30
.04
30
.01
07
.5
Total O
rlean
s FY-1
81
7,9
87
.79
,40
0.0
3,9
93
.71
55
.98
40
.60
.01
4,3
90
.23
,59
7.5
Total O
rlean
s 1
7,9
87
.79
,40
0.0
3,9
93
.71
55
.98
40
.60
.01
4,3
90
.23
,59
7.5
Op
erating A
ssistance
15
6.9
78
.57
8.5
78
.5
Preven
tative Main
tenan
ce9
0.3
72
.27
2.2
18
.1
Surveillan
ce/Secu
rity Equ
ipm
ent
21
.61
7.3
17
.34
.3Safety an
d Se
curity
Facility Main
tenan
ce3
0.0
24
.02
4.0
6.0
New
Transit V
ehicle
60
.04
8.0
48
.01
2.0
Total St. B
ern
ard
FY-1
83
58
.82
40
.00
.00
.00
.00
.02
40
.01
18
.8
Total St. B
ern
ard
35
8.8
24
0.0
0.0
0.0
0.0
0.0
24
0.0
11
8.8
Op
erating A
ssistance
10
2.7
51
.45
1.4
51
.4
Rep
lacemen
t Veh
icles8
1.8
65
.56
5.5
16
.4
AD
P H
ardw
are6
4.5
51
.65
1.6
12
.9
AD
P So
ftware
64
.55
1.6
51
.61
2.9
Preven
tive Main
tenan
ce1
2.5
10
.01
0.0
2.5
Pro
ject Ad
min
istration
12
.51
0.0
10
.02
.5
Total St. Jo
hn
/St. Ch
arles FY
-18
33
8.5
24
0.0
0.0
0.0
0.0
0.0
24
0.0
98
.5
Total St. Jo
hn
/St. Ch
arles
33
8.5
24
0.0
0.0
0.0
0.0
0.0
24
0.0
98
.5
Ferry P
reventative M
ainten
ance
30
0.0
24
0.0
24
0.0
60
.0
Total P
laqu
emin
es FY
-18
30
0.0
24
0.0
0.0
0.0
0.0
0.0
24
0.0
60
.0
Total P
laqu
emin
es
30
0.0
24
0.0
0.0
0.0
0.0
0.0
24
0.0
60
.0
TOTA
L FY-1
82
6,7
72
.51
3,7
63
.93
,99
3.7
31
1.8
1,2
15
.61
,12
9.3
20
,41
4.3
6,3
58
.2
TOTA
L2
6,7
72
.51
3,7
63
.93
,99
3.7
31
1.8
1,2
15
.61
,12
9.3
20
,41
4.3
6,3
58
.2
Page 6 of 27
Am
endment C
onsidered at the Meeting of A
pril 10, 2018 T
ransportation Improvem
ent Program – St. T
amm
any Urbanized A
reas Highw
ay Elem
ent – Financially Constrained
Project No.
Project Description Parish
Project Sponsor
Proposed Improvem
ent Priority*
Work
Phase Est. Cost
Cost + Contingency
Federal Share Fund Source
Fiscal Year
Status
H.010184
LA 59: Curve Realign and Tunnel at Trace
St. Tam
many
DO
TD
Realign Curve and Provide Tunnel for Tam
many Trace
1,2,3 R/W
$1,100,000
$1,100,000 $800,000
$800K (HSIP)
$300K (Local) 18
Updated Cost
H.010184
LA 59: Curve Realign and Tunnel at Trace
St. Tam
many
DO
TD
Realign Curve and Provide Tunnel for Tam
many Trace
1,2,3 U
$511,000
$511,000 $409,000
TAP<200K
18 U
pdated Cost
H.010184
LA 59: Curve Realign and Tunnel at Trace
St. Tam
many
DO
TD
Realign Curve and Provide Tunnel for Tam
many Trace
1,2,3 C
$4,018,000 $4,420,000
$4,200,000 $2.56M
-= H
SIP
$1.64M =
TAP 18
Updated Cost
H.011024
I-10: Med. Protect,
Oak H
arbor Light/Ram
p Raising
St. Tam
many
DO
TD
Cable Barriers, O
verlay, Ramp
Grade Raising
1,3 C
$14,300,000 $15,730,000
$14,187,000 $11.2M
= N
HPP
$3M =
HSIP
18 U
pdated Cost
*1=safety; 2=livable communities; 3=state of good repair; 4=economic competitiveness; 5=environmental sustainability
2017 St. Tammany Transportation Im
provement Program
‐ Transit Element
Project Total Cost
Section 5307 Section 5311
Section 5310
Total Federal Local Match
Comments
Urban O
perating Assistance 4,250,264
2,125,132
2,125,132
2,125,132
Rural Operating Assistance
605,000
302,500
302,500302,500
DOTD Section 5311
Preventive Maintenance
100,000 80,000
80,00020,000
Total FY17
4,955,264 2,205,132
302,500
2,507,6322,447,632
Page 7 of 27
Am
en
dm
en
t Co
nsid
ere
d a
t the
Me
etin
g o
f Ap
ril 10
, 20
18
Tran
spo
rtatio
n Im
pro
vem
en
t Pro
gra
m – S
ou
th Ta
ng
ipa
ho
a U
rba
nize
d A
rea
Hig
hw
ay E
lem
en
t – Fina
ncia
lly Co
nstra
ine
d
Pro
ject N
o.
Pro
ject D
escrip
tion
P
arish
P
roje
ct
Sp
on
sor
Pro
po
sed
Imp
rove
me
nt
Prio
rity*
Wo
rk
Ph
ase
Est.
Co
st C
ost +
Co
ntin
ge
ncy
Fed
era
l Sh
are
Fu
nd
So
urce
Fisca
l
Yea
r S
tatu
s
H.0
12874
I-55: L
A 2
2
Inte
rstate
Lig
htin
g
Tangip
ahoa
DO
TD
Pro
vid
e R
oadw
ay
Lig
htin
g
1,2
E
$245,0
00
$245,0
00
$245,0
00
NH
PP
19
Cost U
pdate
and L
ettin
g
H.0
12874
I-55: L
A 2
2
Inte
rstate
Lig
htin
g
Tangip
ahoa
DO
TD
Pro
vid
e R
oadw
ay
Lig
htin
g
1,2
C
$1,0
00,0
00
$1,1
00,0
00
$990,0
00
NH
PP
19
Cost
Update
, Lettin
g
H.0
11527
Randall/V
itrano R
d.
Brid
ges
Tangip
ahoa
Parish
Brid
ge
Repla
cem
ent
1,3
C
$1,0
81,0
00
$1,1
89,1
00
$951,0
00
FBRO
FF
19
Cost U
pdate
*1=
safety; 2=livable com
munities; 3=
state of good repair; 4=econom
ic competitiveness; 5=
environmental sustainability
Page 8 of 27
ASSETS
Cash
Due from other funds
Due from other governmental units
Prepaid expenses
Total ASSETS
LIABILITIES AND FUND BALANCE
Liabilities
Accounts payable
Due to other governmental units
Uneamed revenue
Total Liabilities
Fund Balanee
Total LIABILITIES AND FLTND BALANCE
Regional Planning CommissionBalance Sheet
As of 2128/2018Current Period Balance
1,345,935.40
274,921.12
27,105.00
24,051.40
1,672,012.92
l7 5,765.94
0.00
I 820.7s
186,586.69
1.485 ,426.23
|,672 ,012.92
Column I Column 2 Column 3 Column 4
RPC BUDCET COMPAREDTOACTUAL EICHT MONTHS
ENDEDFEB. 28, 20 I 8 -I.INAUDITED-
YTD Actual8 Months Ended
2/28/18Actual Expenditures
2/1/18-2t28/18
Variance
Favorable(Unfavorable)
SALARIES: STAFF 1,575.573 87s.336 103,203 700.237
0 0EMPLOYEE BENEFITS IWORKMAN'S COMPENSATION INSURANCE
780,311
8,950!012_21?-
7,319
p26
0
47, !2,07e1,63 1
PER DIEM ALLOWANCE 9.600 1,r00 0 8,500STAFF TRAINING 4.000 2,060 0 1,940COMMISSIONER TRAVELSTAFF - TRAVEL
6;9qI 5.750 13,500
0 0
88
6,300
2,2s0CONFERENCES AND RECISTRATION 6,s00 3,46s 25 3,035MEETING EXPENSE 15,250 7.708 462 7.s42DUES AND SUBSCRIPTIONS
ONLINE DATA SUBSCRIPTIONS6rq50
20,000sls-3-
300
1,480
0
1?0:2_7
19,700REFERENCE MATERIALS 625 0 0 625REGIONAL TRAFFIC CTR MAINTENANCE 47.s00 28,663 2,905 I 8,837IELEPHONE 4,500 2,204 212 2,296OFFICE SUPPLIES tCOMPUTER SUPP/SOFTWARE SUPPORT 52,500
7
24,615
2,025
335
49 51225
27,885IT/GIS (INTELLIGENT TECH) SUPPORT 70.500 44,000 5,s00 26,500POSTACE 1.800 494 266 l,306PRINTING SUPPLIES AND MATEzuALSPHOTOCOPIERS
T
8,009
18,200
660
4,5000
0
7 r?+:o13,700
PUBLIC NOTICES 7,500 873 0 6.627EQUIPMENT RENT/MAINT 5"000 109 0 4,891CENERAL INSURANCEPROFESSIONAL LIAB INS
2,1,0-0,9
I 5,000
r4,4!213,973
1,742
0
1 015q8
1.027CONTRACT PERSONNEL 87.750 46,753 3,456 40.997ADMINISTRATIVE CONSULTANTS 45.500 r 3,378 0 \t t))AUDITEMPLOYEE WELFARE
3q,900
2.800i?,000
l,480 202
0 4?000
1.320AUTO EXPENSE r 7,500 6,977 831 t0,523AUDIO/VIDEO EQUIP FOR RTMC FACILITY r 5,000 0 15,000OFFICFEQVJP & HARDWAREGIS DATA ACQUISITION
6,00q
25,0000
0
q,qoo
25,000MISCELLANEOUS EXPENSE 800 200 0 600GRANT CONTINGENCY 2,017,056 0 2,017,056TOTAL IN.HOUSE EXPENSE 4,966,605 1.562.t29 I 68.582 3,404.476
THIRD PARTY CONTRACTS:GENERAL FTIND 60,000 30,000 0GRANTS & SPECIAL PROJECTS 5.322.633 7s8.829 0
s,382.633 788"829 0 4.s93.804TOTAL THIRD PARTY CONTRACTS
TOTAL EXPENDITURES 10.349.238 2,350,958 I 68,582 7,998,280
Adopted Budget
Page 9 of 27
Travel Requests
Commission Meeting of April 10, 2018
Contract Extensions Commission Meeting of April 10, 2018
Extend through April 30, 2018
Extend through June 30, 2018
1. One staff member, Rebecca Otte, to attend the 2018 EPA Region 6 Brownfield Partners Forum, June 12‐14, 2018, 2018, Dallas, TX.
Fund/Task No. Description Consultant Percent Complete
A‐1.18TC RPC Traffic Counting Program Update ITS Regional, LLC 90%
Fund/Task No. Description Consultant Percent Complete
SL‐1.18 Stage 0 Feasibility Study, LA 1091 (Robert Blvd.) @ Country Club Blvd./John Slidell Park Roundabout Study
J.V. Burkes & Assoc., Inc. 95%
PubEdOut Greater New Orleans Clean Air Coordinator Clear Skies Environmental 72.92%
MC‐2.18 Harrison Avenue Extension Land Use and Transportation Study
Principal Engineering, Inc. 92%
SCPBMP1 St. Charles Comprehensive Pedestrian and Bicycle Master Plan
All South Consulting Engineers 57%
Page 10 of 27
REGIONAL PLANNING COMMISSION MEETING - April 10, 2018 TOTAL BILLED
CONSULTANT CONTRACT NO.
DESCRIPTION
1 $220,000.00 5
(total contract)
(SCPBMP1) $110,000.00 $14,787.07 $47,822.09 $62,609.16All South Engineers -
PRIMERPC Contract No. SCPBMP1 $55,000.00 $7,393.53 $23,911.05 $31,304.58
Dana Brown & Assoc.
$55,000.00 $15,865.56 $15,439.03 $31,304.59
Barowka & Bonura
$38,046.16 $87,172.17 $125,218.33
$94,781.67 56.92%
2 Arcadis U.S., Inc. $175,000.00 5
Elacombe (total contract)
StateProj. No. H.012855 $78,642.00 $8,365.34 $40,191.84 $48,557.18
RPC Task- Elacombe Arcadis -PRIME
$18,267.00 $0.00 $13,700.25 $13,700.25
Callison - Sub
$51,840.00 $3,110.40 $26,956.80 $30,067.20
NY Assoc - Sub
$14,367.00 $0.00 $0.00 $0.00
Civil Design - Sub
$11,884.00 $0.00 $11,884.00 $11,884.00
ITS Regional - Sub
$11,475.74 $92,732.89 $104,208.63
$70,791.37 59.55%
3 $30,000.00 5
(total contract)
EDASLED4 $16,500.00 $825.00 $9,075.00 $9,900.00
Ardyn M. Thriffiley - PRIME
RPC Contract No. EDA-CEDS-2019 $13,500.00 $675.00 $7,425.00 $8,100.00
Johnson Group
$1,500.00 $16,500.00 $18,000.00
$12,000.00 60.00%
4 Burk Kleinpeter, Inc #3
(Fund: BCTunel) $541,119.00 23
(total contract)
$415,448.00 $2,875.58 $332,206.55 $335,082.13
RPC Contract No. BCTunnel ***(BKI amount - prime)
$116,167.00 $0.00 $105,023.00 $105,023.00
(HNTB - sub)
$9,504.00 $0.00 $0.00 $0.00
(Earth Search - sub) $2,875.58 $437,229.55 $440,105.13
$101,013.87 81.33%
5 Burk Kleinpeter, Inc #3
(Fund: BCTunel) $541,119.00 24
(total contract)
$415,448.00 $8,074.73 $335,082.13 $343,156.86
RPC Contract No. BCTunnel ***(BKI amount - prime)
$116,167.00 $0.00 $105,023.00 $105,023.00
(HNTB - sub)
$9,504.00 $0.00 $0.00 $0.00
(Earth Search - sub) $8,074.73 $440,105.13 $448,179.86
$92,939.14 82.82%
6 Burk Kleinpeter, Inc $210,989.00 1
(Fund: JPTSP) (total contract)
$147,010.00 $10,290.70 $0.00 $10,290.70
BKI amount - prime
RPC Contract No. JPTSP $63,979.00 $0.00 $0.00 $0.00
Asakura Robinson -sub
$10,290.70 $0.00 $10,290.70
$200,698.30 4.88%
7 Burk-Kleinpeter, Inc $565,100.00 15
(Fund: SafeStNO) (total contract)
$198,600.00 $8,493.67 $173,579.21 $182,072.88
State Project No. H.012461( p
amount - prime)
RPC Contract No. SafeStNO $59,500.00 $16,749.25 $39,775.75 $56,525.00
(Hawthorne Agency - sub)
$49,000.00 $0.00 $19,600.00 $19,600.00
(Toole Design Group - sub)
$230,000.00 $0.00 $7,500.00 $7,500.00
(Morgan & Company - sub)
$28,000.00 $2,240.00 $8,400.00 $10,640.00
(Soll Planning, LLC - sub)
$27,482.92 $248,854.96 $276,337.88
$288,762.12 48.90%
8 $75,000.00 6
(Total Contract)
A-1.18 State Project No. H972275.1 $63,750.00 $15,937.50 $37,612.50 $53,550.00
RPC Task # A-1.18 DEI - PRIME
$11,250.00 $0.00 $0.00 $0.00
Batture - Sub
$15,937.50 $0.00 $53,550.00
$21,450.00 71.40%
9 Digital Engineering $45,000.00 4
ST-2.18BP (Total Contract)
CONTRACT AMOUNT INVOICE #CURRENT BILLING
PREVIOUS BILLINGS
PERCENT OF CONTRACT
BILLED
UNBILLED BALANCE
All South Consulting Engineers
St, Charles Parish Comprehensive Ped/Bike Master Plan
State Project No. H.012462 / F.A.P. H012462
Land Use & Transportation Scenario Planning Study East Lacombe Area
Ardyn M. Thriffiley & Associates
Comprehensive Economic Development Strategy 2019-2023
State Project No. NA / F.A.P. ED16AUS3020020
Replace Belle Chasse Tunnel and Bridge in Plaquemines Parish
State Project No. H.004791 / Federal Aid Project No. DE-3806(500)
*** Note: BKI, only, was subject to a 5% retainage
Amounts invoiced by BKI on their invoices reflect the 5% retainage reduction
Replace Belle Chasse Tunnel and Bridge in Plaquemines Parish
State Project No. H.004791 / Federal Aid Project No. DE-3806(500)
*** Note: BKI, only, was subject to a 5% retainage
Amounts invoiced by BKI on their invoices reflect the 5% retainage reduction
Public Transit Strategic Plan, Jefferson Parish Transit
Federal Aid Project No. FTA -LA-2017-018-00
Safe Streets for Everyone - A Transportation Safety Campaign for
New Orleans
Design Engineering, Inc.
Conceptual Planning Study, Causeway Blvd. @ US90/Jefferson Hwy.
Stage 0 Feasibility Study, Select Corridors Hammond, LA
* IN APPROVING THESE INVOICES, THE COMMISSION IS AUTHORIZING THE payment of these consultant billings upon the receipt of the requisitioned funds as defined in the RPC PPM, as amended.4/9/20181N:\Data\Excel\RPC\CONSULTANT Billings for Commission Approval\RPC Consultant Invoices for 10 April 2018 Commission meeting
Page 11 of 27
REGIONAL PLANNING COMMISSION MEETING - April 10, 2018 TOTAL BILLED
CONSULTANT CONTRACT NO.
DESCRIPTION CONTRACT AMOUNT INVOICE #CURRENT BILLING
PREVIOUS BILLINGS
PERCENT OF CONTRACT
BILLED
UNBILLED BALANCE
State Proj. No. H.972275.1 $38,250.00 $7,650.00 $22,950.00 $30,600.00
RPC Task ST-2.18BP Digital - Prime
6,750.00 $0.00 $0.00 $0.00
Dana Brown - Sb
$7,650.00 $22,950.00 $30,600.00
$14,400.00 68.00%
10 ITS Regional, LLC RPC Traffic Counting Program Update $22,000 2 $12,100.00 $7,700.00 $19,800.00
A-1.18TC 2017 Transportation System Surveillance (Total Contract)
State Proj. No H.972275.1 $22,000 $12,100.00 $7,700.00 $19,800.00
RPC Task # A-1.18TC Prime $2,200.00 90.00%
11 $75,000.00 6
(total contract)
Task A-3.18 $41,250.00 $4,125.00 $28,875.00 $33,000.00
ITS Regional -Prime
RPC Contract No. A-3.18 $33,750.00 $1,687.50 $28,687.50 $30,375.00
Jefferson Parish to Pay Match Linfield, Hunter & Junius
$5,812.50 $57,562.50 $63,375.00
$11,625.00 84.50%
12 $55,000.00 6
(total contract)
SL-1.18 $48,400.00 $3,700.00 $41,950.00 $45,650.00
Principal - PRIME
$6,600.00 $0.00 $6,600.00 $6,600.00
ITS Regional - Sub
$3,700.00 $48,550.00 $52,250.00
$2,750.00 95.00%
13 $290,000.00 11
(total contract)
(Ochsner1) $159,500.00 $7,975.00 $87,725.00 $95,700.00Linfield, Hunter &
Junius, Inc. amount - PRIME
RPC Contract No. OCHSNER1 $130,500.00 $0.00 $110,925.00 $110,925.00ITS Regional, LLC
amount - sub $7,975.00 $198,650.00 $206,625.00
$83,375.00 71.25%
14 Neel Schaffer, Inc $338,666.00 9
NOI10Plan (total contract)
State Project No H.012837 $176,106.00 $14,639.96 $117,313.99 $131,953.95
RPC Contract NOI10PLan Neel-Schaffer
$101,600.00 $3,048.00 $30,480.00 $33,528.00
GEC, Inc -Sub
$44,027.00 $0.00 $30,818.90 $30,818.90
Urban Systms Inc-Sub
$10,160.00 $0.00 $5,442.00 $5,442.00
Deb Keller & Ptns-Sub
$6,773.00 $0.00 $0.00 $0.00
Earth Search, Inc-Sub
$17,687.96 $184,054.89 $201,742.85
$136,923.15 59.57%
15 $231,000.00 3
(Total Contract)
TDMNO State Project No. H.972274 $207,900.00 $70,686.00 $33,264.00 $103,950.00
RPC Task #TDMNO WSP - PRIME
$23,100.00 $0.00 $0.00 $0.00
Vectura Consulting
$70,686.00 $33,264.00 $103,950.00
$127,050.00 45.00%
State Project No. H.012523 / F.A.P. H012523
I-10 New Orleans Master Plan: Port Access Improvments
WSP USA Inc. Travel Demand Model Update Phase 2
ITS Regional, LLC Traffic Signal Timing & Coordination Study: Manhatthan Blvd. Corridor
State Project No. H.972275.1 / F.A.P. H972275
J.V. Burkes & Associates
Stage 0 Feasibility LA 1091 (Robert) at Country Club Blvd. Roundabout Study
State Proj. No H.972275.1 RPC Task No. SL-1.18
Linfield, Hunter & Junius, Inc.
US90 and LA611 from Causeway to Parish Line
* IN APPROVING THESE INVOICES, THE COMMISSION IS AUTHORIZING THE payment of these consultant billings upon the receipt of the requisitioned funds as defined in the RPC PPM, as amended.4/9/20182N:\Data\Excel\RPC\CONSULTANT Billings for Commission Approval\RPC Consultant Invoices for 10 April 2018 Commission meeting
Page 12 of 27
FIRM NAME:
Consultant/ S ub - Consultant Invo ice C ertificationDATE: 3/29/2OI8 State Project # H.O12462 Fed Project #: HO12462
All South Consulting Engineers, L.L.C.
PROJECT DESCRIPTION: St. Charles Parish Comprehensive Ped/Bike Master Plan (CPBP) RPC Task #: SCPBMPl
RPC INVOICE No. INVOICE PERIOD:
(sequence i.e. #1, #2, etc.) (date range) 2/7/r8-3/t6/18
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by Prime Consultant and Prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
5
ProjectBudget
lnvoicePeriod
Signature of Certifying OfficerTimothy P. Bonura, Principal
% Contract Complete Amount Due thisto Date Period
SEPARATE CONTRACTOR/CONSULTANT AMOU NTS:
TOTALS
AmountPreviouslylnvoiced
AmountBilled
to Date
PROJECT
BILTING STATUS
PRIME
All South Engineers
Sub-Consultant A:
Dana Brown & Assoc.
Sub-Consultant B:
Barowka & Bonura
Sub-Consultant C:
Sub-consultant D:
PROJECT TOTAL
UNBILLED: 594,78t.6
A/ rlraDate
s220,000.00 2/7h8-3/L6/t8 s6p2% s38,046.16 587,L72.17 s125,218.33
Srro,ooo.oo 2/7h8-3/t6/18 56.92o/o 514,787.o7 547,B2z.o9 s62,60e.16
s55,ooo.oo 2/7/t8-3/L6/L8 56.92o/o S7,393.s3 S23,911.0s s31,304.s8
Sss,ooo.oo 12/L/r7 -3/L6/L8 56.92o/o S1s,86s.so s1s,439.03 S31,304.s9
N/A
N/A
538,046.1.6 s87,772.77 5125,218.33
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersitned,do hereby certify that the above invoice{s) accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW: K-*-^-'?-,,---r.*, FINANCIAL REVIEW:
Karen Parsons
RECOMMENDED FOR PAYMENT:
Megan
Jeffrey Roesel
Page 13 of 27
ATTACHMENT B
FIRM NAME
C on sultant/S ub - C onsultant Invoi c e C erti fi cation
DATE: 4/3/20L8 state Project # H.012855 Fed Project #: H012855
Arcadis U.S., lnc.
pRoJEcT DESCRTpTToN: Land Use & Transportation: Scenario Plannin g Study, East Lacombe Area RPC Task #: Elacombe
RPC INVOICE No. INVOICE PERIOD
(sequence i.e. #1, #2, etc.) (date range) t/22/2078 - 3/2s/2018
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by Prime Consultant and Prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwisecomplete all grids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will berequested if necessary.
5
Project
BudgetlnvoicePeriod
AmountPreviously
lnvoiced
AmountBilled
to Date
% Contract Completeto Date
Amount Due thisPeriod
PROJECT
BII-tING STATUS
PRIME
Arcadis U.S., lnc.
sub-consultant A:
CallisonRTKL, lnc.
Sub-Consultant B: N-
Y Associates, lnc.
Sub-Consultant C:
Civil Design &Construction, lnc.
Sub-Consultant D:
ITS Regional, LLC
PROJECT TOTAL
UNBILLED: $lo,lgt.3l
SEPARATE CONTRACTOR/CONSU LTANT AMOUNTS:
TOTA6:
OfficerAkhil Chauhan, PE, PTOE, PTP, PMP, Vice President
ilsl aomSignature of Date
$17s,000.00 tl22/2oL8 - 3l2s/2o!8 595s% stt,475.74 $92,732.89 s104,208.63
578,G42.oo r/22/2oL8 - 3/25/2OL8 6r.740/" S8,36s.34 S4o,Lgt.s4 s48,ss7.18
s18,267.00 75.OOo/o 5r3,7o0.25 513,7o0.2s
s51,840.00 L/22/2OL8 - 3/2s/2018 58.00% S3,110.40 s26,9s6.80 s30,067.20
s14,367.00
s11,884.00 700.oo% s11,884.00 s11,884.00
Su,qzs.zq 592,732.89 5104,208.63
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy, l, the undersigned,do hereby certify that the above invoice(s) accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW FINANCIAL REVIEW:
RECOMMENDED FOR PAYMENT:
Megan
Roesel
REGIONAL PLANNING COMMISSION USE ONLY
Page 14 of 27
ATTACHMENT B
c onsultant/Sub- c onsultant Invo ice c ertifi cationDArE: 4h/2OL8 State Project # N/A Fed Project#: ED16AUS302OO2O
FIRM NAME: Ardvn M. Thriffi ley and Associates, lnc.
PROJECT DESCRIPTION: Comprehensive Economic Development Stratesv 2Ot9-2O23 RPC Task #: EDA-CEDS-2019
March 1- March 31, 2018
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by prime Consultant and prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the prime Consultant, please add "NONE,,, otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary,
RPC INVOICE No.(sequence i.e. #1, #2, etc.)
PROJECT
B'LLING STATUS
PRIME
Ardyn M. Thriffiley
Sub-Consultant A:
The johnson Group
Sub-Consultant B:
Sub-Consultant C:
Sub-Consultant D:
PROJECT TOTAL
UNBILLED:
5INVOICE PERIOD:
(date range)
% Contract Completeto Date
TOTALS:
Amount Due thisPeriod
530,000.00 March1-March3t,20L8 60.o0% s1,500.00 S16,5oo.oo S18,ooo.oo
SE PARATE CONTRACTOR/CONSU LTANT AMOU NTS;
S16,5oo.oo March 1- March 31, 2018 6O.OOTo s82s.00 S9,07s.oo s9,900.00
S13,5oo.oo March 1- March 31, 2018 60.00% s57s.00 s7,42s.00 s8,100.00
N/a
N/A
N/A
$!,soo.oo $19!99!9 $!pp99!9
Stz,ooo.oo
ProiectBudget
lnvoicePeriod
of
AmountPreviouslylnvoiced
AmountBilled
to Date
I '\,/1'- L/V1)
DateArdyn M.
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy, l, the undersigned,do hereby cedify that the above invoice(s) accurately reflect the backup documentation submitted with the invoice.
FINANCIAL REVIEW:Maggie Wood
an LeonRECOMMENDED FOR PAYMENT:
Jeffrey
TECHNICAL REVIEW:
Page 15 of 27
FIRM NAME:
Progress Report Evaluation Form
DATE: f}/31/20f7 RPccoNrRAcr# BCTunnel - Supplement #3
Burk-Kleinpeter, lnc.
Replace Belle Chasse Tunnel and Bridge Environmental AssessmentPROJECT DESCRIPTION
INVOICE Number: #23 > BKI#60207 |NVO|CE PERIOD 09/01,/L7 thru to/3L/17
The following matrix must be completed with each invoice submitted by Prime Contractor. lf no charges are submitted byany Sub-Consultant to the Prime Contractor, please add "NONE", otherwise complete all grids for a submitted Sub-
Consultant to the Prime Contractor in this billing period:
Project
Budget
Stot,ot3.8z
lnvoicePeriod
Y" ContractCompleteto Date
AmountPreviouslylnvoiced
AmountBilled
to Date
Amount Due thisPeriod
PROJECT
BILLING STATUS
PRIME (ONLY)
BKI
Sub-Consultant A:
HNTB
Sub-Consultant B:
Earth Search, lnc.
Sub-Consultant C:
Sub-Consultant D:
SE PARATE CONTRACTO R/CONSU LTANT AMOU NTS
TOTALS:
PROJECT TOTAL
UNBILLED:
//,/r1.fu/zJim Armb ruster, Executive VP-Finance Date
Certifying Officer
Note: Charges submitted by Sub-Consultants to Prime Consultant will not be honored if a copy of the agreementbetween Prime and Sub-Consultant has not been provided to RPC. The Prime is responsible for submitting a coordinated
billing, including a signed copy of each sub-consultant's invoice.
S541,119.00O9/OI/17 Ihru
ro/3L/178]-.33% S2,875.58 5437,229.5s S+qo,ros.rs
s41s,448.0009/0L/!7 thru
to/31/1780.66% s2,87s.s8 s332,206.ss S33s,0s2.13
s116,167.000\/28/17 thru
03/37/1790.47% NONE S1os,023.oo S1os,023.oo
S9,so4.oo NONE NONE
s2,875.58 s437,229.55 5440,705.t3
RPC USE ONLY
TECHNICAL REVIEW:
JaFINANCIAL REVIEW:
Sappingtori Megan LeonardRECOMMENDED FOH pHr rvrrNTi
Jeff rey Roesel
Page 16 of 27
ili
(l
ATTACHMENT B
C onsultant/S ub - C onsultant Invo i c e C ertifi c ati on
DATE: 2/28/20L8 State Project # H.004791
FIRM NAME: Burk-Kleinpeter, lnc.
PROJECT DESCRIPTION: Supplement #3 Re place Belle Chasse Tunnel & Bridge EA RPC Task #: BCrunnel, supp #3
INVOICE PERIOD
(date rangel nlouL7 2/28/L8
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by prime
Consultant and Prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant,please add "NONE", otherwise complete all grids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attachinvoice only. Backup documentation will be requested if necessary.
FEDERAL PROJECT#
PROJECT
BILLING STATUS
PRIME
BKI
Sub-Consultant A:
HNTB
Sub-Consultant B:
Earth Search
Sub-Consultant C:
Sub-Consultant D:
PROJECTTOTAL
UNBILLED:
.j+ 2,1 Hoo4Tsr
ProjectBudget
$gz,gEg.t+
% ContractCompleteto Date
Amount Due thisPeriod
AmountPreviouslylnvoiced
2 - /8. lplE
lnvoicePeriod
AmountBilled
to Date
SEPARATE CONTRACTOR/CO NSU LTANT AMOU NTS:
TOTALS:
Signature of Certifying OfficerJim Armbruster, Executive VP-Finance
Date
S541,119.00TL/ou172/28/t8
82.82% 58,o74.73 S+qo,ros.rr 5448,179.86
541s,448.00fl/0Lh72/28/18
82.60% $8,O74.73 $33s,0s2.13 S343,156.86
S1i.6,i.67.00 90.41% NONE S1os,o23.oo s10s,023.00
S9,s04.oo NONE NONE
N/A
N/A
58,074.73 S44o,to5.i-3 5448,779.86
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,do hereby certify that the above invoice(s) accurately reftect the backup documentation submitted with the invoice,
TECHNICAL REVIEW:&-
FINANCIAL REVIEW
Megan Leonard
RECOMMENDED FOR PAYMENT:
J
Page 17 of 27
AfiACHMENT B
FIRM NAME
C onsultant/ S ub - C onsultant Invo i c e C ertifi c ati on
DATE: 2/28120t8 State Project # Fed Project #: FTA No. LA-2017-018-00
Burk-Kleinpeter, lnc
PROJECT DESCRIPTION Pub lic Transit Strategic Plan, Jefferson Parish Transit RPC Task #: JPTSP
RPC INVOICE No. 2/os/t8 2/28/L8(sequence i.e. #1, #2, etc.) 60681 (01)
The following invoices have been submitted to the Regional Planning commission for payment. A copy of each invoice submitted by Prime consultant and Prime-
approved sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NoNE", otherwise complete all
grids for a submitted Sub-consultant to the prime consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
INVOICE PERIOD
(date range)
Project
Budget
lnvoicePeriod
AmountPreviouslylnvoiced
AmountBilled
to Date
% Contract Complete Amount Due thisto Date Period
PROJECT
BILLING STATUS
PRIME
Burk-Kleinpeter, lnc.
Sub-Consultant A:
Asakura Robinson
Sub-Consultant B:
sub-consultant c
Sub-Consultant D:
s210,989.00 2/os/7s 2/28h8 4.88% $i.0,290.70 s10,290.70
SEPARATE CONTRACTOR/CONSULTANT AMOUNTS
TOTALS:
s200,698.30
5, tf , z.p/8Signature of Certifying Officer
Jim Armbruster, Executive Vice President, Finance
PROJECT TOTAL
UNBILTED:
Date
S147,o1o.oo 2/oe/r8 2/28/78 7.OO% 5ro,29o.7o NONE iLO,29a.7o
s63,979.00 NONE NONE
N/A
N/A
N/A
570,290.70 s10,290.70
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned'
do hereby certify that the above invoice(s) accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW: FINANCIAL REVIEW:
Jason Sappington
RECOMMENDED FOR PAYMENT:
Megan Leonard
Jeffrey Roesel
Page 18 of 27
C onsultant/ S ub - C onsultant Inv o i c e C ertifi c ati on
DATE: 3/31,/2078 State Project # H.OI2461, Fed Project #: HO1246L
FIRM NAME Burk-Kleinpeter, lnc.
PROJECT DESCRTpTToN: Safe Streets for Everyone - Transportation Safety Campaign, New Orleans RPC Task #: SafeStNO
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by Prime Consultant and prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
RPC INVOICE No.(sequence i.e. #1, #2, etc.)
PROJECT
BILLING STATUS
PRIME
Burk-Kleinpeter
Sub-Consultant A: The
Hawthorne Agency
Sub-Consultant B:
Toole Design Group
Sub-Consultant C:
Morgan & Company
Sub-Consultant D: Soll
Planning, LLC
PROJECT TOTAL
UNBILLED:
#15 <> 607L0INVOICE PERIOD:
(date range)
% Contract Completeto Date
02/01./ 201.8 03 / 3L/2018
ProjectBudget
lnvoice
PeriodAmount Due this
Period
AmountPreviouslylnvoiced
AmountBilled
to Date
SEPARATE CONTRACTOR/CONSU LTANT AMOU NTS:
TOTALS
5zgg,l6z.tz
,{, /. zdtgSignature of Certifying Officer
James W. Armbruster, Executive Vice President
Date
$sos,roo.oo 02/07/2018 03/3t/2Or8 48s0% 527,482.92 5248,5s4.96 5276,337.88
S198,6oo.oo 02/07/20t8 03/3r/20r8 91.68% 58,4s3.67 / $r73,si9.21 5t82,072.88
Ssg,soo.oo 95.OO% 516,749.25 539,77s.7s Ss6,52s.oo
S4s,ooo.oo 40.oo% NONE $19,600.00 S19,600.oo
s230,000.00 3.26% NONE S7,soo.oo S7,soo.oo
s28,000.00 38.OOo/o $2,240.oo S8,40o.oo S1o.64o.oo
527,482.92 5248,8s4.96 5276,337.8s
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,do hereby certify that the above invoice(s) accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW:E_fu FINANCIAL REVIEW/ffu Mega n Leonard
RECOMMENDED FOR PAYMENT:
v ca
Page 19 of 27
ATTACHMENT B
C on sultant/Sub - C onsultant Invoice C ertifi cati onDArE: 3/tO/2018 State Project # H.972275.L Fed Project # H972275
FIRM NAME Desien Engineerin g, lnc.
PROJECTDESCRIPTION: CONCCPTUAIPIANNi ng Study, Causeway Blvd. @ US gOlefferson Hwy. RPC Task #: 4-1.18
RPC INVOICE No,(sequence i.e. #1, #2, etc.)
PROJECT
BITLING STATUS
PRIME
DEI
Sub-Consultant A:
Batture, LLC
Sub-Consultant B:
5ub-Consultant C:
Sub-Consultant D
6INVOICE PERIOD
(date range)
% Contract Completeto Date
2/t/20L8-2/28/2078
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by prime Consultant and prime,approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
Project
Budgetlnvoice
PeriodAmount Due this
Period
AmountPreviouslylnvoiced
AmountBilled
to Date
SEPARATE CONTRACTOR/CONSU LTANT AMOUNTS:
TOTALS
s75,000.00 2/r/2018-2/28/2Ot8 7LA0% s1s,937.s0 537,672.sA ss3,ss0.00
563,7s0.00 2/r/2oL8-2/28/2Or8 84.O0% s1s,937.s0 S37,612.s0 Ss3,5so.oo
S11,2so.oo
N/A
N/A
N/A
575,937.50 s3ZE!Z!9 553,550.00PROJECT TOTAL
UNBIILED: Szt,q 00
3 otof Certifying Officer
Jim Martin, Ph.D., PE, PresidentDate
REGIONAL PLANNING COMMISSION IJSE ONLY
The abovelisted amounts and completion percentages have been reviewed for technical and financial accuracy, l, the undersigned,do hereby certify that the above invoice(s) accurately reflect the backup docurpentation submitted with the invoice.
FINANCIAL REVIEW:
Megan
Jeffrey Roesel
TECHNICAL REVIEW: r
Jason Sappington
RECOMMENDED FOR PAYMENT
Page 20 of 27
ATTACTIMENTB
FIRM NAME;
C onsultanVS ub- C onsultant Invo ice Certi fi cation
DATE: 412120L8 state Projectf H.972275.t Fed Project f: H97227s
Dieital Engineerins
FROJECT DESCRIPTION:
RPC lNVt lCE No.
PROJECT
BltuNC STATUS
PRIME
Dlgital tngineering
Sub-Conlultant A:Dana Brown & Assoc.
Sub-Consultant 8:
Sub-Consultant C:
Sub-Consultant Di
PROJECTTOTAL
UNBII.IED:
Stase 0 Feasibility Studv, Selcted Corridors Hammond, LA RPCTask#: 5T-2.18 BP
(sequence l.e. m. $?, etc.) (daterangel February 25, 2018 thorlgh March 3L, 2018
The following invoices have been submitted to the Regional Planning Cimmission for payment. A copy of each involce submitted by prime Consultant and prlme-approved Subeonsultants must be attached. lf no charges are submitted by any Sub-Consultant to thd Prlme Consultant, please add "NONE", otherwise complete allgrids for a submitted Sub-consultant to the Prlme consultant in this billing petiod. Please attach lnvolce only, Baekup docunrentatlon wlll be requested lf necessary.
4INVOICE PERIGDI
% Contract Complete Amount Due thtsto Date Period
TOTALST
ProiectBudget
lrnolcePerlard
AmountPrevlonsly
lnvolced
AmountBllled
to Date
s45,000.00 February 25. 2018 thmeh March 31, ,r*l 68.00% $Z650.oo $22,9s0.00 $ao,ooo.oo
SEPARATE CONTRACTOR/CONSULTANT AMOUNTST
s38,2s0.00 Feliuary 25. zor8tnough March 31, 2018 80.00% SzGso.oo 922,95o.0o $o,600.00
$6,750.00
N/A
N/A
N/A
Wto.oo fr?,esglg $g0,600.oo
$t+,aoo.oo
r/s/rsof Certifying Date
Thomas P. Hickey, P.E, Pieddert, Prlnclpal
REGIONAL PLANNING COMMISSrcN USE ANLY
The above-llsted arnounts ond completion pcrrentages have been revleured for technical and llnancial accuracy. L the undereneddo hereby eertlfu th.t th€ arbove invoke(sl aceurately re{hct the bachup documantetlon s{bmltted wlth th€ lnvotce,
TECHNICALREWEW: FINANCIAL REVIEW:
Alison Maulhardt
RECOMMENDED FOR PAYMENT:
Roesel
Page 21 of 27
ATTACHMENT B
consultant/Sub- consultant Invo ice certifi cationDAIE: Lf ll Il g State project # H.g72275.1. Fed project #: HITZZTS
FIRM NAME: ITS Regiona I, LLC
PROJECT DESCRIPTION
RPC INVOICE No.(sequence i.e. #1, #2, etc.)
PROJECT
BITLING STATUS
RPC Traffic Counting Program U pdate RPC Task #: A-1.18TC
March 1,20'J.8 to March 29 ,2078
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by prime Consultant and prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
lnvoice No. 2INVOICE PERIOD
(date range)
% Contract Completeto Date
ProiectBudget
lnvoicePeriod
Amount Due thisPeriod
AmountPreviouslylnvoiced
AmountBilled
to Date
PRIME
Regional, LLC
tTs
SEPARATE CONTRACTOR/CONSU LIANT AMOU NTS
TOTALS
re of Certifying OfficerGutierrez, PE, PTOE, Owner/Manager
Sub-Consultant A:
Linfield, Hunter & Juni
Sub-Consultant B
Sub-Consultant C:
Sub-Consultant D:
PROJECT TOTAL
UNBILLED: Sz,zoo.oo
s22,000.00 March 1, 2018 to March 29,2OI8 90.oo% S12,1oo.oo s7,700.00 Si.9,8oo.oo
s22,000.00 March 1,201.8 to March 29,zOtB 90.00% Sr.2,1oo.oo s7,700.00 Si.9,8oo.oo
N/A
N/A
N/A
N/A
512,L00.00 su99!9 Sts,soo.oo
REGIONAL PLANNING COMMISSION USE ONLY
The abovelisted amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,do hereby certify that the above invoice(s| accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW: FINANCIAL REVIEW
Megan Leonard
RECOMMENDED FOR PAYMENT:
J Roesel
Page 22 of 27
ATTACHMENT B
FIRM NAME
Consultant/Sub-Consultant Invoice CertificationDATE; 4/2/201,8 State Project # H.972275.I Fed Project # H972275
ITS Regional, LLC
PROJECT DESCRIPTIoN: Traffic Signal Tim ing & Coordination Study: Manhattan Blvd Corridor RPC Task #: 4-3.18
March t,ZOLB to March 3L,2Ot8
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by Prime Consultant and prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NoNE", otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
RPC INVOICE No.(sequence i.e. #\ #2, elc.)
PROJECT
BITLING STATUS
PRIME tTs
Regional, LLC
Sub-Consultant A:
Linfield, Hunter & Junius
Sub-Consultant B
Sub-Consultant C:
Sub-Consultant D:
PROJECT TOTAL
UNBILLED: Stt,6zs.oo
Six (6)INVOICE PERIOD:
(date range)
% Contract Completeto Date
Amount Due thisPeriod
ProjectBudget
lnvoicePeriod
AmountPreviouslylnvoiced
AmountBilled
to Date
SEPARATE CONTRACTOR/CONSU LTANT AMOU NTS
TOTALS:
of Certifying OfficerCarmel Gutierrez, PE, PTOE, Owner/Manager
Date
s7s,000.00 March 1, 2018 to March 3L,2OI8 84.50% Ss,srz,so Ssz,sez.so s63,37s.00
541,250.00 March 1, 2018 to March 31, 2018 80.oo% 54,12s.oo s28,87s.00 533,ooo.oo
s33,7s0.00 January 28, 2018 to February 24,2078 90.oo% S1,687.s0 528,G87.s0 s30,375.00
N/A
N/A
N/A
5s,stz.so Ss7,s62.so S6s,37s.oo
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,do hereby certify that the above invoice(s) accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW
'l"r- ( i,' i .FINANCIAL REVIEW
Alison Maulhardt
RECOMMENDED FOR PAYMENT:
Megan Leonard
Roesel
Page 23 of 27
C on sultant/ S ub - C on su ftarrt. Inv o i c e C erti fi c ati on
DArE: 4h/2}t8 State Project # H.972275.L Fed Project #: H972275
ATTACHMENT B
J.V. Burkes & AssociatesFIRM NAME:
PRoJEcr DEScRtploN: Stage 0 Feasibility, LA 1091 (Robert) at Coun try Club Blvd Roundabout Study RPC Task #: SL-1.18
RPC INVOICE NO, INVOICE PERIOD:
(date range)(sequence i.e. #1, #2, etc.) #6 March L - March 31, 20L8
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by Prime Consultant and prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
ProjectBudget
lnvoicePeriod
Signature of Certifying OfficerSean M. Burkes, Vice President
% Contract Completeto Date
Amount Due thisPeriod
AmountPreviouslylnvoiced
AmountBilled
to Date
PROJECT
BItt|NG STATUS
PRIME
J.V. Burkes
Sub-Consultant A: ITS
Regional, LLC
Sub-Consultant B:
Sub-Consultant C:
Sub-Consultant D:
PROJECT TOTAL
UNBITLED: 52,7s0.00
SEPARATE CONTRACTOR/CONSU LTANT AMOU NTS:
TOTALS:
+l€ l,uDate
$ss,ooo.oo March 1- March 3L,20L8 95.00% S3,7oo.oo S48,550.00 $52,250.00
S48,4oo.oo March 1- March 31, 2018 94.320/" S3,7oo.oo S41,9so.oo S4s,6so.oo
$6,6oo.oo 100.00% s6,500.00 S6,600.oo
N/A
N/A
N/A
s3,700.00 wE!!!9 Ss2,25o.oo
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,do hereby certify that invoice{s} accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW: FINANCIAL REVIEW
Chris Laborde
RECOMMENDED FOR PAYMENT:
Leonard
Jeffrey Roesel
Page 24 of 27
ATTACHMENT 8
C onsultant/S ub - C onsultant Invo ice C ertifi cati on
DATE: 3lI4/20L8 State Project # H.972216.1' Fed Project # H9722t6
FIRM NAME: Linfield, Hunter & Junius, lnc.
pRoJEcr DESCRtpfloN: Access Mgmt & Complete Streets for US 90 and LA 611 near Ochsner RPC Task #: Ochsnerl
11 (date range)
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by Prime Consultant and Prime-
approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise complete all
grids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
RPC INVOICE No.(sequence i.e. #1, #2, etc.)
PROJECT
BILLING STATUS
PRIME
LH&J
Sub-Consultant A: ITS
Regional
Sub-Consultant B:
Sub-consultant C:
Sub-Consultant D:
INVOICE PERIOD
% Contract Completeto Date
12/01/17 to 2/24/18
ProjectBudget
lnvoicePeriod
Amount Due thisPeriod
AmountPrcviouslylnvoiced
AmountBilled
to Date
SEPARATE CONTRACTOR/CONSU LTANT AMOU NTS:
TOTALS:
PROJECT TOTAL
UNBILIED:
*aa rq- aa
)6J,5 /5.UU
3-t41of Certifying Officer
L Girau, PE, Vice President
Date
s290,000.00 L2/0rh7 to 2/24/18 71.25% s7,975.00 s198,650.00 5206,625.00
s159,500.00 I2/ot/L7 to 2/24/I8 60.00% 57,97s.00 587,72s.0o s9s,700.00
s130,s00.00 85.00% s110,92s.00 s110,92s.00
N/A
N/A
N/A
s?,gz!!g 5198,6s0.00 s206,625.00
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,
do hereby certify that the above invoice(s) accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW -clTPgr FINANCIAL REVIEW:
V Jason Sappington
RECOMMENDED FOR PAYMENT
M Leonard
effrey Roesel
Page 25 of 27
ATTACHMENT B
C onsultant/ S ub - C on su ltart Inv o i c e C erti fi c ati on
DATE: 3/t5/2OI8 state Project # H.0L2837 Fed Project # HOL2837
FIRM NAME Neel-Schaffer
PROJECT DESCRIPTION:
RPC INVOICE No.(sequence i.e. #1, f2, etc.)
PROJECT
BILLING STATUS
PRIME
Neel-Schaffer
Sub-Consultant A:
G.E.C., lnc.
Sub-Consultant B:
Urban Systems, lnc.
JUU-!Ur r)UrtOr rt !.
Deborah D. Keller &Partners
Sub-Consultant D:
Earth Search, lnc.
PROJECT TOTAL
UNBILLED:
l-1.0 New Orleans Master Plan RPC Task #: NOllOPlan
9
INVOICE PERIOD
(date range)
% Contract Completeto Date
2/tlL8 - 2/28/L8
The following invoices have been submitted to the Regional Planning Commission for payment. A copy of each invoice submitted by Prime Consultant and Prime-approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise complete allgrids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be requested if necessary.
ProjectBudget
lnvoicePeriod
AmountPreviouslylnvoiced
AmountBilled
to Date
Amount Due thisPeriod
SEPARATE CONTRACTOR/CONSU LTANT AMOU NTS:
TOTALS
s136,923.15
,/x,r4z"zz -Y/s /rrtdignature of Certiding Officer
Nick Ferlito, Vice President
Date
s338,666.00 2h/18 - 2/28/18 59.57% 5L7,687.s6 s184,054.89 52oL,742.85
S176,106.00 2/th8 - 2/28/!8 74.93o/o S14,039.96 s117,313.99 s131,9s3.9s
S101,6oo.oo rlthg - t/28/t8 33.OOo/o s3.048.00 s30,480.00 s33,s28.00
544,027.0O 70.oo% $30,818.90 S30,8r.8.90
S1o,160.oo 53.56o/o Ss,442.oo Ss,442.oo
S6,773.00
577,687.96 5184,0s4.99 5201.742.9s
REGIONAL PLANNING COMMISSION USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,do hereby certify that the above invoice(s) accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW: FINANCIAL REVIEW:
Mega nard
RECOMMENDED FOR PAYMENT:
Jeffrey Roesel
Page 26 of 27
Llrtd
ATTACHMENT B
FIRM NAME:
C onsultantlSub- C o nsultant Invo ice C ertifi cation
DATEr 3/27/2018 State Project # H.972274 Fed Project #: H972274
WSP USA lnc.
pRoJEcr DESCRTpToN: Travel Demand Model Update: Phase 2 RPC Task #: TDMNO
INVOICE PERIOD
(date rangel L2/29/L7 -2123/183
tne to[owtng tnvolces nave been submttted to tne Regtonal Planntng Lommtsslon tor payment. A copy ot each rnvotce submltteo by Pnme Lonsultant and Pnme-
approved Sub-consultants must be attached. lf no charges are submitted by any Sub-Consultant to the Prime Consultant, please add "NONE", otherwise
complete all grids for a submitted Sub-Consultant to the Prime Consultant in this billing period. Please attach invoice only. Backup documentation will be
requested if necessary.
RPC INVOICE No.(sequence i.e. fl1, s2, etc.l
PROJECT
EILIING STATUS
PRIME
WSP
Sub-Consultant A:
V€ctura Consulting
Sub-Consultant B:
5ub-Consultant C:
Sub-Consultant D:
Proiect
Budget
lnvoicePeriod
% Contract Complete Amount Due thisto Date Period
SEPARATE CO NTRACTOR/CONSULTANT AMOUNTS:
TOTALS:
ure of Certifying OfficerVice President, Sr. Area Manager
AmountPreviously
lnvoiced
3")1 "/f
AmountBilled
to Date
PROJECT TOTALStzt,os 00
Date
$231,000.00 r2/29/L7 -2/23h8 45.44% s70,686.00 s33,264.00 s103,950.00
s207,900.00 t2/29/17 -2/23178 so.o0% S70,585.00 s33,264.00 s103,9s0.00
s23,1oo.oo
NIA
N/A
N/A
s?98!999 533,264.0a 5103,950.00
REGIANAL PLANNING COMMISSIOA' USE ONLY
The above-listed amounts and completion percentages have been reviewed for technical and financial accuracy. l, the undersigned,
do hereby ce.tify that the above invoice{s} accurately reflect the backup documentation submitted with the invoice.
TECHNICAL REVIEW FINANCIAL REVIEW:-Y]n.*gd ,-.-#-u*--t-^
Ja$on Sappington .,
RECOMMENDED FOR PAYMEI\ I':
9an
Jeffrey Roesel
Page 27 of 27